CN213979584U - Concrete construction interval separation structure of slag admixture - Google Patents

Concrete construction interval separation structure of slag admixture Download PDF

Info

Publication number
CN213979584U
CN213979584U CN202021899456.3U CN202021899456U CN213979584U CN 213979584 U CN213979584 U CN 213979584U CN 202021899456 U CN202021899456 U CN 202021899456U CN 213979584 U CN213979584 U CN 213979584U
Authority
CN
China
Prior art keywords
concrete
bolt
sleeve
fixed
telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021899456.3U
Other languages
Chinese (zh)
Inventor
殷荣华
成相飞
许福建
邵招娣
孙晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianhe Scarlett To Renewable Resources Co ltd
Nanjing Pujiang Engineering Detection Co ltd
Original Assignee
Jiangsu Tianhe Scarlett To Renewable Resources Co ltd
Nanjing Pujiang Engineering Detection Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tianhe Scarlett To Renewable Resources Co ltd, Nanjing Pujiang Engineering Detection Co ltd filed Critical Jiangsu Tianhe Scarlett To Renewable Resources Co ltd
Priority to CN202021899456.3U priority Critical patent/CN213979584U/en
Application granted granted Critical
Publication of CN213979584U publication Critical patent/CN213979584U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction technical field just discloses a concrete construction interval partition structure of slag admixture, including base face and concrete separation post, the fixed solid fixed ring that is equipped with in column wall middle part of concrete separation post, gu the fixed equal symmetrical fixed two first fixed blocks that are equipped with in left and right sides of fixed ring, two be equipped with the sleeve between the first fixed block, telescopic bobbin base department is through first bolt and first nut fastening connection, telescopic inside slides and is provided with the telescopic link, telescopic section of thick bamboo wall is provided with the second bolt through the screw hole screw thread, the pole wall of telescopic link with through second bolt fastening connection between the sleeve, the lower extreme of telescopic link is equipped with supporting mechanism, the lower extreme of telescopic link pass through supporting mechanism fixed set up in the surface of base face. The utility model discloses can provide a firm supporting role for the concrete partition post to can guarantee the support security of concrete partition post to the building.

Description

Concrete construction interval separation structure of slag admixture
Technical Field
The utility model relates to a construction technical field especially relates to a concrete construction interval separation structure of slag admixture.
Background
Along with the continuous development of the building industry in China, the number of building types is increased correspondingly, the existing high-rise buildings are mostly low-rise commercial buildings, the multifunctional requirements of upper accommodation are met, and the large space required by the low-rise commercial buildings is always subjected to space separation treatment by adopting a certain structural form of concrete columns.
At present, the concrete spacing separation columns adopting the slag admixture are higher and have poorer support stability in the use process, so that the support safety of a high-rise building cannot be ensured. Therefore, the utility model provides a concrete construction interval separation structure of slag admixture.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art because the concrete interval column is higher, and it is relatively poor to support the steadiness to can't guarantee the problem to the support security of high-rise building thing, and the concrete construction interval partition structure of the slag admixture that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a concrete construction interval partition structure of slag admixture, includes base face and concrete partition column, the fixed solid fixed ring that is equipped with in column wall middle part of concrete partition column, gu the equal symmetrical fixed two first fixed blocks that are equipped with in fixed ring's the left and right sides, two be equipped with the sleeve between the first fixed block, telescopic bobbin base department is through first bolt and first nut fastening connection, telescopic inside slides and is provided with the telescopic link, telescopic section of thick bamboo wall is provided with the second bolt through the screw hole screw thread, the pole wall of telescopic link with through second bolt fastening connection between the sleeve, the lower extreme of telescopic link is equipped with supporting mechanism, the lower extreme of telescopic link pass through supporting mechanism fixed set up in the surface of base face.
Preferably, the supporting mechanism comprises supporting blocks and second fixed blocks, the second fixed blocks are symmetrically and fixedly arranged on the upper surfaces of the supporting blocks, the lower ends of the telescopic rods extend to the position between the two second fixed blocks, the lower ends of the telescopic rods are fixedly arranged between the two second fixed blocks through third bolts and second nuts, and two sides of the upper surface of each supporting block are fixedly arranged on the surface of the base surface through fourth bolts.
Preferably, the circumferential wall of the fixing ring is symmetrically provided with two fifth bolts, and the fixing ring is fixedly arranged on the column wall of the concrete separation column through the fifth bolts.
Preferably, the concrete separation column and the base surface are formed by injection molding in advance.
Preferably, the sleeve is a square cylinder, and the telescopic rod is a square rod.
Compared with the prior art, the utility model provides a concrete construction interval partition structure of slag admixture possesses following beneficial effect:
1. this concrete construction interval of slag admixture separates structure through the solid fixed ring that is equipped with, first fixed block, sleeve, first bolt, first nut, telescopic link and second bolt, can provide a firm supporting role for the concrete partition post to can guarantee the support security of concrete partition post to the building.
2. This concrete construction interval partition structure of slag admixture through supporting shoe, second fixed block, third bolt, second nut and the fourth bolt that is equipped with, can be with the stable fixing on the base face of the lower extreme of telescopic link.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can provide a firm supporting role for the concrete partition post to can guarantee the support security of concrete partition post to the building.
Drawings
Fig. 1 is a schematic structural view of a concrete construction interval partition structure of a slag admixture according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a schematic top view of the retaining ring of fig. 1.
In the figure: the concrete partition column comprises a base surface 1, a concrete partition column 2, a fixing ring 3, a first fixing block 4, a sleeve 5, a first bolt 6, a first nut 7, an expansion rod 8, a second bolt 9, a supporting block 10, a second fixing block 11, a third bolt 12, a second nut 13, a fourth bolt 14 and a fifth bolt 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a concrete construction interval separation structure of slag admixture comprises a base surface 1 and a concrete separation column 2, wherein the concrete separation column 2 is formed by pre-injection molding with the base surface 1, the concrete separation column 2 is made by mixing slag admixture, a fixing ring 3 is fixedly arranged in the middle of the column wall of the concrete separation column 2, two first fixing blocks 4 are symmetrically and fixedly arranged on the left side and the right side of the fixing ring 3, a sleeve 5 is arranged between the two first fixing blocks 4, the bottom of the sleeve 5 is fixedly connected with a first nut 7 through a first bolt 6, a telescopic rod 8 is slidably arranged in the sleeve 5, a second bolt 9 is arranged on the wall of the sleeve 5 through a threaded hole, the rod wall of the telescopic rod 8 is fixedly connected with the sleeve 5 through a second bolt 9, a support mechanism is arranged at the lower end of the telescopic rod 8, and is fixedly arranged on the surface of the base surface 1 through the support mechanism, sleeve 5 adopts a square section of thick bamboo, and telescopic link 8 adopts square pole, can avoid telescopic link 8 rotatory phenomenon to appear in sleeve 5's inside.
The supporting mechanism comprises supporting blocks 10 and second fixing blocks 11, the second fixing blocks 11 are symmetrically fixed on the upper surface of the supporting blocks 10, the lower ends of the telescopic rods 8 extend to the space between the two second fixing blocks 11, the lower ends of the telescopic rods 8 are fixedly arranged between the two second fixing blocks 11 through third bolts 12 and second nuts 13, and the two sides of the upper surface of each supporting block 10 are fixedly arranged on the surface of the base surface 1 through fourth bolts 14.
Two fifth bolts 15 are symmetrically arranged on the circumferential wall of the fixing ring 3, and the fixing ring 3 is fixedly arranged on the column wall of the concrete separation column 2 through the fifth bolts 15.
The utility model discloses in, during the use, the staff will fix solid fixed ring 3 cover on the axle wall of concrete partition post 2 and will fix on the column wall of concrete partition post 2 through fifth bolt 15, then staff adjusting sleeve 5's angle and fix supporting shoe 10 on the surface of base face 1 through fourth bolt 14, it is fixed and with fixing between telescopic link 8 and supporting shoe 10 with screwing up between third bolt 12 and second nut 13 thereupon, later with screwing up second bolt 9 and with fixing between sleeve 5 and the telescopic link 8, at last rethread first bolt 6 and second nut 7 with sleeve 5 and solid fixed ring 3 between fixed, can provide a firm supporting role for concrete partition post 2, thereby can guarantee the support security of concrete partition post 2 to the building.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A concrete construction interval separation structure of slag admixture comprises a base surface (1) and a concrete separation column (2), and is characterized in that a fixing ring (3) is fixedly arranged in the middle of the column wall of the concrete separation column (2), two first fixing blocks (4) are symmetrically and fixedly arranged on the left side and the right side of the fixing ring (3), a sleeve (5) is arranged between the two first fixing blocks (4), the bottom of the sleeve (5) is fixedly connected with a first nut (7) through a first bolt (6), a telescopic rod (8) is slidably arranged in the sleeve (5), a second bolt (9) is arranged on the thread of the cylinder wall of the sleeve (5) through a threaded hole, the rod wall of the telescopic rod (8) is fixedly connected with the sleeve (5) through a second bolt (9), and a support mechanism is arranged at the lower end of the telescopic rod (8), the lower end of the telescopic rod (8) is fixedly arranged on the surface of the base surface (1) through a supporting mechanism.
2. The concrete construction interval partition structure of a slag admixture according to claim 1, wherein said supporting mechanism comprises a supporting block (10) and second fixed blocks (11), said second fixed blocks (11) are symmetrically and fixedly disposed on the upper surface of said supporting block (10), the lower end of said telescopic rod (8) extends between two said second fixed blocks (11), and the lower end of the telescopic rod (8) is fixedly disposed between two said second fixed blocks (11) through a third bolt (12) and a second nut (13), and both sides of the upper surface of said supporting block (10) are fixedly disposed on the surface of said base surface (1) through a fourth bolt (14).
3. The concrete construction interval partition structure of a slag admixture according to claim 1, wherein two fifth bolts (15) are symmetrically provided to the circumferential wall of said fixing ring (3), and said fixing ring (3) is fixedly provided to the column wall of said concrete partition column (2) by means of the fifth bolts (15).
4. The concrete construction interval partition structure of slag admixture according to claim 1, wherein said concrete partition columns (2) and said base surface (1) are formed by pre-injection molding.
5. The concrete construction interval partition structure of a slag admixture according to claim 1, wherein said sleeve (5) is a square tube and said expansion link (8) is a square rod.
CN202021899456.3U 2020-09-03 2020-09-03 Concrete construction interval separation structure of slag admixture Active CN213979584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021899456.3U CN213979584U (en) 2020-09-03 2020-09-03 Concrete construction interval separation structure of slag admixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021899456.3U CN213979584U (en) 2020-09-03 2020-09-03 Concrete construction interval separation structure of slag admixture

