CN213954683U - Buffering energy-consumption shockproof building connection structure - Google Patents

Buffering energy-consumption shockproof building connection structure Download PDF

Info

Publication number
CN213954683U
CN213954683U CN202022825980.2U CN202022825980U CN213954683U CN 213954683 U CN213954683 U CN 213954683U CN 202022825980 U CN202022825980 U CN 202022825980U CN 213954683 U CN213954683 U CN 213954683U
Authority
CN
China
Prior art keywords
connection structure
pipeline
clamping device
shock
main part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022825980.2U
Other languages
Chinese (zh)
Inventor
王德海
王胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN202022825980.2U priority Critical patent/CN213954683U/en
Application granted granted Critical
Publication of CN213954683U publication Critical patent/CN213954683U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a shock-absorbing building connection structure with energy consumption buffering function, which comprises a main body, a fixed block, a pipeline, a shock-absorbing device, a clamping device, a bolt and a limiting rod, wherein the pipeline is arranged below the main body, the clamping device is arranged on two sides of the pipeline and comprises a rotating shaft, a rubber pad and a buckle, the bottom of the main body is connected with the shock-absorbing device in a welding mode, the spring is fixedly connected with the inner part of the shock-absorbing device, the spring is connected with a suspender in a welding mode, the bottom of the suspender is fixedly connected with a supporting plate, the shock-absorbing device is arranged below the main body, the main beneficial advantage is that the shock-absorbing device buffers the shock feeling transmitted from the supporting plate by a plurality of springs inside, the buffering efficiency of the device is improved, the stability of the connection part of the main body and a wall is kept, the clamping device is arranged below the shock-absorbing device, and the main beneficial is not only convenient for installing and dismantling the pipeline, and the rubber pad inside can carry out the secondary buffering when protecting the pipeline.

Description

Buffering energy-consumption shockproof building connection structure
Technical Field
The utility model relates to a connect fixed technical field, specifically be a shockproof building connection structure of buffering power consumption.
Background
The water pipe is a water supply pipeline, modern decoration water pipes are constructed in a wall-buried mode, the water pipes are classified into three types, and the first type is a metal pipe, such as a hot-dip cast iron pipe with inner enamel plastics, a copper pipe, a stainless steel pipe and the like. The second type is plastic-clad metal pipes, such as steel-plastic composite pipes, aluminum-plastic composite pipes and the like;
many building sites need give the top installation pipeline of wall body when building the high building, and the device of many fixed pipelines mostly only has simple cable wire, and current building pipe connection structure has following problem: 1. current building pipe connection structure is in pipeline fortune water, can be because the pressure of drawing water from downstairs, lead to the pipeline to shake in disorder, cause the problem that the junction of pipeline appears droing, 2. the most simple structure of current building pipe connection structure, not only fixed effect is poor, and the hard damage that can lead to the fact the pipeline in fixed position moreover, 3. the most function singleness of current building pipe connection structure, not only poor stability, and fixed structure has the problem of installation and dismantlement not convenient for moreover.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a shockproof building connection structure of buffering power consumption has solved current building pipe connection structure and has had following problem through having installed bradyseism device, block device and fixed block: 1. current building pipe connection structure is in pipeline fortune water, can be because the pressure of drawing water from downstairs, lead to the pipeline to shake in disorder, cause the problem that the junction of pipeline appears droing, 2. the most simple structure of current building pipe connection structure, not only fixed effect is poor, and the hard damage that can lead to the fact the pipeline in fixed position moreover, 3. the most function singleness of current building pipe connection structure, not only poor stability, and fixed structure has the problem of installation and dismantlement not convenient for moreover.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a shockproof building connection structure of buffering power consumption, includes main part, fixed block, pipeline, bradyseism device, clamping device, bolt, screw and gag lever post, the both sides of main part are equipped with the fixed block, the below of main part is equipped with the pipeline, the both sides of pipeline are equipped with clamping device, clamping device includes pivot, rubber pad and buckle, bradyseism device is connected through the welded mode in the bottom of main part, the inside fixed connection spring of bradyseism device, the jib is connected through the welded mode to the spring, the bottom fixed connection backup pad of jib.
Preferably, the left side of the clamping device is fixedly connected with the rotating shaft, the right side of the clamping device is fixedly connected with the buckle, and the inner side of the clamping device is connected with the rubber pad in a tabling mode.
Preferably, the main part is connected the fixed block through the welded mode, the fixed block is the symmetric distribution form, the fixed block passes through threaded connection bolt.
Preferably, the inside of the main body is connected with a limiting rod in a welding mode, and the limiting rod is connected with a balancing rod in a welding mode.
Preferably, the limiting rod is fixedly connected with the cushioning device, and the exterior of the cushioning device is fixedly connected with the screw hole.
Preferably, the clamping device is fixedly connected with the shock absorption device, and the clamping device is connected with the pipeline in an embedding mode.
(III) advantageous effects
The utility model provides a shockproof building connection structure of buffering power consumption. The method has the following beneficial effects:
(1) this shockproof building connection structure of buffering power consumption, the bradyseism device is connected through the welded mode through the bottom of main part, the inside fixed connection spring of bradyseism device, the jib is connected through the welded mode to the spring, the bottom fixed connection backup pad of jib, the bradyseism device has been installed in the below of main part, main beneficial benefit is exactly that the sense of vibration that transmits for the backup pad through inside a plurality of springs cushions, improve the efficiency that this device cushions, keep the stability of main part and wall junction.
(2) This buffering power consumption building connection structure that takes precautions against earthquakes, left side fixed connection pivot through block device, block device's right side fixed connection buckle, the rubber pad is connected through the mode of gomphosis to block device's inboard, has installed block device in the below of bradyseism device, and main beneficial benefit is not only convenient for install and dismantle the pipeline, carries out the secondary buffering when the inside rubber pad can protect the pipeline moreover.
(3) This shockproof building connection structure of buffering power consumption passes through the main part and connects the fixed block through the welded mode, and the fixed block passes through threaded connection bolt, has installed the fixed block of symmetry in the both sides of main part, and main beneficial is exactly as the contact surface through the fixed block, protects the main part to can improve the fixity of this device in convenient to installation dismantlement.
Drawings
Fig. 1 is a schematic overall structure diagram of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
FIG. 3 is a schematic structural view of the shock absorber of the present invention;
fig. 4 is a schematic structural view of the fastening device of the present invention.
In the figure, a main body-1, a fixed block-2, a pipeline-3, a cushioning device-4, a spring-41, a hanging rod-42, a supporting plate-43, a clamping device-5, a rotating shaft-51, a rubber pad-52, a buckle-53, a bolt-6, a screw hole-7, a balancing rod-8 and a limiting rod-9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention provides a technical solution: a shock-absorbing and energy-dissipating building connecting structure comprises a main body 1, fixing blocks 2, pipelines 3, shock absorbing devices 4, clamping devices 5, bolts 6, screw holes 7 and limiting rods 9, wherein the fixing blocks 2 are arranged on two sides of the main body 1, the pipelines 3 are arranged below the main body 1, the clamping devices 5 are arranged on two sides of each pipeline 3, each clamping device 5 comprises a rotating shaft 51, a rubber pad 52 and a buckle 53, the bottom of the main body 1 is connected with the shock absorbing devices 4 in a welding mode, the interior of each shock absorbing device 4 is fixedly connected with a spring 41, the spring 41 is connected with a suspender 42 in a welding mode, the bottom of the suspender 42 is fixedly connected with a supporting plate 43, the shock absorbing devices 4 are arranged below the main body 1, and the shock absorbing device has the main beneficial effects that the shock absorbing effect transmitted from the supporting plate 43 through a plurality of springs 41 inside the shock absorbing device is improved, the stability of the connection of the body 1 to the wall is maintained.
The left side fixed connection pivot 51 of blocking device 5, the right side fixed connection buckle 53 of blocking device 5, the inboard of blocking device 5 is through the mode connection rubber pad 52 of gomphosis, has installed blocking device 5 in the below of bradyseism device 4, and the main beneficial benefit not only is convenient for install and dismantle pipeline 3, carries out the secondary buffering when inside rubber pad 52 can protect pipeline 3 moreover.
Main part 1 connects fixed block 2 through the welded mode, fixed block 2 is the symmetric distribution form, fixed block 2 passes through threaded connection bolt 6, has installed the fixed block 2 of symmetry in main part 1's both sides, and main beneficial benefit is exactly as the contact surface through fixed block 2, protects main part 1 to can improve the fixity of this device when the installation of being convenient for is dismantled.
The main part 1 is inside to be connected gag lever post 9 through the welded mode, gag lever post 8 is connected through the welded mode to gag lever post 9, through at the internally mounted of main part 1 gag lever post 9, and main beneficial benefit is exactly to provide the strong point for bradyseism device 4, the balance of fixed main part 1.
9 fixed connection bradyseism device 4 of gag lever post, bradyseism device 4 outside fixed connection screw 7, through the externally mounted screw 7 at bradyseism device 4, main beneficial benefit can use the fixed block device 5 of bolt 7, and the cooperation 3 width of pipeline is fixed.
The clamping device 5 is fixedly connected with the cushioning device 4, the clamping device 5 is connected with the pipeline 3 in an embedded mode, the pipeline 3 is arranged in the clamping device 5, and the main beneficial effect is that the main body 1 can be balanced and fixed through the symmetrical clamping devices 5 through the arrangement positions of the pipeline 3.
The working principle is as follows: when the device is used, the fixing blocks 2 on two sides of the main body 1 are placed at the appointed positions, then the bolts 6 are inserted into the fixing blocks 2 in an embedding mode, the bolts 6 are rotated to enable the fixing blocks 2 to drive the main body 1 to be tightly attached to the wall, after the fixing is completed, the pipeline 3 is placed into the clamping device 5 in the embedding mode, then the clamping device 5 is pushed, the rotating shaft 51 is forced to drive the clamping device 5 to rotate around the rotating shaft 51, the buckle 53 on the right side of the clamping device 5 is inserted into the cushioning device 4 in the embedding mode, then the bolts 6 are inserted into the screw holes 7 on the outer portion of the cushioning device 4, the bolts 6 are rotated to enable the bolts 6 to move towards the interior of the cushioning device 4, the bolts 6 tightly extrude the buckle 53, the pipeline 3 is put into use after being fixed, the pipeline 3 vibrates due to the water flow speed in the interior when the pipeline 3 runs, the rubber pad 52 inside the engaging device 5 is buffered for the first time during vibration, then the vibration is transmitted to the spring 41 through the supporting plate 43, the spring 41 is stressed to contract to buffer the vibration, the main body 1 is kept from shaking, and the connecting stability of the main body 1 is improved.
The utility model discloses a main part 1, fixed block 2, pipeline 3, bradyseism device 4, spring 41, jib 42, backup pad 43, clamping device 5, pivot 51, rubber pad 52, buckle 53, bolt 6, screw 7, balancing pole 8, gag lever post 9, the part is the part that general standard component or technical personnel in the field know, and its structure and principle all are this technical staff all can learn through the technical manual or learn through conventional experimental method, the utility model provides a problem be current building pipe connection simple structure, problem that the function is single, the utility model discloses a make up each other of above-mentioned parts has solved current building pipe connection structure and has had following problem: 1. current building pipe connection structure is in pipeline fortune water, can be because the pressure of drawing water from downstairs, lead to the pipeline to shake in disorder, cause the problem that the junction of pipeline appears droing, 2. the most simple structure of current building pipe connection structure, not only fixed effect is poor, and the hard damage that can lead to the fact the pipeline in fixed position moreover, 3. the most function singleness of current building pipe connection structure, not only poor stability, and fixed structure has the problem of installation and dismantlement not convenient for moreover.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a shockproof building connection structure of buffering power consumption which characterized in that: including main part (1), fixed block (2), pipeline (3), bradyseism device (4), clamping device (5), bolt (6), screw (7) and gag lever post (9), the both sides of main part (1) are equipped with fixed block (2), the below of main part (1) is equipped with pipeline (3), the both sides of pipeline (3) are equipped with clamping device (5), clamping device (5) are including pivot (51), rubber pad (52) and buckle (53), bradyseism device (4) is connected through the welded mode to the bottom of main part (1), inside fixed connection spring (41) of bradyseism device (4), jib (42) are connected through the welded mode in spring (41), bottom fixed connection backup pad (43) of jib (42).
2. The connection structure of claim 1, wherein the connection structure comprises: the left side of the clamping device (5) is fixedly connected with a rotating shaft (51), the right side of the clamping device (5) is fixedly connected with a buckle (53), and the inner side of the clamping device (5) is connected with a rubber pad (52) in a tabling mode.
3. The connection structure of claim 1, wherein the connection structure comprises: the main part (1) is connected with the fixing block (2) in a welding mode, the fixing block (2) is symmetrically distributed, and the fixing block (2) is connected with the bolt (6) through threads.
4. The connection structure of claim 1, wherein the connection structure comprises: the main part (1) is internally connected with a limiting rod (9) in a welding mode, and the limiting rod (9) is connected with a balancing rod (8) in a welding mode.
5. The connection structure of claim 1, wherein the connection structure comprises: the limiting rod (9) is fixedly connected with the cushioning device (4), and the exterior of the cushioning device (4) is fixedly connected with the screw hole (7).
6. The connection structure of claim 1, wherein the connection structure comprises: the clamping device (5) is fixedly connected with the shock absorption device (4), and the clamping device (5) is connected with the pipeline (3) in an embedded mode.
CN202022825980.2U 2020-11-30 2020-11-30 Buffering energy-consumption shockproof building connection structure Active CN213954683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022825980.2U CN213954683U (en) 2020-11-30 2020-11-30 Buffering energy-consumption shockproof building connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022825980.2U CN213954683U (en) 2020-11-30 2020-11-30 Buffering energy-consumption shockproof building connection structure

Publications (1)

Publication Number Publication Date
CN213954683U true CN213954683U (en) 2021-08-13

Family

ID=77212836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022825980.2U Active CN213954683U (en) 2020-11-30 2020-11-30 Buffering energy-consumption shockproof building connection structure

Country Status (1)

Country Link
CN (1) CN213954683U (en)

Similar Documents

Publication Publication Date Title
CN102032396A (en) Damping insulated flame-retardant energy-saving pipe holder
CN206458900U (en) A kind of para-seismic support for pipes
CN213954683U (en) Buffering energy-consumption shockproof building connection structure
CN202167814U (en) Flexible fixing device for vertical laying of cable with large cross-section
CN109378570B (en) Safe and reliable's network basic station antenna erection support
CN112377556B (en) Combined vibration damper for suspension tunnel pipe body and anchor cable
CN114811268A (en) Magnetic absorption type vibration reduction hammer
CN111155362B (en) Floating slab track unit
CN107740520B (en) High strength curtain bearing structure for building
CN211950745U (en) Bridge deck suspension type wind power generation device
CN103233542A (en) Inverted supporting hanging rod and construction method thereof
CN202625664U (en) Attaching and connecting plate in tower crane for assembling steel tube tower
CN216843438U (en) Light pipeline anti-seismic support
CN201908379U (en) Connection fixture for stay rope glass curtain walls
CN108953331A (en) Antidetonation attachment base
CN210770657U (en) Pipeline fixing device is used in hydraulic and hydroelectric engineering construction
CN214790174U (en) Sectional type combination monitoring rod
CN214786311U (en) Rain-shielding sun-proof device for building construction
CN214618215U (en) Electromechanical shock-absorbing support
CN214662882U (en) Main oil supply pipeline support of speed regulator
CN217984468U (en) Wind-water-electricity installation engineering pipe gallery fixing frame convenient for limiting cables
CN220813990U (en) Anti-seismic support structure for comprehensive pipe rack
CN213776796U (en) Connecting and stabilizing device for water supply and drainage pipe
CN214618203U (en) Water pipe antidetonation reinforcing support for building
CN212203395U (en) Anti-seismic support hanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant