CN213898426U CN202022502061.1U CN202022502061U CN213898426U CN 213898426 U CN213898426 U CN 213898426U CN 202022502061 U CN202022502061 U CN 202022502061U CN 213898426 U CN213898426 U CN 213898426U
Authority
CN
China
Prior art keywords
wall
baffle plate
enclosure
copper pipe
enclosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022502061.1U
Other languages
Chinese (zh)
Inventor
梁冬心
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruili Rongfeng National Culture Communication Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022502061.1U priority Critical patent/CN213898426U/en
Application granted granted Critical
Publication of CN213898426U publication Critical patent/CN213898426U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a construction is with enclosing fender relates to the construction field, including first enclosure, the bottom of first enclosure is connected with the fixing base, one side of first enclosure is provided with the second and inhales the sound layer, the inner wall of first enclosure is provided with the second enclosure, the inner wall of second enclosure is provided with first sound layer, the lead screw is installed to the inner wall of second enclosure, the bottom that the inner wall of first enclosure is located the lead screw is connected with the turbine. The utility model discloses a set up turbine, worm, second enclosure board and lead screw, place fixed position with first enclosure board through the fixing base, then according to the job site demand, through artifical rotatory worm handle, the worm rotates and drives the turbine through gear engagement and rotates, and it is rotatory that the turbine is rotatory to drive the lead screw, and the lead screw is rotatory to be driven the second enclosure board and slides from top to bottom in first enclosure board inner wall spout, rises the height that needs used with the second enclosure board through rotatory worm.

Description

Construction is with enclosing fender
Technical Field
The utility model relates to a construction field specifically is a construction is with enclosing fender.
Background
With the development of urbanization in China, the wave of domestic construction and construction is a trend. However, the construction area belongs to an accident occurrence concentration area and is also a polluted serious disaster area. Therefore, the construction region needs to be isolated by the enclosing barrier in the construction process of the facility workers, so that the normal operation of the daily life of people is ensured.
The fender that encloses now no longer carries out the dust fall to the construction area when the construction and handles, avoids enclosing the inside region construction of fender and produces dust pollution and seriously influences the surrounding environment, influences resident's life on every side simultaneously, can not weaken the processing to the noise that the job site produced, prevents to influence resident normal rest on every side, and the fender height-fixing is enclosed to the current, can not carry out the height-adjusting according to the job site demand.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem that the construction area cannot be subjected to dust fall treatment, the noise generated by construction is weakened and the height cannot be adjusted according to the requirements of a construction site, the building construction enclosure is provided.
In order to achieve the above object, the utility model provides a following technical scheme: an enclosure for building construction comprises a first enclosure, wherein the bottom end of the first enclosure is connected with a fixed seat, one side of the first enclosure is provided with a second sound absorption layer, the inner wall of the first enclosure is provided with a second enclosure, the inner wall of the second enclosure is provided with a first sound absorption layer, the inner wall of the second enclosure is provided with a lead screw, the inner wall of the first enclosure is positioned at the bottom end of the lead screw and connected with a turbine, one side of the inner wall of the first enclosure positioned at the turbine is connected with a worm, one side of the inner wall of the second enclosure positioned at the lead screw is provided with a fixed rod, the top end of the second enclosure is connected with a fixed block, one side of the fixed block is connected with a first copper pipe, the outer wall of the first copper pipe is provided with a lantern ring, one end of the lantern ring is connected with a water mist spray nozzle, the outer wall of the first copper pipe is positioned at two sides of the lantern ring and provided with fixed plates, one end of the first copper pipe is connected with a second copper pipe.
Preferably, the outer wall of the first copper pipe is located inside the lantern ring and is provided with a plurality of groups of water outlet holes, and the first copper pipe is connected with an external water pipe through a second copper pipe.
Preferably, the first baffle and the second baffle are provided with thread grooves matched with the screw rod, and the top end of the screw rod is provided with a limiting block.
Preferably, the first enclosure plate and the second enclosure plate are internally provided with mounting holes matched with the fixing rods.
Preferably, the lantern ring is provided with a plurality of groups, and the plurality of groups of lantern rings are equidistantly distributed on the outer wall of the first copper pipe.
Preferably, the inner wall of the first baffle plate is provided with a sliding groove matched with the second baffle plate, and the second baffle plate is connected with the first baffle plate in a sliding mode through the sliding groove in the inner wall of the first baffle plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up turbine, worm, second enclosure and lead screw, place first enclosure to fixed position through the fixing base, then according to job site demand, through artifical rotatory worm handle, the worm rotates and drives the turbine rotation through gear engagement, the turbine rotation drives the lead screw rotation, the lead screw rotation drives the second enclosure and slides from top to bottom in first enclosure inner wall spout, rise the height that needs to use through rotatory worm, the job site of being convenient for can adjust needs height at any time;
2. the utility model discloses a set up first copper pipe, the second copper pipe, the water smoke shower nozzle, the lantern ring, first sound absorbing layer and second sound absorbing layer, stop rotatory worm, be connected second copper pipe and external water pipe, open external water inlet switch, external water is carried to inside the first copper pipe through external water pipe, earlier through the artifical rotatory lantern ring before the construction, rotatory angle to needs of the lantern ring, water smoke shower nozzle through lantern ring one end sprays water smoke, carry out the dust fall processing to a large amount of dusts that the job site produced, avoid enclosing to keep off the inside region construction and produce the serious influence surrounding environment of dust pollution, influence resident life around the while, then absorb the noise that the construction produced through first sound absorbing layer and second sound absorbing layer, thereby weaken the noise that the construction produced, the noise that prevents the construction production is too big, thereby influence resident's rest around.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a first copper tube structure of the present invention;
FIG. 3 is a cross-sectional view of the interior of the collar of the present invention;
fig. 4 is a schematic diagram of the first baffle plate and the second baffle plate of the present invention;
fig. 5 is a schematic view of the structure of the worm wheel and the worm according to the present invention.
In the figure: 1. a first apron plate; 2. a second apron plate; 3. a fixed block; 4. a first copper tube; 5. a first sound absorbing layer; 6. a second sound absorbing layer; 7. a fixed seat; 8. a fixing plate; 9. a collar; 10. a water mist spray head; 11. fixing the rod; 12. a screw rod; 13. a turbine; 14. a worm; 15. a second copper tube.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "disposed" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. The following describes an embodiment of the present invention according to its overall structure.
Referring to fig. 1-5, a fence for building construction comprises a first fence 1, a fixed seat 7 is connected to the bottom end of the first fence 1, a second sound absorbing layer 6 is arranged on one side of the first fence 1, a second fence 2 is arranged on the inner wall of the first fence 1, a first sound absorbing layer 5 is arranged on the inner wall of the second fence 2, a screw rod 12 is arranged on the inner wall of the second fence 2, a turbine 13 is connected to the bottom end of the screw rod 12, a worm 14 is connected to one side of the turbine 13 on the inner wall of the first fence 1, a fixing rod 11 is arranged on one side of the screw rod 12 on the inner wall of the second fence 2, a fixed block 3 is connected to the top end of the second fence 2, a first copper pipe 4 is connected to one side of the fixed block 3, a lantern ring 9 is arranged on the outer wall of the first copper pipe 4, a water mist spray nozzle 10 is connected to one end of the lantern ring 9, and fixing plates 8 are arranged on two sides of the lantern ring 9 on the outer wall of the first copper pipe 4, one end of the first copper tube 4 is connected with a second copper tube 15.
Please refer to fig. 3, the outer wall of the first copper pipe 4 is disposed inside the sleeve ring 9 and has a plurality of water outlets, and the first copper pipe 4 is connected to an external water pipe through a second copper pipe 15, so as to facilitate the spraying of the water mist nozzle 10.
Please refer to fig. 4, the first baffle plate 1 and the second baffle plate 2 are provided with a thread groove matching with the screw rod 12, and the top end of the screw rod 12 is provided with a limiting block, so that the screw rod 12 rotates to drive the second baffle plate 2 to move.
Please refer to fig. 4, the first baffle plate 1 and the second baffle plate 2 are provided with mounting holes matching with the fixing rods 11, so as to fix the second baffle plate 2.
Please refer to fig. 2, the lantern rings 9 are provided with a plurality of sets, and the lantern rings 9 are distributed on the outer wall of the first copper pipe 4 at equal intervals, so as to spray water mist to the construction area.
Please refer to fig. 1, the inner wall of the first baffle plate 1 is provided with a sliding slot matching with the second baffle plate 2, and the second baffle plate 2 is slidably connected with the first baffle plate 1 through the sliding slot on the inner wall of the first baffle plate 1, so that the second baffle plate 2 can slide conveniently.
The working principle is as follows: firstly, a first baffle plate 1 is placed at a fixed position through a fixed seat 7, then according to the requirements of a construction site, a worm 14 handle is manually rotated, the worm 14 rotates to drive a turbine 13 to rotate through gear meshing, the turbine 13 rotates to drive a screw rod 12 to rotate, the screw rod 12 rotates to drive a second baffle plate 2 to slide up and down in a chute on the inner wall of the first baffle plate 1, the second baffle plate 2 is lifted to the height required to be used through the rotating worm 14, the worm 14 stops rotating, a second copper pipe 15 is connected with an external water pipe, an external water inlet switch is opened, external water is conveyed into the first copper pipe through the external water pipe, before construction, a lantern ring 9 is manually rotated to the required angle, water mist is sprayed through a water mist spray nozzle 10 at one end of the lantern ring 9, dust fall treatment is carried out on a large amount of dust generated in the construction site, and the situation that the construction of the internal area of the baffle plate generates dust pollution to seriously affect the surrounding environment is avoided, influence resident's life around simultaneously, then absorb the noise that the construction produced through first sound absorbing layer 5 and second sound absorbing layer 6 to weaken the noise that the construction produced, prevent that the noise that the construction produced is too big, thereby influence resident's rest around.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a construction is with enclosing fender, includes first fender (1), its characterized in that of enclosing: the bottom end of the first baffle plate (1) is connected with a fixing base (7), one side of the first baffle plate (1) is provided with a second sound absorption layer (6), the inner wall of the first baffle plate (1) is provided with a second baffle plate (2), the inner wall of the second baffle plate (2) is provided with a first sound absorption layer (5), the inner wall of the second baffle plate (2) is provided with a screw rod (12), the bottom end, located at the screw rod (12), of the inner wall of the first baffle plate (1) is connected with a turbine (13), one side, located at the turbine (13), of the inner wall of the first baffle plate (1) is connected with a worm (14), one side, located at the screw rod (12), of the inner wall of the second baffle plate (2) is provided with a fixing rod (11), the top end of the second baffle plate (2) is connected with a fixing block (3), one side of the fixing block (3) is connected with a first copper pipe (4), the outer wall of first copper pipe (4) is provided with the lantern ring (9), the one end of lantern ring (9) is connected with water smoke shower nozzle (10), the both sides that the outer wall of first copper pipe (4) is located lantern ring (9) are provided with fixed plate (8), the one end of first copper pipe (4) is connected with second copper pipe (15).
2. The enclosure for building construction according to claim 1, characterized in that: the outer wall of the first copper pipe (4) is located inside the lantern ring (9) and is provided with a plurality of groups of water outlet holes, and the first copper pipe (4) is connected with an external water pipe through a second copper pipe (15).
3. The enclosure for building construction according to claim 1, characterized in that: the screw thread grooves matched with the screw rods (12) are formed in the first enclosing baffle (1) and the second enclosing baffle (2), and the top ends of the screw rods (12) are provided with limit blocks.
4. The enclosure for building construction according to claim 1, characterized in that: the first enclosing baffle (1) and the second enclosing baffle (2) are internally provided with mounting holes matched with the fixing rods (11).
5. The enclosure for building construction according to claim 1, characterized in that: the lantern ring (9) is provided with a plurality of groups, and the lantern rings (9) are distributed on the outer wall of the first copper pipe (4) at equal intervals.
6. The enclosure for building construction according to claim 1, characterized in that: the inner wall of the first baffle plate (1) is provided with a sliding groove matched with the second baffle plate (2), and the second baffle plate (2) is connected with the first baffle plate (1) in a sliding mode through the sliding groove in the inner wall of the first baffle plate (1).
CN202022502061.1U 2020-11-03 2020-11-03 Construction is with enclosing fender Active CN213898426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022502061.1U CN213898426U (en) 2020-11-03 2020-11-03 Construction is with enclosing fender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022502061.1U CN213898426U (en) 2020-11-03 2020-11-03 Construction is with enclosing fender

Publications (1)

Publication Number Publication Date
CN213898426U true CN213898426U (en) 2021-08-06

Family

ID=77116270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022502061.1U Active CN213898426U (en) 2020-11-03 2020-11-03 Construction is with enclosing fender

Country Status (1)

Country Link
CN (1) CN213898426U (en)

Similar Documents

Publication Publication Date Title
CN208467518U (en) A kind of laser cutting device for ceramic tile cutting
CN213898426U (en) Construction is with enclosing fender
CN210229467U (en) Mill dust treatment device
CN216437334U (en) Video online monitoring device
CN207696806U (en) A kind of high-efficiency ceramic tile cutting equipment
CN215696624U (en) Environment-friendly dust removal device with purification function and used for building construction
CN212119349U (en) Dust device for construction
CN212089406U (en) Dust collector that building engineering used
CN211612056U (en) Building engineering construction dust collector
CN213159965U (en) On-spot dust collector for construction
CN210768400U (en) Glass window convenient to clearance
CN214914160U (en) A prevent haze equipment that is used for open-air place of industrial manufacturing to have energy-conserving function
CN112692639A (en) Cleaning device is used in lathe nut processing
CN211228332U (en) Building construction working face sprays dust fall heat sink
CN211229614U (en) Wall skin cleaning equipment for building decoration
CN215539151U (en) Pearlite system dust collector for sand convenient to clearance
CN215595210U (en) Engineering of dust fall function is sprayed in area encloses fender
CN215742589U (en) Spraying dust device for road and bridge construction
CN220901286U (en) Novel dust treatment equipment
CN216653920U (en) Factory building dust collecting equipment
CN214597946U (en) Dust device for house construction site
CN214195837U (en) A protector for building site
CN212881611U (en) Portable dust device of building engineering
CN218309931U (en) Building site noise monitoring devices
CN214075701U (en) Saw bench dust collecting device is used in indoor decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230720

Address after: No. 30, Maoshou Road, Ruili City, Dehong Dai and Jingpo Autonomous Prefecture, Yunnan Province 678600

Patentee after: RUILI RONGFENG NATIONAL CULTURE COMMUNICATION Co.,Ltd.

Address before: 510060 No. 787, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong

Patentee before: Liang Dongxin

TR01 Transfer of patent right