CN213877500U - Progress management display device that building engineering construction was used - Google Patents

Progress management display device that building engineering construction was used Download PDF

Info

Publication number
CN213877500U
CN213877500U CN202120053828.9U CN202120053828U CN213877500U CN 213877500 U CN213877500 U CN 213877500U CN 202120053828 U CN202120053828 U CN 202120053828U CN 213877500 U CN213877500 U CN 213877500U
Authority
CN
China
Prior art keywords
fixedly connected
progress management
display device
construction
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120053828.9U
Other languages
Chinese (zh)
Inventor
何志权
罗海广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120053828.9U priority Critical patent/CN213877500U/en
Application granted granted Critical
Publication of CN213877500U publication Critical patent/CN213877500U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the progress management show that the building engineering construction was used, especially, be a progress management display device that building engineering construction was used, which comprises a fixing plate and i, the top fixedly connected with support frame of fixed plate, the mounting groove has been seted up to the inboard of support frame, the inside fixedly connected with threaded rod of mounting groove, threaded rod one side is equipped with first show board, the bottom fixedly connected with motor main part of threaded rod, one side fixedly connected with second show board of support frame, the top of fixed plate is connected with the install bin, one side of install bin articulates through the hinge has the chamber door, the inside of install bin is equipped with the battery. The utility model discloses a support frame, threaded rod, slider, first show board, motor main part and motor support to make progress management display device that the building engineering construction was used can be better go up and down and altitude mixture control when using, and then make the project can carry out better show.

Description

Progress management display device that building engineering construction was used
Technical Field
The utility model relates to a progress management show technical field that building engineering construction used specifically is a progress management display device that building engineering construction used.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
The existing progress management display device for construction of building engineering also has the following problems:
1. in the using process, the progress management display board cannot be adjusted in height;
2. in the use, progress management display device that building engineering construction was used can't remove.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a progress management display device that building engineering construction was used has solved the problem that can't carry out altitude mixture control and can't remove.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a progress management display device for construction of building engineering comprises a fixed plate, wherein the top of the fixed plate is fixedly connected with a support frame, the inner side of the support frame is provided with a mounting groove, the inside of the mounting groove is fixedly connected with a threaded rod, one side of the threaded rod is provided with a first display plate, the bottom of the threaded rod is fixedly connected with a motor main body, one side of the support frame is fixedly connected with a second display plate, the top of the fixed plate is connected with a mounting box, one side of the mounting box is hinged with a box door through a hinge, the inside of the mounting box is provided with a storage battery, the top of the mounting box is fixedly connected with a connecting rod, the top of the connecting rod is fixedly connected with a solar panel, the top of the fixed plate is fixedly connected with a handrail, the bottom of the fixed plate is fixedly connected with a base, and the bottom of the fixed plate is fixedly connected with an electric push rod, the bottom of the electric push rod is fixedly connected with a rolling wheel.
As a preferred technical scheme of the utility model, the outer wall of threaded rod is connected with the slider through the screw thread rotation, the other end of slider and one side fixed connection of first show board.
As an optimal technical scheme of the utility model, the outer wall fixedly connected with motor support of motor main part, motor support's top and the bottom fixed connection of fixed plate.
As an optimal technical scheme of the utility model, right side the inside fixedly connected with slide bar of support frame, the top fixedly connected with limiting plate of slide bar.
As an optimal technical scheme of the utility model, the top fixedly connected with bracing piece of fixed plate, one side fixedly connected with lighting bulb of bracing piece.
As an optimal technical scheme of the utility model, the bottom fixedly connected with spring of fixed plate, the other end of spring and the top fixed connection of the wheel that rolls.
(III) advantageous effects
Compared with the prior art, the utility model provides a progress management display device that building engineering construction used possesses following beneficial effect:
1. this progress management display device that building engineering construction was used through support frame, threaded rod, slider, first show board, motor main part and motor support to make progress management display device that building engineering construction was used can be better go up and down and altitude mixture control when using, and then make the project can carry out better show.
2. This progress management display device that building engineering construction was used through fixed plate, handrail, base, electric putter, roll wheel and spring to make progress management display device that building engineering construction was used can carry out better removal when using.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a main sectional view of the structure of the present invention;
fig. 3 is a front view of the structure of the present invention.
In the figure: 1. a fixing plate; 2. a support frame; 3. mounting grooves; 4. a threaded rod; 5. a slider; 6. a first display board; 7. a motor main body; 8. a motor bracket; 9. a slide bar; 10. a limiting plate; 11. a second display board; 12. a support bar; 13. an illumination bulb; 14. installing a box; 15. a box door; 16. a storage battery; 17. a connecting rod; 18. a solar panel; 19. a handrail; 20. a base; 21. an electric push rod; 22. a rolling wheel; 23. a spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a progress management display device for construction of building engineering comprises a fixed plate 1, wherein the top of the fixed plate 1 is fixedly connected with a support frame 2, the inner side of the support frame 2 is provided with a mounting groove 3, the inside of the mounting groove 3 is fixedly connected with a threaded rod 4, one side of the threaded rod 4 is provided with a first display plate 6, the bottom of the threaded rod 4 is fixedly connected with a motor main body 7, one side of the support frame 2 is fixedly connected with a second display plate 11, the top of the fixed plate 1 is connected with a mounting box 14, one side of the mounting box 14 is hinged with a box door 15 through a hinge, the inside of the mounting box 14 is provided with a storage battery 16, the top of the mounting box 14 is fixedly connected with a connecting rod 17, the top of the connecting rod 17 is fixedly connected with a solar panel 18, the top of the fixed plate 1 is fixedly connected with a handrail 19, the bottom of the fixed plate 1 is fixedly connected with a base 20, and the bottom of the fixed plate 1 is fixedly connected with an electric push rod 21, the bottom of the electric push rod 21 is fixedly connected with a rolling wheel 22.
In this embodiment, through support frame 2, threaded rod 4, slider 5, first show board 6, motor main part 7 and motor support 8, thereby make progress management display device that building engineering construction used can be better go up and down and altitude mixture control when using, and then make the project can carry out better show, through fixed plate 1, handrail 19, base 20, electric putter 21, rolling wheel 22 and spring 23, thereby make progress management display device that building engineering construction used can carry out better removal when using.
Specifically, the outer wall of threaded rod 4 is connected with slider 5 through the screw thread rotation, and the other end of slider 5 and one side fixed connection of first show board 6.
In this embodiment, the outer wall through threaded rod 4 is connected with slider 5 through the screw thread rotation to make the rotation of threaded rod 4 and drive slider 5 reciprocate, through one side fixed connection of the other end of slider 5 and first show board 6, thereby make reciprocating of slider 5 and drive first show board 6 and carry out the up-and-down motion, and then play the effect of going up and down.
Specifically, the outer wall of the motor main body 7 is fixedly connected with a motor support 8, and the top of the motor support 8 is fixedly connected with the bottom of the fixing plate 1.
In this embodiment, outer wall fixedly connected with motor support 8 through motor body 7, the top through motor support 8 and the bottom fixed connection of fixed plate 1 to make motor body 7 can be more stable when carrying out the work.
Specifically, the inside of the right support frame 2 is fixedly connected with a slide bar 9, and the top of the slide bar 9 is fixedly connected with a limiting plate 10.
In this embodiment, the inside fixedly connected with slide bar 9 through right side support frame 2, the top fixedly connected with limiting plate 10 through slide bar 9 to make first show board 6 can be more stable when going on the up-down regulation, and reduce the phenomenon of card pause, play spacing effect when carrying out the up-down motion to first show board 6 simultaneously.
Specifically, the top of the fixing plate 1 is fixedly connected with a support rod 12, and one side of the support rod 12 is fixedly connected with a lighting bulb 13.
In this embodiment, the supporting rod 12 is fixedly connected to the top of the fixing plate 1, and the illuminating lamp 13 is fixedly connected to one side of the supporting rod 12, so that the device can still be used at night.
Specifically, the bottom of the fixed plate 1 is fixedly connected with a spring 23, and the other end of the spring 23 is fixedly connected with the top of the rolling wheel 22.
In this embodiment, the spring 23 is fixedly connected to the bottom of the fixing plate 1, and the other end of the spring 23 is fixedly connected to the top of the rolling wheel 22, so that the device can be more stable when moving.
The utility model discloses a theory of operation and use flow: in the using process, the outer wall of the threaded rod 4 is connected with the sliding block 5 through threaded rotation, so that the threaded rod 4 rotates and drives the sliding block 5 to move up and down, the other end of the sliding block 5 is fixedly connected with one side of the first display board 6, so that the sliding block 5 moves up and down and drives the first display board 6 to move up and down, and further the lifting effect is achieved, the outer wall of the motor main body 7 is fixedly connected with the motor bracket 8, the top of the motor bracket 8 is fixedly connected with the bottom of the fixing plate 1, so that the motor main body 7 can be more stable in working, the sliding rod 9 is fixedly connected with the inner part of the right side supporting frame 2, the top of the sliding rod 9 is fixedly connected with the limiting plate 10, so that the first display board 6 can be more stable in up and down regulation, the phenomenon of blocking is reduced, and the limiting effect is achieved when the first display board 6 moves up and down, through the top fixedly connected with bracing piece 12 of fixed plate 1, one side fixedly connected with lighting bulb 13 through bracing piece 12, thereby make the device still can use when night, top fixedly connected with install bin 14 through fixed plate 1, inside through install bin 14 is equipped with battery 16, top fixedly connected with connecting rod 17 through install bin 14, top fixedly connected with solar panel 18 through connecting rod 17, thereby make the device can be better when using play energy-concerving and environment-protective effect.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a progress management display device of building engineering construction usefulness, includes fixed plate (1), its characterized in that: the solar energy display cabinet is characterized in that a supporting frame (2) is fixedly connected to the top of the fixing plate (1), a mounting groove (3) is formed in the inner side of the supporting frame (2), a threaded rod (4) is fixedly connected to the inside of the mounting groove (3), a first display plate (6) is arranged on one side of the threaded rod (4), a motor main body (7) is fixedly connected to the bottom of the threaded rod (4), a second display plate (11) is fixedly connected to one side of the supporting frame (2), an installation box (14) is connected to the top of the fixing plate (1), a box door (15) is hinged to one side of the installation box (14) through a hinge, a storage battery (16) is arranged inside the installation box (14), a connecting rod (17) is fixedly connected to the top of the installation box (14), a solar panel (18) is fixedly connected to the top of the connecting rod (17), and a handrail (19) is fixedly connected to the top of the fixing plate (1), the bottom fixedly connected with base (20) of fixed plate (1), the bottom fixedly connected with electric putter (21) of fixed plate (1), the bottom fixedly connected with of electric putter (21) rolls wheel (22).
2. The progress management display device for construction of a construction project according to claim 1, characterized in that: the outer wall of threaded rod (4) is connected with slider (5) through the screw thread rotation, the other end of slider (5) and one side fixed connection of first show board (6).
3. The progress management display device for construction of a construction project according to claim 1, characterized in that: the outer wall of the motor main body (7) is fixedly connected with a motor support (8), and the top of the motor support (8) is fixedly connected with the bottom of the fixing plate (1).
4. The progress management display device for construction of a construction project according to claim 1, characterized in that: the inside fixedly connected with slide bar (9) of right side support frame (2), the top fixedly connected with limiting plate (10) of slide bar (9).
5. The progress management display device for construction of a construction project according to claim 1, characterized in that: the top fixedly connected with bracing piece (12) of fixed plate (1), one side fixedly connected with lighting bulb (13) of bracing piece (12).
6. The progress management display device for construction of a construction project according to claim 1, characterized in that: the bottom of the fixed plate (1) is fixedly connected with a spring (23), and the other end of the spring (23) is fixedly connected with the top of the rolling wheel (22).
CN202120053828.9U 2021-01-08 2021-01-08 Progress management display device that building engineering construction was used Expired - Fee Related CN213877500U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120053828.9U CN213877500U (en) 2021-01-08 2021-01-08 Progress management display device that building engineering construction was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120053828.9U CN213877500U (en) 2021-01-08 2021-01-08 Progress management display device that building engineering construction was used

Publications (1)

Publication Number Publication Date
CN213877500U true CN213877500U (en) 2021-08-03

Family

ID=77045285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120053828.9U Expired - Fee Related CN213877500U (en) 2021-01-08 2021-01-08 Progress management display device that building engineering construction was used

Country Status (1)

Country Link
CN (1) CN213877500U (en)

Similar Documents

Publication Publication Date Title
CN210295857U (en) Safety warning sign for electric power construction
CN201582703U (en) Efficient solar street lamp
CN213877500U (en) Progress management display device that building engineering construction was used
CN110701552A (en) Solar street lamp for building site
CN213746507U (en) Liftable formula solar energy LED street lamp
CN213480115U (en) Wisdom city is with street lamp of convenient regulation and control
CN212777161U (en) Commodity circulation storage is with energy-conserving effectual light
CN111383561A (en) Propaganda device convenient to change propaganda content
CN213293110U (en) Express delivery cabinet for intelligent community
CN109185803A (en) A kind of novel energy-saving environment-friendly LED lamp
CN220379499U (en) Wind-solar integrated environment-friendly lighting street lamp
CN215722976U (en) Long-range lighting device that intelligence construction was used
CN217684497U (en) Interim street lamp based on municipal works
CN215868174U (en) Ultra-low power consumption total reflection type liquid crystal screen electronic station board
CN216047004U (en) Energy-saving lighting device for building engineering
CN216113798U (en) Landscape solar lamp
CN213395109U (en) Novel greenbelt view street lamp
CN217379665U (en) Auxiliary supporting device for door and window installation
CN213849638U (en) Show shelf is trailed to hydraulic engineering project management progress
CN217382716U (en) Grid anti-dazzle LED badminton court floor-lamp
CN214369801U (en) Garden lamp convenient to adjust illumination height
CN215722927U (en) Power-matched new energy power-saving lighting device
CN215892194U (en) Energy-concerving and environment-protective type LED wisdom street lamp
CN218150269U (en) Construction guardrail
CN220205305U (en) Energy storage rack joins externally supporting component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210803

Termination date: 20220108