CN213904849U - Project management progress panel - Google Patents

Project management progress panel Download PDF

Info

Publication number
CN213904849U
CN213904849U CN202023194185.4U CN202023194185U CN213904849U CN 213904849 U CN213904849 U CN 213904849U CN 202023194185 U CN202023194185 U CN 202023194185U CN 213904849 U CN213904849 U CN 213904849U
Authority
CN
China
Prior art keywords
project management
fixed
management progress
board according
seted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023194185.4U
Other languages
Chinese (zh)
Inventor
谢伟民
梁独朕
项伟
江泳
常大江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo International Investment Consulting Co ltd
Original Assignee
Ningbo International Investment Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo International Investment Consulting Co ltd filed Critical Ningbo International Investment Consulting Co ltd
Priority to CN202023194185.4U priority Critical patent/CN213904849U/en
Application granted granted Critical
Publication of CN213904849U publication Critical patent/CN213904849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The application relates to a project management progress display board, belongs to the technical field of project management, and solves the technical problem that an existing display board is unstable in place and easy to slide. The fixing groove is formed in the fixing plate, the fixing groove is provided with a plurality of corresponding fixing grooves and a plurality of universal wheels, and the universal wheels are limited in the fixing groove. This application has the panel and places stable advantage.

Description

Project management progress panel
Technical Field
The application relates to the technical field of project management, in particular to a project management progress display board.
Background
The effect of panel is used in current project management generally for the convenience of show relevant achievement etc. the panel all has support frame, supplementary landing leg, mounting etc. generally, has different kinds to the different needs panel, and common type has propaganda panel, fixed panel and activity panel etc. for project management.
The display board for the existing project management mainly comprises a mounting frame and a board body arranged on the mounting frame, and universal wheels are arranged under the mounting frame, so that the display board is convenient to carry.
In view of the above-mentioned related art, the inventors consider that there is a defect that the display board is unstable in place and easily slips.
SUMMERY OF THE UTILITY MODEL
In order to solve the defect that the display board is unstable in place and easy to slide, the application provides a project management progress display board.
The project management progress display board adopts the following technical scheme:
the utility model provides a project management progress panel, includes the mounting bracket and installs the plate body on the mounting bracket, be provided with a plurality of universal wheels under the mounting bracket, still include the fixed plate, the fixed slot has been seted up on the fixed plate, the fixed slot has a plurality ofly the fixed slot is with a plurality of the universal wheel one-to-one, the universal wheel be spacing in the fixed slot.
Through adopting above-mentioned technical scheme, through setting up the fixed plate to set up the fixed slot on the fixed plate, through spacing the universal wheel in the fixed slot, thereby realize reaching the spacing effect to the panel to the spacing effect of universal wheel, make the panel place before a certain position, can place the fixed plate earlier, finally realize the fixed of panel, make the panel place more stable in situ, simple structure is effective.
Preferably, one side of the fixing plate, which is provided with the side wall of the fixing groove, is provided with a guide surface, and the edge of the guide surface is inclined downwards.
Through adopting above-mentioned technical scheme, fixed plate one side sets up the spigot surface for the panel upper fixed plate that can slide, thereby it is more convenient when making the panel transport upper fixed plate.
Preferably, install in the fixed slot and promote the piece, it is provided with the promotion face to promote piece one side, promote the downward sloping setting of face one side, it is provided with the butt face to promote the piece opposite side, the butt face is perpendicular the tank bottom of fixed slot.
Through adopting above-mentioned technical scheme, through setting up the promotion piece in the fixed slot, when butt face butt universal wheel, better carry on spacingly to the universal wheel, when promoting the face towards the universal wheel, the universal wheel can slide from the fixed slot through promoting the face and go out, promotes face and spigot surface cooperation, finally makes things convenient for the change of panel position.
Preferably, still include the shadoof, shadoof one end outer wall is provided with the gag lever post, the vertical hand-lifting hole of having seted up on the promotion face, annular spacing groove has been seted up to the pore wall of hand-lifting hole lower part, still the vertical spout of having seted up on the promotion face, the spout with carry the hole intercommunication, just the spout with annular spacing groove intercommunication.
Through adopting above-mentioned technical scheme, through the shadoof, conveniently take out the promotion piece from the fixed slot, through inserting the shadoof and carrying the hole, aim at the gag lever post and insert together the spout, rotatory shadoof is in the gag lever post screw in annular spacing groove to it is spacing in the shadoof to carry the shadoof through the gag lever post.
Preferably, the fixing plate is provided with a placement groove, and the lifting rod is placed in the placement groove.
