CN214034924U - Heavy load concatenation shelter - Google Patents

Heavy load concatenation shelter Download PDF

Info

Publication number
CN214034924U
CN214034924U CN202022419529.0U CN202022419529U CN214034924U CN 214034924 U CN214034924 U CN 214034924U CN 202022419529 U CN202022419529 U CN 202022419529U CN 214034924 U CN214034924 U CN 214034924U
Authority
CN
China
Prior art keywords
base
shelter
corner post
wallboard
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022419529.0U
Other languages
Chinese (zh)
Inventor
孙宇飞
司新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Sanjune Electronic Technology Co ltd
Original Assignee
Xi'an Sanjune Electronic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Sanjune Electronic Technology Co ltd filed Critical Xi'an Sanjune Electronic Technology Co ltd
Priority to CN202022419529.0U priority Critical patent/CN214034924U/en
Application granted granted Critical
Publication of CN214034924U publication Critical patent/CN214034924U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a heavy load concatenation shelter, a serial communication port, including base, corner post, wallboard, ring roof beam, roof, four corner posts are installed perpendicularly to the base framework, through bolted connection installation wallboard between corner post and the corner post, the ring roof beam passes through bolted connection with corner post and wallboard, roof location installation is in ring roof beam inside groove and through bolt location installation, a heavy load concatenation shelter, base, corner post, wallboard, ring roof beam, the equal processing in top make into single module, every module all designs has the bolt mounting hole, through bolted connection, combine all modules together, form the concatenation shelter. Heavy load concatenation shelter adopts the bottom to lift by crane the mode, and the design has the hoist and mount lifting lever on the base, and the base can bear great load, and base, corner post, wallboard, circle roof beam, top all make into independent module, and module preparation assembly line operation can make up according to usage space at will, simple structure, and the installation is swift, can effectively improve portable shelter preparation efficiency.

Description

Heavy load concatenation shelter
Technical Field
The utility model relates to a shelter field, especially a heavy load concatenation shelter.
Background
The concatenation shelter is the emergency that will deal with the emergency in the future and sets up emergency command center, and as the carrier of frequently transporting integrated electrical equipment, the concatenation shelter that appears at present uses the scavenging patch mostly, various steel rock wool board etc., its whole bearing capacity is limited, only can install the equipment of small mass and transport, can't use for example container formula data center, the electric cabin etc., container formula data center, the equal non-concatenation preparation in electric cabin, though can bear the equipment of great load, but the preparation is inefficient, the preparation process welding volume is big, also cause the pollution to the environment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a heavy load concatenation shelter. In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a heavy load concatenation shelter, its characterized in that includes base, corner post, wallboard, ring roof beam, roof, and four corner posts are installed perpendicularly to the base framework, pass through bolted connection installation wallboard between corner post and the corner post, and the ring roof beam passes through bolted connection with corner post and wallboard, and the roof location is installed in ring roof beam inside groove and through bolt location installation.
Preferably, the base is a base section bar, the base is provided with a lifting bar, and the spliced shelter can be integrally lifted and shipped by lifting the base.
Preferably, the base connection prefabricated hole is formed in the side face of the corner post in a machining mode, the wall plate connection prefabricated hole is formed in the front end face of the corner post in a machining mode, the ring beam connection prefabricated hole is formed in the side edge of the corner post in a machining mode, and the stability of the installation pair is guaranteed through the design of the three prefabricated holes.
Preferably, the left end face and the right end face of the wallboard are processed and formed with a base connection prefabricated hole and a ring beam connection prefabricated hole, the upper end face of the wallboard is processed and formed with corner posts and wall connection prefabricated holes, and the corner posts and the wall connection prefabricated holes realize quick connection and installation of the corner posts and the wall.
Preferably, the design of ring beam support body both sides has the water drainage tank, convenient timely drainage, and ring beam support body survey terminal surface machine-shaping has module to connect prefabricated hole, and the prefabricated hole design of module connection is wall body module, corner post module and door frame module.
Preferably, the base is fastened and connected with the mounting wall by using a mounting bolt.
Compared with the prior art, the utility model has the advantages of it is following: a single module is manufactured by processing a base, a corner post, a wallboard, a ring beam and a top, each module is provided with a bolt mounting hole, and all the modules are combined together through bolts to form the spliced shelter. Heavy load concatenation shelter adopts the bottom to lift by crane the mode, and the design has the hoist and mount lifting lever on the base, and the base can bear great load, and base, corner post, wallboard, circle roof beam, top all make into independent module, and module preparation assembly line operation can make up according to usage space at will, simple structure, and the installation is swift, can effectively improve portable shelter preparation efficiency.
Drawings
Fig. 1 is the utility model discloses the structural schematic diagram of heavy load concatenation shelter.
Fig. 2 is a schematic view of the working structure of the base of the present invention.
Fig. 3 is a schematic structural view of the corner post of the present invention.
Fig. 4 is a schematic structural view of the wallboard marking of the present invention.
Fig. 5 is a schematic structural view of the ring beam marking of the present invention.
Fig. 6 is the schematic view of the connection structure of the base, the corner post and the wall plate of the present invention.
Figure 7 is the utility model discloses wallboard and wallboard connection structure sketch map.
Fig. 8 is the connection structure diagram of the corner post and the wall plate of the present invention.
Fig. 9 is a schematic view of the structure of the ring beam connected to the wall plate and the corner post.
Fig. 10 is a schematic structural view of the ring beam and the top plate of the present invention.
In the figure: 1. the prefabricated hole is connected to base, 2, corner post, 3, wallboard, 4, girth, 5, roof, 6, base section bar, 7, the lifting hanging bar, 8, base connection prefabricated hole, 9, wallboard, 10, girth connection prefabricated hole, 11, corner post, wall body interconnect prefabricated hole, 12, water drainage tank, 13, module connection prefabricated hole, 14, wall body.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1, fig. 2, fig. 3, fig. 4, fig. 5, fig. 6, fig. 7, fig. 8, fig. 9 and fig. 10, a heavy-load splicing shelter comprises a base 1, corner posts 2, wall boards 3, ring beams 4 and a top board 5, wherein four corner posts 2 are vertically installed on a frame body of the base 1, the wall boards 3 are installed between the corner posts 2 and the corner posts 2 through bolt connection, the ring beams 4 are connected with the corner posts 2 and the wall boards 3 through bolts, and the top board 5 is positioned in an inner groove of the ring beams 4 and is positioned and installed through bolts.
The base 1 is a base section bar 6, the base 1 is provided with a lifting hanging bar 7, and the spliced shelter can be integrally lifted and shipped by the aid of the lifting base.
The side face of the corner post 2 is machined and formed with a base connecting prefabricated hole 8, the positive end face of the corner post 2 is machined and formed with a wallboard connecting prefabricated hole 9, the side edge of the corner post 2 is machined and formed with a ring beam connecting prefabricated hole 10, and the stability of the installation pair is ensured by the design of the three prefabricated holes.
The left end face and the right end face of the wallboard 3 are machined and formed with a base connection prefabricated hole 8 and a ring beam connection prefabricated hole 10, the upper end face of the wallboard 3 is machined and formed with corner posts and wall bodies which are connected with the prefabricated holes 11, and the corner posts and the wall bodies are connected with the prefabricated holes 11 to achieve quick connection and installation of the corner posts 2 and the wall bodies.
The design of 4 support body both sides of circle roof beam has water drainage tank 12, convenient timely drainage, and 4 support body measuring end of circle roof beam machine-shaping have module to connect prefabricated hole 13, and prefabricated hole 13 designs are wall body module, corner post module and door frame module are connected to the module.
The base 1 is tightly connected with a mounting wall 14 by using mounting bolts.
The utility model discloses the theory of operation: a single module is manufactured by processing a base, a corner post, a wallboard, a ring beam and a top, each module is provided with a bolt mounting hole, and all the modules are combined together through bolts to form the spliced shelter. Heavy load concatenation shelter adopts the bottom to lift by crane the mode, and the design has the hoist and mount lifting lever on the base, and the base can bear great load, and base, corner post, wallboard, circle roof beam, top all make into independent module, and module preparation assembly line operation can make up according to usage space at will, simple structure, and the installation is swift, can effectively improve portable shelter preparation efficiency.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.

Claims (6)

1. The utility model provides a heavy load concatenation shelter, its characterized in that, includes base (1), corner post (2), wallboard (3), circle roof beam (4), roof (5), and four corner posts (2) are installed perpendicularly to base (1) support body, through bolted connection installation wallboard (3) between corner post (2) and the corner post (2), circle roof beam (4) and corner post (2) and wallboard (3) pass through bolted connection, and roof (5) fixed position are installed in circle roof beam (4) inside groove and through bolt location installation.
2. A spliced shelter for heavy loads as claimed in claim 1, wherein the base (1) is a base profile (6), the base (1) is designed with a lifting and hanging bar (7), and the spliced shelter can be lifted and shipped integrally by the lifting and hanging base.
3. A heavy-load spliced shelter as claimed in claim 1, wherein the side face of the corner post (2) is formed with a base connecting prefabricated hole (8), the positive end face of the corner post (2) is formed with a wall plate connecting prefabricated hole (9), the side edge of the corner post (2) is formed with a ring beam connecting prefabricated hole (10), and the three prefabricated holes are designed to ensure the stability of installation.
4. The heavy-load splicing shelter as claimed in claim 1, wherein the left and right end faces of the wall plate (3) are formed with base connection prefabricated holes (8) and ring beam connection prefabricated holes (10), the upper end face of the wall plate (3) is formed with corner posts and wall connection prefabricated holes (11), and the corner posts and the wall connection prefabricated holes (11) realize the quick connection and installation of the corner posts (2) and the wall.
5. The heavy-load spliced shelter as claimed in claim 1, wherein drainage grooves (12) are designed on two sides of the frame body of the ring beam (4) to facilitate timely drainage, a module connecting prefabricated hole (13) is formed in the processing and forming of the measuring end face of the frame body of the ring beam (4), and the module connecting prefabricated hole (13) is designed into a wall body module, a corner post module and a door frame module.
6. A heavy load splice shelter as claimed in claim 1 wherein the base (1) is attached securely to the mounting wall (14) using mounting bolts.
CN202022419529.0U 2020-10-27 2020-10-27 Heavy load concatenation shelter Active CN214034924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022419529.0U CN214034924U (en) 2020-10-27 2020-10-27 Heavy load concatenation shelter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022419529.0U CN214034924U (en) 2020-10-27 2020-10-27 Heavy load concatenation shelter

Publications (1)

Publication Number Publication Date
CN214034924U true CN214034924U (en) 2021-08-24

Family

ID=77354770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022419529.0U Active CN214034924U (en) 2020-10-27 2020-10-27 Heavy load concatenation shelter

Country Status (1)

Country Link
CN (1) CN214034924U (en)

Similar Documents

Publication Publication Date Title
CN115783179B (en) Prefabricated modularized foundation platform and assembly method thereof
CN214034924U (en) Heavy load concatenation shelter
CN213926762U (en) Connecting structure of single-node connecting piece of prefabricated house connecting piece system
CN217147007U (en) Vertical frock that transports offshore wind power tower section of thick bamboo
CN215055564U (en) Elevator shaft opening protection device
CN210194907U (en) Novel wallboard for assembly type building
CN210524289U (en) Jig frame for welding H-shaped steel
CN209874185U (en) A piece together formula angle steel lattice keel bearing structure for stone material curtain
CN113863739A (en) Rapid installation method and device for modular cold box
CN203412104U (en) Container module connection reinforcer
RU154791U1 (en) REINFORCED CONSTRUCTION COMPONENT OF BUILDING FROM CONTAINER MODULES
CN218204960U (en) Structure convenient to installation of precast beam component
CN203366905U (en) Magnetic element assembly and magnetic element of magnetic element assembly
CN215160258U (en) Small-size loop wheel machine transportation layer board for construction
CN220414524U (en) Modularized house connector
CN219653919U (en) Hoisting supporting structure for foldable house
CN214399608U (en) Triangular combined support for hoisting component
CN113530046B (en) Curtain wall engineering combined steel structure
CN220022459U (en) Supporting device for large vertical squirrel cage asynchronous motor
CN212427107U (en) Elevator foundation pit template auxiliary device for construction
CN217972198U (en) Lifting lug structure for offshore booster station
CN213632382U (en) Novel ocean module weighing device
CN217557197U (en) Assembly type structure frame convenient to splice fast
CN218669310U (en) Stackable electric control room suitable for low-temperature track drilling machine
CN219457855U (en) Battery box, power supply system and power distribution equipment