CN213928006U - A prefabricated door buttress and connected node for steel construction building steel column department - Google Patents

A prefabricated door buttress and connected node for steel construction building steel column department Download PDF

Info

Publication number
CN213928006U
CN213928006U CN202022496571.2U CN202022496571U CN213928006U CN 213928006 U CN213928006 U CN 213928006U CN 202022496571 U CN202022496571 U CN 202022496571U CN 213928006 U CN213928006 U CN 213928006U
Authority
CN
China
Prior art keywords
steel
column
door
prefabricated
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022496571.2U
Other languages
Chinese (zh)
Inventor
周敬德
施建新
孙宏运
张维喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyuan Mingzhu Science And Technology Co ltd
Original Assignee
Longyuan Mingzhu Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyuan Mingzhu Science And Technology Co ltd filed Critical Longyuan Mingzhu Science And Technology Co ltd
Priority to CN202022496571.2U priority Critical patent/CN213928006U/en
Application granted granted Critical
Publication of CN213928006U publication Critical patent/CN213928006U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a prefabricated door buttress and connected node for steel construction building steel column department belongs to the assembly type structure field. The prefabricated door pillar comprises an upright post and a pre-embedded connecting piece arranged on the upright post; the upright column is a concrete column with built-in steel bars, and at least 1 embedded connecting piece is arranged on the side surface of the installation side of the upright column; each pre-buried connecting piece includes the steel sheet and grabs the muscle with the steel sheet one side is connected, and the muscle is grabbed to the steel is pre-buried to be fixed in the stand and fixed with the built-in reinforcing bar coupling of stand, and the steel sheet is grabbed on the muscle is fixed to the steel and is laminated on the installation side of stand for connect outside steel column. For current door buttress structure, the utility model discloses can realize the assembly of door buttress on the steel column surface of steel construction building fast, through designing the door buttress into festival segmentation concatenation form moreover, can further promote the installation effectiveness of prefabricated door buttress, improve the assembly degree of building.

Description

A prefabricated door buttress and connected node for steel construction building steel column department
Technical Field
The utility model belongs to the assembly type structure field, concretely relates to prefabricated door buttress structure.
Background
The door pillar is a common structure in a brick-concrete structure, and is generally arranged at a position where a door opening is formed on a wall body. When the wall body is turned or a door opening is formed in a thin T-shaped wall body, a door buttress is required to be arranged at the corner of the door close to the wall or on one side of the T-shaped joint wall body in order to facilitate the arrangement of a door frame and ensure the stability of the wall body.
However, with the mass rise of assembly type buildings, a large amount of field operation work in the traditional construction mode is gradually transferred to a factory, building components and accessories are processed and manufactured in the factory, the components and the accessories are transported to a building construction site, and the components and the accessories are assembled and installed on the site through a reliable connection mode. In fabricated buildings, the door opening location often fails to build a door jamb by bricking as in a brick and concrete structure. In the prior art, for example, the invention patent with the application number of CN201510627117.7 discloses a prefabricated building door stack assembly and a construction method thereof, wherein the prefabricated building door stack assembly comprises a prefabricated reinforced concrete door stack, expansion bolts and polymer bonding mortar; reserved bolt holes are formed in the two ends of the prefabricated reinforced concrete door buttress along the length direction, and the hole diameter of each reserved bolt hole is matched with the thread diameter of each expansion bolt; and the polymer bonding mortar is coated on the prefabricated reinforced concrete door jamb and is fixed at the to-be-installed part of the door jamb.
However, for the fabricated building of steel structure, the door buttress often need install on the steel column, and it has certain degree of difficulty to beat to establish expansion bolts on the steel column, also causes the structural strength of steel column impaired easily simultaneously. Accordingly, there continues to be a need for a new type of prefabricated door jamb for prefabricated buildings.
Disclosure of Invention
An object of the utility model is to solve the problem that exists among the prior art to a prefabricated door buttress that is used for steel construction building steel column department is provided, with quick, stable door buttress installation demand among the satisfying steel construction building.
The utility model discloses the concrete technical scheme who adopts as follows:
in a first aspect, the utility model provides a prefabricated door pillar for a steel structure building steel column, which comprises a stand column and a pre-embedded connecting piece arranged on the stand column; the upright column is a concrete column with built-in steel bars, and at least 1 embedded connecting piece is arranged on the side surface of the installation side of the upright column; each pre-buried connecting piece includes the steel sheet and grabs the muscle with the steel sheet one side is connected, and the muscle is grabbed to the steel is pre-buried to be fixed in the stand and fixed with the built-in reinforcing bar coupling of stand, and the steel sheet is grabbed on the muscle is fixed to the steel and is laminated on the installation side of stand for connect outside steel column.
Preferably, two or more embedded connecting pieces are arranged on the upright post.
Preferably, the steel plate has a rectangular shape and a width equal to a width of the mounting-side surface of the pillar.
Preferably, one end of the steel grab rib is welded and fixed with the steel plate, and the other end of the steel grab rib is in a barb form.
Preferably, in the embedded connecting piece, one side of the steel plate is provided with two or more steel grabbing bars.
Preferably, the steel grab bar and the built-in steel bar in the concrete column are fixed through binding and welding.
The second aspect, the utility model provides an utilize arbitrary scheme of above-mentioned first aspect prefabricated door buttress and steel column's connected node, the installation side of prefabricated door buttress and the laminating of steel column, the steel sheet is fixed as an organic whole with the side of steel column.
Preferably, the prefabricated door stacks are formed by vertically splicing multiple sections.
Preferably, in the prefabricated door pile, the abutted seams between two adjacent sections are filled with cement mortar.
Preferably, the steel plate and the side surface of the steel column are fixed by welding or connected into a whole by a fixing piece.
Compared with the prior art, the utility model, following beneficial effect has:
the utility model discloses in according to the characteristics of steel construction assembly type structure, designed a prefabricated door buttress structure that can install on the steel column. This door buttress is connected steel sheet and stand through the steel bar of grabbing as an organic whole and is made the steel sheet laminating arrange in the surface of stand to in connecting outside steel column. For current door buttress structure, the utility model discloses can realize the assembly of door buttress on the steel column surface of steel construction building fast, through designing the door buttress into festival segmentation concatenation form moreover, can further promote the installation effectiveness of prefabricated door buttress, improve the assembly degree of building.
Drawings
FIG. 1 is a schematic view of the assembly of a prefabricated gate pile and steel structural building steel columns;
FIG. 2 is a schematic cross-sectional view of a prefabricated door jamb;
FIG. 3 is a schematic side elevation view of the installation of a prefabricated door pile;
FIG. 4 is an enlarged view of the position I in FIG. 3;
FIG. 5 is a front view and a side view of a pre-buried connector;
FIG. 6 is a schematic view of a multi-segment spliced door jamb;
FIG. 7 is an enlarged view of position II in FIG. 6;
the reference numbers in the figures are: steel column 1, door buttress 2, joint 3, concrete 201, stirrup 202, longitudinal main reinforcement 203, steel plate 204, steel grab reinforcement 205.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein, as those skilled in the art will be able to make similar modifications without departing from the spirit and scope of the present invention. The utility model discloses technical characteristics in each embodiment are under the prerequisite that does not conflict each other, all can carry out corresponding combination.
In the description of the present invention, it will be understood that when an element is referred to as being "connected" to another element, it can be directly connected to the other element or be indirectly connected to the other element, i.e., intervening elements may be present. In contrast, when an element is referred to as being "directly connected" to another element, there are no intervening elements present.
As shown in fig. 1, in a preferred embodiment of the present invention, a prefabricated door pillar 2 for steel column of steel structure building is provided, which can be directly installed on the steel column 1 to meet the installation requirement of the door frame in the steel structure assembly type building. Referring to fig. 2, the prefabricated door pillar 2 includes a pillar and a pre-buried connector disposed on the pillar. The stand column is a concrete column with built-in steel bars, and the pouring and internal steel bar arrangement form of the concrete column can be adjusted according to design requirements. The cross section of the upright post is generally rectangular, 4 longitudinal main reinforcements 203 are arranged in the whole length of the inner part of the upright post body in the embodiment, the 4 longitudinal main reinforcements 203 are connected into a whole by binding the plurality of stirrups 202 at different heights, and the labels of the concrete 201 outside the reinforcements can be adjusted according to corresponding strength requirements.
For convenience of description, in the present invention, a side surface of the column facing the steel column 1 is referred to as a mounting side surface. Referring to fig. 2, 3 and 4, in the present embodiment, 2 embedded connectors are disposed on the side surface of the installation side of the column. Referring to fig. 5, each embedded connector comprises a steel plate 204 and a steel grab bar 205, and the steel plate 204 is arranged on the surface of the column so as to connect the external steel column 1; and the steel grab bar 205 is used for connecting the steel plate 204 and the upright post into a whole. In this embodiment, one side of the steel plate 204 has two steel grab ribs 205, one end of each steel grab rib 205 is welded and fixed with the steel plate 204, and the other end is in the form of a barb. The steel grab bar 205 is pre-buried and fixed in the upright column and is connected and fixed with the built-in steel bar of the upright column, and the steel plate 204 is attached to the side surface of the installation side of the upright column under the fixation of the steel grab bar 205.
The steel plate 204 and the steel grab rib 205 in the embedded connecting piece can be processed in advance and welded into a whole in a factory, then the steel grab rib 205 is bound and fixed on the built-in steel bar of the upright post after the reinforcement cage of the concrete column is bound and before concrete pouring, and the steel plate 204 is kept at the side position of the installation side of the protruding upright post. And after the pre-buried connecting piece is fixed, pouring concrete into the mould, and curing and removing the mould to obtain the prefabricated door buttress 2. In addition, if the strength needs to be enhanced, the steel grab bar 205 and the built-in steel bars of the upright columns can be welded and enhanced.
Certainly, in this embodiment, two embedded connectors are provided on one column, but the specific number of the embedded connectors can be adjusted according to the actual situation, and is at least 1. In practical use, two or more are preferable in consideration of the stress stability of the whole structure.
The steel plate 204 is fixed to the side surface of the steel column 1 by welding or connected to the side surface of the steel column 1 by a fixing member. In consideration of practical convenience of construction, it is preferable to fix the plate by welding. Meanwhile, the steel plate 204 is generally processed into a rectangular shape, and the width thereof is the same as the width of the side surface of the installation side of the column, so as to facilitate welding with the steel column 1.
It should be noted that the prefabricated door pile 2 of the present invention may be a single prefabricated component, and is not necessarily integrally connected with the steel column 1. The prefabricated door stacks 2 can be directly formed in the factory and then transported to the construction site for installation on the steel columns 1. Referring to fig. 1, in the connection node formed after the prefabricated door stack is connected with the steel column 1, the installation side surface of the prefabricated door stack 2 is attached to the steel column 1, and the steel plate 204 is fixed with the side surface of the steel column 1 by welding. From this, can install the door buttress fast on steel column 1 among the steel construction assembly type structure, and then install corresponding door frame, the required construction process in scene that has significantly reduced has improved overall building structure's prefabricated degree.
In addition, in another embodiment of the present invention, another form of prefabricated door jamb 2 is provided. In this embodiment, the prefabricated door jamb 2 is designed as a sectional structure, i.e. the whole vertical prefabricated door jamb 2 is formed by vertically splicing a plurality of sections. Under the method, the prefabricated door piles 2 can be processed into shorter sections with different specifications in a factory and then flexibly assembled on site according to the required length without customizing each node, so that the construction efficiency is further improved. Due to the adoption of the sectional splicing design, cement mortar needs to be filled in the splicing seam 3 between two adjacent sections in the prefabricated door stack 2, and the surface is smoothed. Of course, the end parts of the two ends of the segment can be provided with the tongue-and-groove, so that the segment can be well butted and spliced, and the spliced seam 3 does not need to be processed.
The above-mentioned embodiments are merely a preferred embodiment of the present invention, but it is not intended to limit the present invention. Various changes and modifications can be made by one of ordinary skill in the pertinent art without departing from the spirit and scope of the present invention. Therefore, all the technical schemes obtained by adopting the mode of equivalent replacement or equivalent transformation fall within the protection scope of the utility model.

Claims (10)

1. A prefabricated door pillar for a steel column of a steel structure building is characterized by comprising a stand column and a pre-buried connecting piece arranged on the stand column; the upright column is a concrete column with built-in steel bars, and at least 1 embedded connecting piece is arranged on the side surface of the installation side of the upright column; each pre-buried connecting piece includes steel sheet (204) and grabs muscle (205) of being connected with one side of steel sheet (204), grabs muscle (205) pre-buried being fixed in the stand and fixed with the built-in reinforcing bar coupling of stand, and steel sheet (204) are grabbed muscle (205) and are fixed down the laminating in the installation side of stand at the steel on, are used for connecting outside steel column (1).
2. The precast door pile for the steel column of the steel structure building according to claim 1, wherein two or more pre-embedded connecting members are arranged on the column.
3. The precast gate pile for steel column of steel structure construction according to claim 1, wherein the steel plate (204) has a rectangular shape having the same width as the width of the installation side of the column.
4. The precast door pile for steel column of steel structure construction according to claim 1, wherein the steel grab bar (205) has one end welded to the steel plate (204) and the other end in the form of barb.
5. The precast door pile for steel column of steel structure construction according to claim 1, wherein the pre-buried connector has two or more steel grab bars (205) at one side of the steel plate (204).
6. The precast door pile for steel column of steel structure construction according to claim 1, wherein the steel grab bar (205) is fixed with built-in steel bar in the concrete column by binding welding.
7. A prefabricated door pile and steel column connecting node according to any one of claims 1 to 6, wherein the installation side surface of the prefabricated door pile (2) is attached to the steel column (1), and the steel plate (204) is fixed with the side surface of the steel column (1) into a whole.
8. A connecting joint according to claim 7, characterized in that the prefabricated door jamb (2) is made up of vertical segments.
9. The joint according to claim 8, characterized in that the joints (3) between two adjacent segments in the prefabricated gate pile (2) are filled with cement mortar.
10. The connecting joint according to claim 7, characterized in that the steel plates (204) are integrally connected with the sides of the steel columns (1) by welding or by fasteners.
CN202022496571.2U 2020-11-02 2020-11-02 A prefabricated door buttress and connected node for steel construction building steel column department Active CN213928006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022496571.2U CN213928006U (en) 2020-11-02 2020-11-02 A prefabricated door buttress and connected node for steel construction building steel column department

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022496571.2U CN213928006U (en) 2020-11-02 2020-11-02 A prefabricated door buttress and connected node for steel construction building steel column department

Publications (1)

Publication Number Publication Date
CN213928006U true CN213928006U (en) 2021-08-10

Family

ID=77165688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022496571.2U Active CN213928006U (en) 2020-11-02 2020-11-02 A prefabricated door buttress and connected node for steel construction building steel column department

Country Status (1)

Country Link
CN (1) CN213928006U (en)

Similar Documents

Publication Publication Date Title
US11680401B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
EP3263795B1 (en) Composite structural wall and method of construction thereof
US8074414B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
CN109736479B (en) Assembly type shear wall joint structure and splicing method thereof
CN107975160B (en) Shear wall structure with lateral connecting key groove, manufacturing and assembling method
CN109537811B (en) Manufacturing method of prefabricated column and assembling method of column beam
KR20100054889A (en) Development of fabricated internally confined hollow concrete filled tube using corrugated tube
KR101225661B1 (en) Concrete shear key strengthened with steel cover plate and tension member and the construction method therewith
EA007917B1 (en) Constructing the large-span self-braced buildings of composite load-bearing wall panels and floors
CN108678220B (en) Concrete shear wall with integrally installed reinforcing steel bar templates
CN208363404U (en) A kind of prefabricated panel and its connection structure
KR100946940B1 (en) Joint structure for steel column and flat slab
KR102319225B1 (en) Steel PC shear walls used core system and construction method of the same
CN216787633U (en) Precast concrete component, in-line precast concrete subassembly and building structure
KR20190072336A (en) Building Core System using Precast Concrete Panel with Column in the Center
JP4740029B2 (en) Manufacturing method of floor slab or lining board
CN108571169B (en) Construction method for factory prefabricated steel concrete superposed shear wall assembly type building
CN107447873B (en) Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method
CN212453065U (en) Assembled building frame structure member
CN213928006U (en) A prefabricated door buttress and connected node for steel construction building steel column department
CN112814194B (en) Dry-type connection outer wall structure system and installation method thereof
CN111501996B (en) Connecting joint structure of corbel-free concrete beam and steel column
CN113293866A (en) Door type steel frame system
KR100588194B1 (en) Joint structure of CFT column and RC flat plate and construction method thereof
CN110761399A (en) Vertical splicing structure of prefabricated wall board and assembling method thereof

Legal Events