Through adopting above-mentioned technical scheme, set up the resettlement groove for the shadoof can place in the resettlement groove when not using, makes the shadoof be difficult to lose.
Preferably, the mounting bracket includes two montants, the plate body is fixed in two between the montant, every montant one side level overhang is provided with the installation pole, two the installation pole is parallel and is located same height, the mounting hole has been seted up on the fixed plate, the mounting hole has two, two interval between the mounting hole equals two interval between the installation pole.
Through adopting above-mentioned technical scheme, set up the installation pole on the mounting bracket for when carrying the panel, the fixed plate can pass through the mounting hole hoist and mount on the installation pole, makes things convenient for the transport of fixed plate.
Preferably, a nut is fixed on the mounting rod through threads.
Through adopting above-mentioned technical scheme, thread tightening nut on the installation pole carries on spacingly to the fixed plate through the nut for the panel is when the transport, and the fixed plate is difficult to drop from the installation pole more.
Preferably, a handle is arranged on one side of the fixing plate.
Through adopting above-mentioned technical scheme, set up the handle on the fixed plate, conveniently lift the fixed plate from subaerial to conveniently hoist and mount the fixed plate to the mounting bracket, it is more laborsaving convenient during the operation.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the fixed plate is arranged, the fixed groove is formed in the fixed plate, the universal wheel is limited in the fixed groove, the universal wheel is limited, the effect of limiting the display board is achieved, the fixed plate can be placed before the display board is placed at a certain position, and finally the display board is fixed, so that the display board is placed more stably in place, and the structure is simple and effective;
2. the fixed plate is provided with the guide surface on one side, so that the display board can slide on the fixed plate, the display board can be more conveniently carried on the fixed plate, the lifting block is arranged in the fixed groove, when the abutting surface abuts against the universal wheel, the universal wheel is better limited, when the lifting surface faces the universal wheel, the universal wheel can slide out of the fixed groove through the lifting surface, the lifting surface is matched with the guide surface, and finally, the position of the display board is convenient to replace;
3. set up the installation pole on the mounting bracket for when carrying the panel, the fixed plate can hoist and mount on the installation pole through the mounting hole, makes things convenient for the transport of fixed plate, and threaded fixing nut carries on spacingly to the fixed plate through the nut on the installation pole, makes the panel when the transport, and the fixed plate is difficult to drop from the installation pole more.
Drawings
Fig. 1 is a schematic structural diagram 1 of the present invention, in which a display board is stabilized on the ground;
FIG. 2 is an enlarged view at A in FIG. 1;
FIG. 3 is a cross-sectional view of the lift block and the lift bar;
fig. 4 is a schematic structural diagram 2 of the present invention, carrying the display board.
Reference numerals: 1. a plate body; 2. a fixing plate; 21. fixing grooves; 22. a handle; 23. a guide surface; 24. a placing groove; 25. mounting holes; 31. a vertical rod; 32. a cross bar; 33. a universal wheel; 34. mounting a rod; 35. a nut; 4. a lifting block; 41. lifting the surface; 42. an abutting surface; 43. lifting holes; 44. an annular limiting groove; 45. a chute; 5. lifting a rod; 51. a limiting rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses project management progress panel. Referring to fig. 1, the project management progress panel includes a mounting bracket, a plate body 1 mounted on the mounting bracket, a fixing plate 2, and a stabilizing assembly disposed on the fixing plate 2 for stabilizing the mounting bracket.
The mounting bracket includes montant 31, horizontal pole 32 and universal wheel 33, and montant 31 has two, and two montants 31 vertical settings, and the certain distance in interval between two montants 31, and plate body 1 installs between two montants 31, and 1 both sides of plate body are fixed with two montants 31 respectively.
Horizontal pole 32 has two, and two horizontal poles 32 are parallel to each other, and two horizontal poles 32 and two montants 31 one-to-one, and horizontal pole 32 is located montant 31 down, and montant 31 lower extreme and horizontal pole 32 middle part welded fastening, and universal wheel 33 has four, and on two liang of divisions located two horizontal poles 32 of four universal wheels 33, two universal wheels 33 on every horizontal pole 32 divide the both sides of establishing horizontal pole 32 downside wall length direction.
Referring to fig. 1 and 2, a fixing groove 21 is formed in the fixing plate 2, the fixing grooves 21 are provided with a plurality of fixing grooves 21, the fixing grooves 21 correspond to the universal wheels 33 one by one, in this embodiment, the number of the fixing grooves 21 is four, and the four universal wheels 33 are located in the fixing grooves 21 in a one-to-one correspondence manner.
The fixed plate 2 is provided with guiding surface 23 and handle 22 along the both sides of a montant 31 to the direction of another montant 31 branch, and handle 22 sets up on the lateral wall of fixed plate 2, and guiding surface 23 sets up in the lateral wall of fixed plate 2 and keeps away from handle 22 one side, and the border downward sloping of guiding surface 23 sets up.
Referring to fig. 2 and 3, the stabilizing component includes lifting block 4 and lifting rod 5, lifting block 4 has four, four lifting blocks 4 and four fixed slots 21 one-to-one, lifting block 4 inlays and adorns in fixed slot 21, lifting block 4 is gone up the lateral wall and is set up to lifting surface 41, lifting block 4 lateral wall sets up to butt surface 42, butt surface 42 is perpendicular to the tank bottom of fixed slot 21, lifting surface 41 keeps away from one side downward sloping setting of butt surface 42 for lifting block 4 width direction's cross-section is right angle triangle-shaped.
Lifting rod 5 is a cylinder, 5 one end outer walls of lifting rod are provided with gag lever post 51, the vertical lifting hole 43 of seting up the round hole form on the lifting surface 41, lifting hole 43 diameter is unanimous with lifting rod 5 diameter, lifting rod 5 can slide and insert in lifting hole 43, annular spacing groove 44 has been seted up to the pore wall of lifting hole 43 lower part, still vertically seted up spout 45 on the lifting surface 41, spout 45 and lifting hole 43 intercommunication, and spout 45 lower extreme and annular spacing groove 44 intercommunication, settling groove 24 has been seted up at 2 middle parts of fixed plate, lifting rod 5 places in settling groove 24 (compare fig. 4).
Referring to fig. 1 and 4, a mounting rod 34 is horizontally suspended on one side of the middle of each vertical rod 31, the two mounting rods 34 are parallel and located at the same height, the fixing plate 2 is provided with two mounting holes 25, the distance between the two mounting holes 25 is equal to the distance between the two mounting rods 34, and nuts 35 are screwed on the mounting rods 34.
The implementation principle of the project management progress display board in the embodiment of the application is as follows: when the display board needs to be fixed, the fixing plate 2 is placed at the position where the display board needs to be fixed, the display board is pushed to slide on the fixing plate 2 through the guide surface 23, the display board is pushed until the four universal wheels 33 enter the four fixing grooves 21, the lifting block 4 is embedded into the fixing groove 21 through the lifting rod 5, and the abutting surface 42 abuts against the universal wheel 33, so that the stability of the display board is realized, when the display board needs to be shifted, the lifting block 4 is pulled out by the lifting rod 5 and is installed in the fixing groove 21 again, so that the lifting surface 41 faces the universal wheel 33, the display board slides out of the fixing groove 21 through the lifting surface 41, and slide down from the fixed plate 2 through the guide surface 23, the two mounting holes 25 on the fixed plate 2 correspond to the two mounting rods 34, the mounting rods 34 pass through the mounting holes 25 and are screwed into the nuts 35 on the mounting rods 34, so that the fixed plate 2 and the mounting frame are fixed, and the fixed plate 2 is driven to move together by the movement of the mounting frame.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a project management progress panel, includes the mounting bracket and installs plate body (1) on the mounting bracket, be provided with a plurality of universal wheels (33) under the mounting bracket, its characterized in that: still include fixed plate (2), fixed slot (21) have been seted up on fixed plate (2), fixed slot (21) have a plurality ofly, a plurality of fixed slot (21) and a plurality of universal wheel (33) one-to-one, universal wheel (33) are spacing in fixed slot (21).
2. The project management progress board according to claim 1, wherein: one side of the fixing plate (2) provided with the side wall of the fixing groove (21) is provided with a guide surface (23), and the edge of the guide surface (23) is arranged in a downward inclined mode.
3. The project management progress board according to claim 2, wherein: install in fixed slot (21) and promote piece (4), it is provided with promotion face (41) to promote piece (4) one side, promote face (41) one side downward sloping setting, it is provided with butt face (42) to promote piece (4) opposite side, butt face (42) are perpendicular the tank bottom of fixed slot (21).
4. The project management progress board according to claim 3, wherein: still include lifter (5), lifter (5) one end outer wall is provided with gag lever post (51), vertical lifting hole (43) of having seted up on promotion face (41), annular spacing groove (44) have been seted up to the pore wall of lifting hole (43) lower part, still vertical spout (45) of having seted up on promotion face (41), spout (45) with lifting hole (43) intercommunication, just spout (45) with annular spacing groove (44) intercommunication.
5. The project management progress board according to claim 4, wherein: a placing groove (24) is formed in the fixing plate (2), and the lifting rod (5) is placed in the placing groove (24).
6. The project management progress board according to claim 5, wherein: the mounting bracket includes two montants (31), plate body (1) is fixed in two between montant (31), every montant (31) one side level overhang is provided with installation pole (34), two installation pole (34) are parallel and are located same height, mounting hole (25) have been seted up on fixed plate (2), mounting hole (25) have two, two interval between mounting hole (25) equals two interval between installation pole (34).
7. The project management progress board according to claim 6, wherein: and a nut (35) is fixed on the mounting rod (34) through threads.
8. The project management progress board according to claim 7, wherein: a handle (22) is arranged on one side of the fixing plate (2).
CN202023194185.4U 2020-12-24 2020-12-24 Project management progress panel Active CN213904849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023194185.4U CN213904849U (en) 2020-12-24 2020-12-24 Project management progress panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023194185.4U CN213904849U (en) 2020-12-24 2020-12-24 Project management progress panel

Publications (1)

Publication Number Publication Date
CN213904849U true CN213904849U (en) 2021-08-06

Family

ID=77106359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023194185.4U Active CN213904849U (en) 2020-12-24 2020-12-24 Project management progress panel

Country Status (1)

Country Link
CN (1) CN213904849U (en)

Similar Documents

Publication Publication Date Title
CN204418660U (en) Cast-in-situ concrete beam and slab structure form bracing system
CN104652809A (en) Construction method of support system for templates of concrete beams and slabs
CN204418671U (en) A kind of telescopic concrete blinding support bar system
CN104594628A (en) Structure template supporting system for cast-in-place concrete beam plate and construction method for structure template supporting system
CN213904849U (en) Project management progress panel
CN206022931U (en) Adjustment type bin frame
CN209780275U (en) lifting device for large-span beam reinforcing steel bar
CN212969321U (en) Lifting adjusting device is used in motor installation
CN211647256U (en) Scaffold base with adjustable height
CN202895429U (en) Adjustable cross slope formwork for precast T-shaped beam
CN216042041U (en) Prefabricated plate mounting structure stable in connection
CN208614755U (en) A kind of mounting structure of civil engineering pipeline arranging frame
CN219528350U (en) A but, turnover adjustable support and suspension for suspension
CN204872055U (en) Storage rack is used in prefabricated component production
CN216516741U (en) Ground mortar leveling device
CN211369540U (en) Constructional engineering frame roof beam reinforcing apparatus
CN216605323U (en) Liquid distribution pipe support
CN204726480U (en) A kind of adjustable wire harness rack
CN211395710U (en) Connecting structure of foundation pit stand column and foundation pit bidirectional support
CN204566377U (en) A kind of precast beam steel strand pulling machine hoisting frame device
CN210340194U (en) Automobile lifting device
CN215322602U (en) Regulation type railway signal lamp
CN218335216U (en) Bus duct installing support
CN214822717U (en) Combined power grid contact network for railway electrification engineering
CN219138363U (en) Device for preventing falling of adjustable support of shelving cross beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant