CN213894832U - Construction elevator guide rail frame linkage - Google Patents

Construction elevator guide rail frame linkage Download PDF

Info

Publication number
CN213894832U
CN213894832U CN202022881183.6U CN202022881183U CN213894832U CN 213894832 U CN213894832 U CN 213894832U CN 202022881183 U CN202022881183 U CN 202022881183U CN 213894832 U CN213894832 U CN 213894832U
Authority
CN
China
Prior art keywords
left end
guide rail
rod
construction elevator
belt pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022881183.6U
Other languages
Chinese (zh)
Inventor
刘跃洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022881183.6U priority Critical patent/CN213894832U/en
Application granted granted Critical
Publication of CN213894832U publication Critical patent/CN213894832U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a construction elevator guide rail frame linkage in building elevator technical field, including the mounting, the right part fixed mounting of mounting has the box, and the even fixed mounting in left end of box has the first body of rod, and the equal fixed mounting in left end of the first body of rod has the brush, and box left end stringcourse department is provided with the second body of rod, and the left end of the second body of rod has cup jointed the cavity sleeve, and cavity sleeve's left end fixed mounting has the butt piece, and the upper and lower two of mounting left end evenly are provided with the telescopic link, and the inner fixed mounting of telescopic link has the second gyro wheel. The utility model discloses a belt pulley, brush, telescopic link, PLC controller and butt joint piece's cooperation realizes that the construction elevator guide rail carries out comprehensive cleanness to in time paint lubricating grease, make can even paint on the guide rail of lubricating grease, reduced staff's intensity of labour, also improved the lubricated work efficiency of construction elevator guide rail.

Description

Construction elevator guide rail frame linkage
Technical Field
The utility model relates to a building elevator technical field specifically is a construction elevator guide rail frame linkage.
Background
Construction elevators are generally referred to as construction elevators, but construction elevators comprise a broader definition and construction platforms also belong to the construction elevator series. The simple construction elevator consists of a lift car, a driving mechanism, a standard knot, an attached wall, a chassis, a fence, an electrical system and the like, is a manned cargo-carrying construction machine frequently used in buildings, is comfortable and safe to take due to the unique box body structure, and is usually matched with a tower crane to use on a construction site. Construction elevators produced in China are more and more mature and gradually move to the international world.
The development of elevators is in a peak state, and since most manufacturers or individuals have more choices of multi-story buildings in order to increase the utilization rate of the field, a device is also required to conveniently lift and lower goods. Since the conventional elevator has high cost and low bearing capacity and is not suitable for loading tens of tons or hundreds of tons of goods, a high-bearing elevator has been developed to assist in production and transportation of goods. The construction elevator is safe, has super-large load capacity and is convenient to maintain, so that the special industry is developed more quickly.
Each newly installed elevator must be fully lubricated before use. Present construction elevator guide rail need carry out the fat liquoring lubrication to the guide rail after the installation finishes, this work is mostly accomplished by staff's manual, the staff need take the hanging flower basket to paint guide rail festival one by one, paint the lubrication and need regularly go on repeatedly, it is consuming time hard, and the volume uncontrollable that the staff paintd, lead to a large amount of consumption lubricating grease, make the engineering money increase, too much lubricating grease can adsorb a large amount of dusts on the guide rail, become more difficult to clean, therefore staff's intensity of labour has been increaseed, need improve.
Based on this, the utility model designs a construction elevator guide rail frame linkage to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction elevator guide rail frame linkage, need carry out the fat liquoring lubrication to the guide rail after the installation finishes with the current construction elevator guide rail that proposes in solving above-mentioned background art, this work is mostly accomplished by staff's manual, the staff need take the hanging flower basket to paint guide rail festival one by one, it needs regularly to go on repeatedly to paint the lubrication, it is consuming time hard, and the volume uncontrollable that the staff paintd, lead to a large amount of consumption lubricating grease, make the engineering money increase, too much lubricating grease can adsorb a large amount of dusts on the guide rail, it is difficult to clean to become more, therefore staff's intensity of labour has been increaseed, need carry out the modified problem.
In order to achieve the above object, the utility model provides a following technical scheme: a construction elevator guide rail frame suspension device comprises a fixing part, wherein a box body is fixedly arranged at the right part of the fixing part, a dustproof cover is arranged on the rear wall of the box body, a first cavity is arranged in the box body, a motor is fixedly arranged at the bottom of the first cavity, first rollers are fixedly arranged at the upper part and the lower part of the left end of the fixing part respectively, a first rod body is uniformly and fixedly arranged at the left end of the box body, a hairbrush is fixedly arranged at the left end of the first rod body, a first belt pulley is fixedly arranged at the right part of the first rod body at the upper part and is embedded into the outer wall of the left end of the box body, a second belt pulley is fixedly arranged at the right part of the first rod body at the lower part and penetrates through the wall of the left end cavity of the motor and is fixedly connected with the output end of the motor, a second rod body is arranged at the waist line of the left end of the box body, and a hollow sleeve is sleeved at the left end of the second rod body, the spout has been seted up to the body of rod of the second body of rod, hollow sleeve's left end fixed mounting has the butt piece, the right-hand member fixed mounting of the second body of rod has the double flute belt pulley, and imbeds the left end outer wall of box, the inner race of double flute belt pulley with first belt pulley passes through belt transmission and connects, the outer end race of double flute belt pulley with the second belt pulley passes through belt transmission and connects, the upper and lower two of mounting left end evenly is provided with the telescopic link, the inner fixed mounting of telescopic link has the second gyro wheel.
Preferably, the brush arranged at the top of the left end of the box body is a bristle brush, and the brush arranged at the bottom of the left end of the box body is a bristle brush.
Preferably, the top of the hollow sleeve is fixedly provided with a storage box, the bottom of the storage box is provided with a discharge hole, and the storage box is communicated with the hollow sleeve through the discharge hole.
Preferably, the abutment block is made of an elastic leather material having a mesh opening.
Preferably, a feed inlet is formed in the top of the hollow sleeve, a cavity is formed in the hollow sleeve, a limiting rod is fixedly mounted on the wall of the cavity, and the limiting rod is embedded into a sliding groove formed in the second rod body.
Preferably, the left end outer wall fixed mounting of mounting has the PLC controller, the PLC controller with the telescopic link with first gyro wheel electric connection.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a belt pulley, brush, telescopic link, PLC controller and butt joint piece's cooperation realizes that the construction elevator guide rail carries out comprehensive cleanness to in time paint lubricating grease, make can even paint on the guide rail of lubricating grease, reduced staff's intensity of labour, also improved the lubricated work efficiency of construction elevator guide rail.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the interior of the present invention;
FIG. 2 is a schematic view of the rear structure of the present invention;
fig. 3 is an enlarged schematic view of the structure at a position a of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1-fixing part, 111-guide rail bracket, 01 box body, 001-first cavity, 2-motor, 3-first rod body, 4-first belt pulley, 41-second belt pulley, 5-first roller, 6-brush, 7-double-groove belt pulley, 9-PLC controller, 10-telescopic rod, 11-second roller, 12-second rod body, 13-hollow sleeve, 131-limiting rod, 132-butting block and 14-storage box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a construction elevator guide rail frame suspension device comprises a fixing part 1, a box body 01 is fixedly installed at the right part of the fixing part 1, a dustproof cover is arranged on the rear wall of the box body 01, a first cavity 001 is arranged inside the box body 01, a motor 2 is fixedly installed at the bottom of the first cavity 001, first rollers 5 are fixedly installed at the upper part and the lower part of the left end of the fixing part 1, first rod bodies 3 are uniformly and fixedly installed at the left end of the box body 01, a brush 6 is fixedly installed at the left end of each first rod body 3, a first belt pulley 4 is fixedly installed at the right part of each first rod body 3 positioned at the upper part and is embedded into the outer wall of the left end of the box body 01, a second belt pulley 41 is fixedly installed at the right part of each first rod body 3 positioned at the lower part and penetrates through the left end cavity wall of the first cavity 001 and is fixedly connected with the output end of the motor 2, a second rod body 12 is arranged at the waist line at the left end of the box body 01, a hollow sleeve 13 is sleeved at the left end of the second rod body 12, the spout has been seted up to the body of rod of the second body of rod 12, the left end fixed mounting of hollow sleeve 13 has butt piece 132, the right-hand member fixed mounting of the second body of rod 12 has double flute belt pulley 7, and the left end outer wall of embedding box 01, the inner race of double flute belt pulley 7 passes through belt transmission with first belt pulley 4 to be connected, the outer end race of double flute belt pulley 7 passes through belt transmission with second belt pulley 41 to be connected, the upper and lower two of 1 left end of mounting evenly are provided with telescopic link 10, the inner fixed mounting of telescopic link 10 has second gyro wheel 11.
Further, the top brush 6 located at the left end of the box body 01 is set to be a bristle brush, the bottom brush 6 located at the left end of the box body 01 is set to be a soft brush, impurities such as dust in the guide rail can be cleaned through the bristle brush, and lubricating grease can be uniformly smeared through the soft brush.
Further, the top of the hollow sleeve 13 is fixedly provided with a storage box 14, the bottom of the storage box 14 is provided with a discharge hole, and the storage box 14 is communicated with the hollow sleeve 13 through the discharge hole, so that the lubricating grease in the storage box 14 can automatically fall into the hollow sleeve 13.
Further, the butt block 132 is set up to the elastic leather facing material that has the sieve mesh, is favorable to moving when cavity sleeve 13 rightwards, promotes butt block 132 through the left end of the second body of rod 12 for lubricating grease is evenly oozed by the left end surface of butt block 132, lubricates the guide rail.
Further, the top of the hollow sleeve 13 is provided with a feed inlet, the inside of the hollow sleeve 13 is provided with a cavity, the cavity wall is fixedly provided with a limiting rod 131, and the limiting rod 131 is embedded into a sliding groove formed in the second rod body 12, so that the second rod body 12 can rotate to drive the hollow sleeve 13 to move left and right.
Further, the left end outer wall fixed mounting of mounting 1 has PLC controller 9, PLC controller and telescopic link 10 and first gyro wheel 5 electric connection, is favorable to controlling the walking of first gyro wheel 5 and reciprocates, carries out thorough lubrication to lifting guide.
One specific application of this embodiment is: by placing the fixing member 1 at the bottom of the guide rail frame 111, embedding the first roller 5 at the left end of the box 01 into the i-shaped groove of the guide rail, retracting the second roller 11 at the left end of the fixing member 1 inwards by controlling the telescopic rod 10, aligning with the i-shaped groove and extending out, embedding into the i-shaped groove of the guide rail, then starting the motor 2, controlling the PLC controller 9 to make the fixing member 1 move upwards, driving the two groups of first rod bodies 3 to rotate by the second belt pulley 41 after the motor 2 is started, driving the bristle brush to rotate to clean dust in the guide rail during the upward movement of the fixing member 1, simultaneously rotating the second rod body 12 to make the hollow sleeve 13 move left and right on the rod body of the second rod body 12, moving the hollow sleeve 13 left, the abutting block 132 touches the guide rail, moving the hollow sleeve 13 right, and abutting the right side of the abutting block 132 abuts against the left end of the second rod body 12, make the lubricating grease atress ooze by the left end of butt piece 132, consequently when hollow sleeve 13 moved left, scribble the lubricating grease point on the inner wall of guide rail, scribble lubricating oil by the pappus brush that bottom brush 6 set up again for lubricating grease can be even scribble on the guide rail, has reduced staff's intensity of labour, has also improved the lubricated work efficiency of construction elevator guide rail.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrally connected; may be mechanically coupled, may be directly coupled, or may be indirectly coupled through an intermediary. To those of ordinary skill in the art, the specific meaning of the above terms in the present invention is understood according to the specific situation. In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a construction elevator guide rail frame linkage, includes mounting (1), its characterized in that: the right part of the fixing part (1) is fixedly provided with a box body (01), the rear wall of the box body (01) is provided with a dustproof cover, a first cavity (001) is formed in the box body (01), the bottom of the first cavity (001) is fixedly provided with a motor (2), the upper part and the lower part of the left end of the fixing part (1) are fixedly provided with first rollers (5), the left end of the box body (01) is uniformly and fixedly provided with a first rod body (3), the left end of the first rod body (3) is fixedly provided with a brush (6), the right part of the first rod body (3) at the upper part is fixedly provided with a first belt pulley (4) and is embedded into the outer wall of the left end of the box body (01), the right part of the first rod body (3) at the lower part is fixedly provided with a second belt pulley (41) and penetrates through the left end cavity wall of the first cavity (001), is fixedly connected with the output end of the motor (2), a second rod body (12) is arranged at the left end waist line of the box body (01), the left end of the second rod body (12) is sleeved with a hollow sleeve (13), the rod body of the second rod body (12) is provided with a sliding groove, a butt joint block (132) is fixedly arranged at the left end of the hollow sleeve (13), a double-groove belt pulley (7) is fixedly arranged at the right end of the second rod body (12), and is embedded into the outer wall of the left end of the box body (01), the inner end pulley groove of the double-groove belt pulley (7) is connected with the first belt pulley (4) through belt transmission, the outer end pulley groove of the double-groove belt pulley (7) is connected with the second belt pulley (41) through belt transmission, the upper part and the lower part of the left end of the fixing piece (1) are uniformly provided with telescopic rods (10), and a second roller (11) is fixedly arranged at the inner end of the telescopic rod (10).
2. The construction elevator guide rail frame suspension device according to claim 1, wherein: the brush (6) is arranged at the top of the left end of the box body (01) and is a bristle brush, and the brush (6) is arranged at the bottom of the left end of the box body (01) and is a bristle brush.
3. The construction elevator guide rail frame suspension device according to claim 1, wherein: the top of the hollow sleeve (13) is fixedly provided with a storage box (14), the bottom of the storage box (14) is provided with a discharge hole, and the storage box (14) is communicated with the hollow sleeve (13) through the discharge hole.
4. The construction elevator guide rail frame suspension device according to claim 1, wherein: the abutting block (132) is made of elastic leather surface materials with sieve holes.
5. The construction elevator guide rail frame suspension device according to claim 1, wherein: the top of the hollow sleeve (13) is provided with a feed inlet, the inside of the hollow sleeve (13) is provided with a cavity, a limiting rod (131) is fixedly installed on the cavity wall of the cavity, and the limiting rod (131) is embedded into a sliding groove formed in the second rod body (12).
6. The construction elevator guide rail frame suspension device according to claim 1, wherein: the left end outer wall fixed mounting of mounting (1) has PLC controller (9), the PLC controller with telescopic link (10) with first gyro wheel (5) electric connection.
CN202022881183.6U 2020-12-04 2020-12-04 Construction elevator guide rail frame linkage Active CN213894832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022881183.6U CN213894832U (en) 2020-12-04 2020-12-04 Construction elevator guide rail frame linkage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022881183.6U CN213894832U (en) 2020-12-04 2020-12-04 Construction elevator guide rail frame linkage

Publications (1)

Publication Number Publication Date
CN213894832U true CN213894832U (en) 2021-08-06

Family

ID=77100319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022881183.6U Active CN213894832U (en) 2020-12-04 2020-12-04 Construction elevator guide rail frame linkage

Country Status (1)

Country Link
CN (1) CN213894832U (en)

Similar Documents

Publication Publication Date Title
CN201665256U (en) Self-climbing type multi-functional wall robot
CN106419773A (en) Building glass curtain wall cleaning spider robot
CN111037392A (en) Polishing robot
CN106148869A (en) Automatic zinc-plated robot
CN206630559U (en) Glass of building curtain cleaning spider robot
CN213894832U (en) Construction elevator guide rail frame linkage
CN215828203U (en) Track cleaning device of bridge crane
CN208289573U (en) A kind of full-automatic finishing wall grinding machine
CN202184690U (en) Automatic dry cleaning robot for outer wall of high-rise building
CN210737449U (en) Hydraulic engineering construction is with removing movable support
CN205758443U (en) The low concealed window cleaning equipment of high flexion-extension
CN112343223A (en) Curtain wall mounting device
CN205616133U (en) Electroplate driving of special groined type
CN112842125B (en) Intelligent dust collecting equipment of building
CN110772186B (en) Wall surface cleaning robot
CN209753541U (en) Hoisting cleaning machine for parts for ship building
CN206231787U (en) A kind of Multifunctional mobile ash pan
CN207988468U (en) It is a kind of to stablize fixed building hanging basket
CN211692264U (en) Construction engineering construction double ladder
CN205554351U (en) Automatic balanced type escalator carrier
CN2338413Y (en) Machine for cleaning external wall of high building
CN220862118U (en) Bionic pole-climbing street lamp cleaning robot
CN219003937U (en) Automatic water drill woolen cleaning equipment
CN209733855U (en) Intelligent management device for elevator
CN217602047U (en) Steel construction factory building roofing hanging flower basket instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant