CN213894867U - Material lifting device for building engineering - Google Patents

Material lifting device for building engineering Download PDF

Info

Publication number
CN213894867U
CN213894867U CN202021867698.4U CN202021867698U CN213894867U CN 213894867 U CN213894867 U CN 213894867U CN 202021867698 U CN202021867698 U CN 202021867698U CN 213894867 U CN213894867 U CN 213894867U
Authority
CN
China
Prior art keywords
fixedly connected
inboard
workbin
box
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021867698.4U
Other languages
Chinese (zh)
Inventor
张永栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021867698.4U priority Critical patent/CN213894867U/en
Application granted granted Critical
Publication of CN213894867U publication Critical patent/CN213894867U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of material lifting, in particular to a material lifting device for building engineering, which comprises a hanging plate, wherein the inner side of the hanging plate is rotatably connected with a rotating rod, the outer side of the rotating rod is fixedly connected with a hanging rod, one side of the hanging plate is fixedly connected with a mounting box, the inner side of the mounting box is rotatably connected with a material box, the top end of the material box is slidably connected with a box cover, the inner side of the box cover is fixedly connected with a limiting rod, the inner side of the box cover is fixedly connected with a spring, the other end of the spring is fixedly connected with a push rod, the other end of the push rod is fixedly connected with a connecting rod, a clamping block is fixedly connected with the other end of the connecting rod, the material box is filled in the material box, then the box cover is placed on the material box by stirring the push rod, the spring pushes the push rod to drive the connecting rod to move, the clamping block is pushed by the connecting rod to be clamped with the material box, thereby fixing the box cover is completed, and the sealing of the material box is completed, avoid the material unrestrained at the in-process that promotes, improve the convenience that the material was carried, improve the stability that the device used.

Description

Material lifting device for building engineering
Technical Field
The utility model belongs to the technical field of the material promotes, concretely relates to material lifting device for building engineering.
Background
The construction site materials include the following materials: the concrete block is made of steel bars, reinforced concrete structures, cement, reinforced concrete structures, plastering, various building block materials, wall building, electric wires and cables, electrical pipes, installation and electrical connection pipes, water heating pipes and water supply and drainage pipes. The prior art has the following problems:
1. when the traditional material lifting device for the building engineering is used, materials are easy to spill due to shaking during lifting, and the device is unstable to use;
2. traditional material hoisting device for building engineering is inconvenient when using clean the operation, inconvenient clearance in the inconvenient discharge of waste material and water wash, and the clearance effect is relatively poor, troublesome poeration, waste time and energy.
In order to solve the problem, the application provides a material lifting device for constructional engineering.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a material lifting device for building engineering has the material unrestrained when avoiding the device to promote the material, improves the clear convenience of device, characteristics.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a material lifting device for building engineering, includes the link plate, the link plate inboard rotates and is connected with the bull stick, bull stick outside fixedly connected with peg, link plate one side fixedly connected with install bin, the install bin inboard rotates and is connected with the workbin, workbin top sliding connection has the case lid, the inboard fixedly connected with gag lever post of case lid, the inboard fixedly connected with spring of case lid, spring other end fixedly connected with push rod, push rod opposite side fixedly connected with connecting rod, connecting rod other end fixedly connected with fixture block.
As the utility model relates to a material lifting device for building engineering is preferred, the quantity of link plate is two, two the link plate is the symmetry setting and is in the left end face and the right-hand member face of link plate, the quantity of peg is two, two the peg is the symmetry setting and is in the left end face and the right-hand member face of bull stick.
As the utility model relates to a material lifting device for building engineering is preferred, the spacing groove has been seted up to the install bin inboard, the workbin outside with the spacing groove sliding connection of install bin, the bullet groove has been seted up to the case lid inboard, the bullet groove quantity of case lid is two, the quantity of spring is two, two the spring sets up respectively two the inboard in the bullet groove of case lid, the gag lever post runs through the push rod.
The utility model relates to a material lifting device for building engineering is preferred, terminal surface fixedly connected with support before the install bin, support left side fixedly connected with motor, the terminal fixedly connected with worm of motor spindle, the meshing of worm top has the worm wheel, the worm wheel sets up terminal surface before the install bin, the inboard fixedly connected with of worm wheel changes the cover, it runs through to change the cover the workbin, it is connected with the driving lever to change the inboard rotation of cover, terminal surface fixedly connected with changes the handle before the driving lever, driving lever outside fixedly connected with clearance pole.
As the utility model relates to a material hoisting device for building engineering is preferred, the quantity of support is two, the worm left side through the pivot with the leg joint, change the cover outside with workbin fixed connection, clearance pole bottom with workbin inside wall sliding connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1. to the inboard filling material of workbin, then stir the push rod and place the case lid on the workbin, then the spring promotes the push rod and drives the connecting rod motion, and the connecting rod promotes fixture block and workbin block to the completion is thereby accomplished the fixed to the case lid, is thereby the completion to the closure of workbin, avoids the material unrestrained at the in-process that promotes, improves the convenience that the material was carried, improves the stability that the device used.
2. The back is opened to the case lid, thereby the workbin reversal carries out ejection of compact operation, then the ejection of compact back that finishes, reset the workbin, in needs clearance, it is fixed through holding the driving lever, then the worm operation drives the install bin and rotates, the clearance pole keeps motionless scraping the clearance to the workbin inside wall, the waste residue of conveniently discharging, it is clean if need wash by water, the install bin does not rotate, it rotates to drive the driving lever to rotate, the driving lever drives the clearance pole and rotates and clear up the operation to the workbin, the convenience of the improvement device ejection of compact, and facilitate the clean operation of device, improve the clean effect of device, clear up according to the clearance needs, extend the application range of device, improve the device result of use.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the installation structure of the middle motor of the present invention.
In the figure: 1. hanging the plate; 2. a rotating rod; 3. a hanging rod; 4. installing a box; 5. a material box; 6. a box cover; 7. a limiting rod; 8. a spring; 9. a push rod; 10. a connecting rod; 11. a clamping block; 12. a support; 13. a motor; 14. a worm; 15. a worm gear; 16. Rotating the sleeve; 17. a deflector rod; 18. turning a handle; 19. and cleaning the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
The utility model provides a material lifting device for building engineering, including link plate 1, 1 inboard rotations of link plate are connected with bull stick 2, 2 outside fixedly connected with peg 3 of bull stick, 1 one side fixedly connected with install bin 4 of link plate, 4 inboard rotations of install bin are connected with workbin 5, 5 top sliding connection of workbin has case lid 6, 6 inboard fixedly connected with gag lever post 7 of case lid, 6 inboard fixedly connected with springs 8 of case lid, 8 other end fixedly connected with push rod 9 of spring, 9 opposite side fixedly connected with connecting rod 10 of push rod, 10 other end fixedly connected with fixture block 11 of connecting rod.
In this embodiment: the hanging rod 3 is hung on a hook of a crane, then the hanging rod 3 can rotate relative to the hanging plate 1 through the rotating rod 2, so that the device is convenient to lift, before the hanging rod is used, the push rod 9 is stirred to drive the clamping block 11 to be separated from the material box 5 through the connecting rod 10, the box cover 6 is separated from the material box 5, then materials are filled into the inner side of the material box 5, the push rod 9 is stirred to place the box cover 6 on the material box 5, then the spring 8 pushes the push rod 9 to drive the connecting rod 10 to move, the connecting rod 10 pushes the clamping block 11 to be clamped with the material box 5, so that the fixation of the box cover 6 is completed, the sealing of the material box 5 is completed, after the hanging plate 1 is moved to a position needing blanking, the motor 13 on the bracket 12 at the right end runs, the motor 13 drives the worm 14 to rotate on the bracket 12 at the left end, the worm wheel 14 drives the worm wheel 15 to rotate, the rotating sleeve 16 drives the material box 5 to rotate in the mounting box 4, through the material and drive 19 synchronous motion of clearance pole, the back is opened to case lid 6, thereby the workbin 5 reversal carries out ejection of compact operation, then the ejection of compact back that finishes, reset workbin 5, when needs clearance, it is fixed through holding driving lever 17, then worm 14 operation drives install bin 4 and rotates, clearance pole 19 keeps motionless scraping the clearance to 5 inside walls of workbin, the waste residue of conveniently discharging, if it is clean to wash by water to need, install bin 4 does not rotate, it changes 18 to rotate driving lever 17, driving lever 17 drives clearance pole 19 and rotates and clear up the operation to workbin 5.
In an optional embodiment, the number of the hanging plates 1 is two, the two hanging plates 1 are symmetrically arranged on the left end surface and the right end surface of the hanging plates 1, the number of the hanging rods 3 is two, and the two hanging rods 3 are symmetrically arranged on the left end surface and the right end surface of the rotating rod 2.
In this embodiment: hang peg 3 on the couple of crane, then peg 3 can rotate 1 relative link plate through bull stick 2, makes things convenient for the device to promote the operation.
In an optional embodiment, the inner side of the installation box 4 is provided with a limiting groove, the outer side of the material box 5 is slidably connected with the limiting groove of the installation box 4, the inner side of the box cover 6 is provided with two elastic grooves, the number of the elastic grooves of the box cover 6 is two, the number of the springs 8 is two, the two springs 8 are respectively arranged at the inner sides of the elastic grooves of the two box covers 6, and the limiting rod 7 penetrates through the push rod 9.
In this embodiment: connecting rod 10 promotes fixture block 11 and workbin 5 block to the completion is thereby accomplished the closure to workbin 5 to the completion, avoids the material unrestrained at the in-process that promotes, improves the convenience that the material was carried, improves the stability that the device used.
In an alternative embodiment, a support 12 is fixedly connected to the front end face of the installation box 4, a motor 13 is fixedly connected to the left side of the support 12, a worm 14 is fixedly connected to the end of a main shaft of the motor 13, a worm wheel 15 is meshed with the top end of the worm 14, the worm wheel 15 is arranged on the front end face of the installation box 4, a rotating sleeve 16 is fixedly connected to the inner side of the worm wheel 15, the rotating sleeve 16 penetrates through the material box 5, a shifting rod 17 is rotatably connected to the inner side of the rotating sleeve 16, a rotating handle 18 is fixedly connected to the front end face of the shifting rod 17, and a cleaning rod 19 is fixedly connected to the outer side of the shifting rod 17.
In this embodiment: the convenience of the ejection of compact of the improvement device, and make things convenient for device cleaning operation, improve the clean effect of device, clear up according to the clearance needs, expand the application range of device.
In an alternative embodiment, the number of the brackets 12 is two, the left side of the worm 14 is rotatably connected with the brackets 12 through a rotating shaft, the outer side of the rotating sleeve 16 is fixedly connected with the bin 5, and the bottom end of the cleaning rod 19 is slidably connected with the inner side wall of the bin 5.
In this embodiment: the convenience of the device ejection of compact is improved, and makes things convenient for the clean operation of device, improves the clean effect of device.
The utility model discloses a theory of operation and use flow: the device uses an external power supply to supply power, the power supply is switched on to operate equipment, a hanging rod 3 is hung on a hook of a crane, then the hanging rod 3 can rotate relative to a hanging plate 1 through a rotating rod 2, the lifting operation of the device is facilitated, before the device is used, a push rod 9 is stirred to drive a clamping block 11 to be separated from a material box 5 through a connecting rod 10, a box cover 6 is separated from the material box 5, then materials are filled into the inner side of the material box 5, then the push rod 9 is stirred to place the box cover 6 on the material box 5, then a spring 8 pushes the push rod 9 to drive the connecting rod 10 to move, the connecting rod 10 pushes the clamping block 11 to be clamped with the material box 5, so that the box cover 6 is fixed, the sealing of the material box 5 is completed, the materials are prevented from being scattered in the lifting process, the convenience of material conveying is improved, the stability of the use of the device is improved, and after the lifting is completed, the hanging plate 1 is moved to a position needing blanking, the motor 13 on the right-end bracket 12 operates, the motor 13 drives the worm 14 to rotate on the left-end bracket 12, the worm 14 drives the worm wheel 15 to rotate, the worm wheel 15 drives the rotating sleeve 16 to rotate, the rotating sleeve 16 drives the material box 5 to rotate in the installation box 4, the cleaning rod 19 is driven to synchronously move through materials, after the box cover 6 is opened, the material box 5 rotates reversely to perform discharging operation, then the material box 5 is reset after discharging is finished, when cleaning is needed, the material box is fixed by holding the deflector rod 17 by hand, then the worm 14 operates to drive the installation box 4 to rotate, the cleaning rod 19 keeps still to scrape and clean the inner side wall of the material box 5, waste residues are conveniently discharged, if cleaning by flushing is needed, the installation box 4 does not rotate, the rotating handle 18 drives the deflector rod 17 to rotate, the deflector rod 17 drives the cleaning rod 19 to rotate to perform cleaning operation on the material box 5, the convenience of discharging of the device is improved, and the cleaning operation of the device is convenient, the cleaning effect of the device is improved, the cleaning is carried out according to the cleaning requirement, the application range of the device is expanded, and the application effect of the device is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a material lifting device for building engineering, includes link plate (1), its characterized in that: link plate (1) inboard is rotated and is connected with bull stick (2), bull stick (2) outside fixedly connected with peg (3), link plate (1) one side fixedly connected with install bin (4), install bin (4) inboard is rotated and is connected with workbin (5), workbin (5) top sliding connection has case lid (6), case lid (6) inboard fixedly connected with gag lever post (7), case lid (6) inboard fixedly connected with spring (8), spring (8) other end fixedly connected with push rod (9), push rod (9) opposite side fixedly connected with connecting rod (10), connecting rod (10) other end fixedly connected with fixture block (11).
2. The material lifting device for construction engineering according to claim 1, characterized in that: the quantity of link plate (1) is two, two link plate (1) is the symmetry and sets up the left end face and the right-hand member face of link plate (1), the quantity of peg (3) is two, two peg (3) are the symmetry and set up the left end face and the right-hand member face of bull stick (2).
3. The material lifting device for construction engineering according to claim 1, characterized in that: the spacing groove has been seted up to install bin (4) inboard, workbin (5) the outside with the spacing groove sliding connection of install bin (4), the elastic groove has been seted up to case lid (6) inboard, the elastic groove quantity of case lid (6) is two, the quantity of spring (8) is two, two spring (8) set up respectively two the inboard in the elastic groove of case lid (6), gag lever post (7) run through push rod (9).
4. The material lifting device for construction engineering according to claim 1, characterized in that: terminal surface fixedly connected with support (12) before installing bin (4), support (12) left side fixedly connected with motor (13), motor (13) main shaft end fixedly connected with worm (14), worm (14) top meshing has worm wheel (15), worm wheel (15) set up terminal surface before installing bin (4), cover (16) is changeed to inboard fixedly connected with of worm wheel (15), it runs through to change cover (16) workbin (5), it is connected with driving lever (17) to change cover (16) inboard rotation, terminal surface fixedly connected with changes (18) before driving lever (17), driving lever (17) outside fixedly connected with clearance pole (19).
5. The material lifting device for construction engineering according to claim 4, characterized in that: the quantity of support (12) is two, worm (14) left side through the pivot with support (12) rotate to be connected, change cover (16) outside with workbin (5) fixed connection, clearance pole (19) bottom with workbin (5) inside wall sliding connection.
CN202021867698.4U 2020-09-01 2020-09-01 Material lifting device for building engineering Active CN213894867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021867698.4U CN213894867U (en) 2020-09-01 2020-09-01 Material lifting device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021867698.4U CN213894867U (en) 2020-09-01 2020-09-01 Material lifting device for building engineering

Publications (1)

Publication Number Publication Date
CN213894867U true CN213894867U (en) 2021-08-06

Family

ID=77108787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021867698.4U Active CN213894867U (en) 2020-09-01 2020-09-01 Material lifting device for building engineering

Country Status (1)

Country Link
CN (1) CN213894867U (en)

Similar Documents

Publication Publication Date Title
CN213894867U (en) Material lifting device for building engineering
CN207874558U (en) Self-cleaning mortar mixer
CN209580046U (en) Mortar mixer
CN214345835U (en) High-speed stirring device for manufacturing environment-friendly wall material by using composite sludge
CN211074167U (en) Mortar mixer
CN212188842U (en) Automatic stirring device for fireproof coating
CN211817722U (en) Building wall whitewashes device
CN210651312U (en) Home decoration is with mixing thick liquid device
CN214353309U (en) Concrete mixing device is used in building engineering construction
CN218255909U (en) Convenient clear cement agitating unit
CN218375510U (en) Building wall infiltration patching device
CN219726753U (en) Plastering mortar stirring device
CN217189371U (en) Putty powder agitating unit
CN218593323U (en) A building waterproof layer prosthetic devices for architectural design
CN218281519U (en) Building engineering agitating unit
CN212172900U (en) Silt bucket for construction
CN215825618U (en) Agitating unit of mortar for building engineering
CN216321690U (en) Stirring device for processing gypsum retarder
CN214973411U (en) Self-leveling gypsum stirring device
CN213942880U (en) Novel coating stirring device for building construction
CN218429160U (en) Cement mortar mixer for durable concrete
CN218576593U (en) Ground-mounted ceramic slurry mixing tank
CN220095011U (en) Grouting device
CN213766471U (en) Cement mortar mixer
CN220080905U (en) High-pressure grouting machine convenient for changing charging bucket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant