CN213871842U - Building engineering monitoring device - Google Patents

Building engineering monitoring device Download PDF

Info

Publication number
CN213871842U
CN213871842U CN202022650997.9U CN202022650997U CN213871842U CN 213871842 U CN213871842 U CN 213871842U CN 202022650997 U CN202022650997 U CN 202022650997U CN 213871842 U CN213871842 U CN 213871842U
Authority
CN
China
Prior art keywords
fixed connection
fixedly connected
monitoring device
screw rod
spring damper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022650997.9U
Other languages
Chinese (zh)
Inventor
戴世平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Lanke Information Technology Co ltd
Original Assignee
Hefei Lanke Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Lanke Information Technology Co ltd filed Critical Hefei Lanke Information Technology Co ltd
Priority to CN202022650997.9U priority Critical patent/CN213871842U/en
Application granted granted Critical
Publication of CN213871842U publication Critical patent/CN213871842U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fluid-Damping Devices (AREA)

Abstract

The utility model discloses a building engineering monitoring device, including bottom plate, supervisory equipment body, the upper end fixed mounting of bottom plate is provided with a plurality of spring damper, spring damper's upper end fixed connection is provided with the installing frame, the upper end of installing frame is rotated and is connected and be provided with the rotation axis, fixed connection is provided with the swivel mount on the rotation axis, the spacing jack of a plurality of has been seted up to the peripheral department of swivel mount, the equal fixed connection in both ends is provided with the limiting plate about the installing frame, swing joint is provided with the bolt on the limiting plate. The utility model discloses a set up screw rod, heavy burden piece and adjustment disk on the main tributary strut to be provided with spring damper on the bottom plate, accessible adjustment disk adjusting screw's flexible length to drive heavy burden piece and carry out position adjustment, position adjustment through the heavy burden piece can conveniently keep balance under the inclination of difference, and spring damper can cushion the shock attenuation, can make the device steadily place.

