CN213980234U - Building guardrail for civil engineering - Google Patents
Building guardrail for civil engineering Download PDFInfo
- Publication number
- CN213980234U CN213980234U CN202022653401.0U CN202022653401U CN213980234U CN 213980234 U CN213980234 U CN 213980234U CN 202022653401 U CN202022653401 U CN 202022653401U CN 213980234 U CN213980234 U CN 213980234U
- Authority
- CN
- China
- Prior art keywords
- horizontal pole
- civil engineering
- installation
- mounting
- building guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to the technical field of civil engineering, in particular to a building guardrail for civil engineering, which comprises two bases, wherein supporting rods can be detachably connected on the two bases, two transverse rod components which are arranged in parallel are detachably connected between the two supporting rods, more than two railings which are arranged in parallel are inserted between the two transverse rod components, each transverse rod component comprises a transverse rod and two mounting sleeves, the outer wall of one end of each of the two mounting sleeves which is close to each other is symmetrically and threadedly connected with a connecting sleeve, the building guardrail can be disassembled by arranging the detachable bases, the supporting rods and the transverse rod components, the site assembly and disassembly can be realized, the transportation is more convenient, meanwhile, the mounting sleeves and the connecting sleeves are arranged, the two ends of the transverse rod are only required to be aligned to the corresponding mounting sleeves when the transverse rod is mounted, and then the connecting sleeves are rotated to complete the fixation of the transverse rod, the whole installation process is simple and quick, and the disassembly and assembly efficiency is improved.
Description
Technical Field
The utility model relates to a civil engineering technical field, in particular to building guardrail for civil engineering.
Background
Guardrail mainly used house, highway, business district, protection and protection to personal safety and equipment facility in occasions such as public place, the guardrail often need be used to periphery at large-scale civil engineering, current building guardrail for civil engineering is mostly fixed knot structure, adopt welded fastening's mode more between its railing and the frame, not only need consume a large amount of time to weld fixedly when the installation, and when montant fracture or damage, it is very troublesome to change the dismouting again, and need all demolishs current guardrail then for the guardrail of other patterns when needing to be changed, waste time and energy very much.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to solve the technical problems that: provides a building guardrail for civil engineering.
In order to solve the technical problem, the utility model discloses a technical scheme be:
a building guardrail for civil engineering comprises two bases, wherein supporting rods can be detachably connected to the two bases, two cross rod assemblies which are arranged in parallel can be detachably connected between the two supporting rods, and more than two railings which are arranged in parallel are inserted between the two cross rod assemblies;
the horizontal pole subassembly includes horizontal pole and two installation sleeves, two the installation sleeve symmetry is fixed on two bracing pieces, two the one end outer wall symmetry threaded connection that the installation sleeve is close to each other has the adapter sleeve, the relative both ends of horizontal pole respectively with two installation sleeve looks butt, the first external screw thread of mutually supporting with the adapter sleeve that corresponds is all seted up to the outer wall at the relative both ends of horizontal pole, all fix through the adapter sleeve between the relative both ends of horizontal pole and two installation sleeves.
Further, two the mounting groove has been seted up to the one end symmetry that the installation sleeve is close to each other, the relative both ends symmetry of horizontal pole is equipped with the installation pole of mutually supporting with the mounting groove, the installation pole is pegged graft in the mounting groove that corresponds.
Furthermore, the supporting rod and the base are detachably connected through threads.
Further, the base includes bottom plate and mount pad, the mount pad is fixed on a side of bottom plate, the one end that the bottom plate was kept away from to the mount pad has seted up the internal thread hole, the bracing piece is close to the one end outer wall of mount pad and is equipped with the second external screw thread that mutually supports with the internal thread hole, the bracing piece is pegged graft in the internal thread hole.
Furthermore, the bracing piece is the telescopic link, two the horizontal pole subassembly sets up the stiff end and the flexible end at the telescopic link respectively.
The beneficial effects of the utility model reside in that:
through setting up detachable base, bracing piece and horizontal pole subassembly to make building guardrail dismantle, can on-the-spot dismouting, thereby it is more convenient during making the transportation, simultaneously through setting up installation sleeve and adapter sleeve, make when the horizontal pole installation only need aim at the both ends of horizontal pole corresponding installation sleeve, then rotate the adapter sleeve and just can accomplish the fixed of horizontal pole, whole installation is simple, swift, improves dismouting efficiency.
Drawings
Fig. 1 is a schematic structural view of a civil engineering construction guardrail according to the present invention;
fig. 2 is a partial cross-sectional view of a civil engineering construction fence according to the present invention;
fig. 3 is a schematic structural view of a cross bar of a civil engineering construction guardrail according to the invention;
fig. 4 is a schematic structural view of a base of a building guardrail for civil engineering according to the utility model;
fig. 5 is a schematic structural view of a civil engineering construction guardrail according to the present invention;
description of reference numerals:
1. a base; 11. a base plate; 12. a mounting seat; 121. an internally threaded bore; 2. a support bar; 21. a second external thread; 3. a cross bar assembly; 31. a cross bar; 311. a first external thread; 312. mounting a rod; 32. installing a sleeve; 321. mounting grooves; 33. connecting sleeves; 4. a railing.
Detailed Description
In order to explain the technical content, the objects and the effects of the present invention in detail, the following description is made with reference to the accompanying drawings in combination with the embodiments.
Referring to fig. 1, the technical solution provided by the present invention is:
a building guardrail for civil engineering comprises two bases, wherein supporting rods can be detachably connected to the two bases, two cross rod assemblies which are arranged in parallel can be detachably connected between the two supporting rods, and more than two railings which are arranged in parallel are inserted between the two cross rod assemblies;
the horizontal pole subassembly includes horizontal pole and two installation sleeves, two the installation sleeve symmetry is fixed on two bracing pieces, two the one end outer wall symmetry threaded connection that the installation sleeve is close to each other has the adapter sleeve, the relative both ends of horizontal pole respectively with two installation sleeve looks butt, the first external screw thread of mutually supporting with the adapter sleeve that corresponds is all seted up to the outer wall at the relative both ends of horizontal pole, all fix through the adapter sleeve between the relative both ends of horizontal pole and two installation sleeves.
From the above description, the beneficial effects of the present invention are:
through setting up detachable base, bracing piece and horizontal pole subassembly to make building guardrail dismantle, can on-the-spot dismouting, thereby it is more convenient during making the transportation, simultaneously through setting up installation sleeve and adapter sleeve, make when the horizontal pole installation only need aim at the both ends of horizontal pole corresponding installation sleeve, then rotate the adapter sleeve and just can accomplish the fixed of horizontal pole, whole installation is simple, swift, improves dismouting efficiency.
The working principle of the building guardrail for civil engineering is as follows:
during the installation, install two sets of bracing pieces on two bases respectively earlier, then will aim at the installation sleeve with the one end of horizontal pole earlier to rotate the adapter sleeve, make the adapter sleeve be located between installation sleeve and the horizontal pole, thereby accomplish the fixed of horizontal pole one end, after two sets of horizontal pole one end installations and finish, peg graft the railing in proper order between two sets of horizontal poles, then aim at another group's installation sleeve with the other end of horizontal pole again, and rotate the adapter sleeve and fix, thereby accomplish the installation of guardrail.
Further, two the mounting groove has been seted up to the one end symmetry that the installation sleeve is close to each other, the relative both ends symmetry of horizontal pole is equipped with the installation pole of mutually supporting with the mounting groove, the installation pole is pegged graft in the mounting groove that corresponds.
From the above description, through setting up foretell structure for the horizontal pole can carry out preliminary location through the cooperation of installation pole and installation sleeve when the installation, then fixes through the adapter sleeve, thereby easy to assemble more.
Furthermore, the supporting rod and the base are detachably connected through threads.
As can be seen from the above description, the support rod and the base are detachably connected through the threads, so that the support rod can be conveniently disassembled and assembled.
Further, the base includes bottom plate and mount pad, the mount pad is fixed on a side of bottom plate, the one end that the bottom plate was kept away from to the mount pad has seted up the internal thread hole, the bracing piece is close to the one end outer wall of mount pad and is equipped with the second external screw thread that mutually supports with the internal thread hole, the bracing piece is pegged graft in the internal thread hole.
Furthermore, the bracing piece is the telescopic link, two the horizontal pole subassembly sets up the stiff end and the flexible end at the telescopic link respectively.
From the above description, the bracing piece is the telescopic link, and two horizontal pole subassemblies set up respectively at the stiff end and the flexible end of telescopic link, make like this can be according to the height of the different regulation bracing pieces in use place, and then adjust the distance between two sets of horizontal poles, adapt to different service environment.
Referring to fig. 1 to 5, a first embodiment of the present invention is:
referring to fig. 1, a building guardrail for civil engineering comprises two bases 1, wherein two supporting rods 2 can be detachably connected to the two bases 1, two cross rod assemblies 3 which are arranged in parallel can be detachably connected between the two supporting rods 2, and more than two railings 4 which are arranged in parallel are inserted between the two cross rod assemblies 3;
referring to fig. 2 and 3, the cross bar assembly 3 includes a cross bar 31 and two mounting sleeves 32, the two mounting sleeves 32 are symmetrically fixed on the two support bars 2, the outer walls of the two ends, close to each other, of the two mounting sleeves 32 are symmetrically and threadedly connected with connecting sleeves 33, the two opposite ends of the cross bar 31 are respectively abutted against the two mounting sleeves 32, first external threads 311 matched with the corresponding connecting sleeves 33 are respectively formed on the outer walls of the two opposite ends of the cross bar 31, and the two opposite ends of the cross bar 31 and the two mounting sleeves 32 are fixed by the connecting sleeves 33.
Referring to fig. 2 and 3, two ends of the two mounting sleeves 32 close to each other are symmetrically provided with mounting grooves 321, two opposite ends of the cross bar 31 are symmetrically provided with mounting rods 312 matched with the mounting grooves 321, and the mounting rods 312 are inserted into the corresponding mounting grooves 321.
Referring to fig. 2 and 4, the support rod 2 is detachably connected to the base 1 through a screw thread.
Referring to fig. 4, the base 1 includes a bottom plate 11 and an installation seat 12, the installation seat 12 is fixed on a side surface of the bottom plate 11, an internal threaded hole 121 is formed in one end of the installation seat 12 away from the bottom plate 11, a second external thread 21 matched with the internal threaded hole 121 is formed in an outer wall of one end of the support rod 2 close to the installation seat 12, and the support rod 2 is inserted into the internal threaded hole 121.
Referring to fig. 5, the supporting rod 2 is a telescopic rod, and the two cross bar 31 assemblies 3 are respectively disposed at a fixed end and a telescopic end of the telescopic rod.
The working principle of the building guardrail for civil engineering is as follows:
during the installation, earlier peg graft the 12 inner chambers of mount pad in two sets of bracing pieces 2 bottoms, and rotate bracing piece 2, thereby it is fixed to realize bracing piece 2 through threaded connection, then will aim at installation sleeve 32 with the one end of horizontal pole 31 earlier, and rotate adapter sleeve 33, make adapter sleeve 33 be located between installation sleeve 32 and the horizontal pole 31, thereby accomplish the fixed of horizontal pole 31 one end, after two sets of horizontal pole 31 one end installations finishes, peg graft railing 4 between two sets of horizontal poles 31 in proper order, then aim at another set of installation sleeve 32 with the other end of horizontal pole 31, and rotate adapter sleeve 33 and fix, thereby accomplish the installation of guardrail.
To sum up, the utility model provides a pair of building guardrail for civil engineering is through setting up detachable base, bracing piece and horizontal pole subassembly to make building guardrail dismantle, can the on-the-spot dismouting, thereby it is more convenient when making the transportation, simultaneously through setting up installation sleeve and adapter sleeve, make when the horizontal pole installation only need aim at the both ends of horizontal pole the installation sleeve that corresponds, then rotate the adapter sleeve and just can accomplish the fixed of horizontal pole, whole installation is simple, swift, improves dismouting efficiency.
The above mentioned is only the embodiment of the present invention, and not the limitation of the patent scope of the present invention, all the equivalent transformations made by the contents of the specification and the drawings, or the direct or indirect application in the related technical field, are included in the patent protection scope of the present invention.
Claims (5)
1. The building guardrail for civil engineering is characterized by comprising two bases, wherein supporting rods can be detachably connected to the two bases, two cross rod assemblies which are arranged in parallel can be detachably connected between the two supporting rods, and more than two railings which are arranged in parallel are inserted between the two cross rod assemblies;
the horizontal pole subassembly includes horizontal pole and two installation sleeves, two the installation sleeve symmetry is fixed on two bracing pieces, two the one end outer wall symmetry threaded connection that the installation sleeve is close to each other has the adapter sleeve, the relative both ends of horizontal pole respectively with two installation sleeve looks butt, the first external screw thread of mutually supporting with the adapter sleeve that corresponds is all seted up to the outer wall at the relative both ends of horizontal pole, all fix through the adapter sleeve between the relative both ends of horizontal pole and two installation sleeves.
2. The building guardrail for civil engineering as claimed in claim 1, wherein the two mounting sleeves are symmetrically provided with mounting grooves at the ends close to each other, and the two opposite ends of the cross bar are symmetrically provided with mounting bars matched with the mounting grooves, and the mounting bars are inserted into the corresponding mounting grooves.
3. The building guardrail for civil engineering as claimed in claim 1, wherein the support bar is detachably connected with the base by a screw thread.
4. The building guardrail for civil engineering as claimed in claim 3, wherein the base comprises a bottom plate and a mounting seat, the mounting seat is fixed on one side surface of the bottom plate, an internal thread hole is formed at one end of the mounting seat far away from the bottom plate, a second external thread matched with the internal thread hole is formed on the outer wall of one end of the support rod close to the mounting seat, and the support rod is inserted into the internal thread hole.
5. The building guardrail for civil engineering as claimed in claim 1, wherein the support bar is a telescopic bar, and the two cross bar assemblies are respectively provided at a fixed end and a telescopic end of the telescopic bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022653401.0U CN213980234U (en) | 2020-11-17 | 2020-11-17 | Building guardrail for civil engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022653401.0U CN213980234U (en) | 2020-11-17 | 2020-11-17 | Building guardrail for civil engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213980234U true CN213980234U (en) | 2021-08-17 |
Family
ID=77264748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022653401.0U Active CN213980234U (en) | 2020-11-17 | 2020-11-17 | Building guardrail for civil engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213980234U (en) |
-
2020
- 2020-11-17 CN CN202022653401.0U patent/CN213980234U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111173249B (en) | Overhanging support system attached to rectangular beam and column | |
CN213980234U (en) | Building guardrail for civil engineering | |
CN217054477U (en) | Y-shaped supporting device for temporary support of prefabricated wall | |
CN214834737U (en) | Plug-in type board primary and secondary keel fast-assembling early-dismantling ear-shaped connecting piece | |
CN215484493U (en) | High-stability diagonal tension door type scaffold | |
CN210827850U (en) | Quick detachable temporary building fixed knot constructs | |
CN107939037B (en) | Remote steel pipe scaffold wall connecting device | |
CN220979053U (en) | Steel pipe guardrail of job site | |
CN216865888U (en) | Novel building scaffold fastener structure | |
CN202152561U (en) | Multifunctional light wall | |
CN212154363U (en) | Assembled guardrail rod for constructional engineering | |
CN218148880U (en) | Steel structure anti-seismic frame structure | |
CN212897607U (en) | Tower type supporting truss | |
CN213087369U (en) | Assembled module well construction operation platform | |
CN221823115U (en) | Constructional column steel bar embedded part | |
CN218933875U (en) | Vertical pump line fixing device | |
CN219158614U (en) | Protective frame for building construction | |
CN220080287U (en) | Energy-saving steel structure installation mechanism | |
CN216076207U (en) | Building engineering scaffold convenient to equipment | |
CN220015735U (en) | Temporary audience stand rail buckle accessory | |
CN221627725U (en) | Temporary guardrail | |
CN218375533U (en) | Prefabricated floor bearing structure | |
CN216713838U (en) | Beam bottom supporting and jacking device capable of being rapidly installed and disassembled | |
CN219931859U (en) | Recyclable steel member | |
CN215330647U (en) | Supporting device lower joist for installing shock insulation support on building cut column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |