CN213897696U - Steel plate rib point support glass curtain wall system - Google Patents

Steel plate rib point support glass curtain wall system Download PDF

Info

Publication number
CN213897696U
CN213897696U CN202021957343.4U CN202021957343U CN213897696U CN 213897696 U CN213897696 U CN 213897696U CN 202021957343 U CN202021957343 U CN 202021957343U CN 213897696 U CN213897696 U CN 213897696U
Authority
CN
China
Prior art keywords
curtain wall
glass
steel plate
vertical
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021957343.4U
Other languages
Chinese (zh)
Inventor
熊保龙
史春芳
王涛
孙江龙
张海瑞
孙君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Construction and Development Co Ltd filed Critical China Construction First Group Construction and Development Co Ltd
Priority to CN202021957343.4U priority Critical patent/CN213897696U/en
Application granted granted Critical
Publication of CN213897696U publication Critical patent/CN213897696U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

A steel plate rib point support glass curtain wall system comprises a main body structure, a glass curtain wall, a first connecting piece, a second connecting piece, a third connecting piece, a first embedded piece and a second embedded piece; the glass curtain wall is formed by splicing a group of curtain wall glass; the upper part and the lower part of the inner side surface of the curtain wall glass are provided with transverse steel plate ribs; vertical steel plate ribs are arranged on two sides of the inner side surface of the curtain wall glass; the first connecting piece connects vertically adjacent curtain wall glass; the second connecting piece connects the four pieces of curtain wall glass and is arranged corresponding to the structural column; the fourth connecting piece is used for connecting the four pieces of curtain wall glass, and the third connecting piece is positioned between the adjacent structural columns; the first embedded parts are arranged on the structural beam at intervals along the transverse direction and are arranged corresponding to the vertical seams; the second embedded parts are embedded on the structural columns at intervals along the vertical direction and are arranged corresponding to the second connecting parts. The utility model provides a traditional construction method to the whole high technical problem who has restriction, with large costs, installation difficulty, the efficiency of construction is low and the difficult assurance of structure safety of building.

Description

Steel plate rib point support glass curtain wall system
Technical Field
The utility model belongs to the technical field of building engineering, in particular to glass curtain wall system is propped up to steel sheet rib point.
Background
Modern architects have more and more novel requirements on design concepts of various curtain walls and have more and more high requirements on permeability of buildings, so that point type glass curtain walls with various shapes are more and more. In the general steel plate/glass rib point support curtain wall modeling, the rib plates are integrated from bottom to top (or are integrated through connection), and are not supported transversely or fixed in a steel cable or a welded steel plate and steel pipe mode to assist in bearing wind pressure. The construction method has the defects of limitation on the overall height of the building, high cost, difficulty in installation, low construction efficiency, difficulty in ensuring the structural safety and the like.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel sheet rib point props up glass curtain wall system, it has the restriction to the whole height of building to solve traditional construction method, and the technical problem that the cost is big, installation difficulty, efficiency of construction are low and the structure safety is difficult for guaranteeing.
In order to achieve the above purpose, the utility model adopts the following technical scheme.
A steel plate rib point support glass curtain wall system comprises a main body structure and a glass curtain wall; the main body structure comprises a structural beam and structural columns connected to the bottom of the structural beam at intervals; the glass curtain wall is formed by splicing a group of curtain wall glass, a transverse seam is reserved between the vertically adjacent curtain wall glass, and a vertical seam is reserved between the horizontally adjacent curtain wall glass; transverse steel plate ribs are respectively arranged on the inner side surface of the curtain wall glass along the top transverse edge and the bottom transverse edge; vertical steel plate ribs are respectively arranged on the inner side surface of the curtain wall glass and along the vertical edges on the two sides;
the steel plate rib point support glass curtain wall system also comprises a first connecting piece, a second connecting piece, a third connecting piece, a first embedded piece and a second embedded piece; the first connecting piece is arranged in the middle of the vertical joint and connects vertically adjacent curtain wall glass; the first connecting piece is connected with the vertical steel plate rib; the second connecting piece is arranged at the intersection point of the transverse seam and the vertical seam and is used for connecting the four pieces of curtain wall glass, and the second connecting piece is arranged corresponding to the structural column; the second connecting piece is connected with the vertical steel plate rib; the third connecting piece is arranged at the intersection point of the transverse seam and the vertical seam and is used for connecting the four pieces of curtain wall glass, and the third connecting piece is positioned between the adjacent structural columns; the third connecting piece is connected with the transverse steel plate rib;
the first embedded parts are arranged on the structural beam at intervals along the transverse direction and are arranged corresponding to the vertical seams; the first embedded part is connected with the vertical steel plate ribs on the adjacent curtain wall glass; the second embedded parts are embedded on the structural column at intervals along the vertical direction and are arranged corresponding to the second connecting parts; the second embedded part is connected with the transverse steel plate rib and the vertical steel plate rib.
Preferably, the first embedded part comprises a first embedded plate and a first adapter plate; the first embedded plate is embedded in the outer surface of the structural beam and corresponds to the upper end of the glass curtain wall; a first embedded rib is arranged on the back of the first embedded plate and embedded in the structural beam; the two first connecting plates are vertically connected to the outer side face of the first buried plate respectively; and the two first adapter plates are respectively connected with the vertical steel plate ribs on two sides of the vertical seam.
Preferably, the first connecting piece comprises a first stainless steel glass clamp and a first connecting plate; the first stainless steel glass clamp is arranged in the middle of the vertical joint, and two ends of the first stainless steel glass clamp are respectively clamped on the curtain wall glass on two sides; the first connecting plate is connected to the inner side of the first stainless steel glass clamp, and the inner end of the first connecting plate is located between the adjacent vertical steel plate ribs and connected with the vertical steel plate ribs.
Preferably, the second connecting piece comprises a second stainless steel glass clamp and a second connecting plate; the second stainless steel glass clamp is arranged at the intersection point position of the four pieces of curtain wall glass and is arranged corresponding to the structural column; four corner parts of the second stainless steel glass clamp are respectively clamped on four pieces of curtain wall glass; the second connecting plate is connected to the inner side of the second stainless steel glass clamp, and the upper portion of the inner end of the second stainless steel glass clamp is connected with the vertical steel plate rib adjacent to the upper layer.
Preferably, the second embedded part comprises a second embedded plate and a second adapter plate; the second embedded plate is embedded in the outer surface of the structural column at a position corresponding to the second connecting piece; a second embedded rib is arranged on the back of the second embedded plate and embedded in the structural column; the two second adapter plates are respectively and horizontally connected to the outer side face of the second buried plate; two second adapter plates are respectively inserted in the transverse seams at the two sides of the vertical seam and connected with the transverse steel plate ribs. The vertical adapter plate is connected with the vertical steel plate ribs.
Preferably, the third connecting piece comprises a third stainless steel glass clamp and a third connecting plate; the third stainless steel glass clamp is arranged at the intersection point position of the four pieces of curtain wall glass and is positioned between the structural columns; four corner parts of the third stainless steel glass clamp are respectively clamped on four pieces of curtain wall glass; the third connecting plate is connected to the inner side of the third stainless steel glass clamp and inserted into the transverse seam; and the third connecting plate is connected with the transverse steel plate rib on one side of the vertical seam.
Preferably, an upper corner brace is connected between the transverse steel plate rib and the vertical steel plate rib on the upper side of the transverse seam; and a lower corner connector is connected between the transverse steel plate rib and the vertical steel plate rib on the lower side of the transverse seam.
Compared with the prior art, the utility model has the following characteristics and beneficial effect.
1. The keel of the utility model adopts transverse steel plate ribs and longitudinal steel plate ribs, the connection between keels adopts angle connectors and pin shaft components, and the pin shaft components also play a role of fixing the connecting piece, and then the curtain wall glass is fixed by the fixture of the connecting piece; the utility model discloses a horizontal steel sheet rib and vertical steel sheet rib form a latticed structure through burying piece, round pin axle subassembly and connecting piece, because the atress is even, can build the glass curtain wall of large tracts of land, still because all steel sheet ribs, bury piece, round pin axle subassembly, connecting piece, curtain glass all are processing at the mill, can guarantee precision and processing cycle, and shorten on-the-spot installation time.
2. The utility model adopts the steel plate ribs and the point supporting piece glass curtain wall, and has the advantages of factory processing, convenient installation, lower cost, safety, reliability, easy purchase, low price and uniform structural stress; the steel plate rib is used as a keel of the point support piece, has the characteristic of high strength, and can be used for manufacturing a large-span point support glass curtain wall.
3. The thickness of the steel plate rib in the utility model is thinner than the thickness of the conventional aluminum alloy structural beam and structural column, and the lighting permeability is excellent; all the steel plate ribs, the connecting pieces, the embedded pieces and the pin shaft assemblies are processed in factories, so that the processing period, the precision and the quality are ensured; and the field installation connection adopts the mechanical connection of the pin shaft assembly, so that the problems of welding reliability and welding secondary pollution are avoided, and the quality of the curtain wall is ensured.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic front structural view of the steel plate rib point support glass curtain wall system of the present invention.
Fig. 2 is a top view of point a in fig. 1.
Fig. 3 is a side view of point a in fig. 1.
Fig. 4 is a top view of point B in fig. 1.
Fig. 5 is a side view of point B in fig. 1.
Fig. 6 is a top view of point D in fig. 1.
Fig. 7 is a side view of point D in fig. 1.
Fig. 8 is a top view of point C in fig. 1.
Fig. 9 is a side view of point C in fig. 1.
Fig. 10 is a schematic structural view of a first embedded part in the present invention.
Fig. 11 is a schematic structural view of a second embedded component in the present invention.
Fig. 12 is a schematic structural diagram of the first connecting member according to the present invention.
Fig. 13 is a schematic structural diagram of a second connecting member according to the present invention.
Reference numerals: 1-structural beam, 2-structural column, 3-curtain wall glass, 4-transverse joint, 5-vertical joint, 6-transverse steel plate rib, 7-vertical steel plate rib, 8-first connecting piece, 8.1-first stainless steel glass clamp, 8.2-first connecting plate, 9-second connecting piece, 9.1-second stainless steel glass clamp, 9.2-second connecting plate, 10-third connecting piece, 10.1-third stainless steel glass clamp, 10.2-third connecting plate, 11-first embedded piece, 11.1-first embedded plate, 11.2-first adapter plate, 11.3-first embedded rib, 11.4-first stiffening plate, 12-second embedded piece, 12.1-second embedded plate, 12.2-second adapter plate, 12.3-second embedded rib, 12.4-vertical adapter plate, 13-upper corner connector, 14-lower corner connector, 15-first pin shaft assembly, 16-fourth pin shaft assembly, 19-fifth pin assembly, and 14-fourth pin assembly, 20-sixth pin assembly.
Detailed Description
As shown in fig. 1 to 13, the steel plate rib point support glass curtain wall system comprises a main body structure and a glass curtain wall; the main body structure comprises a structural beam 1 and structural columns 2 connected to the bottom of the structural beam 1 at intervals; the glass curtain wall is formed by splicing curtain wall glass 3, a transverse seam 4 is reserved between the vertically adjacent curtain wall glass 3, and a vertical seam 5 is reserved between the horizontally adjacent curtain wall glass 3; transverse steel plate ribs 6 are respectively arranged on the inner side surface of the curtain wall glass 3 along the top transverse edge and the bottom transverse edge; vertical steel plate ribs 7 are respectively arranged on the inner side surface of the curtain wall glass 3 and along the vertical edges at the two sides;
the steel plate rib point support glass curtain wall system also comprises a first connecting piece 8, a second connecting piece 9, a third connecting piece 10, a first embedded piece 11 and a second embedded piece 12; the first connecting piece 8 is arranged in the middle of the vertical joint 5 and connects the vertically adjacent curtain wall glass 3; the first connecting piece 8 is connected with the vertical steel plate rib 7; the second connecting pieces 9 are arranged at the intersection points of the transverse seams 4 and the vertical seams 5 to connect the four pieces of curtain wall glass 3, and the second connecting pieces 9 are arranged corresponding to the structural columns 2; the second connecting piece 9 is connected with the vertical steel plate rib 7; the third connecting piece 10 is arranged at the intersection point of the transverse seam 4 and the vertical seam 5 to connect the four pieces of curtain wall glass 3, and the third connecting piece 10 is positioned between the adjacent structural columns 2; the third connecting piece 10 is connected with the transverse steel plate rib 6;
the first embedded parts 11 are arranged on the structural beam 1 at intervals along the transverse direction and are arranged corresponding to the vertical seams 5; the first embedded part 11 is connected with the vertical steel plate rib 7 on the adjacent curtain wall glass 3; the second embedded parts 12 are embedded on the structural column 2 at intervals along the vertical direction and are arranged corresponding to the second connecting parts 9; the second embedded part 12 is connected with the transverse steel plate rib 6 and the vertical steel plate rib 7.
In the embodiment, a space is reserved between the transverse steel plate rib 6 and the curtain wall glass 3; and a space is reserved between the vertical steel plate rib 7 and the curtain wall glass 3.
In this embodiment, the first embedded part 11 includes a first embedded plate 11.1 and a first adapter plate 11.2; the first embedded plate 11.1 is embedded in the outer surface of the structural beam 1 and corresponds to the upper end of the glass curtain wall; a first buried rib 11.3 is arranged on the back of the first buried plate 11.1, and the first buried rib 11.3 is buried in the structural beam 1; two first connecting plates 11.2 are vertically connected to the outer side face of the first buried plate 11.1 respectively; the two first connecting plates 11.2 are respectively connected with the vertical steel plate ribs 7 at two sides of the vertical seam 5.
In this embodiment, the first adapter plate 11.2 is connected to the vertical steel plate rib 7 on the corresponding side through a first pin assembly 15.
In this embodiment, a first stiffener plate 11.4 is arranged between the first adapter plate 11.2 and the first buried plate 11.1.
In this embodiment, the first connecting member 8 includes a first stainless steel glass clamp 8.1 and a first connecting plate 8.2; the first stainless steel glass clamp 8.1 is arranged in the middle of the vertical joint 5, and two ends of the first stainless steel glass clamp 8.1 are respectively clamped on the curtain wall glass 3 on two sides; the first connecting plate 8.2 is connected to the inner side of the first stainless steel glass clamp 8.1, and the inner end of the first connecting plate 8.2 is located between the adjacent vertical steel plate ribs 7 and connected with the vertical steel plate ribs 7.
In this embodiment, the first connecting plate 8.2 is connected to the vertical steel plate ribs 7 on both sides thereof through a sixth pin assembly 20.
In this embodiment, the second connecting member 9 includes a second stainless steel glass clamp 9.1 and a second connecting plate 9.2; the second stainless steel glass clamp 9.1 is arranged at the joint position of the four pieces of curtain wall glass 3 and corresponds to the structural column 2; four corner parts of the second stainless steel glass clamp 9.1 are respectively clamped on the four pieces of curtain wall glass 3; the second connecting plate 9.2 is connected to the inner side of the second stainless steel glass clamp 9.1, and the upper part of the inner end of the second stainless steel glass clamp 9.1 is connected with the vertical steel plate rib 7 adjacent to the upper layer.
In this embodiment, the second connecting plate 9.2 is connected to the vertical steel plate ribs 7 on both sides through a second pin assembly 16.
In this embodiment, the second embedded part 12 includes a second embedded plate 12.1, a second adapter plate 12.2 and a vertical adapter plate 12.4; the second embedded plate 12.1 is embedded in the outer surface of the structural column 2 at a position corresponding to the second connecting piece 9; a second embedded rib 12.3 is arranged on the back of the second embedded plate 12.1, and the second embedded rib 12.3 is embedded in the structural column 2; two second adapter plates 12.2 are horizontally connected to the outer side face of the second buried plate 12.1 respectively; two second adapter plates 12.2 are respectively inserted into the transverse slots 4 at two sides of the vertical slot 5 and connected with the transverse steel plate rib 6. The vertical adapter plate 12.4 is connected to the vertical steel plate rib 7.
In this embodiment, the second adapter plate 12.2 is connected to the transverse steel plate ribs 6 on the upper and lower sides through a third pin assembly 17.
In this embodiment, a vertical adapter plate 12.4 is arranged on one side of the second adapter plate 12.2, which is close to the vertical steel plate rib 7; the vertical adapter plate 12.4 is connected with the vertical steel plate rib 7.
In this embodiment, the third connecting member 10 includes a third stainless steel glass clamp 10.1 and a third connecting plate 10.2; the third stainless steel glass clamp 10.1 is arranged at the intersection point position of the four pieces of curtain wall glass 3 and is positioned between the structural columns 2; four corner parts of the third stainless steel glass clamp 10.1 are respectively clamped on four pieces of curtain wall glass 3; the third connecting plate 10.2 is connected to the inner side of the third stainless steel glass clamp 10.1, and the third connecting plate 10.2 is inserted into the transverse seam 4; the third connecting plate 10.2 is connected with the transverse steel plate rib 6 at one side of the vertical seam 5.
In this embodiment, an upper corner brace 13 is connected between the transverse steel plate rib 6 and the vertical steel plate rib 7 at the upper side of the third connecting piece 10; and a lower corner brace 14 is connected between the transverse steel plate rib 6 and the vertical steel plate rib 7 on the lower side of the third connecting piece 10.
In the embodiment, the transverse steel plate rib 6 is connected with the lower corner brace 14 and the upper corner brace 13 through a fourth pin shaft assembly 18; the vertical steel plate rib 7 is connected with the lower corner connector 14 and the upper corner connector 13 through a fifth pin shaft assembly 19.

Claims (7)

1. A steel plate rib point support glass curtain wall system comprises a main body structure and a glass curtain wall; the main body structure comprises a structural beam (1) and structural columns (2) connected to the bottom of the structural beam (1) at intervals; the glass curtain wall is formed by splicing a group of curtain wall glass (3), a transverse seam (4) is reserved between the vertically adjacent curtain wall glass (3), and a vertical seam (5) is reserved between the transversely adjacent curtain wall glass (3); the method is characterized in that: transverse steel plate ribs (6) are respectively arranged on the inner side surface of the curtain wall glass (3) along the top transverse edge and the bottom transverse edge; vertical steel plate ribs (7) are respectively arranged on the inner side surface of the curtain wall glass (3) and along the vertical edges at the two sides;
the steel plate rib point support glass curtain wall system also comprises a first connecting piece (8), a second connecting piece (9), a third connecting piece (10), a first embedded piece (11) and a second embedded piece (12); the first connecting piece (8) is arranged in the middle of the vertical joint (5) and connects the vertically adjacent curtain wall glass (3); the first connecting piece (8) is connected with the vertical steel plate rib (7); the second connecting pieces (9) are arranged at the intersection points of the transverse seams (4) and the vertical seams (5) to connect the four pieces of curtain wall glass (3), and the second connecting pieces (9) are arranged corresponding to the structural columns (2); the second connecting piece (9) is connected with the vertical steel plate rib (7); the third connecting piece (10) is arranged at the intersection point of the transverse seam (4) and the vertical seam (5) to connect the four pieces of curtain wall glass (3), and the third connecting piece (10) is positioned between the adjacent structural columns (2); the third connecting piece (10) is connected with the transverse steel plate rib (6);
the first embedded parts (11) are arranged on the structural beam (1) at intervals along the transverse direction and are arranged corresponding to the vertical seams (5); the first embedded part (11) is connected with a vertical steel plate rib (7) on the adjacent curtain wall glass (3); the second embedded parts (12) are embedded on the structural column (2) at intervals along the vertical direction and are arranged corresponding to the second connecting parts (9); the second embedded part (12) is connected with the transverse steel plate rib (6) and the vertical steel plate rib (7).
2. The steel plate rib point-supported glass curtain wall system as claimed in claim 1, wherein: the first embedded part (11) comprises a first embedded plate (11.1) and a first adapter plate (11.2); the first embedded plate (11.1) is embedded in the outer surface of the structural beam (1) and corresponds to the upper end of the glass curtain wall; a first buried rib (11.3) is arranged on the back of the first buried plate (11.1), and the first buried rib (11.3) is buried in the structural beam (1); two first transfer plates (11.2) are vertically connected to the outer side face of the first buried plate (11.1) respectively; the two first adapter plates (11.2) are respectively connected with the vertical steel plate ribs (7) at two sides of the vertical seam (5).
3. The steel plate rib point-supported glass curtain wall system as claimed in claim 1, wherein: the first connecting piece (8) comprises a first stainless steel glass clamp (8.1) and a first connecting plate (8.2); the first stainless steel glass clamp (8.1) is arranged in the middle of the vertical joint (5), and two ends of the first stainless steel glass clamp (8.1) are respectively clamped on the curtain wall glass (3) on two sides; the first connecting plate (8.2) is connected to the inner side of the first stainless steel glass clamp (8.1), and the inner end of the first connecting plate (8.2) is located between the adjacent vertical steel plate ribs (7) and connected with the vertical steel plate ribs (7).
4. The steel plate rib point-supported glass curtain wall system as claimed in claim 1, wherein: the second connecting piece (9) comprises a second stainless steel glass clamp (9.1) and a second connecting plate (9.2); the second stainless steel glass clamp (9.1) is arranged at the intersection point position of the four pieces of curtain wall glass (3) and is arranged corresponding to the structural column (2); four corner parts of the second stainless steel glass clamp (9.1) are respectively clamped on four pieces of curtain wall glass (3); the second connecting plate (9.2) is connected to the inner side of the second stainless steel glass clamp (9.1), and the upper portion of the inner end of the second stainless steel glass clamp (9.1) is connected with the vertical steel plate rib (7) adjacent to the upper layer.
5. The steel plate rib point-supported glass curtain wall system as claimed in claim 4, wherein: the second embedded part (12) comprises a second embedded plate (12.1), a second adapter plate (12.2) and a vertical adapter plate (12.4); the second embedded plate (12.1) is embedded in the outer surface of the structural column (2) at a position corresponding to the second connecting piece (9); a second embedded rib (12.3) is arranged on the back of the second embedded plate (12.1), and the second embedded rib (12.3) is embedded in the structural column (2); the number of the second adapter plates (12.2) is two, the second adapter plates comprise vertical adapter plates (12.4), and the vertical adapter plates are respectively and horizontally connected to the outer side face of the second buried plate (12.1); two second adapter plates (12.2) are respectively inserted into the transverse seams (4) at the two sides of the vertical seam (5) and connected with the transverse steel plate ribs (6); the vertical adapter plate (12.4) is connected with the vertical steel plate rib (7).
6. The steel plate rib point-supported glass curtain wall system as claimed in claim 1, wherein: the third connecting piece (10) comprises a third stainless steel glass clamp (10.1) and a third connecting plate (10.2); the third stainless steel glass clamp (10.1) is arranged at the intersection point position of the four pieces of curtain wall glass (3) and is positioned at the joint position of the curtain wall glass (3) between the structural columns (2); four corner parts of the third stainless steel glass clamp (10.1) are respectively clamped on four pieces of curtain wall glass (3); the third connecting plate (10.2) is connected to the inner side of the third stainless steel glass clamp (10.1), and the third connecting plate (10.2) is inserted into the transverse seam (4); and the third connecting plate (10.2) is connected with the transverse steel plate rib (6) on one side of the vertical seam (5).
7. The steel plate rib point-supported glass curtain wall system as claimed in claim 6, wherein: an upper corner brace (13) is connected between the transverse steel plate rib (6) on the upper side of the transverse seam (4) and the vertical steel plate rib (7); and a lower corner brace (14) is connected between the transverse steel plate rib (6) at the lower side of the transverse seam (4) and the vertical steel plate rib (7).
CN202021957343.4U 2020-09-09 2020-09-09 Steel plate rib point support glass curtain wall system Expired - Fee Related CN213897696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021957343.4U CN213897696U (en) 2020-09-09 2020-09-09 Steel plate rib point support glass curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021957343.4U CN213897696U (en) 2020-09-09 2020-09-09 Steel plate rib point support glass curtain wall system

Publications (1)

Publication Number Publication Date
CN213897696U true CN213897696U (en) 2021-08-06

Family

ID=77109513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021957343.4U Expired - Fee Related CN213897696U (en) 2020-09-09 2020-09-09 Steel plate rib point support glass curtain wall system

Country Status (1)

Country Link
CN (1) CN213897696U (en)

Similar Documents

Publication Publication Date Title
CN110541478B (en) Connecting joint of connecting piece inserted steel pipe column and steel beam
CN211257397U (en) Steel construction assembled wall body
CN210597866U (en) Steel construction assembled wallboard
CN213897696U (en) Steel plate rib point support glass curtain wall system
CN214696841U (en) Aluminum template for building corner
CN115262973A (en) Construction method of multidirectional multi-curvature large-span curved surface latticed shell system
CN113789858A (en) Tenon-and-mortise self-locking connecting system of H-shaped steel structure and construction method thereof
CN211735781U (en) Modular assembly type steel structure house body
CN210105122U (en) Roof structure for assembling house
CN215670394U (en) Curtain wall keel connection and installation construction node thereof
CN104453089A (en) Steel beam device of steel structure house
CN216195513U (en) H shaped steel structure tenon fourth of twelve earthly branches auto-lock location structure
CN114346596B (en) Manufacturing method of concave hyperbolic three-dimensional pipe truss and double box columns
CN211816953U (en) Steel pipe connecting piece and connection structure of flower umbrella building
CN212670855U (en) Assembly type building node connection structure
CN210621958U (en) Assembled steel structure
CN210459527U (en) Bamboo laminated wood beam column side node
CN110886386B (en) Building square column joint connecting structure and connecting method thereof
CN113653229A (en) Curtain wall mounting structure and mounting method thereof
CN219411824U (en) Beam end template
CN220814459U (en) Assembled double-deck metal curtain wall construction
CN218493086U (en) Internal corner template structure of fair-faced concrete wall
CN215211669U (en) Profiled steel sheet wall connection structure for steel structure
CN219753969U (en) Keel jacking integrated template structure
CN209260613U (en) Corrugated guardrail connecting hinge part and connecting elements

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210806