CN213901218U - Heat supply starting structure of 200MW steam turbine - Google Patents

Heat supply starting structure of 200MW steam turbine Download PDF

Info

Publication number
CN213901218U
CN213901218U CN202021886598.6U CN202021886598U CN213901218U CN 213901218 U CN213901218 U CN 213901218U CN 202021886598 U CN202021886598 U CN 202021886598U CN 213901218 U CN213901218 U CN 213901218U
Authority
CN
China
Prior art keywords
condenser
heat supply
pipe
air
supply network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021886598.6U
Other languages
Chinese (zh)
Inventor
刘龙
李宏海
周亮
郭硕
孙崇旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATANG BAODING THERMAL POWER PLANT
Original Assignee
DATANG BAODING THERMAL POWER PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATANG BAODING THERMAL POWER PLANT filed Critical DATANG BAODING THERMAL POWER PLANT
Priority to CN202021886598.6U priority Critical patent/CN213901218U/en
Application granted granted Critical
Publication of CN213901218U publication Critical patent/CN213901218U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a steam turbine field specifically discloses a 200MW steam turbine heat supply start structure, including the condenser, the lower surface mounting of condenser has the inlet tube, the right side of condenser is provided with the heat supply network heater, install the female pipe of air through the air hose between heat supply network heater and the condenser, the vacuum pump is installed to one side of the female pipe of air, install the stop valve on the air hose between heat supply network heater, the condenser. The vacuum pump is used for quickly pumping air in a heat supply network heater and a heating steam extraction pipeline before a unit is started, and is beneficial to the flow of steam in the pipeline and the condensation in the heater, a main pipe at the inlet of a heat supply network drain pump is connected with a straight-through condenser, so that the drainage of the heat supply network heater during starting is facilitated, each heat supply network heater is connected with an air pipe and an air main pipe, the air main pipe is connected with the vacuum pump, the air pipe is connected with the condenser, and valves are respectively additionally arranged, so that the adjustment of operators is facilitated.

Description

Heat supply starting structure of 200MW steam turbine
Technical Field
The utility model relates to a steam turbine field specifically is a 200MW steam turbine heat supply start structure.
Background
After a steam turbine is transformed into a back pressure type heat supply unit, steam does not enter a low pressure cylinder, main steam passes through a high pressure main steam valve and a high pressure adjusting steam valve, a high pressure steam guide pipe enters a high pressure cylinder to do work, and other medium pressure steam exhausts are all used for heat supply, so that the heat supply steam extraction quantity of the unit is improved, the heat supply capacity of the unit is expanded, after the steam turbine is transformed for heat supply, in the starting process of the unit, the steam inlet quantity is reduced, the medium pressure steam exhausts are blocked, the tail of the medium pressure cylinder generates blast overtemperature, shafting vibration is caused, the unit cannot be normally started, after multiple starting and rushing, the unit needs to be quickly connected after rushing to 3000r/min, the constant speed can not be kept for testing, hidden dangers are buried for the safe operation of the unit, and rushing is stopped due to vibration protection in the multiple starting processes, so that the service life of the unit is influenced to a certain extent.
However, after the steam turbine is subjected to heat supply transformation, in the starting process of the unit, the steam inlet amount is reduced, medium-pressure steam exhaust is blocked, and accordingly blast overtemperature is generated at the tail of the medium-pressure cylinder, shafting vibration is caused, and the unit cannot be normally started. Accordingly, a heat supply starting structure for a 200MW steam turbine is provided by those skilled in the art to solve the problems set forth in the background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a 200MW steam turbine heat supply starts structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a 200MW steam turbine heat supply start-up structure, includes the condenser, the lower surface mounting of condenser has the inlet tube, one side of inlet tube is provided with the outlet pipe, the lower surface mounting who is located the condenser between outlet pipe and the inlet tube has the heat well pipe, the right side of condenser is provided with the heat supply network heater, install the female pipe of air through the air hose between heat supply network heater and the condenser, the vacuum pump is installed to one side of the female pipe of air, install the stop valve on the air hose between heat supply network heater, the condenser.
As a further aspect of the present invention: the heat well pipe is communicated with the condenser, and the water inlet pipe is communicated with the condenser.
As a further aspect of the present invention: the vacuum pump is communicated with the air main pipe, and the heat supply network heater is communicated with the air main pipe.
As a further aspect of the present invention: and an exhaust pipe interface is arranged on the upper surface of the condenser, and a condensed water outlet is arranged on one side of the heat well pipe.
As a further aspect of the present invention: the exhaust pipe interface is communicated with the condenser, and the condensed water outlet is communicated with the hot well pipe.
As a further aspect of the present invention: the internally mounted of condenser has the condensation tube bank, one side of condensation tube bank is located the top of inlet tube and is provided with the water inlet room, and the top that the opposite side of condensation tube bank is located the outlet pipe is provided with the delivery port room.
As a further aspect of the present invention: the condensation tube bundle is communicated with the water inlet chamber and the water outlet chamber, and the water outlet pipe is communicated with the condenser.
Compared with the prior art, the beneficial effects of the utility model are that: the small vacuum pump is additionally arranged at the head station of the heat supply network, and is used for quickly pumping air in a heat supply network heater and a heating steam extraction pipeline before a unit is started, so that the flowing of steam in the pipeline and the condensation in the heater are facilitated, the main pipe at the inlet of the heat supply network drain pump is connected with the straight condenser all the way, the drainage and the discharge of the heat supply network heater during the starting are facilitated, each heat supply network heater is connected with the air main pipe all the way, the air main pipe is connected with the vacuum pump all the way, the condenser all the way is connected with the condenser, and valves are additionally arranged respectively, so that the adjustment of an operator is facilitated.
Drawings
FIG. 1 is a schematic structural diagram of a heat supply starting structure of a 200MW steam turbine;
FIG. 2 is a cross-sectional view of a condenser in a 200MW steam turbine heat supply start-up configuration;
FIG. 3 is a schematic diagram of the operation of the device in the heat supply starting structure of the 200MW steam turbine.
In the figure: 1. a condenser; 2. a water inlet pipe; 3. a water outlet pipe; 4. a heat well pipe; 5. an exhaust pipe interface; 6. a condensed water outlet; 7. a water inlet chamber; 8. a water outlet chamber; 9. a condenser tube bundle; 10. a vacuum pump; 11. a heat supply network heater; 12. an air main pipe; 13. and (5) stopping the valve.
Detailed Description
Please refer to fig. 1-3, in an embodiment of the present invention, a 200MW steam turbine heat supply starting structure, including condenser 1, the lower surface mounting of condenser 1 has inlet tube 2, one side of inlet tube 2 is provided with outlet pipe 3, the lower surface mounting that lies in condenser 1 between outlet pipe 3 and the inlet tube 2 has heat well pipe 4, the right side of condenser 1 is provided with heat supply network heater 11, install the female pipe of air 12 through the air pipe between heat supply network heater 11 and condenser 1, vacuum pump 10 is installed to one side of the female pipe of air 12, heat supply network heater 11, install stop valve 13 on the air pipe between condenser 1.
In fig. 1, 2, 3: inlet tube 2 and condenser 1 through connection, hot well pipe 4 and condenser 1 through connection, vacuum pump 10 and the female pipe 12 through connection of air, heat supply network heater 11 and the female pipe 12 through connection of air, the last surface mounting of condenser 1 has blast pipe interface 5, condensate outlet 6 is installed to one side of hot well pipe 4, blast pipe interface 5 and condenser 1 through connection, condensate outlet 6 and hot well pipe 4 through connection, the internally mounted of condenser 1 has condenser bank 9, one side of condenser bank 9 is located the top of inlet tube 2 and is provided with water inlet chamber 7, and the opposite side of condenser bank 9 is located the top of outlet pipe 3 and is provided with delivery port chamber 8, condenser bank 9 and water inlet chamber 7, delivery port chamber 8 through connection, outlet pipe 3 and condenser 1 through connection.
In fig. 1, 2: checking the vacuum conditions of the heat supply network heater 11 and the pipeline, when the vacuum of the condenser 1 is close to the vacuum of the heat supply network heater 11, starting the heat supply network heater 11 to the throat air door of the condenser and the heat supply network drain water to the door of the condenser, paying attention to the vacuum change, if no heat supply network is newly added with a small vacuum pump, considering starting the heat supply network heater to the throat air door of the condenser and the heat supply network drain water to the door of the condenser in advance, and establishing the vacuum together with the host air system.
The utility model discloses a theory of operation is: each heating network heater 11 is additionally provided with a vacuumizing pipeline before an exhaust valve is started, a stop valve 13 is arranged before branch pipelines are connected into an air main pipe 12, so that operators can selectively put in the vacuumizing pipeline according to needs, the air main pipe 12 can be directly connected into a condensation throat, and a main valve is additionally arranged before the air main pipe is connected into a condenser 1 and is used for plugging a plate when a unit is in pure condensation working condition operation so as to prevent vacuum leakage; when a vacuum pump 10 which is not used in an idle state is available, the air main pipe 12 can be provided with a branch, a vacuum pump 10 is added for quickly vacuumizing a heat supply network heater 11 before a unit is started, the normal water circulation of a first pipe network of the heat supply network is checked, a vacuumizing door of the heat supply network heater 11 is opened, an exhaust pipe interface 5 at the top of a condenser 1 is closed, a small vacuum pump valve newly added to the first station is opened, a condenser valve of a newly-added vacuumizing pipeline is closed, an electric door of a heating steam extraction and heat supply network is closed, a steam extraction pipeline draining door is opened, after draining is finished, the draining is closed, draining doors of the heat supply network heaters 11 and draining ground drain doors are closed, a manual door of the heat supply network draining and heat condenser 1 is closed, the vacuum pump 10 of the heat supply network first station is started again, and the heat supply network heaters 11 and steam inlet pipelines of the heat supply network first station are vacuumized.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a 200MW steam turbine heat supply start-up structure, includes condenser (1), its characterized in that, the lower surface mounting of condenser (1) has inlet tube (2), one side of inlet tube (2) is provided with outlet pipe (3), the lower surface mounting that is located condenser (1) between outlet pipe (3) and inlet tube (2) has hot well pipe (4), the right side of condenser (1) is provided with heat supply network heater (11), install female pipe of air (12) through the air hose between heat supply network heater (11) and condenser (1), vacuum pump (10) are installed to one side of female pipe of air (12), install on the air hose between heat supply network heater (11), condenser (1) stop valve (13).
2. A 200MW steam turbine heating starting structure according to claim 1, wherein the heat well pipe (4) is connected to the condenser (1) and the water inlet pipe (2) is connected to the condenser (1).
3. A 200MW steam turbine heating starting structure according to claim 1, wherein the vacuum pump (10) is connected to the air main (12) and the heating network heater (11) is connected to the air main (12).
4. A 200MW steam turbine heating starting structure according to claim 1, characterized in that the upper surface of the condenser (1) is provided with an exhaust pipe joint (5), and one side of the hot well pipe (4) is provided with a condensed water outlet (6).
5. A heating starting structure of a 200MW steam turbine according to claim 4, characterized in that the exhaust pipe connector (5) is connected to the condenser (1) and the condensed water outlet (6) is connected to the hot well pipe (4).
6. A 200MW steam turbine heat supply starting structure according to claim 1, characterized in that the condenser (1) is internally provided with a condenser bundle (9), one side of the condenser bundle (9) is provided with a water inlet chamber (7) above the water inlet pipe (2), and the other side of the condenser bundle (9) is provided with a water outlet chamber (8) above the water outlet pipe (3).
7. The heating starting structure of the 200MW steam turbine according to claim 6, wherein the condenser tube bundle (9) is connected with the water inlet chamber (7) and the water outlet chamber (8) in a penetrating way, and the water outlet pipe (3) is connected with the condenser (1) in a penetrating way.
CN202021886598.6U 2020-09-02 2020-09-02 Heat supply starting structure of 200MW steam turbine Active CN213901218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021886598.6U CN213901218U (en) 2020-09-02 2020-09-02 Heat supply starting structure of 200MW steam turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021886598.6U CN213901218U (en) 2020-09-02 2020-09-02 Heat supply starting structure of 200MW steam turbine

Publications (1)

Publication Number Publication Date
CN213901218U true CN213901218U (en) 2021-08-06

Family

ID=77108898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021886598.6U Active CN213901218U (en) 2020-09-02 2020-09-02 Heat supply starting structure of 200MW steam turbine

Country Status (1)

Country Link
CN (1) CN213901218U (en)

Similar Documents

Publication Publication Date Title
CN105298622B (en) The automatic exhaust system of cooling water system for diesel engine
CN104405459A (en) Backpressure machine acting and heat supply device for steam exhaust heat supply network of intermediate pressure cylinder of steam turbine
CN102011616A (en) High-flow, low-parameter and high-backpressure expansion power energy-saving system
CN204299632U (en) For back pressure machine acting and the heating arrangement of Steam Turbine Through IP Admission steam discharge heating network
CN204554783U (en) A kind of exhaust steam of electric power plant re-use device
CN213901218U (en) Heat supply starting structure of 200MW steam turbine
CN212614913U (en) Safe and energy-saving system for shaft seal steam of supercritical unit
US11131465B2 (en) Vacuum steam heating system
CN108800976B (en) Condensate water level adjusting system and method suitable for double back pressure heat supply unit
CN107560451B (en) Energy-saving vacuum device
CN112343678B (en) Starting control method of thermal power generating unit
CN210218248U (en) Water-saving and energy-saving type water jet air extractor system
CN113294773A (en) Condensate water and heat supply network hydrophobic water mixing system applied to cogeneration unit
CN209687558U (en) A kind of steam turbine of thermal power plant low-vacuum-operating phase gland packing leakage processing mechanism
CN103775329B (en) A kind of possess heat supply and the double mode Sealing Water for Feedwater Pump system of pure condensate
CN208567560U (en) A kind of condensed water Water Level Regulating System suitable for double back pressure thermal power plant units
CN209801455U (en) Low-pressure drainage optimization structure of 600MW unit
CN208184799U (en) Extraction and condensing unit based on jet heat pump changes back pressure unit system
CN215810288U (en) Condenser cooling water pipe leaking stoppage system
CN212376701U (en) Structure for maintaining operation of steam feed pump under low-load working condition
CN219367754U (en) Closed domestic hot water system
CN211924258U (en) Energy-saving and efficient steam seal steam supply system of steam turbine
CN220710252U (en) Liquid cooling system
CN220355508U (en) Steam turbine exhaust steam waste heat heating device
CN111396143A (en) Structure and method for maintaining operation of steam-driven feed pump under low-load working condition