CN213926091U - Novel hydraulic engineering side slope construction protection system - Google Patents

Novel hydraulic engineering side slope construction protection system Download PDF

Info

Publication number
CN213926091U
CN213926091U CN202022553198.XU CN202022553198U CN213926091U CN 213926091 U CN213926091 U CN 213926091U CN 202022553198 U CN202022553198 U CN 202022553198U CN 213926091 U CN213926091 U CN 213926091U
Authority
CN
China
Prior art keywords
fixedly connected
protection
pull
hydraulic engineering
pointed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022553198.XU
Other languages
Chinese (zh)
Inventor
刘斌
崔慧慧
刘维方
李伟
王楠
王俊龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuifa Design Group Dongying Co ltd
Original Assignee
Shuifa Design Group Dongying Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shuifa Design Group Dongying Co ltd filed Critical Shuifa Design Group Dongying Co ltd
Priority to CN202022553198.XU priority Critical patent/CN213926091U/en
Application granted granted Critical
Publication of CN213926091U publication Critical patent/CN213926091U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a novel hydraulic engineering side slope construction protection system, which belongs to the hydraulic engineering field and comprises a protection net, a protection frame is fixedly connected with the outer side of the protection net, the protection frame is fixedly connected with a plurality of lantern rings, the interior of the lantern rings is sleeved with a pull rope in a sliding way, one end of the pull rope is fixedly connected with a buckle, four corners of the protection frame are respectively fixedly connected with a mounting ring, through the arrangement of the pull rope and the buckle, splicing and assembling between the protection nets are convenient, and through the arrangement of the lantern rings, the protection frame is protected, the pull rope is prevented from rubbing the protection frame when being pulled, the damage of the connection part is avoided, the protection net and the protection frame are respectively protected, and through the upper end of a pointed pile being fixedly connected with a pull ring and a lug, the rope can conveniently pass through the pull ring to pull the pointed pile upwards, the hammer is convenient to beat the upper end of the lug, so that the pointed pile is quickly connected to the ground, thereby increasing the speed of installing the protective net and being convenient to assemble and disassemble.

Description

Novel hydraulic engineering side slope construction protection system
Technical Field
The utility model relates to a hydraulic engineering field, more specifically say, relate to a novel hydraulic engineering side slope construction protection system.
Background
Hydraulic engineering is a specialty of common higher schools and belongs to the field of hydraulic engineering and management. The technology has the advantages of cultivating moral, intelligence, body and beauty comprehensive development, having good professional moral and humanistic literacy, mastering basic knowledge of hydraulic engineering construction technology, hydraulic engineering construction organization and management and the like, having the capabilities of farmland hydraulic engineering construction and management, town hydraulic engineering construction and management, rural drinking water safety management, engineering surveying and mapping and the like, and being high in quality technical skills for engaging in the works of farmland hydraulic engineering construction and management, urban hydraulic engineering construction and management, rural drinking water engineering safety management and the like.
Present neotype hydraulic engineering side slope construction protection system is that the protection network is laid and is pasted aslope, protect the slope, avoid slope silt to run off, the slope collapses, but the protection network on current protection slope is when connecting the concatenation, the majority is to make the connection of protection network splice through ordinary rope, not only troublesome, the protection network is pulled easily when the concatenation in addition and is out of shape the damage, the inconvenient installation and the dismantlement of the most tip stake of fixed protection network simultaneously, bring a lot of inconveniences for installation work.
SUMMERY OF THE UTILITY MODEL
Problem to existence among the prior art, the utility model aims to provide a novel hydraulic engineering side slope construction protection system, setting through stay cord and buckle, the convenience makes concatenation equipment between the protection network, and setting through the lantern ring, play the guard action to the protective frame, avoid the stay cord to take place to rub with the protective frame when dragging, avoid dragging the junction and damage, play the guard action respectively to protection network and protective frame, and upper end fixed connection pull ring and lug through the pointed head stake, make things convenient for the rope to pass the pull ring and upwards pull out the pointed head stake, make things convenient for the hammer to beat the upper end of lug, make pointed head stake quick connection to underground, thereby the speed of protection network installation has been strengthened, and convenient loading and unloading.
In order to solve the above problems, the utility model adopts the following technical proposal.
A novel hydraulic engineering slope construction protection system comprises a protection net, wherein a protection frame is fixedly connected to the outer side of the protection net, a plurality of lantern rings are fixedly connected to the protection frame, pull ropes are sleeved in the lantern rings in a sliding mode, a buckle is fixedly connected to one end of each pull rope, mounting rings are fixedly connected to four corners of the protection frame respectively, pointed piles are inserted in the mounting rings in a sliding mode and provided with a plurality of resistance reduction grooves, pull rings are fixedly connected to the upper ends of the pointed piles, protruding blocks are fixedly connected to the upper ends of the pull rings, splicing and assembling of the protection net are facilitated through the arrangement of the pull ropes and the buckle, the protection frame is protected through the arrangement of the lantern rings, friction between the pull ropes and the protection frame is avoided when the pull ropes are pulled, damage of the pulling joints is avoided, and the protection net and the protection frame are protected respectively, and through the upper end fixed connection pull ring and the lug of pointed end stake, make things convenient for the rope to pass the pull ring and upwards pull out pointed end stake, make things convenient for the hammer to beat the upper end of lug for pointed end stake quick connection to underground, thereby increaseed the speed of protection network installation, convenient loading and unloading moreover.
Further, the material of protection network is made for the metal, the material of the lantern ring is made for the metal, through the setting of the lantern ring, during the installation concatenation protection network, has increaseed the tightness of junction, damages the protective frame when avoiding connecting the concatenation.
Further, the stay cord is made for the steel wire, the material of collar is made for the metal, through stay cord fixed connection buckle, conveniently makes both ends carry out fixed connection about the stay cord, and the buckle belongs to prior art, and this technical scheme is no longer repeated.
Furthermore, the lower end of the pointed pile is conical, the upper end of the pointed pile is cylindrical, the lower end of the pointed pile is conical, the contact area between the lower end of the pointed pile and the ground is reduced, and the rapid descending speed of the pointed pile is increased.
Furthermore, the pull ring and the lug are made of metal respectively, the length of the lug is larger than the inner diameter of the pull ring, the pull ring is conveniently slid through a rope to pull out the pointed pile from the ground through the arrangement of the pull ring, the upper end of the lug is beaten through a hammer, and the pointed pile is conveniently and quickly moved to the ground.
Compared with the prior art, the utility model has the advantages of:
(1) this scheme passes through the setting of stay cord and buckle, the equipment of splicing between the convenient messenger protection network, and the setting through the lantern ring, play the guard action to the protective frame, avoid the stay cord to take place to rub with the protective frame when dragging, avoid dragging the junction to damage, play the guard action respectively to the protection network and protective frame, and upper end fixed connection pull ring and lug through the pointed head stake, make things convenient for the rope to pass the pull ring and upwards pull up the pointed head stake, make things convenient for the hammer to beat the upper end of lug, make pointed head stake quick connection to underground, thereby the speed of protection network installation has been strengthened, and convenient loading and unloading.
(2) The material of protection network is made for the metal, and the material of the lantern ring is made for the metal, through the setting of the lantern ring, during the installation concatenation protection network, has increaseed the tightness of junction, damages the protective frame when avoiding connecting the concatenation.
(3) The stay cord is made for the steel wire, and the material of collar is made for the metal, through stay cord fixed connection buckle, conveniently makes both ends carry out fixed connection about the stay cord, and the buckle belongs to prior art, and this technical scheme no longer gives unnecessary details.
(4) The lower end of the pointed pile is conical, the upper end of the pointed pile is cylindrical, the contact area of the lower end of the pointed pile and the ground is reduced by setting the lower end of the pointed pile into the conical shape, and the rapid descending speed of the pointed pile is increased.
(5) The material of pull ring and lug is made for the metal respectively, and the length of lug is greater than the internal diameter of pull ring, through the setting of pull ring, conveniently passes the pull ring through the rope slip and extracts the underground to the pointed head stake, beats the upper end of lug through the hammer, conveniently arrives the underground to pointed head stake quick travel.
Drawings
Fig. 1 is a schematic view of a protection net of the present invention;
fig. 2 is a partial schematic view of the connection of the protection net of the present invention;
fig. 3 is an enlarged schematic view of a pointed pile of the present invention;
fig. 4 is an enlarged cross-sectional view of the pointed pile of the present invention.
The reference numbers in the figures illustrate:
1 protective net, 2 protective frames, 3 lantern rings, 4 pull ropes, 5 buckles, 6 mounting rings, 7 pointed piles, 8 drag reduction grooves, 9 pull rings and 10 convex blocks.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-4, a novel hydraulic engineering slope construction protection system comprises a protection net 1, referring to fig. 1-3, a protection frame 2 is fixedly connected to the outer side of the protection net 1, a plurality of lantern rings 3 are fixedly connected to the protection frame 2, a pull rope 4 is slidably sleeved in the lantern rings 3, a buckle 5 is fixedly connected to one end of the pull rope 4, mounting rings 6 are respectively and fixedly connected to four corners of the protection frame 2, pointed piles 7 are slidably inserted in the mounting rings 6, the pointed piles 7 are provided with a plurality of resistance reduction grooves 8, pull rings 9 are fixedly connected to the upper ends of the pointed piles 7, bumps 10 are fixedly connected to the upper ends of the pull rings 9, the protection net 1 can be conveniently spliced and assembled through the arrangement of the pull rope 4 and the buckle 5, the protection frame 2 is protected through the arrangement of the lantern rings 3, and friction between the pull rope and the protection frame 2 is avoided when the pull rope is pulled, avoid dragging the junction and damage, play the guard action respectively to protection network 1 and protective frame 2, through the upper end fixed connection pull ring 9 and the lug 10 of pointed pile 7, make things convenient for the rope to pass pull ring 9 and upwards pull out pointed pile 7, make things convenient for the hammer to beat the upper end of lug 10 for pointed pile 7 is connected to the underground fast, thereby has increaseed the speed of protection network 1 installation, convenient loading and unloading moreover.
Please refer to fig. 1, the material of protection network 1 is made for the metal, and the material of the lantern ring 3 is made for the metal, through the setting of the lantern ring 3, during installation concatenation protection network 1, has increaseed the tightness of junction, damages protection frame 2 when avoiding connecting the concatenation, and stay cord 4 is made for the steel wire, and the material of collar 6 is made for the metal, through stay cord fixed connection buckle 5, conveniently makes both ends carry out fixed connection about stay cord 4, and buckle 5 belongs to prior art, and this technical scheme no longer gives details.
Referring to fig. 3, the lower end of the pointed pile 7 is conical, the upper end of the pointed pile 7 is cylindrical, the lower end of the pointed pile 7 is conical, the contact area between the lower end of the pointed pile 7 and the ground is reduced, the rapid descending speed of the pointed pile 7 is increased, the pull ring 9 and the bump 10 are made of metal respectively, the length of the bump 10 is larger than the inner diameter of the pull ring 9, the pull ring 9 is arranged, the pointed pile 7 can be conveniently pulled out of the ground through the pull ring 9 in a sliding mode through a rope, the upper end of the bump 10 is hammered through a hammer, and the pointed pile 7 can be conveniently and rapidly moved to the ground.
The protection net 1 is moved to one end of another protection net 1, then two adjacent lantern rings are arranged in the sliding process of the pull rope 4, the left end and the right end of the pull rope 4 are fixedly connected through a buckle 5, then the protection net 1 is spliced and assembled, the pointed pile 7 slides through the inside of a mounting ring 6, the upper end of a lug 10 is beaten through a hammer, the pointed pile 7 is conveniently and quickly moved to the underground, the pointed pile 7 is conveniently pulled out of the underground through the pull ring 9 through the arrangement of the pull ring 9 through the sliding of the rope, the splicing and assembling between the protection nets 1 are conveniently realized through the arrangement of the pull rope 4 and the buckle 5, the protection frame 2 is protected through the arrangement of the lantern rings 3, the pull rope is prevented from being rubbed with the protection frame 2 when being pulled, the damage of the pulling joint is avoided, the protection effect is respectively realized on the protection net 1 and the protection frame 2, and the pull ring 9 and the lug 10 are fixedly connected through the upper end of the pointed pile 7, make things convenient for the rope to pass pull ring 9 and upwards pull out pointed pile 7, make things convenient for the hammer to beat the upper end of lug 10 for pointed pile 7 is connected to the underground fast, thereby has increaseed the speed of protection network 1 installation, convenient loading and unloading moreover.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (5)

1. The utility model provides a novel hydraulic engineering side slope construction protection system, includes protection network (1), its characterized in that: the outer side fixedly connected with protective frame (2) of protection network (1), a plurality of lantern rings (3) of protective frame (2) fixedly connected with, stay cord (4) have been cup jointed in the inside slip of the lantern ring (3), one end fixedly connected with buckle (5) of stay cord (4), four corners difference fixedly connected with collar (6) of protective frame (2), the inside slip grafting of collar (6) has pointed pile (7), pointed pile (7) are equipped with a plurality of drag reduction grooves (8), the upper end fixedly connected with pull ring (9) of pointed pile (7), the upper end fixedly connected with lug (10) of pull ring (9).
2. The novel hydraulic engineering slope construction protection system of claim 1, characterized in that: the protective net (1) is made of metal, and the lantern ring (3) is made of metal.
3. The novel hydraulic engineering slope construction protection system of claim 1, characterized in that: the pull rope (4) is made of steel wires, and the mounting ring (6) is made of metal.
4. The novel hydraulic engineering slope construction protection system of claim 1, characterized in that: the lower end of the pointed pile (7) is in a conical shape, and the upper end of the pointed pile (7) is in a cylindrical shape.
5. The novel hydraulic engineering slope construction protection system of claim 1, characterized in that: the pull ring (9) and the lug (10) are made of metal respectively, and the length of the lug (10) is larger than the inner diameter of the pull ring (9).
CN202022553198.XU 2020-11-07 2020-11-07 Novel hydraulic engineering side slope construction protection system Active CN213926091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022553198.XU CN213926091U (en) 2020-11-07 2020-11-07 Novel hydraulic engineering side slope construction protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022553198.XU CN213926091U (en) 2020-11-07 2020-11-07 Novel hydraulic engineering side slope construction protection system

Publications (1)

Publication Number Publication Date
CN213926091U true CN213926091U (en) 2021-08-10

Family

ID=77166686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022553198.XU Active CN213926091U (en) 2020-11-07 2020-11-07 Novel hydraulic engineering side slope construction protection system

Country Status (1)

Country Link
CN (1) CN213926091U (en)

Similar Documents

Publication Publication Date Title
CN213926091U (en) Novel hydraulic engineering side slope construction protection system
CN212270942U (en) Geotechnical engineering submersible concrete pouring sealing telescopic pipe
CN107012866B (en) Pull wire ground anchor easy to recycle
CN207844841U (en) A kind of great diameter and long pile cages decentralization suspender
CN217260543U (en) Windproof ship cover
CN210001519U (en) Tower type lifting structure
CN207348057U (en) A kind of guy anchor easily recycled
CN212153291U (en) Water conservancy slope protection net that can high-speed joint
CN102136699B (en) Method for unfolding lead wire to cross line and wire protection tool
CN206411303U (en) A kind of aerial optical cable squirrel-preventing device
CN209099976U (en) A kind of Telescopic drill rod casing applied in MJS construction
CN203946016U (en) A kind of cement pole trailing device
CN107142761A (en) A kind of cable peculiar to vessel
CN211579127U (en) Data line convenient to arrange
CN218851683U (en) Non-slip lead for fishing
CN211340193U (en) Rope with elasticity
CN218997554U (en) A long section of thick bamboo wire cover for dragging cable
CN214302812U (en) Pulling-up hanging basket for construction of constructional engineering
CN218771207U (en) Vertical ground anchor that bores of fixed seabed optical cable
CN214961942U (en) Lower-hanging cultivation rope
CN2379513Y (en) Protective sleeve of pulling cable
CN218712621U (en) Ecological bank protection bearing structure of hydraulic engineering
CN216689453U (en) Side slope reinforcing apparatus for building municipal engineering
CN218896226U (en) Self-bearing micro pipeline
CN218602194U (en) Insulating protection rope