Description

Building engineering monitoring device
Technical Field
The utility model relates to a monitoring device technical field specifically is a building engineering monitoring device.
Background
The monitoring system is one of the most applied systems in the security system, the construction site monitoring system suitable for the market at present is a handheld video communication device, the video monitoring is the mainstream at present, the development history of the video monitoring system is necessary to be known again in the global day by day when the IP technology is gradually unified, from the technical point of view, the development of the video monitoring system is divided into a first generation analog video monitoring system (CCTV), to a second generation digital video monitoring system (DVR) based on a PC + multimedia card, to a third generation digital video monitoring system (IPVS) based on the IP network, and most monitoring is carried out by a monitoring camera device when video acquisition is carried out.
The prior building engineering monitoring device has the following defects: because the terrain environment of a construction site is complex, the existing building engineering monitoring device is difficult to keep balance on the inclined ground, and is inconvenient to stably place on the inclined ground; in addition, because the building site dust is more, present building engineering monitoring device needs to carry out the manual work deashing in addition, and the clearance is troublesome.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering monitoring device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building engineering monitoring device comprises a bottom plate and a monitoring equipment body, wherein a plurality of spring shock absorbers are fixedly arranged at the upper end of the bottom plate, an installation frame is fixedly connected and arranged at the upper end of each spring shock absorber, a rotating shaft is rotatably connected and arranged at the upper end of the installation frame, a rotating frame is fixedly connected and arranged on the rotating shaft, a plurality of limiting jacks are arranged at the periphery of the rotating frame, limiting plates are fixedly connected and arranged at the left end and the right end of the installation frame, bolts are movably connected and arranged on the limiting plates, a main support frame is fixedly connected and arranged on the rotating frame, a screw rod is arranged in the middle of the main support frame through threaded connection, an adjusting disc is fixedly connected and arranged at one end of the screw rod, which is far away from the adjusting disc, a rotating ring is fixedly connected and arranged at one end of the rotating ring, which is far away from the screw rod, is fixedly connected and arranged with a connecting rod, the one end fixed connection that the screw rod was kept away from to the connecting rod is provided with rotatory circle, two be provided with the burden piece through recess sliding connection between the rotatory circle, the upper end fixed connection of main tributary strut is provided with the intermediate lamella, the equal fixed connection in upper end four corners department of intermediate lamella is provided with the bracing piece, the upper end fixed connection of bracing piece is provided with the roof, fixed connection is provided with clean water tank on the roof, clean water tank's lower extreme fixed connection is provided with the water pipe, fixed mounting is provided with manual ball valve on the water pipe, the lower extreme fixed mounting of water pipe is provided with the water spray circle, supervisory equipment body fixed mounting sets up on the intermediate lamella.
Preferably, the bolt is matched with the limiting hole.
Preferably, a handle is fixedly connected to the outer side of the adjusting disc.
Preferably, the spacing jacks are arranged at uniform intervals.
Preferably, the water spraying ring is matched with the monitoring equipment body in size.
Preferably, the spring dampers are arranged at uniform intervals and are symmetrical in position.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model can adjust the extension length of the screw rod through the adjusting disc and drive the weight bearing block to adjust the position through the screw rod, the weight bearing block can be conveniently kept balanced under different inclination angles through the position adjustment of the weight bearing block, and the spring damper can buffer and absorb shock, so that the device can be stably placed;
2. the utility model discloses still be provided with clean water tank, water spray ring and manual ball valve simultaneously, clean water tank sets up in supervisory equipment body top, when cleaning, can open manual ball valve to carry out the deashing of spraying water to the supervisory equipment body through the water spray ring, have simple structure, convenient to use, excellent in use effect's advantage.
Drawings
Fig. 1 is a schematic view of the overall structure of a construction engineering monitoring device of the present invention;
fig. 2 is a schematic structural view of the integral rotating frame of the construction engineering monitoring device of the present invention;
fig. 3 is an enlarged view of a portion a of fig. 1.
In the figure: 1. a base plate; 2. a spring damper; 3. installing a frame; 4. a limiting plate; 5. a main supporting frame; 6. adjusting the disc; 7. a grip; 8. a screw; 9. a negative weight block; 10. a connecting rod; 11. a rotating ring; 12. a middle plate; 13. monitoring the equipment body; 14. a support bar; 15. a top plate; 16. cleaning the water tank; 17. a manual ball valve; 18. a water spraying ring; 19. a water pipe; 20. rotating the frame; 21. a rotating shaft; 22. limiting the jacks; 23. and (4) a bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a building engineering monitoring device comprises a bottom plate 1 and a monitoring equipment body 13, wherein a plurality of spring dampers 2 are fixedly arranged at the upper end of the bottom plate 1, an installation frame 3 is fixedly connected at the upper end of each spring damper 2, a rotating shaft 21 is rotatably connected and arranged at the upper end of the installation frame 3, a rotating frame 20 is fixedly connected and arranged on the rotating shaft 21, a plurality of limiting jacks 22 are arranged at the periphery of the rotating frame 20, limiting plates 4 are fixedly connected and arranged at the left end and the right end of the installation frame 3, bolts 23 are movably connected and arranged on the limiting plates 4, a main support frame 5 is fixedly connected and arranged on the rotating frame 20, a screw rod 8 is arranged in the middle of the main support frame 5 through threaded connection, an adjusting disc 6 is fixedly connected and arranged at one end of the screw rod 8 far away from the adjusting disc 6, a rotating ring 11 is fixedly connected and arranged at one end of the screw rod 8 far away from the adjusting disc 6, the one end fixed connection that screw rod 8 was kept away from to rotatory circle 11 is provided with connecting rod 10, the one end fixed connection that screw rod 8 was kept away from to connecting rod 10 is provided with rotatory circle 11, two be provided with burden weight 9 through recess sliding connection between the rotatory circle 11, the upper end fixed connection of main tributary strut 5 is provided with intermediate lamella 12, the equal fixed connection in upper end four corners department of intermediate lamella 12 is provided with bracing piece 14, the upper end fixed connection of bracing piece 14 is provided with roof 15, fixed connection is provided with clean water tank 16 on the roof 15, the lower extreme fixed connection of clean water tank 16 is provided with water pipe 19, fixed mounting is provided with manual ball valve 17 on the water pipe 19, the lower extreme fixed mounting of water pipe 19 is provided with water spray ring 18, supervisory equipment body 13 fixed mounting sets up on intermediate lamella 12.
The bolt 23 and spacing hole phase-match can make spacing fixed more stable, the outside fixed connection of adjustment disk 6 is provided with handle 7, and the handle 7 of setting can conveniently rotate adjustment disk 6, the interval that spacing jack 22 was seted up is even, can make rotatory frame 20 homoenergetic fix under each rotation angle, the big or small phase-match of water spray ring 18 and supervisory equipment body 13 can make clean more abundant, the interval that spring damper 2 set up is even, and position symmetry can strengthen the shock attenuation effect.
The working principle is as follows: the utility model discloses a through set up screw rod 8 on main tributary strut 5, heavy burden piece 9 and adjustment disk 6, and be provided with spring damper 2 on bottom plate 1, the flexible length of 6 adjustment screw rod 8 of accessible adjustment disk, and drive the weight 9 and carry out position adjustment, position adjustment through weight 9 can conveniently be kept balanced under the inclination of difference, and spring damper 2 can cushion the shock attenuation, can make the device steadily place, still be provided with clean water tank 16 simultaneously, water spray ring 18 and manual ball valve 17, clean water tank 16 sets up in supervisory equipment body 13 top, when cleaning, can open manual ball valve 17, and spray water the deashing to supervisory equipment body 13 through water spray ring 18, and the steam generator is simple in structure, high durability and convenient use, excellent in use's advantage.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering monitoring device, includes bottom plate (1), supervisory equipment body (13), its characterized in that: the upper end fixed mounting of bottom plate (1) is provided with a plurality of spring damper (2), the upper end fixed connection of spring damper (2) is provided with installing frame (3), the upper end of installing frame (3) is rotated and is connected and is provided with rotation axis (21), fixed connection is provided with rotatory frame (20) on rotation axis (21), the peripheral department of rotatory frame (20) has seted up a plurality of spacing jack (22), the equal fixed connection of both ends is provided with limiting plate (4) about installing frame (3), swing joint is provided with bolt (23) on limiting plate (4), fixed connection is provided with main tributary strut (5) on rotatory frame (20), the middle department of main tributary strut (5) is provided with screw rod (8) through threaded connection, the one end fixed connection of screw rod (8) is provided with adjusting disc (6), the one end fixed connection that adjusting disc (6) was kept away from to screw rod (8) is provided with rotatory circle (11), the device is characterized in that a connecting rod (10) is fixedly connected to one end, far away from the screw rod (8), of each rotating ring (11), one end, far away from the screw rod (8), of each connecting rod (10) is fixedly connected with each rotating ring (11), a negative weight block (9) is arranged between the two rotating rings (11) in a sliding connection mode through a groove, an intermediate plate (12) is fixedly connected to the upper end of each main support frame (5), supporting rods (14) are fixedly connected to four corners of the upper end of each intermediate plate (12), a top plate (15) is fixedly connected to the upper end of each supporting rod (14), a cleaning water tank (16) is fixedly connected to the top plate (15), a water pipe (19) is fixedly connected to the lower end of each cleaning water tank (16), a manual ball valve (17) is fixedly installed to the water pipe (19), and a water spraying ring (18) is fixedly installed to the lower end of the water pipe (19), the monitoring equipment body (13) is fixedly arranged on the middle plate (12).
2. A construction monitoring device according to claim 1, characterised in that: the bolt (23) is matched with the limiting hole.
3. A construction monitoring device according to claim 1, characterised in that: a handle (7) is fixedly connected with the outer side of the adjusting disc (6).
4. A construction monitoring device according to claim 1, characterised in that: the spacing jacks (22) are arranged at uniform intervals.
5. A construction monitoring device according to claim 1, characterised in that: the water spraying ring (18) is matched with the monitoring equipment body (13) in size.
6. A construction monitoring device according to claim 1, characterised in that: the spring shock absorbers (2) are arranged at uniform intervals and are symmetrical in position.
CN202022650997.9U 2020-11-13 2020-11-13 Building engineering monitoring device Active CN213871842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022650997.9U CN213871842U (en) 2020-11-13 2020-11-13 Building engineering monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022650997.9U CN213871842U (en) 2020-11-13 2020-11-13 Building engineering monitoring device

Publications (1)

Publication Number Publication Date
CN213871842U true CN213871842U (en) 2021-08-03

Family

ID=77056384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022650997.9U Active CN213871842U (en) 2020-11-13 2020-11-13 Building engineering monitoring device

Country Status (1)

Country Link
CN (1) CN213871842U (en)

Similar Documents

Publication Publication Date Title
CN213626139U (en) Effectual building steel construction of elasticity shock attenuation
CN213871842U (en) Building engineering monitoring device
CN208652035U (en) A kind of lifting steelframe for remotely intelligently monitoring
CN211948760U (en) Water conservancy and hydropower engineering's drain pipe reinforced structure
CN210266577U (en) Portable monitoring device of engineering supervision usefulness
CN214743810U (en) But convenient height-adjusting's antidetonation support overhauls
CN213710503U (en) Steel structure bearing frame for building engineering
CN210920543U (en) Anti-seismic support hanger
CN213336092U (en) Iron tower monitoring device based on artificial intelligence
CN208890726U (en) A kind of new type solar energy bracket
CN210422018U (en) Environment-friendly green building
CN112985886A (en) Sample collection system is used in soil heavy metal restoration
CN207321163U (en) A kind of photovoltaic bracket
CN206865399U (en) A kind of solar photovoltaic assembly mounting and positioning device
CN220337890U (en) Intelligent information collector
CN221002154U (en) Intelligence sun shade membrane mounting structure device
CN213712533U (en) Raw milk intelligent monitoring device
CN213177268U (en) A a lightweight antidetonation gallows for large-scale underground storage logistics center
CN218480316U (en) Effectual support of shock attenuation
CN214657176U (en) Resistance to compression foundation structure
CN215442494U (en) Take shock-absorbing support's ready-package steel construction
CN211286770U (en) Wall body supports connecting device for ancient building
CN209905470U (en) Energy-concerving and environment-protective building pipe fitting rack for civil engineering
CN219954514U (en) Pipeline anti-seismic bracket
CN216692955U (en) High-rise monitoring external fixation auxiliary frame for skynet system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant