CN214033728U - Foundation pit for construction - Google Patents

Foundation pit for construction Download PDF

Info

Publication number
CN214033728U
CN214033728U CN202023066819.8U CN202023066819U CN214033728U CN 214033728 U CN214033728 U CN 214033728U CN 202023066819 U CN202023066819 U CN 202023066819U CN 214033728 U CN214033728 U CN 214033728U
Authority
CN
China
Prior art keywords
plate
fixedly connected
connecting plate
threaded rod
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023066819.8U
Other languages
Chinese (zh)
Inventor
段超荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023066819.8U priority Critical patent/CN214033728U/en
Application granted granted Critical
Publication of CN214033728U publication Critical patent/CN214033728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a construction technical field specifically is a foundation ditch for construction, the on-line screen storage device comprises a base, the top fixedly connected with support column of base, the inside swing joint of support column has the threaded rod, the top fixedly connected with roof of threaded rod, one side fixedly connected with backup pad of support column, the first connecting plate of top fixedly connected with of backup pad, the constant head tank has been seted up to the inside of first connecting plate. The utility model has the advantages that: through setting up the movable plate, when the installation guardrail, rotate the movable plate, make the movable plate be located between two guardrails to fix two guardrails through first mounting panel and second mounting panel, increase the maintenance area of guardrail, reduce the use quantity of guardrail, when the staff process, demolish the slide of roof bottom, rotate the movable plate to one side of first connecting plate, the staff process of being convenient for, make the staff pass through between two arbitrary guardrails, the practicality is good.

Description

Foundation pit for construction
Technical Field
The utility model relates to a construction technical field, especially a foundation ditch for construction.
Background
The foundation pit is a soil pit excavated at a designed position of a foundation according to the elevation of the foundation and the plane size of the foundation, is a part of an important engineering or supporting structure as a main structure, and generally needs to be provided with a guardrail at the periphery of the foundation pit in order to prevent safety accidents.
The existing foundation pit for building construction has the following defects:
1. when the guardrail is used for protection in the existing foundation pit for building construction, the guardrail needs to be used for multiple times, and the guardrail is fixed in size and inconvenient to carry and transport;
2. present foundation ditch for construction uses the guardrail when protecting, because the guardrail all seals around with the foundation ditch, the staff of being not convenient for gets into.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a foundation ditch for construction, solved the problem of proposing among the above-mentioned background art.
The purpose of the utility model is realized through the following technical scheme: a foundation pit for building construction comprises a base, wherein a supporting column is fixedly connected to the top of the base, a threaded rod is movably connected to the interior of the supporting column, and a top plate is fixedly connected to the top of the threaded rod;
a supporting plate is fixedly connected to one side of the supporting column, a first connecting plate is fixedly connected to the top of the supporting plate, a positioning groove is formed in the first connecting plate, a positioning block is movably connected to the interior of the positioning groove, a second connecting plate is fixedly connected to one side of the positioning block, the second connecting plate is fixedly connected to the bottom of the top plate, and the second connecting plate is movably connected to one side of the first connecting plate;
one side fixedly connected with fixed plate of support column, one side swing joint of fixed plate has the movable plate, the spout has been seted up to the inside of movable plate, the inside swing joint of spout has the slide, slide swing joint is in the bottom of roof.
Optionally, the top and the bottom of the moving plate are both provided with a fixed plate, and the fixed plate and the moving plate are movably connected through a connecting shaft.
Optionally, the movable plate is far away from the first mounting panel of one side fixedly connected with of fixed plate, one side fixedly connected with second mounting panel of support column, second mounting panel swing joint uses the bolt to fix first mounting panel in one side of second mounting panel in one side of first mounting panel, fixes two guardrails, increases the protective area of single guardrail, reduces the use quantity of guardrail, and the practicality is good.
Optionally, a threaded hole is formed in the supporting column, the threaded rod is movably connected in the threaded hole, the length of the threaded rod in the supporting column is changed by rotating the threaded rod, the distance between the top plate and the supporting plate is further changed, and the purpose of changing the protection height is achieved.
Optionally, the outer surface of the threaded rod is fixedly connected with a rotating wheel, and the rotating wheel is movably connected to the bottom of the top plate.
Optionally, the top of threaded rod is fixedly connected with the locating plate, locating plate swing joint is in the inside of roof.
Optionally, the equal fixedly connected with support column in both sides of roof and backup pad, the fixed orifices has all been seted up to the inside of base and slide.
The utility model has the advantages of it is following:
1. this foundation ditch for construction, through setting up the support column, threaded rod swing joint is in the inside threaded hole of support column, the guardrail uses the completion back, rotate the runner, make the length increase of the inside threaded rod of support column, the locating plate rotates in the inside of roof simultaneously, fix a position, make the roof remove to the direction of backup pad, and the locating piece slides in the inside of constant head tank, the second connecting plate removes in one side of first connecting plate, make first connecting plate remove the top to the backup pad, and the runner is located the top of support column, make the height of guardrail reduce, remove the inside of slide to the movable plate, and rotate the movable plate to one side of first connecting plate, reduce the volume of guardrail, be convenient for deposit and transport.
2. This foundation ditch for construction, through setting up the movable plate, connecting axle swing joint is passed through to movable plate and fixed plate, when the installation guardrail, rotate the movable plate, make the movable plate be located between two guardrails, and fix two guardrails through first mounting panel and second mounting panel, increase the maintenance area of guardrail, reduce the use quantity of guardrail, when the inside staff of foundation ditch passes through, demolish the slide of roof bottom, rotate the movable plate to one side of first connecting plate, the staff of being convenient for passes through, make the staff pass through between two arbitrary guardrails, the practicality is good.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic structural view of the moving plate of the present invention;
FIG. 3 is a schematic structural view of the base of the present invention;
FIG. 4 is a schematic structural view of the support post of the present invention;
fig. 5 is a schematic structural diagram of the first connecting plate of the present invention.
In the figure: 1-base, 2-support column, 3-threaded rod, 4-top plate, 5-support plate, 6-first connecting plate, 7-positioning groove, 8-positioning block, 9-second connecting plate, 10-fixing plate, 11-moving plate, 12-sliding groove, 13-sliding plate, 14-first mounting plate, 15-second mounting plate, 16-rotating wheel and 17-positioning plate.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-5, a foundation pit for building construction comprises a base 1, a supporting column 2 is fixedly connected to the top of the base 1, a threaded rod 3 is movably connected to the inside of the supporting column 2, and a top plate 4 is fixedly connected to the top of the threaded rod 3;
a supporting plate 5 is fixedly connected to one side of the supporting column 2, a first connecting plate 6 is fixedly connected to the top of the supporting plate 5, a positioning groove 7 is formed in the first connecting plate 6, a positioning block 8 is movably connected to the inside of the positioning groove 7, a second connecting plate 9 is fixedly connected to one side of the positioning block 8, the second connecting plate 9 is fixedly connected to the bottom of the top plate 4, and the second connecting plate 9 is movably connected to one side of the first connecting plate 6;
one side fixedly connected with fixed plate 10 of support column 2, one side swing joint of fixed plate 10 has movable plate 11, and spout 12 has been seted up to movable plate 11's inside, and the inside swing joint of spout 12 has slide 13, slide 13 swing joint in the bottom of roof 4.
As an optional technical solution of the utility model:
the top and the bottom of the moving plate 11 are both provided with a fixed plate 10, and the fixed plate 10 and the moving plate 11 are movably connected through a connecting shaft.
As an optional technical solution of the utility model:
one side of the movable plate 11 far away from the fixed plate 10 is fixedly connected with a first mounting plate 14, one side of the support column 2 is fixedly connected with a second mounting plate 15, and the second mounting plate 15 is movably connected to one side of the first mounting plate 14.
As an optional technical solution of the utility model:
threaded hole is seted up in the inside of support column 2, threaded rod 3 swing joint in the inside of threaded hole.
As an optional technical solution of the utility model:
the outer surface of the threaded rod 3 is fixedly connected with a rotating wheel 16, and the rotating wheel 16 is movably connected to the bottom of the top plate 4.
As an optional technical solution of the utility model:
the top fixedly connected with locating plate 17 of threaded rod 3, locating plate 17 swing joint is in the inside of roof 4, when threaded rod 3 rotated, fixes a position through locating plate 17.
As an optional technical solution of the utility model:
the equal fixedly connected with support column 2 in both sides of roof 4 and backup pad 5, the fixed orifices has all been seted up to the inside of base 1 and slide 13, through the fixed orifices, uses the bolt, is convenient for fix base 1 subaerial at foundation ditch top, fixes the guardrail.
The working process of the utility model is as follows: the guardrails are moved to enable the base 1 to be positioned on the ground at the top of a foundation pit, the base 1 is fixed by using bolts to finish installation, the movable plate 11 is arranged, the movable plate 11 and the fixed plate 10 are movably connected through a connecting shaft, when the guardrails are installed, the movable plate 11 is rotated to enable the movable plate 11 to be positioned between the two guardrails, the two guardrails are fixed through the first mounting plate 14 and the second mounting plate 15, the maintenance area of the guardrails is increased, the using number of the guardrails is reduced, the sliding plate 13 is pushed upwards to enable the sliding plate 13 to slide in the sliding groove 12, the sliding plate 13 is positioned at the bottom of the top plate 4 and is fixed, the protection height is increased, when an operator in the foundation pit passes through, the sliding plate 13 at the bottom of the top plate 4 is removed, the movable plate 11 is rotated to enable the movable plate 11 to be rotated to one side of the first connecting plate 6, the operator can pass through any two guardrails, the utility model has the advantages that the utility model is good, through the support column 2, the threaded rod 3 is movably connected in the threaded hole inside the support column 2, after the guardrail is used, the rotating wheel 16 is rotated to enable the threaded rod 3 to rotate in the threaded hole, the length of the threaded rod 3 inside the support column 2 is increased, meanwhile, the positioning plate 17 rotates in the top plate 4 to perform positioning, the top plate 4 moves towards the support plate 5, the positioning block 8 slides in the positioning groove 7, the second connecting plate 9 moves on one side of the first connecting plate 6, the second connecting plate 9 moves to the top of the support plate 5, the rotating wheel 16 is positioned at the top of the support column 2, the height of the guardrail is reduced, the sliding plate 13 moves to the inside of the movable plate 11, the movable plate 11 rotates to one side of the first connecting plate 6, the volume of the guardrail is reduced, the guardrail is convenient to store and transport, when in use, the rotating wheel 16 is rotated reversely, the distance between the top plate 4 and the supporting plate 5 is increased, and the purpose of protection is achieved.
To sum up, when the foundation pit for building construction is used, the supporting columns 2 are arranged, the threaded rods 3 are movably connected in the threaded holes in the supporting columns 2, after the guardrail is used, the rotating wheels 16 are rotated to increase the lengths of the threaded rods 3 in the supporting columns 2, meanwhile, the positioning plates 17 are rotated in the top plates 4 to perform positioning, the top plates 4 are moved towards the supporting plates 5, the positioning blocks 8 slide in the positioning grooves 7, the second connecting plates 9 move on one sides of the first connecting plates 6 to enable the second connecting plates 9 to move to the tops of the supporting plates 5, the rotating wheels 16 are located at the tops of the supporting columns 2 to enable the height of the guardrail to be reduced, the sliding plates 13 are moved into the movable plates 11, the movable plates 11 are rotated to one sides of the first connecting plates 6, the size of the guardrail is reduced, and storage and transportation are facilitated; through setting up the movable plate 11, movable plate 11 and fixed plate 10 pass through connecting axle swing joint, when the installation guardrail, rotate movable plate 11, make movable plate 11 be located between two guardrails, and fix two guardrails through first mounting panel 14 and second mounting panel 15, increase the maintenance area of guardrail, reduce the use quantity of guardrail, when the inside staff of foundation ditch passes through, demolish the slide 13 of roof 4 bottom, rotate movable plate 11 to one side of first connecting plate 6, the staff of being convenient for passes through, make the staff pass through between two arbitrary guardrails, therefore, the practicality is good.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a foundation ditch for construction which characterized in that: the device comprises a base (1), wherein a supporting column (2) is fixedly connected to the top of the base (1), a threaded rod (3) is movably connected to the inside of the supporting column (2), and a top plate (4) is fixedly connected to the top of the threaded rod (3);
a supporting plate (5) is fixedly connected to one side of the supporting column (2), a first connecting plate (6) is fixedly connected to the top of the supporting plate (5), a positioning groove (7) is formed in the first connecting plate (6), a positioning block (8) is movably connected to the inside of the positioning groove (7), a second connecting plate (9) is fixedly connected to one side of the positioning block (8), the second connecting plate (9) is fixedly connected to the bottom of the top plate (4), and the second connecting plate (9) is movably connected to one side of the first connecting plate (6);
one side fixedly connected with fixed plate (10) of support column (2), one side swing joint of fixed plate (10) has movable plate (11), spout (12) have been seted up to the inside of movable plate (11), the inside swing joint of spout (12) has slide (13), slide (13) swing joint is in the bottom of roof (4).
2. The foundation pit for building construction according to claim 1, wherein: the top and the bottom of the moving plate (11) are both provided with a fixed plate (10), and the fixed plate (10) is movably connected with the moving plate (11) through a connecting shaft.
3. The foundation pit for building construction according to claim 1, wherein: the movable plate (11) is far away from a first mounting plate (14) fixedly connected with one side of the fixed plate (10), a second mounting plate (15) fixedly connected with one side of the supporting column (2), and the second mounting plate (15) is movably connected to one side of the first mounting plate (14).
4. The foundation pit for building construction according to claim 1, wherein: threaded holes are formed in the supporting columns (2), and the threaded rods (3) are movably connected to the inner portions of the threaded holes.
5. The foundation pit for building construction according to claim 1, wherein: the outer surface of the threaded rod (3) is fixedly connected with a rotating wheel (16), and the rotating wheel (16) is movably connected to the bottom of the top plate (4).
6. The foundation pit for building construction according to claim 1, wherein: the top fixedly connected with locating plate (17) of threaded rod (3), locating plate (17) swing joint is in the inside of roof (4).
7. The foundation pit for building construction according to claim 1, wherein: the equal fixedly connected with support column (2) in both sides of roof (4) and backup pad (5), the fixed orifices has all been seted up to the inside of base (1) and slide (13).
CN202023066819.8U 2020-12-18 2020-12-18 Foundation pit for construction Active CN214033728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023066819.8U CN214033728U (en) 2020-12-18 2020-12-18 Foundation pit for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023066819.8U CN214033728U (en) 2020-12-18 2020-12-18 Foundation pit for construction

Publications (1)

Publication Number Publication Date
CN214033728U true CN214033728U (en) 2021-08-24

Family

ID=77339926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023066819.8U Active CN214033728U (en) 2020-12-18 2020-12-18 Foundation pit for construction

Country Status (1)

Country Link
CN (1) CN214033728U (en)

Similar Documents

Publication Publication Date Title
CN214033728U (en) Foundation pit for construction
CN212614787U (en) Temporary support device for working face coal seam roadway excavation
CN216939112U (en) Steel reinforcement framework splicing device for box culvert processing
CN211391324U (en) Anti-falling mechanism of transportation device for building construction
CN111470145A (en) Conveying pipe protection device for subway grouting construction
CN211522919U (en) Steel case roof beam both sides anticollision barrier installation frock
CN212516288U (en) Land and soil resource management is with holographic show sand table of topography
CN211395389U (en) Highway bridge construction equipment
CN113417505A (en) Portable construction enclosure for smart city infrastructure construction
CN209192906U (en) A kind of fire resistant doorsets transfer frame
CN217734765U (en) Movable tunnel operation platform
CN220580533U (en) Top beam supporting device with anti-tilting structure
CN214783902U (en) Swift pile device that drives that road was used
CN112112169B (en) Deep foundation pit supporting system and construction method thereof
CN219260720U (en) Bridge anticollision structure
CN220451365U (en) A strut for hydraulic and hydroelectric engineering
CN115992722A (en) Mobile tunnel supporting equipment and method
CN218952007U (en) Horizontal movement hanging basket device for installing upper pipe box of bridge guardrail
CN211719153U (en) Urban rail transit website addressing planning device
CN112796805B (en) Strutting arrangement for tunnel construction
CN215927002U (en) Town road reconnaissance probing safety protection encloses fender fast
CN220014690U (en) Safety fence for building engineering management
CN215906808U (en) Supporting device for bridge construction
CN219327020U (en) Movable bridge width limiting device
CN217193202U (en) Portal formula welded platform device that can walk and go up and down

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant