CN213889948U - Tool storage device for budget estimation of railway construction drawing - Google Patents

Tool storage device for budget estimation of railway construction drawing Download PDF

Info

Publication number
CN213889948U
CN213889948U CN202022507974.2U CN202022507974U CN213889948U CN 213889948 U CN213889948 U CN 213889948U CN 202022507974 U CN202022507974 U CN 202022507974U CN 213889948 U CN213889948 U CN 213889948U
Authority
CN
China
Prior art keywords
connecting rod
tool box
cover plate
rotating connecting
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022507974.2U
Other languages
Chinese (zh)
Inventor
崔伟朋
王海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Reclaimer Environmental Technology Co Ltd
Original Assignee
Nanjing Reclaimer Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Reclaimer Environmental Technology Co Ltd filed Critical Nanjing Reclaimer Environmental Technology Co Ltd
Priority to CN202022507974.2U priority Critical patent/CN213889948U/en
Application granted granted Critical
Publication of CN213889948U publication Critical patent/CN213889948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model discloses a railway construction drawing is instrument strorage device for budget, including tool holder one, tool holder two, tool holder three, baffle, rotatory connecting rod one, rotatory connecting rod two, rotatory connecting rod three, rotation axis, torsional spring mechanism, apron one, apron two, hasp and hinge, tool holder one has two sets ofly to do the utility model discloses the basement, tool holder two has two sets ofly and horizontal independent symmetry to locate tool holder one, tool holder three has two sets ofly and horizontal independent symmetry to locate on tool holder two, rotatory connecting rod one, rotatory connecting rod two and rotatory connecting rod three are equipped with respectively two sets ofly and the symmetry locates on the tool holder preceding terminal surface outer wall, rotatory connecting rod one, rotatory connecting rod two and the three lower extreme of rotatory connecting rod are located perpendicularly to the rotation axis. The utility model belongs to the technical field of project engineering cost, specifically indicate a convenient to carry, easy operation, can classify and deposit instrument, automatic railway construction drawing tool strorage device for budget.

Description

Tool storage device for budget estimation of railway construction drawing
Technical Field
The utility model belongs to the technical field of project engineering cost, specifically indicate a railway construction drawing is instrument strorage device for budget.
Background
The construction diagram budget refers to a construction installation project budget cost file compiled according to the construction diagram, budget quota, various expense standards, natural and economic technical conditions of a construction area and the like. The budget price file includes: budget specification, total budget book, single project comprehensive budget book, unit project budget book, main material table and supplement unit valuation table. During the process of preparing the budget cost file, a budget builder needs to browse a large amount of relevant data to obtain corresponding data, and simultaneously needs to enter the site to measure and draw drawings at any time, so that the calculation process is complicated, and a tool storage device such as technical data, specifications, pens, rulers, compasses and the like is lacked, thereby bringing inconvenience to the budget builder, increasing the workload of the worker and reducing the working efficiency.
Disclosure of Invention
In order to solve the problem, the utility model provides a convenient to carry, easy operation, can classify and deposit the instrument, improve work efficiency's railway construction drawing tool strorage device for budget.
In order to realize the above functions, the utility model discloses the technical scheme who takes as follows: a tool storage device for budget of railway construction drawings comprises a first tool box, a second tool box, a third tool box, a partition plate, a first rotary connecting rod, a second rotary connecting rod, a third rotary connecting rod, a rotary shaft, a torsion spring mechanism, a first cover plate, a second cover plate, a lock catch and hinges, wherein the first tool box is divided into two groups, the second tool box is divided into two groups which are transversely independently and symmetrically arranged on the first tool box, the third tool box is divided into two groups which are transversely independently and symmetrically arranged on the second tool box, the partition plate is arranged in the middle of the first tool box and plays a role in blocking, one end of the rotary connecting rod is hinged to the outer wall of the first tool box, the other end of the rotary connecting rod is hinged to the right end of the outer wall of the first tool box, so that the first rotary connecting rod forms an angle with the horizontal plane, one end of the second rotary connecting rod is hinged to the outer wall of the first tool box, and the other end of the second rotary connecting rod is hinged to the outer wall of the third tool box, the middle part of the second rotating connecting rod is hinged to the middle part of the outer wall of the tool box, so that the second rotating connecting rod is parallel to the first rotating connecting rod, one end of the third rotating connecting rod is hinged to the outer wall of the second tool box, the other end of the third rotating connecting rod is hinged to the outer wall of the third tool box, so that the third rotating connecting rod is parallel to the second rotating connecting rod, the rotating shaft is vertically arranged at the lower ends of the first rotating connecting rod, the second rotating connecting rod and the third rotating connecting rod, the torsional spring mechanisms are provided with a plurality of groups and are sleeved on the rotating shaft, the torsional spring mechanisms are respectively arranged on the inner wall of the bottom of the first tool box, the inner wall of the bottom of the second tool box and the inner wall of the bottom of the third tool box, the first cover plate is rotatably arranged on the third tool box, the second cover plate and the first cover plate are bilaterally symmetrical to each other, one end of the lock is arranged in the middle part of the right end of the first cover plate, and the other end of the second cover plate is arranged in the middle part of the left end of the second cover plate, so as to play a role in locking and preventing others from being stolen, the hinge symmetry is located apron one outer wall and is located on the three outer walls of tool holder simultaneously, torsional spring mechanism includes torsional spring, swivel axis seat and torsional spring fixing base, the torsional spring cup joints on locating the rotation axis, the torsional spring fixing base is located respectively on tool holder one, tool holder two and the three bottom inner walls of tool holder, the swivel axis seat is located perpendicularly on the torsional spring fixing base, the rotation axis rotates and locates on the swivel axis seat.
Furthermore, the first cover plate is provided with a second buckle seat and a second buckle, the second buckle seat is arranged on the first cover plate, the second buckle is rotatably arranged on the second buckle seat, the second cover plate is provided with a first buckle seat and a first buckle, the first buckle seat is arranged on the second cover plate, and the first buckle is rotatably arranged on the first buckle seat.
Furthermore, a handle support and a handle are arranged on the first cover plate and the second cover plate, the handle support is symmetrically arranged on the first cover plate and the second cover plate, and the handle is rotatably arranged on the handle support.
Furthermore, the first rotating connecting rod, the second rotating connecting rod and the third rotating connecting rod are respectively provided with two groups and symmetrically arranged on the outer wall of the front end face of the tool box.
Further, the length between the hinge points of the first rotating connecting rod and the second rotating connecting rod is equal to the length between the hinge points of the first rotating connecting rod and the third rotating connecting rod.
Further, the first tool box, the second tool box and the third tool box are all made of light materials, such as: pp plastics, aluminum alloys, etc.
Further, the first rotating connecting rod, the second rotating connecting rod and the third rotating connecting rod are all made of light materials with good bending resistance and wear resistance, such as: carbon fibers, polymer synthetic resins, and the like.
The utility model adopts the above structure to gain beneficial effect as follows: the utility model provides a pair of tool storage device for railway construction drawing budget easy operation, the mechanism is compact, reasonable in design, through opening hasp and buckle one and buckle two, rotatory connecting rod one, rotatory connecting rod two and rotatory connecting rod three rotate under the effect of torsional spring and drive the tool holder and remove to automatically, realize automaticly opening the tool holder. According to the needs, different tools, drawings, technical background data, budget files and the like are placed in different tool boxes, convenience is provided for workers, and the working efficiency is improved.
Drawings
FIG. 1 is a schematic view of the overall structure of a tool storage device for budget estimation of railway construction drawings of the present invention;
FIG. 2 is a schematic structural view of a torsion spring mechanism of the tool storage device for budget estimation of railway construction drawings of the present invention;
FIG. 3 is a schematic structural view of a top cover plate of the tool storage device for budget estimation of railway construction drawings of the present invention;
fig. 4 is the utility model relates to an effect picture after tool storage device is opened for railway construction drawing budget.
The tool box comprises a first tool box, a second tool box, a third tool box, a fourth tool box, a fifth tool box, a sixth tool box, a fifth tool, a sixth tool, a fourth tool, a partition, a fifth tool, a sixth tool, a fifth tool, a sixth tool, a fifth tool, a sixth tool, a fifth tool, a sixth tool, a fifth tool, a sixth tool, a fifth tool, a sixth.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "middle", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. The present invention will be described in further detail with reference to the accompanying drawings.
As shown in FIGS. 1-4, the utility model relates to a tool storage device for budget of railway construction drawing, which comprises a first tool box 1, a second tool box 2, a third tool box 3, a partition plate 4, a first rotary connecting rod 5, a second rotary connecting rod 6, a third rotary connecting rod 7, a rotary shaft 8, a torsion spring mechanism 9, a first cover plate 10, a second cover plate 11, a lock catch 16 and a hinge 19, wherein the first tool box 1 is provided with two groups, the second tool box 2 is provided with two groups which are transversely and independently symmetrically arranged on the first tool box 1, the third tool box 3 is provided with two groups which are transversely and independently symmetrically arranged on the second tool box 2, the partition plate 4 is arranged in the middle of the first tool box 1, one end of the first rotary connecting rod 5 is hinged on the outer wall of the first tool box 1, the other end of the first rotary connecting rod 5 is hinged on the right end of the outer wall of the second tool box 2, one end of the second rotary connecting rod 6 is hinged on the outer wall of the first tool box 1, the other end of the rotary connecting rod 6 is hinged on the outer wall of the third tool box 3, the middle part of the second rotating connecting rod 6 is hinged to the middle part of the second tool box 2, one end of the third rotating connecting rod 7 is hinged to the outer wall of the second tool box 2, the other end of the third rotating connecting rod 7 is hinged to the outer wall of the third tool box 3, so that the third rotating connecting rod 7 is parallel to the second rotating connecting rod 6, the rotating shaft 8 is vertically arranged at the lower ends of the first rotating connecting rod 5, the second rotating connecting rod 6 and the third rotating connecting rod 7, the torsion spring mechanisms 9 are provided with a plurality of groups and are sleeved on the rotating shaft 8, the torsion spring mechanisms 9 are respectively arranged on the inner wall of the bottom of the first tool box 1, the inner wall of the bottom of the second tool box 2 and the inner wall of the bottom of the third tool box 3, the first cover plate 10 is rotatably arranged on the third tool box 3, the second cover plate 11 and the first cover plate 10 are arranged in bilateral symmetry, one end of the lock 16 is arranged in the middle part of the right end of the first cover plate 10, the other end of the lock 16 is arranged in the middle part of the left end of the second cover plate 11, the hinge 19 is symmetrically arranged on the outer wall of the first cover plate 10 and is arranged on the outer wall of the third tool box 3, the torsion spring mechanism 9 comprises a torsion spring 20, a rotating shaft seat 21 and a torsion spring fixing seat 22, wherein the torsion spring 20 is sleeved on the rotating shaft 8, the torsion spring fixing seat 22 is respectively arranged on the inner walls of the bottoms of the first tool box 1, the second tool box 2 and the third tool box 3, the rotating shaft seat 21 is vertically arranged on the torsion spring fixing seat 22, and the rotating shaft 8 is rotatably arranged on the rotating shaft seat 21.
The improved cover plate is characterized in that a second buckle seat 14 and a second buckle 15 are arranged on the first cover plate 10, the second buckle seat 14 is arranged on the first cover plate 10, the second buckle 15 is rotatably arranged on the second buckle seat 14, a first buckle seat 12 and a first buckle 13 are arranged on the second cover plate 11, the first buckle seat 12 is arranged on the second cover plate 11, and the first buckle 13 is rotatably arranged on the first buckle seat 12.
And the first cover plate 10 and the second cover plate 11 are provided with handle supports 17 and handles 18, the handle supports 17 are symmetrically arranged on the first cover plate 10 and the second cover plate 11, and the handles 18 are rotatably arranged on the handle supports 17.
The length between the hinge points of the second rotating connecting rod 6 is equal to the length of the first rotating connecting rod 5 and the third rotating connecting rod 7.
The tool box I1, the tool box II 2 and the tool box III 3 are all made of light materials.
The first rotating connecting rod 5, the second rotating connecting rod 6 and the third rotating connecting rod 7 are all made of light materials with good bending resistance and wear resistance.
During the specific use, before work begins, the staff opens the hasp 16, the first buckle 13 and the second buckle 15, and the left and right sides rotation connecting rod 5, the second rotation connecting rod 6 and the third rotation connecting rod 7 rotate synchronously under the effect of the torsional spring 20 torsion, drive toolbox 1, the second toolbox 2 and the third toolbox 3 to move to the left and right sides simultaneously, and stop rotating and moving until as shown in the state of fig. 4, realize automatic opening. According to the requirement, the worker can store different types of tools and data in the tool boxes I1, II 2 and III 3, such as: ruler, set square, steel rule, tape measure, compasses, pencil box, technical background of a project data, budget file, construction drawing etc. realize that the instrument is categorised, can ask for fast and get, improve work efficiency's purpose, after the work is accomplished, put into the instrument box that corresponds to the instrument of different grade type again, straining buckle one 13 and buckle two 15, lock hasp 16 simultaneously, can also conveniently carry when safety protection budget file and instrument.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (6)

1. The utility model provides a railway construction drawing budgets uses instrument strorage device which characterized in that: the tool box comprises a first tool box, a second tool box, a third tool box, a partition plate, a first rotating connecting rod, a second rotating connecting rod, a third rotating connecting rod, a rotating shaft, a torsional spring mechanism, a first cover plate, a second cover plate, a lock catch and a hinge, wherein the first tool box is provided with two groups, the second tool box is provided with two groups which are transversely independently and symmetrically arranged on the first tool box, the third tool box is provided with two groups which are transversely independently and symmetrically arranged on the second tool box, the partition plate is arranged in the middle of the first tool box, one end of the rotating connecting rod is hinged on the outer wall of the first tool box, the other end of the rotating connecting rod is hinged on the right end of the outer wall of the first tool box, the other end of the rotating connecting rod is hinged on the outer wall of the first tool box, the middle of the rotating connecting rod is hinged on the middle of the second tool box, the other end of the rotating connecting rod is hinged on the outer wall of the second tool box, and the other end of the rotating connecting rod is hinged on the outer wall of the third tool box, the rotating shaft is vertically arranged at the lower ends of the first rotating connecting rod, the second rotating connecting rod and the third rotating connecting rod, the torsional spring mechanisms are provided with a plurality of groups and are sleeved on the rotating shaft, the torsional spring mechanisms are respectively positioned on the inner wall of the bottom of the first tool box, the inner wall of the bottom of the second tool box and the inner wall of the bottom of the third tool box, the first cover plate is rotatably arranged on the third tool box, the second cover plate and the first cover plate are symmetrically arranged in a left-right direction, one end of the lock catch is arranged in the middle of the right end of the first cover plate, the other end of the lock catch is arranged in the middle of the left end of the second cover plate, the hinge is symmetrically arranged on the outer wall of the first cover plate and is simultaneously arranged on the outer wall of the third tool box, the torsional spring mechanism comprises a torsional spring, a rotating shaft seat and a torsional spring fixing seat, the torsional spring is sleeved on the rotating shaft, the torsional spring fixing seat is respectively arranged on the inner walls of the bottoms of the first tool box, the second tool box and the third tool box, the rotating shaft seat is vertically arranged on the torsional spring fixing seat, the rotating shaft is rotatably arranged on the rotating shaft seat.
2. The tool storage device for the budget of the railway construction drawing according to claim 1, wherein: the cover plate I is provided with a first buckle seat and a second buckle, the second buckle seat is arranged on the first cover plate, the second buckle is rotatably arranged on the second buckle seat, the second cover plate is provided with a first buckle seat and a first buckle, the first buckle seat is arranged on the second cover plate, and the first buckle is rotatably arranged on the first buckle seat.
3. The tool storage device for the railway construction drawing budget according to claim 2, wherein: the handle support and the handle are arranged on the first cover plate and the second cover plate, the handle support is symmetrically arranged on the first cover plate and the second cover plate, and the handle is rotatably arranged on the handle support.
4. The tool storage device for the railway construction drawing budget according to claim 3, wherein: the length between the hinge points of the first rotating connecting rod and the second rotating connecting rod is equal to the length between the hinge points of the first rotating connecting rod and the third rotating connecting rod.
5. The tool storage device for the railway construction drawing budget according to claim 4, wherein: the tool box I, the tool box II and the tool box III are all made of light materials.
6. The tool storage device for the railway construction drawing budget according to claim 5, wherein: the first rotating connecting rod, the second rotating connecting rod and the third rotating connecting rod are all made of light materials with good bending resistance and wear resistance.
CN202022507974.2U 2020-11-03 2020-11-03 Tool storage device for budget estimation of railway construction drawing Active CN213889948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022507974.2U CN213889948U (en) 2020-11-03 2020-11-03 Tool storage device for budget estimation of railway construction drawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022507974.2U CN213889948U (en) 2020-11-03 2020-11-03 Tool storage device for budget estimation of railway construction drawing

Publications (1)

Publication Number Publication Date
CN213889948U true CN213889948U (en) 2021-08-06

Family

ID=77116700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022507974.2U Active CN213889948U (en) 2020-11-03 2020-11-03 Tool storage device for budget estimation of railway construction drawing

Country Status (1)

Country Link
CN (1) CN213889948U (en)

Similar Documents

Publication Publication Date Title
CN213889948U (en) Tool storage device for budget estimation of railway construction drawing
CN111657669A (en) Architectural design workstation
CN213862281U (en) Convenient real estate valuation toolbox of official working
CN206314712U (en) A kind of multifunctional engineering account valuation tool box
CN214016370U (en) On-spot sampling tool is used in building engineering cost budget
CN213030078U (en) Containing box convenient to accomodate mechanical engineering drawing instrument
CN216464522U (en) Toolbox for construction engineering cost
CN215501989U (en) Data recording device for engineering budget
CN211662022U (en) Portable toolbox is used in survey and drawing
CN213550170U (en) Portable toolbox is used in building engineering budget
CN216393297U (en) Cement apparatus for producing with cement mortar data recording board
CN221659249U (en) Tool placement box
CN212738169U (en) Intelligent engineering cost budgeting tool
CN219328397U (en) Measurement device for building construction
CN220966638U (en) Portable drawing tool bag
CN212472877U (en) Engineering cost data storage rack
CN213695983U (en) Engineering cost tool box
CN215323989U (en) Rapid tool classifying and storing device
CN219396525U (en) Engineering cost drawing device for engineering management
CN217673961U (en) Categorised device that stores based on high-speed railway repair tools
CN211195618U (en) Multifunctional surveying instrument
CN220062818U (en) Diameter measuring device
CN213703394U (en) Toolbox for engineering cost budget
CN216770725U (en) Water level detection device for hydraulic engineering design
CN221044434U (en) Storage tool box for engineering cost

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant