CN214026252U - Prefabricated staircase mould - Google Patents

Prefabricated staircase mould Download PDF

Info

Publication number
CN214026252U
CN214026252U CN202020973676.XU CN202020973676U CN214026252U CN 214026252 U CN214026252 U CN 214026252U CN 202020973676 U CN202020973676 U CN 202020973676U CN 214026252 U CN214026252 U CN 214026252U
Authority
CN
China
Prior art keywords
mould
die
positioning
dies
prefabricated staircase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020973676.XU
Other languages
Chinese (zh)
Inventor
陈宇
濮一巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Dingchen Construction Technology Co ltd
Original Assignee
Suzhou Dingchen Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Dingchen Construction Technology Co ltd filed Critical Suzhou Dingchen Construction Technology Co ltd
Priority to CN202020973676.XU priority Critical patent/CN214026252U/en
Application granted granted Critical
Publication of CN214026252U publication Critical patent/CN214026252U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a prefabricated stair mould, including two side forms, two die blocks and both ends mould, the die block is installed to both sides mould bottom, the both ends of two side forms are passed through the end mould and are connected, enclose jointly between two side forms, two end mould and the die block when merging and establish into the pouring chamber, be equipped with the guide rail on the base, be equipped with slider on die block and the side form, the gliding setting of slider is on the guide rail, an end mould side is connected fixedly through the hinge and is made it carry out the switching action with the side of one of them side form, end mould opposite side and another side form fixed connection, both sides mould top installation is to drawing frock, hanging some frock and lug. In this way, the utility model discloses can obtain accurate positioning when making the mould use through the cooperation of toper reference column and locating hole, easy to assemble, the end mould that conveniently, opens and shuts fast reduces mould component quantity, does benefit to the group and tears open and shut.

Description

Prefabricated staircase mould
Technical Field
The utility model relates to a prefabricated component field especially relates to a prefabricated staircase mould.
Background
With the continuous release of national policies, the prefabricated building systems are rapidly developed nationwide like bamboo shoots in spring after rain. The assembly type building is that corresponding building prefabricated parts are manufactured in a processing plant and then transported to a construction site for assembly. The system achieves the aims of short construction period, low cost and high efficiency of the building. In a building prefabricated part factory, the problems of the prefabricated staircase, such as size accuracy, appearance quality, production period and the like, are determined by the advantages and disadvantages of the staircase mold, so that how to make the building prefabricated staircase mold have the characteristics of easy operability, low cost, high efficiency and high quality is very important.
Among the current vertical stair steel mould, left end mould and right-hand member mould are the independent structure, and the mould opens and shuts and needs the manual work to open left end mould and right-hand member mould and close, and a component just need be opened once every production, then takes out stair prefabricated component, then the end mould is closed, and the bolt-up equipment, this kind of mode inefficiency, intensity of labour is big.
When the end mould opened and shut, about the end mould needed the repeated positioning, this influenced stair prefabricated component's precision greatly, in actual production, the end mould often opened and shut about, and the long-time wearing and tearing of end mould and die block about, lead to about, the clearance of end mould and die block is bigger and bigger, and cement mortar spills from the clearance, and the life of mould reduces.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the main technical problem who solves provides a prefabricated staircase mould can obtain accurate positioning when making the mould use through the cooperation of toper reference column and locating hole, and easy to assemble, the end mould that conveniently, opens and shuts fast reduces mould component quantity, does benefit to the assembly and dismantles.
In order to solve the technical problem, the utility model discloses a technical scheme be: the utility model provides a prefabricated stair mould, includes two side forms, two die blocks and both ends mould, the die block is installed to both sides mould bottom, the both ends of two side forms are passed through the end mould and are connected, enclose jointly between two side forms, two end mould and the die block when merging and establish into the pouring chamber, be equipped with the guide rail on the base, be equipped with slider on die block and the side form, the gliding setting of slider is on the guide rail, an end mould side is connected fixedly through the hinge and is made it carry out the switching action with the side of one of them side form, end mould opposite side and another side form fixed connection, the installation of both sides mould top is to drawing frock, hanging some frock and lug.
Further, the sliding device comprises a side die and a bottom die, a sliding support is fixedly mounted on the side die and the bottom die, a pulley block is mounted at the lower end of the sliding support, and the pulley block slides on the guide rail.
Furthermore, the outer side surfaces of the two side dies are provided with stiffened plates which are arranged on the outer side surfaces of the two side dies in a frame mode.
Further, handles are arranged on the two side dies and the outer side faces of the two end dies.
Further, to drawing the frock including the fixed locating lever that sets up the lateral surface at the both sides mould, the locating lever upper end is equipped with the location bayonet socket, the lead screw has been placed on the location bayonet socket, the cover is equipped with positioning sleeve on the lead screw, the lead screw is located the outer end of location bayonet socket and passes through the nut fixed when the both sides mould combines.
Further, a positioning device is arranged between the two bottom dies.
Further, the hoisting point tool comprises a hoisting point frame and a round pipe, wherein the hoisting point frame is fixedly arranged on the upper end surfaces of the two side dies, and the round pipe is fixedly arranged on the hoisting point frame.
Further, the counter-pulling tool is provided with a plurality of groups and arranged at intervals, and/or the hoisting point tool is provided with a plurality of groups and arranged at intervals.
Furthermore, convex beam overhanging baffles are arranged on the upper end faces of the two ends of the two side dies.
Furthermore, the positioning device comprises a conical positioning column arranged on the inner side surface of one bottom die, and a positioning hole corresponding to the conical positioning column is arranged on the inner side surface of the other bottom die.
The utility model has the advantages that: the utility model discloses a prefabricated stair mould, stair end mould pass through the pulling handle, and self-control hinge rotates and realizes opening and shutting, and the end mould is opened the back, and general stair mould does not set up the hinge, needs manpower recombination end mould, and the hinge has made things convenient for the equipment. One side mould of the stair mould is supported by the sliding support, the handle is pulled, and the pulley block slides on the guide rail, so that the labor is saved, and the travelling crane lifting is not needed. When the two side dies and the two bottom dies are closed, the conical positioning columns impact the positioning holes, so that accurate positioning is realized, and the installation is convenient. The upper convex beam overhanging baffle side plate is welded on the upper end surface of the end of the two side dies, so that the light receiving surface can receive light conveniently. The split tooling consists of a screw rod and a positioning rod, and the accuracy of the overall dimension of the die can be ensured. The convex beam parts are respectively molded into a whole on two sides, so that the number of mold components is reduced, and assembly and disassembly are facilitated. The mold can be accurately positioned when in use through the matching of the conical positioning column and the positioning hole.
Drawings
Fig. 1 is a schematic structural view of the prefabricated staircase mold according to the present invention when closed;
fig. 2 is a schematic structural view of the prefabricated staircase mold when closed;
fig. 3 is a schematic structural view of the prefabricated staircase mold when the prefabricated staircase mold is opened;
fig. 4 is a schematic structural view of the prefabricated staircase mold when being opened.
1. Side mould; 2. bottom die; 3. end die; 4. a base; 5. a guide rail; 6. a sliding device; 7. a hinge; 8. oppositely pulling the tool; 9. hoisting a point tool; 10. lifting lugs; 11. a step die; 12. back molding; 13. a sliding support; 14. a pulley block; 15. adding a rib plate; 16. a handle; 17. positioning a rod; 18. positioning the bayonet; 19. a screw rod; 20. positioning the sleeve; 21. a hoisting point frame; 22. a circular tube; 23. the convex beam overhangs the baffle; 24. A conical positioning column; 25. and (7) positioning the holes.
Detailed Description
The following detailed description of the preferred embodiments of the present invention will be provided to enable those skilled in the art to more easily understand the advantages and features of the present invention, and to make clear and definite definitions of the protection scope of the present invention.
Referring to fig. 1 to 4, an embodiment of the present invention includes: the utility model provides a prefabricated stair mould, includes two side forms 1, two die blocks 2 and both ends mould 3, die block 2 is installed to two side forms 1 bottom, the both ends of two side forms 1 are passed through end mould 3 and are connected, enclose jointly between two side forms 1, two end mould 3 and the die block 2 when merging and establish into the pouring chamber, be equipped with guide rail 5 on the base 4, be equipped with slider 6 on die block 2 and the side form 1, the gliding setting of slider 6 is on guide rail 5, 3 one side ends of end mould are connected fixedly through hinge 7 and the side of one of them side form 1 and are made it carry out the switching action, 3 opposite sides of end mould pass through bolt fixed connection with another side form 1, 1 top installation of two side forms is to drawing frock 8, hanging point frock 9 and lug 10.
As shown in fig. 1-4, the two side molds in the present invention are a step mold 11 and a back mold 12, respectively.
Further, the sliding device 7 comprises a sliding support 13, the sliding support 13 is installed on the back mold 12 and the bottom mold 2 for fixing the back mold 12, a pulley block 14 is installed at the lower end of the sliding support 13, and the pulley block 14 slides on the guide rail 5.
Further, the outer side surfaces of the two side dies 1 are provided with reinforcing plates 15, and the reinforcing plates 15 are arranged on the outer side surfaces of the two side dies 1 in a frame mode.
Further, handles 16 are arranged on the outer side surfaces of the two side dies 1 and the two end dies 3.
Further, to drawing frock 8 including the fixed locating lever 17 that sets up the lateral surface at two side moulds 1, locating lever 17 upper end is equipped with location bayonet socket 18, lead screw 19 has been placed on the location bayonet socket 18, the cover is equipped with positioning sleeve 20 on the lead screw 19, it is fixed that the outer end that lead screw 19 is located location bayonet socket 20 when two side moulds 1 merge passes through the nut.
Further, a positioning device is arranged between the two bottom dies 2.
Further, the hoisting point tool 9 comprises a hoisting point frame 21 and a round pipe 22, the hoisting point frame 21 is fixedly arranged on the upper end surfaces of the two side dies 1, and the round pipe 22 is fixedly arranged on the hoisting point frame 21. Bolts are inserted into the round tubes 22 and fix embedded parts.
Further, the counter-pulling tool 8 is provided with multiple groups and arranged at intervals, and/or the hoisting point tool 9 is provided with multiple groups and arranged at intervals.
Furthermore, the upper end surfaces of the two ends of the two side moulds 1 are respectively provided with a convex beam overhanging baffle 23.
Further, the positioning device includes a conical positioning column 24 disposed on an inner side surface of one bottom mold 2, and a positioning hole 25 corresponding to the conical positioning column 24 is disposed on an inner side surface of the other bottom mold 2.
The utility model has the advantages that: the utility model discloses a prefabricated stair mould, stair end mould pass through the pulling handle, and self-control hinge rotates and realizes opening and shutting, and the end mould is opened the back, and general stair mould does not set up the hinge, needs manpower recombination end mould, and the hinge has made things convenient for the equipment. One side mould of the stair mould is supported by the sliding support, the handle is pulled, and the pulley block slides on the guide rail, so that the labor is saved, and the travelling crane lifting is not needed. When the two side dies and the two bottom dies are closed, the conical positioning columns impact the positioning holes, so that accurate positioning is realized, and the installation is convenient. The upper convex beam overhanging baffle side plate is welded on the upper end surface of the end of the two side dies, so that the light receiving surface can receive light conveniently. The split tooling consists of a screw rod and a positioning rod, and the accuracy of the overall dimension of the die can be ensured. The convex beam parts are respectively molded into a whole on two sides, so that the number of mold components is reduced, and assembly and disassembly are facilitated. The mold can be accurately positioned when in use through the matching of the conical positioning column and the positioning hole.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (10)

1. The utility model provides a prefabricated stair mould, its characterized in that includes two side forms, two die blocks and both ends mould, the die block is installed to both sides mould bottom, the both ends of two side forms are passed through the end mould and are connected, enclose jointly between two side forms, two end moulds and the die block when merging and establish into the pouring chamber, be equipped with the guide rail on the base, be equipped with slider on die block and the side form, the gliding setting of slider is on the guide rail, an end mould side is connected fixedly through the hinge and is made it carry out the switching action with the side of one of them side form, end mould opposite side and another side form fixed connection, the installation of both sides top is to drawing frock, hoisting point frock and lug.
2. The prefabricated staircase mold of claim 1, wherein: the sliding device comprises a side die and a bottom die, wherein a sliding support is fixedly installed on the side die and the bottom die, a pulley block is installed at the lower end of the sliding support, and the pulley block slides on the guide rail.
3. The prefabricated staircase mold of claim 1, wherein: and the outer side surfaces of the two side dies are provided with stiffened plates which are arranged on the outer side surfaces of the two side dies in a frame form.
4. The prefabricated staircase mold of claim 1, wherein: handles are arranged on the two side dies and the outer side faces of the two end dies.
5. The prefabricated staircase mold of claim 1, wherein: the split tooling comprises a fixed positioning rod arranged on the outer side surface of the two side dies, a positioning bayonet is arranged at the upper end of the positioning rod, a lead screw is placed on the positioning bayonet, a positioning sleeve is sleeved on the lead screw, and the outer end of the lead screw, which is located at the positioning bayonet when the two side dies are combined, is fixed through a nut.
6. The prefabricated staircase mold of claim 1, wherein: and a positioning device is arranged between the two bottom dies.
7. The prefabricated staircase mold of claim 1, wherein: the hoisting point tool comprises a hoisting point frame and a round pipe, wherein the hoisting point frame is fixedly arranged on the upper end surfaces of the two side dies, and the round pipe is fixedly arranged on the hoisting point frame.
8. The prefabricated staircase mold of claim 1, wherein: the counter-pulling tool is provided with a plurality of groups and arranged at intervals, and/or the lifting point tool is provided with a plurality of groups and arranged at intervals.
9. The prefabricated staircase mold of claim 1, wherein: and convex beam overhanging baffles are arranged on the upper end faces of the two ends of the two side moulds.
10. The stair prefabrication mold of claim 6, wherein: the positioning device comprises a conical positioning column arranged on the inner side surface of one bottom die, and a positioning hole corresponding to the conical positioning column is arranged on the inner side surface of the other bottom die.
CN202020973676.XU 2020-06-01 2020-06-01 Prefabricated staircase mould Active CN214026252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020973676.XU CN214026252U (en) 2020-06-01 2020-06-01 Prefabricated staircase mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020973676.XU CN214026252U (en) 2020-06-01 2020-06-01 Prefabricated staircase mould

Publications (1)

Publication Number Publication Date
CN214026252U true CN214026252U (en) 2021-08-24

Family

ID=77331649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020973676.XU Active CN214026252U (en) 2020-06-01 2020-06-01 Prefabricated staircase mould

Country Status (1)

Country Link
CN (1) CN214026252U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113752367A (en) * 2021-09-24 2021-12-07 辽宁龙星环保科技有限公司 Green manufacturing mold for prefabricated staircase and processing method of prefabricated staircase

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113752367A (en) * 2021-09-24 2021-12-07 辽宁龙星环保科技有限公司 Green manufacturing mold for prefabricated staircase and processing method of prefabricated staircase

Similar Documents

Publication Publication Date Title
CN209665709U (en) It is a kind of for making the formwork structure of prefabricated bent cap
CN214026252U (en) Prefabricated staircase mould
CN205580844U (en) But reuse's reinforced concrete beam type test piece pouring mold
CN105170836A (en) Portable multi-jacking multifunctional high-tensile reinforcement bar bending and straightening machine and operation method thereof
CN108214874A (en) Pretensioning prestressed concrete track board assembly line puts a system and its application
CN211279060U (en) Easy dismounting's assembled utility tunnel roof die set
CN209868938U (en) Prefabricated piping lane forming die
CN212129975U (en) Detachable adjustable triangular truss assembly type mould platform
CN212764009U (en) Superposed beam die
CN207888895U (en) Pretensioning prestressed concrete track board assembly line puts a system
CN210414963U (en) Box girder internal mold supporting slideway component and slideway
CN207888896U (en) Pretensioning prestressed concrete track board assembly line tensioning system
CN220285321U (en) Detachable building body mould of marking time
CN220353034U (en) Integrated reinforced well cover
CN220565702U (en) Wall body water pipe indent structure
CN214364919U (en) Support die carrier support column
CN214497580U (en) Underground pipe gallery integral component die
CN103352475B (en) Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold
CN220699957U (en) General prefabricated post mould
CN219387172U (en) Template for pouring bridge pier column
CN213653966U (en) Concrete prefabricated member for constructional engineering
CN218892040U (en) Steel mould structure for prefabrication construction of hollow slab beam
CN212104746U (en) Bottom die detachable steel bar truss floor support plate
CN220279965U (en) Prefabricated member template device with adjustable be convenient for drawing of patterns
CN220377830U (en) House beam pouring template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant