CN213927411U - Safety hanging basket for engineering construction - Google Patents

Safety hanging basket for engineering construction Download PDF

Info

Publication number
CN213927411U
CN213927411U CN202022584291.7U CN202022584291U CN213927411U CN 213927411 U CN213927411 U CN 213927411U CN 202022584291 U CN202022584291 U CN 202022584291U CN 213927411 U CN213927411 U CN 213927411U
Authority
CN
China
Prior art keywords
steel wire
engineering construction
skidding
wire rope
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022584291.7U
Other languages
Chinese (zh)
Inventor
顾淑玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Youdi Construction Engineering Co ltd
Original Assignee
Jiangsu Youdi Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Youdi Construction Engineering Co ltd filed Critical Jiangsu Youdi Construction Engineering Co ltd
Priority to CN202022584291.7U priority Critical patent/CN213927411U/en
Application granted granted Critical
Publication of CN213927411U publication Critical patent/CN213927411U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a safety hanging basket for engineering construction, the outer surface of the lower end of the main body is provided with a fastening buckle, the outer surface of the upper end of the main body is provided with an anti-skidding channel steel and a high-strength suspender, the high-strength suspender is positioned at one side of the inner wall of the anti-skidding channel steel, the outer surface of the periphery of the high-strength suspender is provided with a protective sleeve, the outer surface of the periphery of the anti-skidding channel steel is provided with a steel wire mesh, the outer surface of the rear end of the steel wire mesh is provided with a personnel channel, the high-strength suspender comprises a carbon steel wire rope, a connecting buckle and maintenance oil, and through the arrangement, an anti-skidding rubber cushion in the anti-skidding channel steel can still effectively increase the friction force of the surface even in rainwater weather, so that people can not skid because of the ground in the channel steel, and have certain safety guarantee for people working in the air, bringing better use prospect.

Description

Safety hanging basket for engineering construction
Technical Field
The utility model relates to an engineering construction field specifically is a basket is hung with safety to engineering construction.
Background
The safety cradle is a cantilever construction means, a suspender adopted by the early safety cradle needs to be replaced irregularly under the long-time work and the load bearing effect, the suspender can be worn, the quality of the suspender is continuously reduced, the abrasion resistance is low, the safety cradle can only be replaced for ensuring safety, and the early safety cradle does not perform corresponding protection work on the suspender, so that the whole suspender is exposed outside, an internal steel wire is broken after the surface is worn to form an agnail on the surface, workers can be injured, and an anti-skidding facility is not adopted inside channel steel adopted by the early safety cradle, particularly, the friction coefficient is reduced in rainy days, the workers can slide, and the safety cradle is also in the air, has certain potential safety hazards for the workers, and certain adverse effects are brought to the use process of the people when the existing safety cradle is installed and used, therefore, the safe hanging basket for engineering construction is provided.
SUMMERY OF THE UTILITY MODEL
Solves the technical problem
Not enough to prior art, the utility model provides a basket is hung with safety to engineering construction possesses advantages such as high strength jib, protective sheath and anti-skidding channel-section steel, can effectively solve the problem among the background art.
Technical scheme
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a basket is hung with safety to engineering construction, the lower extreme surface of main part is provided with the fastening knot, the upper end surface of main part is provided with anti-skidding channel-section steel and high strength jib, the high strength jib is located inner wall one side of anti-skidding channel-section steel, the surface all around of high strength jib is provided with the protective sheath, the surface all around of anti-skidding channel-section steel is provided with the wire net, the rear end surface of wire net is provided with personnel's passageway, the high strength jib includes carbon steel wire rope, connector link and maintenance oil, the protective sheath includes synthetic rubber, sealing glue and connects the face, anti-skidding channel-section steel includes anti-skidding cushion, waterproof adhesive and binding face.
Preferably, the connecting buckles are located at the upper end and the lower end of the carbon steel wire rope, and the maintenance oil is located on the peripheral outer surface of the carbon steel wire rope.
Preferably, the carbon steel wire rope is fixedly connected with the connecting buckle through being wound with the connecting buckle, and the maintenance oil is fixedly connected with the carbon steel wire rope through being coated with the carbon steel wire rope.
Preferably, the synthetic rubber is positioned on the peripheral outer surface of the sealant, and the sealant is positioned on the peripheral outer surface of the connecting surface.
Preferably, the synthetic rubber is fixedly connected with the sealant through the viscosity of the sealant, and the sealant is fixedly connected with the connecting surface through the viscosity of the sealant.
Preferably, the antiskid rubber gasket is positioned on the outer surface of the upper end of the waterproof adhesive, and the waterproof adhesive is positioned on the outer surface of the upper end of the attaching surface.
Preferably, the antiskid cushion is through viscose and the waterproof adhesive fixed connection that sets up, the waterproof adhesive is through the viscose and the binding face fixed connection that sets up.
Advantageous effects
Compared with the prior art, the utility model provides a basket is hung with safety to engineering construction possesses following beneficial effect:
1. this basket is hung with safety to engineering construction, through setting up, the jib that the carbon steel wire rope that the high strength jib adopted was woven and is formed has high intensity and has high strength's resistance to wears equally, the quality of effectual promotion jib to the time that can use is longer.
2. This basket is hung with safety to engineering construction, through setting up, the synthetic rubber that the protective sheath adopted can bond whole jib through sealed complete parcel for the jib avoids producing the barb because of long-term tensile and friction, and then the staff is hindered to effectual production that prevents the barb, and the protection jib that equally can be fine does not receive external erosion.
3. This basket is hung with safety to engineering construction, through setting up, the inside anti-skidding cushion of anti-skidding channel-section steel just can effectual increase surperficial frictional force still at rainwater weather for people can not skid because of the inside ground of channel-section steel and slide to, have certain safety guarantee to the people who work in the air.
Drawings
Fig. 1 is the utility model relates to an engineering construction is with overall structure schematic diagram of basket is hung to safety.
Fig. 2 is the utility model relates to a high strength jib structure of basket is hung with safety to engineering construction.
Fig. 3 is the utility model relates to a protective sheath structure chart of basket is hung with safety to engineering construction.
Fig. 4 is the utility model relates to an engineering construction is with antiskid channel steel structure chart of basket is hung to safety. In the figure: 1. a main body; 2. anti-skid channel steel; 3. steel wire mesh; 4. a personnel passage; 5. a high-strength boom; 6. a protective sleeve; 7. fastening buckles; 501. a carbon steel wire rope; 502. a connecting buckle; 503. maintaining the oil; 601. synthesizing rubber; 602. sealing glue; 603. a connecting surface; 201. an anti-slip rubber pad; 202. waterproof adhesive; 203. and (6) a binding surface.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a safe hanging basket for engineering construction, a fastening buckle 7 is arranged on the outer surface of the lower end of a main body 1, an anti-skid channel steel 2 and a high-strength suspender 5 are arranged on the outer surface of the upper end of the main body 1, the high-strength suspender 5 is positioned on one side of the inner wall of the anti-skid channel steel 2, a protective sleeve 6 is arranged on the outer surface of the periphery of the high-strength suspender 5, a steel wire mesh 3 is arranged on the outer surface of the periphery of the anti-skid channel steel 2, a personnel passage 4 is arranged on the outer surface of the rear end of the steel wire mesh 3, the high-strength suspender 5 comprises a carbon steel wire rope 501, a connecting buckle 502 and maintenance oil 503, the protective sleeve 6 comprises synthetic rubber 601, a sealant 602 and a connecting face 603, the anti-skid channel steel 2 comprises an anti-skid rubber pad 201, a waterproof adhesive 202 and a binding face 203.
Further, the connecting buckles 502 are located at the upper end and the lower end of the carbon steel wire rope 501, and the maintenance oil 503 is located on the peripheral outer surface of the carbon steel wire rope 501.
Further, the carbon steel wire rope 501 is wound around the connecting buckle 502 and fixedly connected with the connecting buckle 502, and the maintenance oil 503 is fixedly connected with the carbon steel wire rope 501 by painting the carbon steel wire rope 501.
Further, the synthetic rubber 601 is located on the peripheral outer surface of the sealant 602, and the sealant 602 is located on the peripheral outer surface of the connecting surface 603.
Further, the synthetic rubber 601 is fixedly connected to the sealant 602 by the self-adhesiveness of the sealant 602, and the sealant 602 is fixedly connected to the connecting surface 603 by the self-adhesiveness.
Further, the anti-slip rubber pad 201 is positioned on the upper outer surface of the waterproof adhesive 202, and the waterproof adhesive 202 is positioned on the upper outer surface of the attaching surface 203.
Further, the anti-slip rubber mat 201 is fixedly connected with the waterproof adhesive 202 through the arranged adhesive, and the waterproof adhesive 202 is fixedly connected with the attaching surface 203 through the arranged adhesive.
Principle of operation
The utility model discloses a by main part 1, anti-skidding channel-section steel 2, the wire net 3, personnel's passageway 4, high strength jib 5, protective sheath 6, fastening buckle 7, carbon steel wire 501, connector buckle 502, maintenance oil 503, synthetic rubber 601, sealed glue 602, connect the face 603, anti-skidding rubber pad 201, waterproof adhesive 202, parts such as binding face 203 constitute, through setting up, the jib that the carbon steel wire that the high strength jib adopted weaves, have high strength and have high-strength wear-resisting equally, the quality of effectual promotion jib, and the time that can use is longer, through setting up, the synthetic rubber that the protective sheath adopted can be through sealed complete parcel bonding whole jib of glue, make the jib avoid producing the barb because of long-term drawing and friction, and then the effectual production that prevents the barb injures the staff, and the protection jib that equally can be fine does not receive external erosion, through setting up, the inside anti-skidding cushion of anti-skidding channel-section steel just can effectual increase surperficial frictional force at rainwater weather still for people can not skid because of the inside ground of channel-section steel and slide to have certain safety guarantee to the people who work in the air.
It is noted that, herein, relational terms such as first and second (a, b, etc.) and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a basket is hung with safety to engineering construction, includes main part (1), its characterized in that: the outer surface of the lower end of the main body (1) is provided with a fastening buckle (7), the outer surface of the upper end of the main body (1) is provided with an anti-skidding channel steel (2) and a high-strength suspender (5), the high-strength suspender (5) is positioned on one side of the inner wall of the anti-skidding channel steel (2), the outer surface of the periphery of the high-strength suspender (5) is provided with a protective sleeve (6), the outer surface of the periphery of the antiskid channel steel (2) is provided with a steel wire mesh (3), a personnel passage (4) is arranged on the outer surface of the rear end of the steel wire mesh (3), the high-strength suspender (5) comprises a carbon steel wire rope (501), a connecting buckle (502) and maintenance oil (503), the protective sleeve (6) comprises synthetic rubber (601), sealant (602) and a connecting surface (603), the anti-slip channel steel (2) comprises an anti-slip rubber mat (201), a waterproof adhesive (202) and a binding surface (203).
2. The safety hanging basket for engineering construction according to claim 1, characterized in that: the connecting buckles (502) are located at the upper end and the lower end of the carbon steel wire rope (501), and the maintenance oil (503) is located on the peripheral outer surface of the carbon steel wire rope (501).
3. The safety hanging basket for engineering construction according to claim 2, wherein: the carbon steel wire rope (501) is fixedly connected with the connecting buckle (502) by being wound with the connecting buckle (502), and the maintenance oil (503) is fixedly connected with the carbon steel wire rope (501) by coating the carbon steel wire rope (501).
4. The safety hanging basket for engineering construction according to claim 1, characterized in that: the synthetic rubber (601) is located on the peripheral outer surface of the sealing rubber (602), and the sealing rubber (602) is located on the peripheral outer surface of the connecting surface (603).
5. The safety hanging basket for engineering construction according to claim 4, wherein: the synthetic rubber (601) is fixedly connected with the sealant (602) through the self viscosity of the sealant (602), and the sealant (602) is fixedly connected with the connecting surface (603) through the self viscosity.
6. The safety hanging basket for engineering construction according to claim 1, characterized in that: the anti-slip rubber mat (201) is located on the outer surface of the upper end of the waterproof adhesive (202), and the waterproof adhesive (202) is located on the outer surface of the upper end of the attaching surface (203).
7. The safety hanging basket for engineering construction according to claim 6, wherein: the anti-skidding rubber mat (201) is fixedly connected with a waterproof adhesive (202) through the arranged adhesive, and the waterproof adhesive (202) is fixedly connected with the binding surface (203) through the arranged adhesive.
CN202022584291.7U 2020-11-10 2020-11-10 Safety hanging basket for engineering construction Expired - Fee Related CN213927411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022584291.7U CN213927411U (en) 2020-11-10 2020-11-10 Safety hanging basket for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022584291.7U CN213927411U (en) 2020-11-10 2020-11-10 Safety hanging basket for engineering construction

Publications (1)

Publication Number Publication Date
CN213927411U true CN213927411U (en) 2021-08-10

Family

ID=77167339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022584291.7U Expired - Fee Related CN213927411U (en) 2020-11-10 2020-11-10 Safety hanging basket for engineering construction

Country Status (1)

Country Link
CN (1) CN213927411U (en)

Similar Documents

Publication Publication Date Title
CN213927411U (en) Safety hanging basket for engineering construction
CN211620996U (en) Anti-falling safety rope made of fireproof material
CN205313899U (en) Novel wire rope is marked in area
CN212609017U (en) Steel bar hoisting and clamping device for building engineering
CN213011552U (en) Wear-resistant hoisting belt with periphery twisted with different-diameter protective belt
CN211077306U (en) Grit conveyer belt
CN207194054U (en) A kind of driver's cabin for being easy to disengaging
CN210682952U (en) Hoisting and fixing device for small articles for subway construction
CN213011554U (en) Anticorrosive anti-skidding synthetic fiber hoisting belt
CN210710361U (en) Hoisting machinery lifting hook and mousing-hook device thereof
CN219058267U (en) Anti-skid wear-resistant heavy lifting belt
CN112027885A (en) Steel bar hoisting and clamping device for building engineering
CN211126807U (en) Transmission line strain insulator overhauls manned operation frame
CN220276153U (en) Aloft work anti-falling device
CN205643791U (en) Communication optical fiber cable
CN212939330U (en) Waterproof corrosion-resistant metal hook
CN217745411U (en) Safety belt secondary protection rope
CN213365107U (en) Switching support of cap type optical cable joint box
CN217295516U (en) Braided bag with handle antiskid structure
CN212863786U (en) Synthetic fiber hoisting belt
CN220300138U (en) High-strength sling device for ocean engineering
CN214063040U (en) Mining automatic rope track cruise device
CN205780578U (en) A kind of closed annular elevator steel band body
CN216190341U (en) Flexible hoisting belt with protective sleeve
CN217593652U (en) Safety belt fixing device for high-altitude outer wall operators

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210810