CN213885630U CN202022859238.3U CN202022859238U CN213885630U CN 213885630 U CN213885630 U CN 213885630U CN 202022859238 U CN202022859238 U CN 202022859238U CN 213885630 U CN213885630 U CN 213885630U
Authority
CN
China
Prior art keywords
tower body
pipe
tower
gas treatment
waste gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022859238.3U
Other languages
Chinese (zh)
Inventor
吴志宇
阮文婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dingli Environmental Protection Technology Co ltd
Original Assignee
Shenzhen Dingli Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dingli Environmental Protection Technology Co ltd filed Critical Shenzhen Dingli Environmental Protection Technology Co ltd
Priority to CN202022859238.3U priority Critical patent/CN213885630U/en
Application granted granted Critical
Publication of CN213885630U publication Critical patent/CN213885630U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a filler type cyclone waste gas treatment tower, which relates to the technical field of filler type waste gas treatment towers, comprising a tower body, wherein a water tank is installed at the bottom of the tower body, an air inlet is arranged at the bottom of the front surface of the tower body, an air outlet pipe is installed at the top of the tower body, a filler block is installed inside the tower body, a fan is installed at the top of the water tank, a third guide pipe is installed at one side of the fan, a hollow plate is installed at the lower position on the tower body close to the air inlet, a funnel is installed at the inner wall of the hollow plate, a support plate is installed at one side of the funnel close to the inside of the tower body, the utility model solves the problems that the filler can block the waste gas from flowing upwards and the circulation speed of the waste gas becomes slow, and the liquid after spraying drips at the bottom of the tower after penetrating through the filler through the support plate arranged at the bottom inside of the tower body, leading to problems of corrosion of the bottom of the column.

Description

Filler type cyclone waste gas treatment tower
Technical Field
The utility model belongs to the technical field of filler formula exhaust-gas treatment tower, concretely relates to filler formula whirlwind exhaust-gas treatment tower.
Background
The filler formula exhaust-gas treatment tower is the exhaust-gas treatment tower of the pollutant in the absorption waste gas of utilizing the filler, install the filler inside the treating column, waste gas is through the filler, and get rid of the pollutant in the waste gas through the mode that sprays, but current filler formula exhaust-gas treatment tower still has the weak point when using, the filler can block waste gas upflow, waste gas circulation speed slows down, the efficiency of influence processing waste gas, and the liquid after spraying sees through behind the filler drippage at the bottom of the tower, lead to corrosion at the bottom of the tower, influence the tower body life-span.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a filler formula whirlwind exhaust-gas treatment tower to the filler that proposes in solving above-mentioned background art can block waste gas upflow, and waste gas circulation speed slows down, and the liquid after spraying sees through to drip at the bottom of the tower after filling, leads to the problem of tower bottom corrosion.
In order to achieve the above object, the utility model provides a following technical scheme: the filler type cyclone waste gas treatment tower comprises a tower body, wherein a water tank is arranged at the bottom of the tower body, an air inlet is arranged at the bottom of the front surface of the tower body, an air outlet pipe is arranged at the top of the tower body, a filler block is arranged inside the tower body,
the fan is installed at the top of water tank, and one side of fan installs the third pipe, the below position department that is close to the air inlet on the tower body installs hollow core plate, and the inner wall of hollow core plate installs the funnel, the funnel extends to the inside bottom of tower body.
Preferably, the layer board is installed to one side that the inside of tower body is close to the funnel, and the sealing plug is installed to the one end of layer board, the drain has been seted up to rear surface bottom one side of tower body, and one side of drain is installed hollow box, the blow off pipe is installed to the one end of hollow box, and the sewage case is installed to the one end of blow off pipe.
Preferably, the pump body is installed at the top of water tank, and one side of the pump body installs first pipe, the second pipe is installed to the one end of first pipe, and the one end of second pipe extends to the inside of tower body, install rotatory nozzle on the second pipe.
Preferably, the supporting plate is of a circular arc-shaped structure, and the top of the supporting plate is provided with a waterproof coating.
Preferably, an observation window is installed on the outer wall of the tower body, and the observation window is made of transparent glass.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses an at the hollow core plate of the bottom front surface setting of tower body, utilize the fan to hollow core plate internal input air, the air provides atmospheric pressure in entering the tower body, is convenient for upwards blow waste gas to improve the flow velocity of waste gas, the waste gas of being convenient for is through packing, has improved the treatment effeciency, has solved to pack and can block waste gas flow upwards, the problem that waste gas circulation speed slows down.
(2) The utility model discloses a layer board that sets up in the inside bottom of tower body, the sewage that produces after spraying drips on the layer board, then the discharge tower body, can automatic collection sewage, avoid the sewage pollution tower body, has solved the liquid after spraying and has seen through dripping at the bottom of the tower after the filler, leads to the problem of tower bottom corrosion.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an external view of the present invention;
fig. 3 is a rear view of the present invention;
fig. 4 is a rear view of the tower body of the present invention;
FIG. 5 is a top view of the hollow plate and the third conduit of the present invention;
fig. 6 is a side view of the pallet of the present invention;
in the figure: 1-a filler block; 2-a tower body; 21-an observation window; 3-a first conduit; 4-a pump body; 5-a water tank; 6-a supporting plate; 61-a sealing plug; 7-rotating the spray head; 8-a second conduit; 9-a fan; 10-a third conduit; 11-hollow core slab; 12-an air inlet; 13-an air outlet pipe; 14-a sewage tank; 15-a sewage draining pipe; 16-a hollow box; 17-a sewage draining outlet; 18-funnel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on trivial matters in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, is easy to have a specific orientation configuration and operation, and thus are not to be construed as being obvious limitations of the present invention, and furthermore, the terms "first" and "second" are only used for descriptive purposes and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; either directly or indirectly through intervening profiles, or both. To those of ordinary skill in the art, the above-described meanings specifically in the present invention may be cleaved in specific outline.
Referring to fig. 1-6, the present invention provides the following technical solutions: the filler type cyclone waste gas treatment tower comprises a tower body 2, wherein a water tank 5 is arranged at the bottom of the tower body 2, a water inlet pipeline is arranged at the top of the water tank 5 and is used for adding spraying liquid, an air inlet 12 is arranged at the bottom of the front surface of the tower body 2, an air outlet pipe 13 is arranged at the top of the tower body 2, and a filler block 1 is arranged inside the tower body 2;
fan 9 is installed at the top of water tank 5, and third pipe 10 is installed to one side of fan 9, the below position department that is close to air inlet 12 on the tower body 2 installs hollow plate 11, and funnel 18 is installed to hollow plate 11's inner wall, funnel 18 extends to the inside bottom of tower body 2, air inlet 12 switches on outside exhaust gas pipe, waste gas gets into tower body 2, fan 9 bloies simultaneously, the air passes through third pipe 10, get into hollow plate 11, discharge through funnel 18 again, the hole on the air process layer board 6, then upflow, and propelling movement waste gas upflow, waste gas is through packing block 1 and through spraying, discharge from outlet duct 13 at last.
Further, the layer board 6 is installed to the inside one side that is close to funnel 18 of tower body 2, and the sealing plug 61 is installed to the one end of layer board 6, and drain 17 has been seted up to rear surface bottom one side of tower body 2, and one side of drain 17 is installed hollow box 16, and blow off pipe 15 is installed to the one end of hollow box 16, and sewage case 14 is installed to the one end of blow off pipe 15, is provided with water pipe and valve on the sewage case 14, is convenient for discharge sewage.
Further, the pump body 4 is installed at the top of water tank 5, and first pipe 3 is installed to one side of the pump body 4, second pipe 8 is installed to the one end of first pipe 3, and the one end of second pipe 8 extends to the inside of tower body 2, install rotatory nozzle 7 on the second pipe 8, the spray liquid in the pump body 4 extraction water tank 5, the spray liquid passes through first pipe 3 and second pipe 8, spout from rotatory nozzle 7 at last, the spray liquid sprays in tower body 2, and filter the filth in the waste gas, the spray liquid sees through packing block 1, then drip on layer board 6, the spray liquid flows at layer board 6 top, then flow to drain 17, reentrant hollow box 16, at last through blow off pipe 15 and enter sewage tank 14.
Further, the supporting plate 6 is of a circular arc-shaped structure, and a waterproof coating is arranged on the top of the supporting plate 6.
Further, an observation window 21 is installed on the outer wall of the tower body 2, and the observation window 21 is made of transparent glass.
The pump body 4 and the fan 9 are both electrically connected with an external power supply and start to work after being electrified.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Filler formula whirlwind exhaust-gas treatment tower, including tower body (2), its characterized in that: a water tank (5) is arranged at the bottom of the tower body (2), an air inlet (12) is arranged at the bottom of the front surface of the tower body (2), an air outlet pipe (13) is arranged at the top of the tower body (2), a packing block (1) is arranged in the tower body (2),
fan (9) are installed at the top of water tank (5), and one side of fan (9) installs third pipe (10), the below position department that is close to air inlet (12) on tower body (2) installs hollow plate (11), and funnel (18) are installed to the inner wall of hollow plate (11), funnel (18) extend to the inside bottom of tower body (2).
2. The packed cyclone waste gas treatment tower of claim 1, wherein: the inside of tower body (2) is close to one side of funnel (18) and installs layer board (6), and the one end of layer board (6) installs sealing plug (61), drain (17) have been seted up to rear surface bottom one side of tower body (2), and one side of drain (17) is installed hollow box (16), blow off pipe (15) are installed to the one end of hollow box (16), and sewage case (14) are installed to the one end of blow off pipe (15).
3. The packed cyclone off-gas treatment tower of claim 2, wherein: the pump body (4) is installed at the top of water tank (5), and first pipe (3) are installed to one side of the pump body (4), second pipe (8) are installed to the one end of first pipe (3), and the one end of second pipe (8) extends to the inside of tower body (2), install rotatory nozzle (7) on second pipe (8).
4. The packed cyclone off-gas treatment tower of claim 3, wherein: the supporting plate (6) is of a circular arc-shaped structure, and a waterproof coating is arranged at the top of the supporting plate (6).
5. The packed cyclone off-gas treatment tower of claim 4, wherein: an observation window (21) is installed on the outer wall of the tower body (2), and the observation window (21) is made of transparent glass.
CN202022859238.3U 2020-12-03 2020-12-03 Filler type cyclone waste gas treatment tower Active CN213885630U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022859238.3U CN213885630U (en) 2020-12-03 2020-12-03 Filler type cyclone waste gas treatment tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022859238.3U CN213885630U (en) 2020-12-03 2020-12-03 Filler type cyclone waste gas treatment tower

Publications (1)

Publication Number Publication Date
CN213885630U true CN213885630U (en) 2021-08-06

Family

ID=77100136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022859238.3U Active CN213885630U (en) 2020-12-03 2020-12-03 Filler type cyclone waste gas treatment tower

Country Status (1)

Country Link
CN (1) CN213885630U (en)

Similar Documents

Publication Publication Date Title
CN213885630U (en) Filler type cyclone waste gas treatment tower
CN203727987U (en) Normal and reverse liquid-sealed novel breather applied to tops of large storage tanks
CN202117743U (en) Tail gas purification device for engine
CN214233430U (en) Energy-saving efficient type purifying column
CN201952235U (en) Acid mist absorption tower for graphite purification
CN212819122U (en) Flue gas desulfurization equipment
CN201085978Y (en) Organic waste gas purifier
CN208627000U (en) A kind of spray desulfurizing tower with multistep treatment for smoke gas treatment
CN204865511U (en) A desulfurization dust remover for brickfield
CN207071313U (en) A kind of new acid-fume absorber
CN209848663U (en) Cyclone purification tower
CN211753727U (en) Pneumatic rotary spray tower
CN201815214U (en) Air washing type dust remover
CN210584353U (en) Nitrogen oxide exhaust treatment device
CN209093047U (en) A kind of hot dip part technique acid fog absorption tower
CN211411482U (en) High-efficient air filter equipment of dust waste gas
CN205145931U (en) High -efficient whirlwind formula exhaust gas purification device
CN214862303U (en) Pneumatic cyclone separation and purification device
CN217139912U (en) Circulating leaching waste gas treatment tower in pyrometallurgical copper smelting
CN220939898U (en) Desulfurizing tower with gas detection function
CN217287694U (en) Civil engineering construction dust collection device
CN213253802U (en) Waste gas treatment engineering deacidification tower
CN219217618U (en) A high-efficient scrubbing tower for petrochemical industry waste water treatment
CN220564558U (en) Multistage spray type biogas biological desulfurization device