Rapid modeling system for characteristic cultural building
Technical Field
The utility model relates to a chinese characteristic culture building technical field specifically is a quick modeling system of characteristic culture building.
Background
The building art source is far from growing, the building art styles of different regions and nationalities are different, but the traditional buildings have common characteristics in aspects of group layout, space, structure, building materials, decoration art and the like, are different from the western world, enjoy the world and have a plurality of types of cultural buildings, mainly comprise palace, temple, pagoda, dwelling, garden buildings and the like, on the building concept, the ancient buildings embody clear ceremony concept, the emphasis level embodies strict regulations on shape, color, scale, structure, components and the like, the building form is perfected to a certain extent, but the development of the buildings is limited, simultaneously, in the development process of the ancient buildings of the same form of the natural concept of the same style of the heaven and man, the buildings are emphasized, the city sites are selected, the construction is made according to the conditions of the places, the landscape embodiment is particularly obvious, the strength is strong.
The existing Chinese characteristic culture building modeling system is inconvenient for centralized storage of data of characteristic culture buildings in the using process and carries out classified modeling according to building data, so that the modeling efficiency of the characteristic culture buildings is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick modeling system of characteristic culture building possesses the efficient advantage, has solved the in-process that current chinese characteristic culture building modeling system was using, is not convenient for concentrate the storage to the data of characteristic culture building to carry out classification modeling according to building data, reduced the problem of characteristic culture building modeling efficiency.
In order to achieve the above object, the utility model provides a following technical scheme: a rapid modeling system for a characteristic cultural building comprises a data centralized storage server, wherein the input end of the data centralized storage server is respectively in signal connection with a building position positioning module, a building surveying and mapping module and a building image shooting module, the data centralized storage server is in bidirectional electrical connection with a data management module, the output end of the data centralized storage server is respectively in signal connection with a first building modeling module, a second building modeling module and a third building modeling module, the output ends of the first building modeling module, the second building modeling module and the third building modeling module are in signal connection with a model storage server, the model storage server is in bidirectional electrical connection with a data storage backup module, the output end of the model storage server is in electrical connection with a modeling printing module, and the model storage server is respectively in bidirectional signal connection with a cloud storage server and a model integration module, the cloud storage server is connected with a mobile terminal in a bidirectional signal mode, the first building modeling module comprises a modeling server, the output end of the modeling server is respectively and electrically connected with a building image display and a model display, and the modeling server is connected with a building modeling tool in a bidirectional signal mode.
Preferably, the output end of the building modeling tool is in signal connection with the input end of the model storage server, and the input end of the modeling server is in signal connection with the output end of the data centralized storage server.
Preferably, the building position positioning module is a GPS positioning module, and the building surveying and mapping module is a three-dimensional laser surveying and mapping instrument.
Preferably, the architectural image shooting module is a high-definition camera, and the data storage backup module is a solid hard disk set.
Preferably, the building printing module is a 3D printer, and the mobile terminal is a smart phone.
Preferably, the second building modeling module and the third building modeling module are the same as the first building modeling module, and the building image display and the model display are both high-definition displays.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a data concentration storage server, the data management module, first building modeling module, the second building modeling module, the third building modeling module, model storage server, the backup module of data storage, the cooperation of model integration module and cloud storage server is used, the in-process of current chinese characteristic culture building modeling system in the use has been solved, be not convenient for concentrate the storage to the data of characteristic culture building, and carry out the categorised modeling according to building data, the problem of characteristic culture building modeling efficiency has been reduced.
2. The utility model discloses a set up building position orientation module, can be convenient for gather cultural building's spatial information, through setting up building mapping module, can be convenient for measure cultural building's three-dimensional data, shoot the module through setting up the building image, can be convenient for shoot cultural building, concentrate the storage server through setting up the data, can be convenient for concentrate the storage to cultural building's data, through setting up data management module, can be convenient for manage the building data who stores, through first building modeling module, second building modeling module and third building modeling module's cooperation is used, can be convenient for carry out the classification modeling to cultural building's different positions.
Drawings
FIG. 1 is a schematic diagram of the system of the present invention;
fig. 2 is a schematic diagram of a first building modeling module of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-2, a rapid modeling system for characteristic cultural buildings comprises a data centralized storage server, a building location positioning module, a building mapping module and a building image shooting module, wherein the data centralized storage server is arranged to facilitate centralized storage of data of the cultural buildings, the input end of the data centralized storage server is respectively in signal connection with the building location positioning module, the building mapping module and the building image shooting module, the building location positioning module is arranged to facilitate acquisition of spatial information of the cultural buildings, the building mapping module is arranged to facilitate measurement of three-dimensional data of the cultural buildings, the building image shooting module is arranged to facilitate shooting of the cultural buildings, the building location positioning module is a GPS positioning module, the building mapping module is a three-dimensional laser mapper, the building image shooting module is a high-definition camera, and the data centralized storage server is electrically connected with a data management module in two directions, the data management module is arranged to facilitate management of stored building data, the output end of the data centralized storage server is respectively connected with the first building modeling module, the second building modeling module and the third building modeling module through signals, and classification modeling can be conveniently carried out on different positions of cultural buildings through the matching use of the first building modeling module, the second building modeling module and the third building modeling module are the same as the first building modeling module, the output ends of the first building modeling module, the second building modeling module and the third building modeling module are connected with the model storage server through signals, the model storage server is electrically connected with the data storage backup module in a bidirectional way, the data storage backup module is a solid hard disk set, and the output end of the model storage server is electrically connected with the modeling printing module, the model storage server is respectively in bidirectional signal connection with a cloud storage server and a model integration module, the building printing module is a 3D printer, the cloud storage server is in bidirectional signal connection with a mobile terminal, the mobile terminal is a smart phone, the first building modeling module comprises a modeling server, the output end of the modeling server is respectively and electrically connected with a building image display and a model display, the building image display and the model display are high-definition displays, the modeling server is in bidirectional signal connection with a building modeling tool, the output end of the building modeling tool is in signal connection with the input end of the model storage server, the input end of the modeling server is in signal connection with the output end of the data centralized storage server, and the data management module, the first building modeling module, the second building modeling module, the third building modeling module is connected to the second building modeling module, the second building modeling module is connected to the second building model, the second building model is different types are different from the second building model, the second building model is different types are different from the building models, and different types are different, and different from the different types are different from the building models are different, and different in different from the different types are different in different, and different in different types are different in different types, and different types are different in different types are different types, and different types are different types, and different types are different in different types, and different types are different types, and different in different types are different in different types, and different types are different in different types, and different types, the model storage server, the data storage backup module, the model integration module and the cloud storage server are matched for use, and the problem that the characteristic culture building modeling efficiency is reduced because the data of the characteristic culture building are not conveniently stored in a centralized manner and the classified modeling is carried out according to the building data in the using process of the existing Chinese characteristic culture building modeling system is solved.
When the system is used, the building position positioning module positions position information of cultural buildings, the building surveying and mapping module measures three-dimensional information of the cultural buildings, the building image shooting module shoots the cultural buildings, the collected cultural building information is transmitted to the data centralized storage server to be stored in a centralized mode, the data management module manages the collected cultural building information, the first building modeling module, the second building modeling module and the third building modeling module receive the cultural building data in the data centralized storage server and perform classified modeling on different positions of the cultural buildings according to the cultural building data, the modeling data are transmitted to the model storage server after the modeling is completed, the model storage server transmits the modeling data to the data backup module to backup the modeling data, and the model integration module receives the model data in the model storage server, and combining the cultural building models, transmitting the combined cultural building models into a cloud storage server for storage, transmitting the combined cultural building models into a modeling and printing module, and printing the solid cultural building models.
In summary, the following steps: the rapid modeling system for the Chinese characteristic cultural building solves the problem that the existing Chinese characteristic cultural building modeling system is inconvenient to store data of characteristic cultural buildings in a centralized mode in the using process and is classified and modeled according to building data, and the modeling efficiency of the characteristic cultural building is reduced by matching the data centralized storage server, the data management module, the first building modeling module, the second building modeling module, the third building modeling module, the model storage server, the data storage backup module, the model integration module and the cloud storage server.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.