CN213952120U - River course brick of convenient equipment - Google Patents

River course brick of convenient equipment Download PDF

Info

Publication number
CN213952120U
CN213952120U CN202022445917.6U CN202022445917U CN213952120U CN 213952120 U CN213952120 U CN 213952120U CN 202022445917 U CN202022445917 U CN 202022445917U CN 213952120 U CN213952120 U CN 213952120U
Authority
CN
China
Prior art keywords
layer
hole
top surface
river course
fretwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022445917.6U
Other languages
Chinese (zh)
Inventor
马积兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hexian Feijun New Building Materials Co ltd
Original Assignee
Hexian Feijun New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hexian Feijun New Building Materials Co ltd filed Critical Hexian Feijun New Building Materials Co ltd
Priority to CN202022445917.6U priority Critical patent/CN213952120U/en
Application granted granted Critical
Publication of CN213952120U publication Critical patent/CN213952120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a river course brick technical field just discloses a river course brick of convenient equipment, including river course brick body, the inside three-layer that contains of river course brick body, first layer are the fretwork layer and the solid layer of third layer for leaking water layer, second floor, it includes first top surface, first hole, second hole, sand grip and first bottom surface to leak the water layer, the fretwork layer includes second top surface, first recess, lug, second bottom surface and fretwork groove, the solid layer includes third top surface, second recess and third bottom surface. This river course brick of convenient equipment through at the internal portion of leaking the water course and install first hole and second hole, and the second hole is greater than first hole, and rivers leak down through first hole and come out from the second hole, and when river course precipitation, circulate first hole through the second hole, and because the second hole can cause certain pressure than first hole greatly, wash the outside of first hole, reached the not obstructed beneficial effect of rubbish.

Description

River course brick of convenient equipment
Technical Field
The utility model relates to a river course brick technical field specifically is a river course brick of convenient equipment.
Background
In the course that the river course was seted up, need carry out laying of river course brick in the slope bank of the both sides of river course, strengthen consolidating through the river course brick to the slope bank of river course both sides or river course.
Although the river course brick on the existing market is convenient to assemble, the function of leaking is not strong, and through whole fretwork, through bottom and soil contact, the slow water that lets gets into the soil still can have rubbish simultaneously to block up inside, and is extremely inconvenient to the clearance.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a river course brick of convenient equipment possesses the fast that leaks, and rubbish advantage such as unblock has solved above-mentioned technical problem.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a river course brick of convenient equipment, includes river course brick body, river course brick body is inside to contain the three-layer, and the first layer is for leaking water layer, second floor and the third layer is solid layer, it includes first top surface, first hole, second hole, sand grip and first bottom surface to leak the water layer, fretwork layer includes second top surface, first recess, lug, second bottom surface and fretwork groove, solid layer includes third top surface, second recess and third bottom surface.
Preferably, the water leakage layer, the hollow layer and the solid layer are located inside the river brick body, the water leakage layer is located at the top of the hollow layer and is movably connected with the hollow layer, the hollow layer is located at the top of the solid layer, and the hollow layer is sleeved with the solid layer.
Through above-mentioned technical scheme, through leaking water layer and fretwork layer sliding connection, easy to assemble cup joints through the fretwork layer and the layer that leaks, easy to assemble can one deck cover one deck, has reached the benefit of convenient equipment.
Preferably, the first top surface is located on the top surface of the water leakage layer, the first hole is formed in the top of the first top surface, the second hole is formed in the bottom of the first bottom surface, the protruding strip is installed at the bottom of the first bottom surface and is fixedly connected with the first bottom surface, and the first bottom surface is located at the bottom of the water leakage layer.
Through the technical scheme, the first top surface is arranged on the top surface of the water leakage layer, the first holes are formed in the surface of the first top surface, the number of the first holes is seventeen, water on the surface can flow down through the first holes, the bottom of the first bottom surface is formed through the second holes, the second holes are communicated with the first holes and are larger than the first holes, blocking of garbage can be effectively avoided, meanwhile, the river channel brick body is installed in an inclined mode, water can be discharged through the first holes and the second holes below, garbage in the first holes can be effectively cleaned while the water is discharged, meanwhile, a certain washing effect can be achieved on the first top surface, the sand grip is fixedly installed at the bottom of the first bottom surface, and sliding connection can be conducted on the hollow layer below.
Preferably, the second top surface is located at the top of the hollowed-out layer, the first groove is formed in the top of the second top surface, the bump is installed at the bottom of the second bottom surface and is fixedly connected with the second bottom surface, and the hollowed-out groove is formed inside the hollowed-out layer.
Through above-mentioned technical scheme, through installing the second top surface at fretwork layer top, and second top surface has seted up first recess, can carry out sliding connection with the layer that leaks, through at fretwork layer bottom fixedly connected with lug, and the shape of lug is cylindrical, can cup joint solid layer, sets up inside the fretwork layer through the fretwork groove, can circulate the water of fretwork layer inside, has avoided blockking up.
Preferably, the third top surface is located solid layer top, the second recess is seted up at third top surface top, the third bottom surface is located solid layer bottom.
Through above-mentioned technical scheme, through installing the third top surface at solid bed top, and the second recess is seted up at third top surface, can make things convenient for fretwork layer bottom fixed connection's lug to inlay it, installs in the solid bed bottom through the third bottom surface, and the solid bed leads to the body to adopt and to have certain unevenness's surface, has increased self frictional force.
Compared with the prior art, the utility model provides a river course brick of convenient equipment possesses following beneficial effect:
1. this river course brick of convenient equipment through installation fretwork layer and solid layer, through the inside fretwork groove in fretwork layer, can carry out quick leaking, has reached the quick beneficial effect of the speed of leaking.
2. This river course brick of convenient equipment through at the internal portion of leaking the water course and install first hole and second hole, and the second hole is greater than first hole to the two link up, rivers leak down through first hole and come out from the second hole, when river course precipitation, because the slope relation, circulate first hole through the second hole, and because the second hole can cause certain pressure than first hole greatly, wash the outside of first hole, reached the not obstructed beneficial effect of rubbish.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a top view of the river brick body of the structure of the present invention;
fig. 3 is a bottom schematic view of the river brick body of the structure of the utility model;
fig. 4 is the utility model discloses side schematic diagram is disassembled to structure river brick body.
Wherein: 1. a river brick body; 2. a water leakage layer; 201. a first top surface; 202. a first hole; 203. A second hole; 204. a convex strip; 205. a first bottom surface; 3. a hollowed-out layer; 301. a second top surface; 302. A first groove; 303. a bump; 304. a second bottom surface; 305. hollowing out the grooves; 4. a solid layer; 401. a third top surface; 402. a second groove; 403. and a third bottom surface.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, a river brick convenient to assemble includes a river brick body 1, the interior of the river brick body 1 includes three layers, the first layer is a water leakage layer 2, the second layer is a hollow layer 3, and the third layer is a solid layer 4, the water leakage layer 2 includes a first top surface 201, a first hole 202, a second hole 203, a protruding strip 204, and a first bottom surface 205, the hollow layer 3 includes a second top surface 301, a first groove 302, a protruding block 303, a second bottom surface 304, and a hollow groove 305, and the solid layer 4 includes a third top surface 401, a second groove 402, and a third bottom surface 403.
Specifically, leak water layer 2, fretwork layer 3 and solid layer 4 are located inside river course brick body 1, it is located fretwork layer 3 top to leak water layer 2, leak water layer 2 and fretwork layer 3 swing joint, fretwork layer 3 is located solid layer 4 top, fretwork layer 3 cup joints with solid layer 4, the advantage is through leaking water layer 2 and fretwork layer 3 sliding connection, easy to assemble, cup joint with water layer 2 through fretwork layer 3, easy to assemble, can one deck cover one deck, the benefit of convenient equipment has been reached.
Specifically, the first top surface 201 is located on the top surface of the water leakage layer 2, the first holes 202 are formed on the top of the first top surface 201, the second holes 203 are formed on the bottom of the first bottom surface 205, the ribs 204 are installed on the bottom of the first bottom surface 205 and fixedly connected with the first bottom surface 205, and the first bottom surface 205 is located on the bottom of the water leakage layer 2. the advantage is that the first top surface 201 is formed on the top surface of the water leakage layer 2, the first holes 202 are formed on the surface of the first top surface 201, the number of the first holes 202 is seventeen, so that the water on the surface can flow down through the plurality of the first holes 202, the water can flow down through the second holes 203 formed on the bottom of the first bottom surface 205 and is communicated with the first holes 202 through the second holes 203, and the second holes 203 are larger than the first holes 202, so that the blockage of the garbage can be effectively avoided, and the water can be discharged through the first holes 202 and the second holes 203 below due to the inclined installation of the river brick body 1, the waste that can effectual clearance first hole 202 when the exhaust can play certain washing effect to first top surface 201 simultaneously, through sand grip 204 fixed mounting in first bottom surface 205 bottom, can carry out sliding connection to the fretwork layer 3 of below.
Specifically, second top surface 301 is located fretwork layer 3 top, first recess 302 is seted up at second top surface 301 top, lug 303 is installed in second bottom surface 304 bottom, and with second bottom surface 304 fixed connection, fretwork groove 305 is seted up inside fretwork layer 3, the advantage is through installing the second top surface at fretwork layer 3 top, and first recess 302 has been seted up on second top surface 301 top surface, can carry out sliding connection with layer 2 that leaks, through fixedly connected with lug 303 in fretwork layer 3 bottom, and the shape of lug 303 is cylindrical, can cup joint solid layer 4, set up inside fretwork layer 3 through fretwork groove 305, can circulate the inside water of fretwork layer 3, the jam has been avoided.
Specifically, third top surface 401 is located solid layer 4 top, second recess 402 is seted up at third top surface 401 top, third bottom surface 403 is located solid layer 4 bottom, the advantage is through installing third top surface 401 at solid layer 4 top, and second recess 402 is seted up at third top surface 401 top surface, can make things convenient for the lug 303 of 3 bottom fixed connection in fretwork layer to inlay it, install in solid layer 4 bottom through third bottom surface 403, and solid layer 4 general body adopts and has certain unevenness's surface, self frictional force has been increased.
When using, through installing solid layer 4 bottommost, fretwork layer 3 is connected with solid layer 4 through cup jointing, and the layer 2 that leaks is connected with fretwork layer 3 through sliding connection to accomplish installation river course brick body 1, the shape through river course brick body 1 simultaneously is regular hexagon, can carry out quick equipment.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a river course brick of convenient equipment, includes river course brick body (1), its characterized in that: river course brick body (1) is inside to contain the three-layer, and first layer is for leaking water layer (2), second floor and the third layer is solid layer (4), leak water layer (2) including first top surface (201), first hole (202), second hole (203), sand grip (204) and first bottom surface (205), fretwork layer (3) include second top surface (301), first recess (302), lug (303), second bottom surface (304) and fretwork groove (305), solid layer (4) include third top surface (401), second recess (402) and third bottom surface (403).
2. The easy-to-assemble river brick of claim 1, wherein: the river brick is characterized in that the water leakage layer (2), the hollow-out layer (3) and the solid layer (4) are located inside the river brick body (1), the water leakage layer (2) is located at the top of the hollow-out layer (3), the water leakage layer (2) is movably connected with the hollow-out layer (3), the hollow-out layer (3) is located at the top of the solid layer (4), and the hollow-out layer (3) is sleeved with the solid layer (4).
3. The easy-to-assemble river brick of claim 1, wherein: first top surface (201) are located water leakage layer (2) top surface, first top surface (201) top is seted up in first hole (202), first bottom surface (205) bottom is seted up in second hole (203), sand grip (204) are installed in first bottom surface (205) bottom, and with first bottom surface (205) fixed connection, first bottom surface (205) are located water leakage layer (2) top.
4. The easy-to-assemble river brick of claim 1, wherein: the second top surface (301) is located at the top of the hollow layer (3), the first groove (302) is formed in the top of the second top surface (301), the bump (303) is installed at the bottom of the second bottom surface (304) and fixedly connected with the second bottom surface (304), and the hollow groove (305) is formed in the hollow layer (3).
5. The easy-to-assemble river brick of claim 1, wherein: the third top surface (401) is located on the top of the solid layer (4), the second groove (402) is formed in the top of the third top surface (401), and the third bottom surface (403) is located on the bottom of the solid layer (4).
CN202022445917.6U 2020-10-27 2020-10-27 River course brick of convenient equipment Active CN213952120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022445917.6U CN213952120U (en) 2020-10-27 2020-10-27 River course brick of convenient equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022445917.6U CN213952120U (en) 2020-10-27 2020-10-27 River course brick of convenient equipment

Publications (1)

Publication Number Publication Date
CN213952120U true CN213952120U (en) 2021-08-13

Family

ID=77205928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022445917.6U Active CN213952120U (en) 2020-10-27 2020-10-27 River course brick of convenient equipment

Country Status (1)

Country Link
CN (1) CN213952120U (en)

Similar Documents

Publication Publication Date Title
CN207277485U (en) Sponge city flood drainage system
CN213952120U (en) River course brick of convenient equipment
CN200975004Y (en) Smell preventing and counter flow proof device of horizontal type drainpipe
CN102953411A (en) Socket-connecting-type silent drain pipe
CN201045214Y (en) Special-shaped concrete drain pipe
CN201817907U (en) Automatic sealing type floor drain
CN206015541U (en) A kind of pervious concrete plumbing installation
CN108277936A (en) Anti-clogging noise-proofing roof drainage system
CN209907514U (en) Automatic direct flushing closestool
CN208670421U (en) A kind of novel water stopping joint
CN209398960U (en) A kind of inside spin extrusion type hollow spiral hush pipe
CN208650292U (en) A kind of toilet checkdam structure
CN109610269A (en) The water suction plank road in gardens
CN201265184Y (en) Multi-layer valve type fluid non-return soft valve
CN201738437U (en) Float ball type floor drain
CN206034595U (en) Squatting pan and drain seal structure thereof
CN217268409U (en) Siphon tube
CN217177178U (en) Expansion type sealing rubber ring
CN217782296U (en) Leachate drainage system for refuse landfill
CN214005283U (en) Roadbed structure capable of preventing roadbed from softening
CN2518940Y (en) Leak-proof water drain jacket
CN212560948U (en) Water collecting well for tramcar linear drainage system
CN217482214U (en) Reducing type sealing rubber mat water-closing sleeve connecting structure
CN214574155U (en) Inspection shaft lid that protectiveness is good
CN218779804U (en) Drainage device for roof waterproof engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant