CN213937222U - Drilling cable clamp - Google Patents

Drilling cable clamp Download PDF

Info

Publication number
CN213937222U
CN213937222U CN202022705365.8U CN202022705365U CN213937222U CN 213937222 U CN213937222 U CN 213937222U CN 202022705365 U CN202022705365 U CN 202022705365U CN 213937222 U CN213937222 U CN 213937222U
Authority
CN
China
Prior art keywords
shaped steel
double
steel plate
sides
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022705365.8U
Other languages
Chinese (zh)
Inventor
俞庆礼
李广文
张吉东
孙晋中
孟庆伦
张峰
李兵兵
汤振东
张磊
蔡士浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINING HEGANG COAL MINE
Original Assignee
JINING HEGANG COAL MINE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINING HEGANG COAL MINE filed Critical JINING HEGANG COAL MINE
Priority to CN202022705365.8U priority Critical patent/CN213937222U/en
Application granted granted Critical
Publication of CN213937222U publication Critical patent/CN213937222U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

Drilling cable clamp is including two "U" shaped steel board embedding side, characterized by: double U-shaped steel plate fastening sides are installed above the embedded sides of the double U-shaped steel plates, single U-shaped steel plates are installed below the embedded sides of the double U-shaped steel plates, cables are arranged between the embedded sides of the double U-shaped steel plates and the fastening sides of the double U-shaped steel plates and fixed through fixing pieces, and hanging steel wire ropes are clamped between the embedded sides of the double U-shaped steel plates and the single U-shaped steel plates and fixed through the fixing pieces. The double-U-shaped steel plate clamping device is characterized in that a fixing piece is arranged between the double-U-shaped steel plate embedding side and the double-U-shaped steel plate fastening side, the fixing piece comprises a middle bolt and a middle nut (and a middle gasket, the two sides of the double-U-shaped steel plate embedding side and the double-U-shaped steel plate fastening side are respectively provided with a side bolt, a side nut and a side gasket, and the double-U-shaped steel plate embedding side and the double-U-shaped steel plate fastening side are of arc structures and are tightly attached to and extruded with a cable.

Description

Drilling cable clamp
Technical Field
The invention relates to a fixing device for drilling and laying cables, which is a special device for solving the problems that the cables are prevented from being damaged by self weight in the hoisting process due to deeper drilling and heavy cable weight.
Background
When a coal mine completes a cable laying task in a well by drilling, due to the fact that the drilling hole is deep and the weight of the cable is heavy, the cable can be damaged by dead weight in the hoisting process due to direct cable laying, the cable cannot be used, economic loss can be caused to enterprises, power supply safety in the well can be affected, maintenance and repair are not convenient, and the special device for cable laying in the drilling hole is invented in order to solve the problem that the cable is damaged by dead weight in the hoisting and laying process.
Disclosure of Invention
The invention aims to provide special fixing equipment which can prevent a cable from being damaged by self gravity in the process of hoisting, lowering and laying of a drill hole and protect the cable from being safely laid in the drill hole.
In order to achieve the purpose, the invention adopts the technical scheme that: drilling cable clamp is including two "U" shaped steel board embedding side, characterized by: double U-shaped steel plate fastening sides are installed above the embedded sides of the double U-shaped steel plates, single U-shaped steel plates are installed below the embedded sides of the double U-shaped steel plates, cables are arranged between the embedded sides of the double U-shaped steel plates and the fastening sides of the double U-shaped steel plates and fixed through fixing pieces, and hanging steel wire ropes are clamped between the embedded sides of the double U-shaped steel plates and the single U-shaped steel plates and fixed through the fixing pieces. The double-U-shaped steel plate clamping device is characterized in that a fixing piece is arranged between the double-U-shaped steel plate embedding side and the double-U-shaped steel plate fastening side, the fixing piece comprises a middle bolt and a middle nut (and a middle gasket, the two sides of the double-U-shaped steel plate embedding side and the double-U-shaped steel plate fastening side are respectively provided with a side bolt, a side nut and a side gasket, and the double-U-shaped steel plate embedding side and the double-U-shaped steel plate fastening side are of arc structures and are tightly attached to and extruded with a cable.
The inner walls of the double U-shaped steel plate embedding side and the double U-shaped steel plate fastening side are provided with rubber pads, the bottom of the double U-shaped steel plate embedding side is provided with a saddle-shaped cushion block, the saddle-shaped cushion block and the single U-shaped steel plate tightly extrude the suspension steel wire rope, and the surface of the saddle-shaped cushion block is in an arc shape and matched with the profile of the suspension steel wire rope.
The lower part of the embedded side of the double U-shaped steel plate is provided with a sleeve with internal threads, and the single U-shaped steel plate is fixedly connected with the embedded side of the double U-shaped steel plate through the matching of a bottom bolt and the sleeve.
The application of the drilling cable clamp can distribute the hoisting weight of the cable on the auxiliary steel wire rope in the process of lowering the cable in the special cable hole for coal mine construction, avoid the cable from being damaged by dead weight in the hoisting process, avoid the hole clamping in the midway of lowering the cable, avoid the cable from being wound by the steel wire rope, and also protect the insulating sheath of the cable from being damaged. The successful application of the drilling cable clamp leads the construction technology to be popularized and applied in a wider range in China.
The drilling cable clamp disclosed by the invention is simple in structure, convenient to operate, easy to process, safe and reliable, and also solves the technical problem of fixing 2 cables by using 1 steel wire rope. The method is applied for the first time in China, is successfully implemented, greatly saves construction cost, can save investment of ore deposit, and is safe and reliable. The problems that the existing production mine shaft has more unsafe factors and needs to be intensively stopped for operation for a long construction period when cables are laid are solved, and the safety performance and the economic benefit are very obvious.
Drawings
FIG. 1 is a front view structural diagram of the present invention;
FIG. 2 is a front view of a double "U" shaped steel plate of the present invention;
FIG. 3 is a bottom view of the double "U" shaped steel plate insert side of the present invention;
FIG. 4 is a top plan view of the double "U" shaped steel plate insert of the present invention;
FIG. 5 is a front view of the fastening side of the double "U" shaped steel plate of the present invention;
FIG. 6 is a top view of the fastening side of the double "U" shaped steel plate of the present invention;
FIG. 7 is a top view of a single "U" shaped steel plate of the present invention;
FIG. 8 is a front view of a single U-shaped steel plate according to the present invention.
In the drawings: 1. the embedded side of the double U-shaped steel plate; 2. A fastening side of a double U-shaped steel plate; 3. a single U-shaped steel plate; 4. saddle-shaped cushion blocks; 5. a bottom bolt; 6. a bottom gasket; 7. a bottom nut; 8. a rubber pad; 9. a middle bolt; 10. a middle nut; 11. an intermediate gasket; 12. a side bolt; 13. a side nut; 14. a side gasket; 15. a cable; 16. and (4) hanging the steel wire rope.
Detailed Description
The invention will be further described with reference to the following figures and specific examples:
the used drilling cable clamp has the advantages of simple structure, convenience in processing, convenience in operation of personnel during cable hoisting and lowering and flexibility in use.
Fig. 1, 2, 3 and 4 show the drill cable clamp of the present invention, where fig. 1 is a structure diagram of the drill cable clamp, including: a double U-shaped steel plate embedded side 1; a double U-shaped steel plate fastening side 2; a single U-shaped steel plate 3; a saddle-shaped cushion block 4; a bolt 5; a gasket 6; a nut 7; a rubber pad 8 and the like.
A borehole cable clamp comprising: the double-U-shaped steel plate embedded side, the double-U-shaped steel plate fastening side, the single-U-shaped steel plate, nuts, bolts, washers, saddle-shaped cushion blocks, rubber pads and the like. The method is characterized in that: the embedded sides of the double U-shaped steel plates are respectively welded with 4 short bolts at the back parts of the two U-shaped steel plates, and the middle of the bow part is welded with 2 long bolts, and 2 bolt holes are reserved at two ends of the U-shaped steel plates respectively. Two U-shaped steel plate fastening sides reserve 2 bolt holes in the middle of the arch part, and two ends of the U-shaped steel plate reserve 2 bolt holes respectively. 2 bolt holes are reserved at two ends of the single U-shaped steel plate respectively. Wherein: the embedded side of the double U-shaped steel plate is matched with the single U-shaped steel plate to fix the steel wire rope, and the steel wire rope is fixed through a fastening nut. Then the two paths of cables are respectively placed into a U-shaped groove at the embedding side of the double U-shaped steel plate, a rubber pad is placed between the U-shaped groove and the cables, the fastening side of the double U-shaped steel plate is clamped with the cables, and finally the cables are fixed by screwing nuts.
According to drilling cable anchor clamps, characterized by: the embedded sides of the double U-shaped steel plates are respectively welded with 4 short bolts at the back parts of the two U-shaped steel plates, and the middle parts of the arch parts are welded with 2 long bolts, and 2 bolt holes are reserved at two ends of each U-shaped steel plate.
According to drilling cable anchor clamps, characterized by: the double U-shaped steel plate fastening side is reserved with 2 bolt holes in the middle of the arch part, and the two ends of the U-shaped steel plate are reserved with 2 bolt holes respectively.
According to drilling cable anchor clamps, characterized by: and 2 bolt holes are reserved at two ends of the single U-shaped steel plate respectively.
According to drilling cable anchor clamps, characterized by: the embedded side of the double U-shaped steel plate is matched with the single U-shaped steel plate to fix the steel wire rope, and the steel wire rope is fixed through a fastening nut. Then the two paths of cables are respectively placed into a U-shaped groove at the embedding side of the double U-shaped steel plate, a rubber pad is placed between the U-shaped groove and the cables, the fastening side of the double U-shaped steel plate is clamped with the cables, and finally the cables are fixed by screwing nuts.
The embedded side 1 of the double U-shaped steel plate is respectively welded with 4 short bolts 5 at the back of the two U-shaped steel plates, and the middle of the arch part is welded with 2 long bolts 9, and two ends of the U-shaped steel plate are respectively reserved with 2 bolt holes.
According to the invention, 2 bolt holes are reserved in the middle of the arch part at the fastening side 2 of the double U-shaped steel plate, and 2 bolt holes are reserved at two ends of the U-shaped steel plate respectively.
Two ends of a single U-shaped steel plate 3 are respectively reserved with 2 bolt holes.
The invention is characterized in that when the cable is lowered in the drill hole: the double U-shaped steel plate embedded side 1 is attached to a suspension steel wire rope, a saddle-shaped cushion block 4 is arranged in the middle, a single U-shaped steel plate 3 penetrates through a bolt 5 to be clamped into the double U-shaped steel plate embedded side 1, a washer 6 is arranged, and the double U-shaped steel plate embedded side 1 is fixed on the suspension steel wire rope by screwing a nut 7. After the double U-shaped steel plate embedded side 1 is fixed on a suspension steel wire rope, two paths of cables are respectively placed into a U-shaped groove of the double U-shaped steel plate embedded side 1, a rubber pad 8 is placed between the U-shaped groove and the cables, then the double U-shaped steel plate fastening side 2 penetrates through a bolt 9 to clamp the cables, a gasket 11 is placed, and the two paths of cables are fixed on the double U-shaped steel plate embedded side 1 by screwing a nut 10. And finally, reinforcing and fixing the two ends of the double U-shaped steel plate embedded side 1 and the double U-shaped steel plate fastening side 2 by using bolts 12, washers 14 and nuts 13, namely completing the installation work of 1 drilling cable clamp.
In the vertical traction process of the hoisting cable, the cable is fixed on the auxiliary steel wire rope by the cable clamps every 3m, the two cable clamps are arranged at intervals, the distance between every two adjacent clamps of the same cable is 3m, the hoisting weight of the cable is distributed on the auxiliary steel wire rope, the cable is prevented from being damaged by self weight in the hoisting process, the cable is fully protected, and the safety performance and the economic benefit are very obvious.
The above-mentioned embodiments are merely illustrative of the preferred embodiments of the present invention, and do not limit the concept and the protection scope of the present invention, and various modifications and improvements made to the technical solution of the present invention by those skilled in the art without departing from the design concept of the present invention shall fall within the protection scope of the present invention.

Claims (4)

1. Drilling cable clamp is including two "U" shaped steel board embedding side, characterized by: double U-shaped steel plate fastening sides (2) are installed above the double U-shaped steel plate embedding sides (1), single U-shaped steel plates (3) are installed below the double U-shaped steel plate embedding sides (1), cables are arranged between the double U-shaped steel plate embedding sides (1) and the double U-shaped steel plate fastening sides (2) and fixed through fixing pieces, and hanging steel wire ropes (16) are clamped between the double U-shaped steel plate embedding sides (1) and the single U-shaped steel plates (3) and fixed through the fixing pieces.
2. The drilling cable clamp as claimed in claim 1, wherein a fixing member is arranged between the double U-shaped steel plate embedding side (1) and the double U-shaped steel plate fastening side (2), the fixing member comprises a middle bolt (9), a middle nut (10) and a middle washer (11), a side bolt (12), a side nut (13) and a side washer (14) are respectively arranged on two sides of the double U-shaped steel plate embedding side (1) and the double U-shaped steel plate fastening side (2), and the double U-shaped steel plate embedding side (1) and the double U-shaped steel plate fastening side (2) are in an arc structure and are tightly pressed with the cable (15).
3. The drilling cable clamp as claimed in claim 1, wherein the inner walls of the double U-shaped steel plate embedding side (1) and the double U-shaped steel plate fastening side (2) are provided with rubber pads (8), the bottom of the double U-shaped steel plate embedding side is provided with a saddle-shaped cushion block (4), the saddle-shaped cushion block (4) and the single U-shaped steel plate (3) tightly press the suspension steel wire rope (16), and the surface of the saddle-shaped cushion block (4) is in an arc shape and is matched with the profile of the suspension steel wire rope (16).
4. The drilling cable clamp as claimed in claim 1, wherein a sleeve with internal threads is arranged below the embedded side (1) of the double U-shaped steel plate, and the single U-shaped steel plate (3) is fixedly connected with the embedded side (1) of the double U-shaped steel plate through the matching of a bottom bolt (5) and the sleeve.
CN202022705365.8U 2020-11-20 2020-11-20 Drilling cable clamp Expired - Fee Related CN213937222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022705365.8U CN213937222U (en) 2020-11-20 2020-11-20 Drilling cable clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022705365.8U CN213937222U (en) 2020-11-20 2020-11-20 Drilling cable clamp

Publications (1)

Publication Number Publication Date
CN213937222U true CN213937222U (en) 2021-08-10

Family

ID=77171104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022705365.8U Expired - Fee Related CN213937222U (en) 2020-11-20 2020-11-20 Drilling cable clamp

Country Status (1)

Country Link
CN (1) CN213937222U (en)

Similar Documents

Publication Publication Date Title
CN110932168A (en) Method for replacing strain insulator of extra-high voltage direct current full tower
CN202298464U (en) Steel strand connecting anchorage for hanging cable of stay cable
CN213937222U (en) Drilling cable clamp
CN215287701U (en) Special lifting appliance for prefabricated wall
CN112302032A (en) Steel waist beam structure and construction method thereof
CN201774188U (en) Water-cooled cable mounting clamp
CN110965797A (en) Steel beam edge protection device
CN214272653U (en) Prestressed anchorage utensil based on recoverable type anchor rope uses
CN211521328U (en) Fixing device for ash sliding pipe of deep shaft
CN210457155U (en) Vertical precast concrete slab lifting device of prefabricated building
CN211645930U (en) Tunnel inverted arch construction trestle
CN113308996A (en) Lowering method based on cable-stayed bridge cradle bottom basket lowering device
CN207957568U (en) A kind of special fixture for crossing river for cable machine rope
CN214116273U (en) Green reuse type anchor cable
CN214227790U (en) Coal mining machine towing device
CN219793695U (en) Suspension bridge sling replacement device
CN218754476U (en) Hoisting device of bare concrete large formwork structure
CN212479297U (en) Anchor cable lockset for deep well roadway support
CN219034735U (en) Roadway support equipment
CN220351519U (en) Annular rail device for assembly type curtain wall hoisting
CN215249048U (en) Large caisson lifting appliance
CN214141248U (en) Flange plate hoisting tool capable of adjusting gravity center of flange plate
CN212374702U (en) Sliding adjustable clamp for mounting pipeline below platform
CN217215893U (en) Drilling cable clamp
CN220267771U (en) Anti-impact fixing device for hanging pipeline in impact dangerous area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210810