Publications (1)

Publication Number Publication Date
CN213979584U true CN213979584U (en) 2021-08-17

Family

ID=77253137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021899456.3U Active CN213979584U (en) 2020-09-03 2020-09-03 Concrete construction interval separation structure of slag admixture

Country Status (1)

Country Link
CN (1) CN213979584U (en)

Similar Documents

Publication Publication Date Title
CN204552087U (en) A kind of steel column foot concrete blinding construction equipment
CN111364795A (en) Shock resistance ancient building foundation reinforced structure
CN213979584U (en) Concrete construction interval separation structure of slag admixture
CN218061413U (en) Pre-buried device is used in fixed of bulky concrete form
CN213143493U (en) Steel sheet shear force wall quick positioning connection structure in assembly type structure
CN206295425U (en) A kind of folded form is transfusion bed
CN213268849U (en) Building brace rod with adjustable length
CN112723094A (en) Integrated wall-attached device based on synchronous climbing of light steel platform
CN113638585A (en) High-strength light honeycomb truss type support system
CN210239339U (en) Building rail convenient to assembly connection
CN208950292U (en) A kind of building built connection structure
CN112127497A (en) Civil engineering antidetonation structure
CN209837658U (en) Special fastener for outer rod of cross brace of fastener type steel pipe scaffold
CN208733817U (en) A kind of assembling type steel structure building Special-Shaped Column
CN204590563U (en) A kind of Novel dismountable scaffold
CN111335357A (en) Pipe gallery formwork supporting system and construction method thereof
CN203499235U (en) Structure for locating scaffold
CN218114859U (en) Mounting structure of tower crane basis
CN219773575U (en) Multifunctional building safety protection scaffold board frame board
CN218375533U (en) Prefabricated floor bearing structure
CN218061705U (en) Earthquake-resistant structure for integrated house
CN217841135U (en) Detachable railing
CN218815175U (en) Aluminum alloy template for building construction
CN215484207U (en) Green building design is with concatenation formula roof safety barrier
CN207846908U (en) A kind of aluminum section bar guardrail of Fast Installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant