CN213928165U - Rail guard preparation mounting structure - Google Patents

Rail guard preparation mounting structure Download PDF

Info

Publication number
CN213928165U
CN213928165U CN202021738534.1U CN202021738534U CN213928165U CN 213928165 U CN213928165 U CN 213928165U CN 202021738534 U CN202021738534 U CN 202021738534U CN 213928165 U CN213928165 U CN 213928165U
Authority
CN
China
Prior art keywords
frame
guardrail
window frame
guardrail frame
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021738534.1U
Other languages
Chinese (zh)
Inventor
夏绪勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Hongxin Aluminum Industry Co ltd
Original Assignee
Jiangxi Hongxin Aluminum Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Hongxin Aluminum Industry Co ltd filed Critical Jiangxi Hongxin Aluminum Industry Co ltd
Priority to CN202021738534.1U priority Critical patent/CN213928165U/en
Application granted granted Critical
Publication of CN213928165U publication Critical patent/CN213928165U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a rail guard preparation mounting structure, including window frame, guardrail frame and guardrail pipe, the window frame includes interior window frame and outer window frame, and outer window frame is connected to interior window frame, and the guardrail frame mainly comprises guardrail frame backup pad and guardrail frame fixed plate, and the guardrail pipe is installed on guardrail frame fixed plate, sets up interior window frame baffle on the interior window frame, and the guardrail frame passes through on the window frame baffle including the connecting piece installation. The utility model discloses a mainly constitute guardrail frame backup pad and guardrail frame fixed plate with the guardrail frame, make the guardrail frame only have two walls, can reduce the required material of guardrail frame effectively, reduce cost to as long as wear a section bar wall during guardrail frame processing wall, can improve machining efficiency. The guardrail frame is fixed on the window frame through connection, and screws or screw hole covers cannot be seen on the window frame, so that the appearance is attractive.

Description

Rail guard preparation mounting structure
Technical Field
The utility model relates to a large-scale healthy apparatus field, concretely relates to rail guard preparation mounting structure.
Background
The guardrail tubes of the existing guardrail products are all installed on the tubular guardrail frame and connected with the frame of the window through screws, the guardrail tubes are generally transversely fixed on the hard materials of the guardrail frame through screws, and electric drills need to penetrate through two walls of the tubular frame materials in the process of fixing the guardrail tubes. The manufacturing and mounting mode has the following defects: 1. two profile walls need to be perforated for fixing the guardrail pipe, and the processing efficiency is not high. 2. The guardrail frame needs four material group frames, and is high in cost. 3. When the guardrail frame is directly fixed on the frame through screws, the screws or screw hole covers can be seen on the guardrail frame, and the guardrail frame is not attractive.
SUMMERY OF THE UTILITY MODEL
The utility model provides a rail guard preparation mounting structure can reduce the required material of rail guard frame, promotes the process velocity reduce cost to the screw is hidden in the window frame, more is pleasing to the eye.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a rail guard preparation mounting structure, includes window frame, guardrail frame and guardrail pipe, and the window frame includes interior window frame and outer window frame, and outer window frame is connected to interior window frame, and the guardrail frame mainly comprises guardrail frame backup pad and guardrail frame fixed plate, and the guardrail pipe is installed on guardrail frame fixed plate, sets up interior window frame baffle on the interior window frame, and the guardrail frame passes through the connecting piece and installs on the interior window frame baffle.
Further, still including the fixed block, the fixed block setting is on guardrail frame fixed plate, and the fixed block is connected the connecting piece.
Furthermore, the connecting piece is Z-shaped, and two ends of the connecting piece are respectively connected with the fixing block and the inner window frame baffle.
Further, the connector is left with a height for the nut to accommodate.
Furthermore, a guardrail frame fixing plate after the guardrail frame and the window frame are assembled and connected props against the inner window frame baffle, and the guardrail frame supporting plate props against the outer wall of the inner window frame.
Furthermore, a bolt positioning groove is formed in the middle of the guardrail frame fixing plate.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses a mainly constitute guardrail frame backup pad and guardrail frame fixed plate with the guardrail frame, make the guardrail frame only two walls, can reduce the required material of guardrail frame effectively, reduce cost to as long as wear a section bar wall during guardrail frame processing wall, just can pass through the bolt with the guardrail frame and manage fixedly, can improve machining efficiency. The guardrail frame is fixed on the window frame through connection, and screws or screw hole covers cannot be seen on the window frame, so that the appearance is attractive.
Drawings
FIG. 1 is an overall schematic view of a window;
FIG. 2 is a front view of the present invention;
fig. 3 is a top view of the guard rail of the present invention;
FIG. 4 is a top view of the window frame structure of the present invention;
fig. 5 is a schematic structural view of the guardrail frame of the present invention;
FIG. 6 is a schematic view of the structure of the connector of the present invention;
in the figure: 1. the window comprises a window frame, 2. an inner window frame, 3. an outer window frame, 4. a guardrail frame, 5. a guardrail frame supporting plate, 6. a guardrail frame fixing plate, 7. a guardrail pipe, 8. an inner window frame baffle, 9. an inner window frame outer wall, 10. a connecting piece, 11. a fixing block, 12. a bolt positioning groove and 13. a bolt.
Detailed Description
Referring to fig. 1-6, a guard rail manufacturing and mounting structure comprises a window frame 1, a guard rail frame 4 and a guard rail pipe 7, wherein the window frame 1 comprises an inner window frame 2 and an outer window frame 3, the inner window frame 2 is connected with the outer window frame 3, the guard rail frame 4 mainly comprises a guard rail frame supporting plate 5 and a guard rail frame fixing plate 6, the guard rail pipe 7 is mounted on the guard rail frame fixing plate 6, an inner window frame baffle 8 is arranged on the inner window frame 2, and the guard rail frame 4 is mounted on the inner window frame baffle 8 through a connecting piece 10. The guardrail frame 4 mainly comprises a guardrail frame supporting plate 5 and a guardrail frame fixing plate 6, so that the guardrail frame 4 only has two wall surfaces, the materials required by the guardrail frame 4 can be effectively reduced, and the cost is reduced. When the guardrail frame 4 is processed into the wall surface and the guardrail frame 4 is processed into the wall surface, the guardrail frame 4 can be fixed with the guardrail pipe 7 through the bolt 13 as long as one section wall is penetrated, so that the processing efficiency can be improved, and the mounting and dismounting efficiency can be improved. The guardrail frame 4 is fixed on the window frame 1 through connection, and screws or screw hole covers cannot be seen on the window frame 1, so that the appearance is attractive. And the utility model discloses a guardrail frame 4 passes through connecting piece 10 to be fixed on window frame 1, can also be with the stability that increases guardrail frame 4 and window frame 1 junction.
The guardrail frame fixing plate comprises a guardrail frame fixing plate 6, and is characterized by further comprising a fixing block 11, wherein the fixing block 11 is arranged on the guardrail frame fixing plate 6, and the fixing block 11 is connected with a connecting piece 10. The guardrail frame 4 can be better fixed on the inner window frame 2 by connecting the fixing block 11 with the connecting piece.
Wherein, the connecting piece 10 is Z type connecting piece 10, and fixed block 11 and interior window frame baffle 8 are connected respectively at connecting piece 10 both ends. Set connecting piece 10 to Z type connecting piece 10, can the connecting piece 10 top keep closely laminating fixedly with interior window frame baffle 8, and Z type connecting piece 10 bottom then can be connected fixedly with fixed block 11 while can also support guardrail frame fixed plate 6, provides the holding power to guardrail frame fixed plate 6, increases the stability that guardrail frame 4 and window frame 1 are connected.
Wherein the connecting piece 10 leaves a height for accommodating the nut. The nut can be hidden between the connecting piece 10 and the window frame 1, and the appearance is more exquisite.
Wherein, the guardrail frame fixing plate 6 after the guardrail frame 4 is assembled and connected with the window frame 1 is propped against the inner window frame baffle 8, and the guardrail frame supporting plate 5 is propped against the outer wall 9 of the inner window frame. The stability of the joint of the guardrail frame 4 and the inner window frame 2 can be increased, and the joint of the guardrail frame 4 and the inner window frame 2 is prevented from shaking.
Wherein, the middle of the guardrail frame fixing plate 6 is provided with a bolt positioning groove 12. The bolt positioning groove 12 can provide a punching reference when the guardrail pipe 7 is installed, and the working efficiency is improved.
Wherein, a height for accommodating the nut is reserved between the lower part of the sinking step and the upper part of the sinking step. The nut may be hidden between the lower portion of the sunken step and the upper portion of the sunken step.
When the guardrail is installed, a hole is formed in the bolt positioning groove 12 of the guardrail frame, the guardrail pipe 7 and the guardrail frame are fixed through the bolt 13 to form the guardrail, the fixing block 11 is provided with a hole, and the fixing block 11 is connected with the connecting piece 10 through the bolt 13. And the guardrail frame fixing plate 6 and the guardrail frame supporting plate 5 are respectively abutted against the inner window frame baffle 8 and the inner window frame outer wall 9, the inner window frame baffle 8 is provided with a hole, the inner window frame baffle 8 is connected with the connecting piece 10 through the bolt 13, and the guardrail frame 4 and the inner window frame 2 are fixed to complete installation.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A guard rail manufacturing and mounting structure is characterized in that: including window frame, guardrail frame and guardrail pipe, the window frame includes interior window frame and outer window frame, and outer window frame is connected to interior window frame, and the guardrail frame mainly comprises guardrail frame backup pad and guardrail frame fixed plate, and the guardrail pipe is installed on guardrail frame fixed plate, sets up interior window frame baffle on the interior window frame, and the guardrail frame passes through the connecting piece and installs on the interior window frame baffle.
2. The guard rail manufacturing and mounting structure according to claim 1, wherein: the guardrail frame fixing plate is characterized by further comprising a fixing block, the fixing block is arranged on the guardrail frame fixing plate, and the fixing block is connected with a connecting piece.
3. The guard rail manufacturing and mounting structure according to claim 1, wherein: the connecting piece is Z type connecting piece, and fixed block and interior window frame baffle are connected respectively to the connecting piece both ends.
4. The guard rail manufacturing and mounting structure according to claim 1, wherein: the connector leaves a height for the nut to accommodate.
5. The guard rail manufacturing and mounting structure according to claim 1, wherein: the guardrail frame fixing plate after the guardrail frame and the window frame are assembled and connected is pressed against the inner window frame baffle and the guardrail frame supporting plate is pressed against the outer wall of the inner window frame.
6. The guard rail manufacturing and mounting structure according to claim 1, wherein: the middle of the guardrail frame fixing plate is provided with a bolt positioning groove.
CN202021738534.1U 2020-08-19 2020-08-19 Rail guard preparation mounting structure Active CN213928165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021738534.1U CN213928165U (en) 2020-08-19 2020-08-19 Rail guard preparation mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021738534.1U CN213928165U (en) 2020-08-19 2020-08-19 Rail guard preparation mounting structure

Publications (1)

Publication Number Publication Date
CN213928165U true CN213928165U (en) 2021-08-10

Family

ID=77142998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021738534.1U Active CN213928165U (en) 2020-08-19 2020-08-19 Rail guard preparation mounting structure

Country Status (1)

Country Link
CN (1) CN213928165U (en)

Similar Documents

Publication Publication Date Title
CN213928165U (en) Rail guard preparation mounting structure
CN211037454U (en) Combined building decoration curtain wall
CN213930120U (en) But quick assembly disassembly's laser level meter
CN212352282U (en) Punching mechanism used in acrylic plate machining process
CN208009727U (en) A kind of Curtain wall frame
CN218552047U (en) Curtain box structure convenient to assemble
CN106710802A (en) Transformer support convenient to install
CN218911909U (en) Photovoltaic curtain wall
CN220790087U (en) Section bar connecting end cover
CN215368201U (en) Super large grid-type furred ceiling
CN110048664B (en) Water surface photovoltaic bracket with mortise and tenon type structure and mounting method thereof
CN212453287U (en) Integrated furred ceiling mounting bracket convenient to installation
CN209907682U (en) Metal curtain wall bracket hanging piece
CN212554324U (en) Pressing device for processing environment-friendly baking-free bricks
CN220117527U (en) Connection structure of glass curtain wall
CN217858814U (en) Locking device of electric spindle
CN212958240U (en) Detachable door frame structure
CN210780645U (en) Solar cell panel mount
CN218643622U (en) Energy-saving environment-friendly metal unit curtain wall
CN215155022U (en) Hoisting cabinet under vehicle
CN213520692U (en) High-power semiconductor laser
CN214138122U (en) Rear axle reinforcing ring
CN217027746U (en) Steel structure pillar with multiple supporting plates
CN215113851U (en) Drier with uniform heating function for producing anhydrous sodium acetate
CN216447789U (en) Slide way type multi-screen splicing support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A protective fence production and installation structure

Granted publication date: 20210810

Pledgee: China Postal Savings Bank Co.,Ltd. Anyi County Branch

Pledgor: Jiangxi Hongxin Aluminum Industry Co.,Ltd.

Registration number: Y2024980036835