CN214037159U CN202023118125.4U CN202023118125U CN214037159U CN 214037159 U CN214037159 U CN 214037159U CN 202023118125 U CN202023118125 U CN 202023118125U CN 214037159 U CN214037159 U CN 214037159U
Authority
CN
China
Prior art keywords
main pipe
reserved
reserved sleeve
fixed plate
sleeve main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023118125.4U
Other languages
Chinese (zh)
Inventor
李延晓
田镇
崔宏国
孙淼源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Kaituo Construction Co ltd
Jinhan Construction Co ltd
Original Assignee
Shandong Kaituo Construction Co ltd
Jinhan Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Kaituo Construction Co ltd, Jinhan Construction Co ltd filed Critical Shandong Kaituo Construction Co ltd
Priority to CN202023118125.4U priority Critical patent/CN214037159U/en
Application granted granted Critical
Publication of CN214037159U publication Critical patent/CN214037159U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the building, concretely relates to go out roofing preformed casing structure. The utility model discloses a reserved sleeve structure for a roof, which comprises a reserved sleeve main pipe, a water stop ring and a fixed plate; the water stop ring is fixedly arranged on the reserved sleeve main pipe; the fixed plate is fixedly connected to the outer circumferential surface of the bottom of the reserved sleeve main pipe; the reserved sleeve main pipe is fixedly arranged on the floor template through a fixed plate. The reserved sleeve structure for the outgoing roof has simple manufacture and low manufacture cost, can effectively prevent the reserved sleeve from shifting, and ensures the accuracy of the position of the reserved sleeve; the welded water stop ring can increase the infiltration resistance and has a waterproof effect.

Description

Go out roofing and reserve bushing structure
Technical Field
The utility model relates to a go out roofing and reserve bushing structure belongs to building technical field.
Background
When the construction site goes out roofing reserved pipe construction, because the reserved pipe is fixed insecure, the reserved pipe takes place the displacement during concrete placement, leads to going out roofing pipeline position inaccurate, reserve the unable and lower floor pipe connection scheduling problem of sleeve pipe, in case reworking, causes local concrete to produce the construction joint, increases later stage seepage risk. Therefore, a roof covering reserved sleeve structure is applied to solve the problems.
SUMMERY OF THE UTILITY MODEL
According to the not enough among the above prior art, the utility model discloses the technical problem who solves is: the shortcoming of prior art is overcome, provides a go out roofing and reserves sleeve pipe structure, can prevent effectively that the reservation sleeve pipe from taking place to shift, guarantees to reserve the accuracy of sleeve pipe position.
The utility model discloses a reserved sleeve structure for a roof, which comprises a reserved sleeve main pipe, a water stop ring and a fixed plate; the water stop ring is fixedly arranged on the reserved sleeve main pipe; the fixed plate is fixedly connected to the outer circumferential surface of the bottom of the reserved sleeve main pipe; the reserved sleeve main pipe is fixedly arranged on the floor template through a fixed plate.
The seal ring welding on reserve the outer periphery of female pipe of sleeve pipe, increase the infiltration resistance, play water-proof effects.
Further preferably, fixed slab along the radial evenly distributed of the outer circumference of reserving the female socle bottom of sleeve pipe.
Fixed slab one end welding reserve the outer circumference in sleeve pipe female pipe bottom, the other end of fixed plate reserves the mounting hole.
Reserve the female pipe of sleeve pipe pass through the mounting hole on the fixed slab by mounting (iron nail) and fix on the floor template, make and reserve female pipe bottom of sleeve pipe and laminate completely with the floor template.
Compared with the prior art, the utility model beneficial effect who has is:
the reserved sleeve structure for the outgoing roof has simple manufacture and low manufacture cost, can effectively prevent the reserved sleeve from shifting, and ensures the accuracy of the position of the reserved sleeve; the welded water stop ring can increase the infiltration resistance and has a waterproof effect.
Drawings
Fig. 1 is a schematic view of an installation structure of a roof preformed sleeve structure according to the present invention;
fig. 2 is a front view of the structure of the roof preformed sleeve of the present invention;
fig. 3 is the utility model discloses a top view of roofing preformed sleeve structure.
In the figure: 1. a main pipe; 2. a water stop ring; 3. fixing the plate; 4. a floor template; 5. and a fixing member.
Detailed Description
The invention will be further described with reference to the following examples:
as shown in fig. 1 to 3, the reserved sleeve structure for the roof of the utility model comprises a reserved sleeve main pipe 1, a water stop ring 2 and a fixed plate 3; the reserved sleeve main pipe 1 is fixedly connected with the water stop ring 2; the fixed plate 3 is fixedly connected to the outer circumferential surface of the bottom of the reserved sleeve main pipe 1; the fixed plate 3 is fixed on the floor formwork 4.
Wherein, the water stop ring 2 is welded on the outer circumference of the reserved casing main pipe 1; the fixed plate pieces 3 are radially and uniformly distributed along the outer circumference of the bottom of the reserved sleeve main pipe 1; one end of the fixed plate 3 is welded on the outer circumferential surface of the bottom of the reserved sleeve main pipe 1; and a mounting hole is reserved on the other end of the fixed plate 3.
During installation, the reserved sleeve main pipe 1 is fixed on the floor template 4 through the installation hole on the fixed plate 3 by using a fixing piece 5 (iron nail).
The utility model discloses simple manufacture, the cost of manufacture is low moreover, can prevent effectively that the reservation sleeve pipe from taking place to shift, guarantees the accuracy of reserving the sleeve pipe position.

Claims (5)

1. The utility model provides a go out roofing and reserve bushing structure, is including reserving female pipe of bushing (1), its characterized in that: the water-proof device also comprises a water-proof ring (2) and a fixed plate (3); the water stop ring (2) is fixedly arranged on the reserved sleeve main pipe (1); the fixed plate (3) is fixedly connected to the outer circumferential surface of the bottom of the reserved sleeve main pipe (1); the reserved sleeve main pipe (1) is fixedly arranged on the floor template (4) through a fixing plate (3);
the water stop ring (2) is welded on the outer circumferential surface of the reserved sleeve main pipe (1).
2. The roofing pre-sleeve structure of claim 1, wherein: the fixed plate pieces (3) are radially and uniformly distributed along the outer circumference of the bottom of the reserved sleeve main pipe (1).
3. The roofing pre-sleeve structure of claim 1, wherein: one end of the fixed plate (3) is welded on the outer circumferential surface of the reserved sleeve main pipe (1), and the other end of the fixed plate (3) is reserved with a mounting hole.
4. A roof leaving preformed sleeve structure according to claim 3, characterized in that: the reserved sleeve main pipe (1) is fixed on the floor template (4) through a fixing piece (5) through a mounting hole on the fixing plate (3).
5. A roof leaving preformed sleeve structure according to claim 4, characterized in that: the fixing piece (5) is an iron nail.
CN202023118125.4U 2020-12-21 2020-12-21 Go out roofing and reserve bushing structure Active CN214037159U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023118125.4U CN214037159U (en) 2020-12-21 2020-12-21 Go out roofing and reserve bushing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023118125.4U CN214037159U (en) 2020-12-21 2020-12-21 Go out roofing and reserve bushing structure

Publications (1)

Publication Number Publication Date
CN214037159U true CN214037159U (en) 2021-08-24

Family

ID=77340414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023118125.4U Active CN214037159U (en) 2020-12-21 2020-12-21 Go out roofing and reserve bushing structure

Country Status (1)

Country Link
CN (1) CN214037159U (en)

Similar Documents

Publication Publication Date Title
CN205841994U (en) A kind of new indoor drainage system combined water proof pipe collar
CN214037159U (en) Go out roofing and reserve bushing structure
CN105650357A (en) Disposable embedded water stop joint for constructional engineering drainage and construction method thereof
CN109025899B (en) Well sealing device
CN110656713A (en) Construction method for connecting wall boards by adopting single-end cold-rolled head grouting sleeve inverted insertion method
CN111255161B (en) Steel bar connection grouting sleeve structure and construction process
CN211735694U (en) Drainage mounting structure comprising main floor drain and auxiliary floor drain
CN204551694U (en) A kind of pre-buried type balcony floor drain
CN112982623A (en) Assembly type construction method for drainage pipeline of high-rise building
CN211550767U (en) Water stop pipe joint
CN211816675U (en) Downpipe waterproof casing structure for kitchen and bathroom
CN207376843U (en) Expansion joint leakage-proof structure
CN212001647U (en) There is peripheral seepage prevention structure of sleeve pipe floor pipe
CN211738263U (en) Board connection structure is worn to water and electricity pipeline assembled
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
CN211738267U (en) Prefabricated balcony riser mounting structure
CN215861260U (en) Waterproof device for connecting bolt hole
CN111946014A (en) Quick mounting structure in recessed ground of assembled bathroom
CN219221502U (en) Waterproof structure for installing rear hole casing of basement outer wall
CN102352675B (en) Roofing eave waterproof structure
CN2814074Y (en) Device for sealing up pipe in the wall
CN207064863U (en) A kind of new waterproof sleeve pipe
CN212868781U (en) Waterproof structure of superimposed sheet and PVC water piping connection department
CN211898512U (en) Waterproof sleeve and tower crane foundation mounting structure
CN215635439U (en) Drain pipe pre-embedding device with telescopic and waterproof functions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant