CN213930007U - Foundation bolt fixing and mounting device - Google Patents

Foundation bolt fixing and mounting device Download PDF

Info

Publication number
CN213930007U
CN213930007U CN202023033634.7U CN202023033634U CN213930007U CN 213930007 U CN213930007 U CN 213930007U CN 202023033634 U CN202023033634 U CN 202023033634U CN 213930007 U CN213930007 U CN 213930007U
Authority
CN
China
Prior art keywords
support column
connecting plate
slider
mounting device
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023033634.7U
Other languages
Chinese (zh)
Inventor
未晓兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Tailian Fastener Group Co ltd
Original Assignee
Hebei Tailian Fastener Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Tailian Fastener Group Co ltd filed Critical Hebei Tailian Fastener Group Co ltd
Priority to CN202023033634.7U priority Critical patent/CN213930007U/en
Application granted granted Critical
Publication of CN213930007U publication Critical patent/CN213930007U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an rag bolt fixed mounting technical field, and disclose a rag bolt fixed mounting device, solved and can't control and detect rag bolt's vertical height at present, and can't unify the problem to the height of a plurality of rag bolts, it includes first support column, first support column one side is connected with the second support column, the utility model discloses, through twisting the screw rod, the briquetting moves to one side, the framework is located first support column and second support column upper end and slides, drives the connecting plate and slides from top to bottom, detects through the horizon tester, prevents the angle slope of connecting plate, and the angle that influences rag bolt is out of plumb, can conveniently adjust the height of connecting plate, is applicable to the object of a plurality of heights; through twisting fixing bolt, remove first slider and second slider, the mounting panel that makes moves, conveniently adjusts the position of rag bolt body, also can unify a plurality of rag bolt's vertical height.

Description

Foundation bolt fixing and mounting device
Technical Field
The utility model belongs to the technical field of rag bolt fixed mounting, specifically be a rag bolt fixed mounting device.
Background
Anchor bolts, which are screw members for fastening devices and the like to a concrete foundation, are generally used for foundations such as railways, highways, power enterprises, factories, mines, bridges, tower cranes, large-span steel structures, large buildings and the like. Has stronger stability.
When the existing foundation bolts are fixed, the vertical heights of the foundation bolts are not controlled and detected, the heights of the foundation bolts cannot be unified, the positioning accuracy of the foundation bolts is easily influenced, and therefore a foundation bolt fixing and mounting device needs to be designed.
Disclosure of Invention
To the above situation, for overcoming prior art's defect, the utility model provides a rag bolt fixed mounting device has solved at present unable vertical height to rag bolt and has controlled and detect effectively, and can't highly carry out unified problem to a plurality of rag bolt.
In order to achieve the above object, the utility model provides a following technical scheme: a fixing and mounting device for a rag bolt comprises a first supporting column, wherein one side of the first supporting column is connected with a second supporting column, the lower ends of the first supporting column and the second supporting column are respectively connected with a base, the upper parts of the first supporting column and the second supporting column are respectively connected with a frame body, the first supporting column and the second supporting column penetrate and extend to the upper ends of the corresponding frame bodies, the middle part of one side of each frame body is connected with a screw rod, one end of the screw rod penetrates and extends into the frame bodies and is connected with a pressing block, one side of each pressing block is connected with one side of the first supporting column and one side of the second supporting column, one side of each frame body is connected with a connecting plate, the middle part of each connecting plate is provided with a first through hole, one side of each connecting plate is slidably connected with a first sliding block, the other side of each connecting plate is slidably connected with a second sliding block, the first sliding blocks and the second sliding blocks are fixedly connected with the connecting plates through fixing bolts, one side of each first sliding block is connected with a mounting plate, the middle part of the upper ends of the mounting plates is provided with a second through hole, threaded holes are evenly formed in the periphery of the mounting plate, foundation bolt bodies are in threaded connection inside the threaded holes, and a horizontal tester is embedded in the first connecting plate.
Preferably, the connecting plate both sides have all been seted up the spout, and first slider and second slider all are located the spout that corresponds and protect a sliding connection.
Preferably, the shape of briquetting one side is the arc, and two briquetting one sides all are with first support column and second support column looks adaptation.
Preferably, bearings are embedded at the joints of the screw rod, the frame body and the pressing block.
Preferably, both sides of the upper end of the base are connected with supporting rods, and the other ends of the supporting rods are connected with the surfaces of the lower ends of the first supporting column and the second supporting column.
Preferably, the number of the threaded holes is four.
Preferably, the number of the fixing bolts is four.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses, through the setting of first support column, second support column, base, framework, screw rod, briquetting, connecting plate and horizontal tester, twist and move the screw rod, the briquetting moves to one side, the framework is located first support column and second support column upper end and slides, drives the connecting plate and slides from top to bottom, detects through the horizontal tester, prevents the angle slope of connecting plate, and the angle that influences rag bolt is out of plumb, can conveniently adjust the height of connecting plate, is applicable to the object of a plurality of heights;
(2) through the setting of connecting plate, first through-hole, first slider, second slider, fixing bolt, mounting panel, second through-hole, screw hole, rag bolt body and spout, twist and move fixing bolt, remove first slider and second slider, the mounting panel that makes moves, conveniently adjusts the position of rag bolt body, can conveniently control rag bolt's vertical height, also can unify a plurality of rag bolt's vertical height simultaneously.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the mounting structure of the mounting plate of the present invention;
FIG. 3 is a schematic view of the structure of the chute of the present invention;
in the figure: 1. a first support column; 2. a second support column; 3. a base; 4. a frame body; 5. a screw; 6. briquetting; 7. a connecting plate; 8. a first through hole; 9. a first slider; 10. a second slider; 11. fixing the bolt; 12. mounting a plate; 13. a second through hole; 14. a threaded hole; 15. a foundation bolt body; 16. a level tester; 17. a chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the first embodiment, as shown in fig. 1, 2 and 3, the utility model comprises a first support column 1 capable of supporting a connecting plate 7, a second support column 2 connected to one side of the first support column 1, a base 3 connected to the lower ends of the first support column 1 and the second support column 2, so that the first support column 1 and the second support column 2 can be supported, a frame 4 connected to the upper portions of the first support column 1 and the second support column 2, a screw 5 connected to the middle portion of one side of the frame 4, a pressing block 6 connected to one end of the screw 5 extending into the frame 4, and a connecting plate 7 connected to one side of the two pressing blocks 6, the first support column 1 and the second support column 2, a connecting plate 7 connected to one side of the frame 4, and a first through hole 8 formed in the middle portion of the connecting plate 7, 7 one side sliding connection of connecting plate has first slider 9, 7 opposite side sliding connection of connecting plate has second slider 10, first slider 9 all passes through fixing bolt 11 and 7 fixed connection of connecting plate with second slider 10, 9 one side of first slider is connected with mounting panel 12, second through-hole 13 has been seted up at mounting panel 12 upper end middle part, mounting panel 12 evenly has seted up threaded hole 14 all around, make things convenient for rag bolt body 15 to fix, 14 inside equal threaded connection of threaded hole has rag bolt body 15, 7 one survey of connecting plate inlays and is equipped with horizontal tester 16, the convenience can be measured the horizontal position of connecting plate 7.
In the second embodiment, on the basis of the first embodiment, the sliding grooves 17 are formed in both sides of the connecting plate 7, and the first sliding block 9 and the second sliding block 10 are both located in the corresponding sliding grooves 17 and are in sliding connection, so that the mounting plate 12 is convenient to move.
In the third embodiment, on the basis of the first embodiment, one side of each pressing block 6 is arc-shaped, and one side of each pressing block 6 is matched with the first supporting column 1 and the second supporting column 2, so that the first supporting column 1 and the second supporting column 2 can be conveniently clamped.
In the fourth embodiment, on the basis of the first embodiment, bearings are embedded at the joints of the screw 5, the frame 4 and the pressing block 6, so that friction between the screw 5 and the frame 4 and between the screw and the pressing block 6 is reduced.
Fifth, on the basis of first embodiment, 3 upper end both sides of base all are connected with the bracing piece, and the bracing piece other end is connected with first support column 1 and 2 lower extreme surfaces of second support column, can make the better support of first support column 1 and second support column 2.
Sixth embodiment, on the basis of first embodiment, the quantity of screw hole 14 is four groups, conveniently fixes a plurality of rag bolt bodies 15 simultaneously.
Seventh embodiment, on the basis of the first embodiment, the number of the fixing bolts 11 is four, so that the dogbone can fix the first slider 9 and the second slider 10 well.
The working principle is as follows: when in use, the first support column 1 and the second support column 2 are placed at one side of an object needing to be provided with foundation bolts, the screw 5 is screwed, the press block 6 moves towards one side, the frame body 4 is positioned at the upper ends of the first support column 1 and the second support column 2 and slides, the height of the connecting plate 7 is adjusted, the inclination of the angle of the connecting plate 7 is prevented from influencing the placement accuracy of the foundation bolt body 15 through the detection of the horizontal tester 16, meanwhile, the fixing bolt 11 is screwed, the fixing bolt 11 is taken down, the first slide block 9 and the second slide block 10 are moved, the mounting plate 12 is moved, the position of the foundation bolt body 15 is conveniently adjusted, after the position is adjusted to a proper position, the first slider 9 and the second slider 10 are fixed by the fixing bolt 11, and the position of the anchor bolt body 15 is adjusted by the screw hole 14, and the height of the anchor bolt body 15 can be controlled.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a rag bolt fixed mounting device, includes first support column (1), its characterized in that: one side of the first support column (1) is connected with a second support column (2), the lower ends of the first support column (1) and the second support column (2) are connected with a base (3), the upper parts of the first support column (1) and the second support column (2) are connected with a frame body (4), the first support column (1) and the second support column (2) penetrate through and extend to the upper end of the corresponding frame body (4), the middle part of one side of the frame body (4) is connected with a screw rod (5), one end of the screw rod (5) penetrates through and extends to the inside of the frame body (4) and is connected with a pressing block (6), one sides of the two pressing blocks (6) are connected with one sides of the first support column (1) and the second support column (2), one side of the frame body (4) is connected with a connecting plate (7), the middle part of the connecting plate (7) is provided with a first through hole (8), one side of the connecting plate (7) is slidably connected with a first sliding block (9), the other side of the connecting plate (7) is slidably connected with a second sliding block (10), first slider (9) and second slider (10) are all through fixing bolt (11) and connecting plate (7) fixed connection, and first slider (9) one side is connected with mounting panel (12), and second through-hole (13) have been seted up at mounting panel (12) upper end middle part, and evenly threaded hole (14) have all around mounting panel (12), and the equal threaded connection in screw hole (14) has rag bolt body (15), and connecting plate (7) are surveyed and are inlayed and are equipped with horizontal tester (16).
2. An anchor stud fixing and mounting device as claimed in claim 1, wherein: connecting plate (7) both sides have all been seted up spout (17), and first slider (9) and second slider (10) all are located corresponding spout (17) internal protection sliding connection.
3. An anchor stud fixing and mounting device as claimed in claim 1, wherein: the shape of briquetting (6) one side is the arc, and two briquetting (6) one sides all with first support column (1) and second support column (2) looks adaptation.
4. An anchor stud fixing and mounting device as claimed in claim 1, wherein: and bearings are embedded at the joints of the screw rod (5), the frame body (4) and the pressing block (6).
5. An anchor stud fixing and mounting device as claimed in claim 1, wherein: the support rod is connected to both sides of the upper end of the base (3), and the other end of the support rod is connected with the surfaces of the lower ends of the first support column (1) and the second support column (2).
6. An anchor stud fixing and mounting device as claimed in claim 1, wherein: the number of the threaded holes (14) is four.
7. An anchor stud fixing and mounting device as claimed in claim 1, wherein: the number of the fixing bolts (11) is four.
CN202023033634.7U 2020-12-16 2020-12-16 Foundation bolt fixing and mounting device Active CN213930007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023033634.7U CN213930007U (en) 2020-12-16 2020-12-16 Foundation bolt fixing and mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023033634.7U CN213930007U (en) 2020-12-16 2020-12-16 Foundation bolt fixing and mounting device

Publications (1)

Publication Number Publication Date
CN213930007U true CN213930007U (en) 2021-08-10

Family

ID=77153020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023033634.7U Active CN213930007U (en) 2020-12-16 2020-12-16 Foundation bolt fixing and mounting device

Country Status (1)

Country Link
CN (1) CN213930007U (en)

Similar Documents

Publication Publication Date Title
CN107190637B (en) The bridge pad being conveniently replaceable
CN207392771U (en) A kind of guide type steel column locator
CN213930007U (en) Foundation bolt fixing and mounting device
CN209817099U (en) Large-span steel house room bearing structure
CN208645665U (en) A kind of pedestal structure for the installation of preform lid beam steel
CN207211785U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN215858149U (en) Adjustable base is laid to stone material
CN214996176U (en) Municipal administration public facilities built-in fitting mounting tool
CN208105340U (en) A kind of high-precision foundation pile test for static load structure
CN219973268U (en) Tower crane foundation
CN210194439U (en) Unloading device for adjusting pier stud tie beam and cover beam bracket elevation
CN210243380U (en) Rock-soil bearing capacity testing device
CN215573498U (en) Road bridge bearing capacity test detection device
CN217930286U (en) Building engineering straightness check out test set that hangs down
CN215716082U (en) Concrete embedded part for civil engineering
CN110095356A (en) A kind of dynamical reaction measuring device under Impact Load
CN212956135U (en) Adjusting lifting and supporting device for assembling super-large steel structure bridge sections
CN215179403U (en) Levelness adjusting device
CN217106227U (en) Cup mouth bearing-inserting type steel frame column leveling structure
CN219509343U (en) Mountain region photovoltaic fixed bolster socket joint formula basis lower column fixing device
CN216051749U (en) Concrete shrinkage test device
CN220247175U (en) Bracket for rapid assembly of corridor
CN212179756U (en) Quick positioner of inclined plane height measurement of making level
CN213014347U (en) Structure of foundation bolt of rock stratum surface anchoring iron tower foundation
CN218381247U (en) Weighing device for spinning workshop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant