CN213926257U - A pile device for construction - Google Patents

A pile device for construction Download PDF

Info

Publication number
CN213926257U
CN213926257U CN202022410584.3U CN202022410584U CN213926257U CN 213926257 U CN213926257 U CN 213926257U CN 202022410584 U CN202022410584 U CN 202022410584U CN 213926257 U CN213926257 U CN 213926257U
Authority
CN
China
Prior art keywords
fixedly connected
pile
face
positioning block
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022410584.3U
Other languages
Chinese (zh)
Inventor
范君楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022410584.3U priority Critical patent/CN213926257U/en
Application granted granted Critical
Publication of CN213926257U publication Critical patent/CN213926257U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a pile device for construction, which comprises a mounting bracket, mounting bracket upper end one side fixedly connected with roof, terminal surface fixedly connected with guide arm under the roof, roof up end fixedly connected with wheel carrier, wheel carrier swing joint has the pulley, be provided with the wire rope on the pulley, wire rope one end fixedly connected with locating piece, the guide way has been seted up in the locating piece, the guide arm runs through in the guide way. The utility model discloses in, the flexible pulling wire rope of hoist engine, the guide effect through the traction of pulley and guide arm, can control the locating piece and leave the removal in the vertical direction, then aim at the position that needs the pile with the stake hole, put down the locating piece to ground, reuse the pile hammer and pile, can play the effect of location, the motor will bore ground double-screw bolt and bore ground, can fix whole device, avoid leading to the device to shift because the too big vibrations of pile process, influence the pile effect.

Description

A pile device for construction
Technical Field
The utility model relates to a pile device field especially relates to a pile device for construction.
Background
The pile driver consists of a pile hammer, a pile frame, accessory equipment and the like. The pile hammer is attached between two parallel vertical guide rods at the front part of the pile frame and is hoisted by a hoisting hook. The pile frame is a steel structure tower frame, and a winch is arranged at the rear part of the pile frame and used for hoisting the pile and the pile hammer. The front of the pile frame is provided with a guide frame consisting of two guide rods for controlling the piling direction so that the pile can accurately penetrate into the stratum according to the designed direction. The basic technical parameters of the pile driver are the impact section weight, the impact kinetic energy and the impact frequency. The power source of the pile hammer according to the movement can be divided into a drop hammer, a steam hammer, a diesel hammer, a hydraulic hammer and the like.
The pile driving device has the advantages that the pile driving position cannot be located in the using process of the existing pile driving device, the pile body cannot be driven to the corresponding position accurately, the engineering quality is influenced, the vibration is large in the working process of the pile driver, the whole device is easy to vibrate, the moving position of the device is caused, and the pile driving effect is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects in the prior art and providing a piling device for construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a pile driving device for construction comprises a mounting frame, wherein a top plate is fixedly connected to one side of the upper end of the mounting frame, a guide rod is fixedly connected to the lower end face of the top plate, a wheel carrier is fixedly connected to the upper end face of the top plate, a pulley is movably connected to the wheel carrier, a steel cable is arranged on the pulley, a positioning block is fixedly connected to one end of the steel cable, a guide groove is formed in the positioning block, and the guide rod penetrates through the guide groove;
the positioning block is characterized in that a buffer groove is formed in the lower end face of the positioning block, sliding grooves are formed in two sides of the inner wall of the buffer groove, a sliding block is connected in the sliding grooves in a sliding mode, one end, away from the sliding grooves, of the sliding block is fixedly connected with a positioning column, a pad foot is fixedly connected to the bottom end of the positioning column, and a spring is fixedly connected between the upper wall of the buffer groove and the top end of the positioning column;
the lower extreme of mounting bracket and the one side tight pulley of keeping away from the roof are connected with the base, the mounting bracket one end fixedly connected with mount is kept away from to the base up end, mount up end fixedly connected with motor, the output fixedly connected with of motor bores ground double-screw bolt.
As a further description of the above technical solution:
the hydraulic pile hammer is characterized in that a hydraulic cylinder is fixedly connected to the lower end face of the top plate, a telescopic block is fixedly connected to the output end of the hydraulic cylinder, a pile hammer is fixedly connected to the bottom end of the telescopic block, and a pile body is clamped to the bottom end of the pile hammer.
As a further description of the above technical solution:
a pile hole is formed between the upper end face and the lower end face of the positioning block and is located in the middle of the positioning block.
As a further description of the above technical solution:
and a reinforcing column is fixedly connected between the base and the mounting frame and is obliquely arranged.
As a further description of the above technical solution:
the base up end fixedly connected with hoist engine, the one end fixed connection in the output of hoist engine is kept away from to the locating piece to the steel cable.
As a further description of the above technical solution:
the top plate is provided with a rope passing hole, and the steel cable passes through the rope passing hole.
As a further description of the above technical solution:
the positioning columns are provided with four groups, and the four groups of positioning columns are respectively positioned on the periphery of the lower end face of the positioning block.
As a further description of the above technical solution:
the guide rods are provided with two groups, and the ground drilling studs penetrate through the fixing frame and the base.
The utility model discloses following beneficial effect has:
1. the utility model discloses a hoist engine, guide arm, locating piece etc. that set up, the flexible pulling wire rope of hoist engine, through the pulling action of pulley and the guide effect of guide arm, can control the locating piece and leave the removal in the vertical direction, then aim at the position that needs the pile with the stake hole, put down the locating piece to ground, reuse the pile hammer and pile, can play the effect of location, avoid hitting other positions with the stake.
2. The utility model discloses a motor, mount, the ground double-screw bolt that bores that set up etc, the motor drives and bores the ground double-screw bolt and rotate, will bore the ground double-screw bolt and bore into ground, can play the effect of stabilizing whole device, fixes whole device, avoids leading to the device to shift because the too big vibrations of pile process influence the pile effect.
3. The utility model discloses a spring, reference column, the pad foot etc. that set up, the spring can play better location effect with the reference column cooperation, is applicable to unevenness's ground, makes the locating piece can keep the horizontality equally on different ground, is favorable to the pile.
4. The utility model discloses a strengthening the post that sets up, the bulk strength of strengthening whole device that can be very big plays protection device's effect.
Drawings
Fig. 1 is a schematic structural diagram of a piling device for construction according to the present invention;
fig. 2 is a left side view of a piling device for construction according to the present invention;
fig. 3 is an overall schematic view of the connection between the guide rod and the positioning post of the piling device for construction according to the present invention;
fig. 4 is an enlarged view of a point a in fig. 1.
Illustration of the drawings:
1. a base; 2. an earth boring stud; 3. a fixed mount; 4. a motor; 5. a winch; 6. a steel cable; 7. A reinforcement column; 8. a mounting frame; 9. a pulley; 10. a top plate; 11. a guide bar; 12. a hydraulic cylinder; 13. rope passing holes; 14. a telescopic block; 15. a pile hammer; 16. a pile body; 17. positioning blocks; 18. a positioning column; 19. a foot pad; 20. a buffer tank; 21. a spring; 22. a slider; 23. a chute; 24. a wheel carrier; 25. pile holes; 26. A guide groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides an embodiment: a pile driving device for construction comprises a mounting frame 8, a top plate 10 is fixedly connected to one side of the upper end of the mounting frame 8, a guide rod 11 is fixedly connected to the lower end face of the top plate 10, a wheel carrier 24 is fixedly connected to the upper end face of the top plate 10, a pulley 9 is movably connected to the wheel carrier 24, a steel cable 6 is arranged on the pulley 9, a positioning block 17 is fixedly connected to one end of the steel cable 6, a guide groove 26 is formed in the positioning block 17, the guide rod 11 penetrates through the guide groove 26, a rope passing hole 13 is formed in the top plate 10, the steel cable 6 penetrates through the rope passing hole 13, a winch 5 telescopically pulls the steel cable 6, the positioning block 17 can be controlled to move in the vertical direction through the traction effect of the pulley 9 and the guide effect of the guide rod 11, then a pile hole 25 is aligned to a position needing to be driven, the positioning block 17 is placed on the ground, a pile driving is carried out by using a pile hammer 15, and the positioning effect can be achieved, avoiding driving the pile to other positions.
Terminal surface has seted up dashpot 20 under locating piece 17, spout 23 has been seted up to 20 inner wall both sides of dashpot, sliding connection has slider 22 in the spout 23, 23 one end fixedly connected with reference column 18 of spout are kept away from to slider 22, 18 bottom fixedly connected with of reference column fills up foot 19, fixedly connected with spring 21 between 20 upper walls of dashpot and the 18 top of reference column, spring 21 can play better location effect with the 18 cooperation of reference column, be applicable to unevenness's ground, make locating piece 17 equally can keep the horizontality in different ground, be favorable to the pile.
The lower extreme of mounting bracket 8 and the one side tight pulley of keeping away from roof 10 are connected with base 1, 8 one end fixedly connected with mounts 3 of mounting bracket are kept away from to the 1 up end of base, 3 up end fixedly connected with motors 4 of mounts, the output fixedly connected with of motor 4 bores ground double-screw bolt 2, 1 up end fixedly connected with hoist engine 5 of base, 17 one end fixed connection of locating piece in hoist engine 5's output is kept away from to wire rope 6, motor 4 drives and bores ground double-screw bolt 2 and rotates, to bore ground double-screw bolt 2 and bore ground, can play the effect of stabilizing whole device, fix whole device, avoid leading to the device aversion because the too big vibrations of pile driving process, influence the pile effect.
The end face fixedly connected with pneumatic cylinder 12 under roof 10, pneumatic cylinder 12 output end fixedly connected with flexible piece 14, flexible piece 14 bottom fixedly connected with pile hammer 15, pile hammer 15 bottom joint has pile body 16, pile hole 25 has been seted up between the terminal surface about the locating piece 17, pile hole 25 is located the locating piece 17 intermediate position, fixedly connected with enhancement post 7 between base 1 and the mounting bracket 8, enhancement post 7 is the slope setting, reference column 18 is provided with four groups, four groups of reference columns 18 are located respectively under the locating piece 17 terminal surface all around, guide arm 11 is provided with two sets ofly, bore ground double-screw bolt 2 and run through mount 3 and base 1, the bulk strength of whole device of enhancement that enhancement post 7 can be very big plays protection device's effect.
The working principle is as follows: when the device is used for piling in a construction site, firstly, the pile body 16 is clamped through the pile hammer 15, the winch 5 stretches and pulls the steel cable 6, the positioning block 17 can be controlled to move in the vertical direction through the traction effect of the pulley 9 and the guiding effect of the guide rod 11, then the pile hole 25 is aligned to the position needing piling, the positioning block 17 is put down to the ground for positioning, the motor 4 drives the ground drilling stud 2 to rotate, the ground drilling stud 2 is drilled into the ground, the whole device is fixed, the device is prevented from shifting due to excessive vibration in the piling process, the pile body 16 is driven into the ground from the pile hole 25 in the middle of the positioning block 17 through the matching of the hydraulic cylinder 12 and the pile hammer 15, the piling effect is effectively improved, and the labor intensity is reduced.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (8)

1. A pile driving device for construction, includes mounting bracket (8), its characterized in that: a top plate (10) is fixedly connected to one side of the upper end of the mounting frame (8), a guide rod (11) is fixedly connected to the lower end face of the top plate (10), a wheel carrier (24) is fixedly connected to the upper end face of the top plate (10), a pulley (9) is movably connected to the wheel carrier (24), a steel cable (6) is arranged on the pulley (9), a positioning block (17) is fixedly connected to one end of the steel cable (6), a guide groove (26) is formed in the positioning block (17), and the guide rod (11) penetrates through the guide groove (26);
a buffer groove (20) is formed in the lower end face of the positioning block (17), sliding grooves (23) are formed in two sides of the inner wall of the buffer groove (20), a sliding block (22) is connected in the sliding groove (23) in a sliding mode, one end, far away from the sliding groove (23), of the sliding block (22) is fixedly connected with a positioning column (18), the bottom end of the positioning column (18) is fixedly connected with a pad foot (19), and a spring (21) is fixedly connected between the upper wall of the buffer groove (20) and the top end of the positioning column (;
the lower extreme of mounting bracket (8) and the one side tight pulley of keeping away from roof (10) are connected with base (1), mounting bracket (8) one end fixedly connected with mount (3) are kept away from to base (1) up end, mount (3) up end fixedly connected with motor (4), the output end fixedly connected with of motor (4) bores ground double-screw bolt (2).
2. A piling device for use in construction according to claim 1, wherein: terminal surface fixedly connected with pneumatic cylinder (12) under roof (10), pneumatic cylinder (12) output end fixedly connected with flexible piece (14), flexible piece (14) bottom fixedly connected with pile hammer (15), pile hammer (15) bottom joint has pile body (16).
3. A piling device for use in construction according to claim 1, wherein: a pile hole (25) is formed between the upper end face and the lower end face of the positioning block (17), and the pile hole (25) is located in the middle of the positioning block (17).
4. A piling device for use in construction according to claim 1, wherein: and a reinforcing column (7) is fixedly connected between the base (1) and the mounting frame (8), and the reinforcing column (7) is obliquely arranged.
5. A piling device for use in construction according to claim 1, wherein: the steel cable fixing device is characterized in that a winch (5) is fixedly connected to the upper end face of the base (1), and one end, far away from the positioning block (17), of the steel cable (6) is fixedly connected to the output end of the winch (5).
6. A piling device for use in construction according to claim 1, wherein: the top plate (10) is provided with a rope passing hole (13), and the steel cable (6) penetrates through the rope passing hole (13).
7. A piling device for use in construction according to claim 1, wherein: four groups of positioning columns (18) are arranged, and the four groups of positioning columns (18) are respectively positioned on the periphery of the lower end face of the positioning block (17).
8. A piling device for use in construction according to claim 1, wherein: two groups of guide rods (11) are arranged, and the ground drilling studs (2) penetrate through the fixing frame (3) and the base (1).
CN202022410584.3U 2020-10-27 2020-10-27 A pile device for construction Expired - Fee Related CN213926257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022410584.3U CN213926257U (en) 2020-10-27 2020-10-27 A pile device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022410584.3U CN213926257U (en) 2020-10-27 2020-10-27 A pile device for construction

Publications (1)

Publication Number Publication Date
CN213926257U true CN213926257U (en) 2021-08-10

Family

ID=77225284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022410584.3U Expired - Fee Related CN213926257U (en) 2020-10-27 2020-10-27 A pile device for construction

Country Status (1)

Country Link
CN (1) CN213926257U (en)

Similar Documents

Publication Publication Date Title
CN207332754U (en) Electric pole is digged pit upright bar integrated apparatus
CN209741839U (en) A vibration pile driver for bridge construction
CN116816277A (en) Multifunctional ramming ring and drill rod combination device
CN213926257U (en) A pile device for construction
CN212248238U (en) Pile driver is used in bridge construction
CN202131986U (en) Pile driver
CN208023576U (en) Pile monkey component and piling machine with the pile monkey component
CN210288386U (en) Civil engineering is with a tractor serves several purposes pile driver
CN212688948U (en) Drilling mechanism for screw threaded pile and anchor pile
CN210422486U (en) Immersed tube gravel pile machine
CN211713959U (en) Bridge construction is with pile device
CN210658349U (en) Center pillar supporting device for piling in pavement construction
CN111271001A (en) Pile-driving drilling machine capable of efficiently replacing drill bit
CN112726610A (en) Static pressure pile machine with stirring pile function
CN219218992U (en) Pile driver with high accuracy
CN211950357U (en) Pile-driving drilling machine capable of efficiently replacing drill bit
CN218933102U (en) Multifunctional pile driver
CN211447071U (en) Cleaning device of rotary excavating pile machine
CN214741086U (en) Rotary drilling rig
CN216275676U (en) Traction, hanging and pulling reinforcing device of pile driver
CN205348179U (en) High frequency opposition lightened pile driver
CN218090843U (en) Low clearance vibration immersed tube pile driver
CN213114630U (en) Tension display structure of hydraulic vibration hammer
CN221032397U (en) Pile driver
CN212956523U (en) Anti-shake vibration pile driver for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210810