CN213865019U - Steel grating hot-dip galvanizing tool - Google Patents

Steel grating hot-dip galvanizing tool Download PDF

Info

Publication number
CN213865019U
CN213865019U CN202023099476.5U CN202023099476U CN213865019U CN 213865019 U CN213865019 U CN 213865019U CN 202023099476 U CN202023099476 U CN 202023099476U CN 213865019 U CN213865019 U CN 213865019U
Authority
CN
China
Prior art keywords
steel grating
main body
dip galvanizing
hook
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023099476.5U
Other languages
Chinese (zh)
Inventor
杨小文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Huaye Steel Grating Co ltd
Original Assignee
Hebei Huaye Steel Grating Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Huaye Steel Grating Co ltd filed Critical Hebei Huaye Steel Grating Co ltd
Priority to CN202023099476.5U priority Critical patent/CN213865019U/en
Application granted granted Critical
Publication of CN213865019U publication Critical patent/CN213865019U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a steel grating hot-dip galvanizing fixture, which comprises a stand column main body and a plurality of hook plates, wherein the hook plates are arranged on one side surface of the vertical wall of the stand column main body at equal intervals, the top opening and the bottom root of the hook plate are fixedly connected to the vertical wall of the stand column main body, and a frame bearing the steel grating can be clamped between the hook plates and the vertical wall of the stand column main body; the top of stand main part is provided with the hoist and mount portion of being convenient for lift by crane. The utility model discloses steel grating hot dip galvanizing frock can hoist the steel grating of the same specification of multi-disc simultaneously and dip in the galvanizing bath, has improved galvanizing operation production efficiency.

Description

Steel grating hot-dip galvanizing tool
Technical Field
The utility model relates to a steel grating production processing subsidiary facility technical field especially relates to a steel grating hot dip galvanizing frock.
Background
The steel grating plate is also called as steel grating plate, the steel grating plate is a steel product with square lattices in the middle by using flat steel in a cross arrangement according to a certain distance and welding, and is mainly used for manufacturing ditch cover plates, steel structure platform plates, step plates of steel ladders and the like, and the cross rods are generally made of twisted square steel. Hot dip galvanising is the joining of both a substrate and a coating by reacting molten metal with an iron substrate to produce an alloy layer. The hot dip galvanizing is to pickle the steel product, to remove the ferric oxide on the surface of the steel product, and then to wash the steel product in a mixed water solution tank of ammonium chloride or zinc chloride or ammonium chloride and zinc chloride, and then to send the steel product into a hot dip galvanizing tank. The hot dip galvanizing has the advantages of uniform plating layer, strong adhesive force, long service life and the like. Steel grating plates made of carbon steel often need to be subjected to hot-dip galvanizing for rust prevention treatment, so that the service life is prolonged.
The steel grating is mostly in the shape of a strip plate, when the steel grating with large size and specification is subjected to hot-dip galvanizing operation, the conventional iron chain side bolt hoisting mode can only throw materials one by one and enter a galvanizing bath for galvanizing at each time, and the problems of complex hoisting and low production efficiency exist.
Therefore, it is necessary to develop a hot-dip galvanizing tool for steel grating plates aiming at the defects.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel grating hot dip galvanizing frock can hoist the steel grating of the same specification of multi-disc simultaneously and dip in the galvanizing bath, has improved galvanizing operation production efficiency.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to a steel grating hot dip galvanizing fixture, which comprises a stand column main body and a plurality of hook plates, wherein the hook plates are arranged on one side surface of the vertical wall of the stand column main body at equal intervals, the top opening and the bottom root of the hook plate are fixedly connected to the vertical wall of the stand column main body, and a frame bearing the steel grating can be clamped between the hook plates and the vertical wall of the stand column main body; the top of stand main part is provided with the hoist and mount portion of being convenient for lift by crane.
The vertical column is made of square tubes, the vertical column body and the hook plate are respectively provided with a plug hole and a locking hole which are coaxially communicated, the locking hole is formed in the upper portion of the protruding end of the hook plate, and the plug is inserted into the plug hole and the locking hole.
Furthermore, the bolt holes and the locking holes are arranged in parallel and are arranged along the height direction of the upright post main body.
Further, still include the locking hook, locking hook fixed connection with the couple board is relative stand main part founds on the wall side, the tail end of plug sets up elbow bend, elbow bend can the joint be in the draw-in groove of locking hook.
Further, the hoisting part is a hoisting hole arranged at the top of the upright post main body.
Further, hoist and mount portion includes rings, the root fixed connection of rings is in the top of stand main part.
Further, the top of stand main part is provided with the seal closure, rings root fixed connection be in on the top surface of seal closure, just rings root both sides are fixedly connected with reinforcing plate respectively still.
Further, the bottom of the upright post main body is fixedly connected with a base, and a large chamfer or a fillet is arranged at the lower line of the base.
Compared with the prior art, the utility model discloses a beneficial technological effect:
the utility model relates to a steel grating hot dip galvanizing frock's beneficial effect:
the utility model relates to a steel grating hot dip galvanizing frock through set up a plurality of couple boards on the founding wall side at the stand main part, and every couple board can the joint bear the frame of a steel grating, consequently this frock can once load a plurality of steel gratings. During the actual use, the tool is respectively arranged at four corner positions of the steel grating, and a plurality of steel gratings which are stacked in parallel and have the same specification can be simultaneously lifted. And a certain distance is arranged between the steel grating plates up and down, so that mutual interference is avoided during hot dip galvanizing, and galvanizing quality defects caused by laminating are avoided. The utility model discloses steel grating hot dip galvanizing frock can hoist the steel grating of the same specification of multi-disc simultaneously and dip in the galvanizing bath, has improved galvanizing operation production efficiency.
In addition, the plug bolts are inserted into the plug bolt holes and the locking holes to close the openings at the tops of the hook plates, so that the frame of the steel grating plate is locked and prevented from falling off; the plurality of bolt holes and the locking holes are arranged along the height direction of the upright post main body, so that the corresponding bolt holes and the corresponding locking holes are conveniently selected according to the height of the steel grating for inserting and locking, and the shaking caused by overlarge margin in the hoisting process is reduced; through set up the locking hook on the upright wall side of stand main part relative with the couple board, the elbow bend of the tail end that can the locking plug, the plug that avoids the handling in-process to rock or the vibration to arouse is not hard up to fall. Through welded connection reinforcing plates respectively at root both sides of rings, can increase rings and seal closure's joint strength, avoid appearing unexpected fracture and cause the incident. The base is arranged at the bottom of the upright post main body, so that the side frame of the steel grating can be assembled conveniently after four fixtures are vertically placed; meanwhile, after the bottom of the upright post main body enters the bottom of the galvanized groove, smooth buffering is performed through a chamfer or a fillet, and equipment damage caused by hard collision of the corner line on the bottom of the galvanized groove is avoided.
Drawings
The present invention will be further explained with reference to the following description of the drawings.
FIG. 1 is a schematic structural view of the steel grating hot-dip galvanizing fixture of the present invention;
FIG. 2 is a left side view schematic structural diagram of the steel grating hot dip galvanizing fixture of the present invention;
FIG. 3 is a right side view schematic structural diagram of the steel grating hot dip galvanizing fixture of the present invention;
figure 4 is utilized the utility model discloses overlook the schematic diagram of structure when steel grating hot dip galvanizing frock hoists the steel grating.
Description of reference numerals: 1. a column body; 101. sealing cover; 102. a reinforcing plate; 103. a plug hole; 2. a hook plate; 201. a locking hole; 3. plugging; 4. a locking hook; 5. a hoisting ring; 6. a base; 601. large chamfering; 7. a steel grating.
Detailed Description
The core of the utility model is to provide a steel grating hot-dip galvanizing frock, can hoist and mount the steel grating of the same specification of multi-disc simultaneously and dip in the galvanizing bath, improved galvanizing operation production efficiency.
In the following, the technical solutions in the embodiments of the present invention will be clearly and completely described with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to the drawings, fig. 1 is a schematic structural view of a steel grating hot-dip galvanizing fixture according to the present invention; FIG. 2 is a left side view schematic structural diagram of the steel grating hot dip galvanizing fixture of the present invention; FIG. 3 is a right side view schematic structural diagram of the steel grating hot dip galvanizing fixture of the present invention; figure 4 is utilized the utility model discloses overlook the schematic diagram of structure when steel grating hot dip galvanizing frock hoists the steel grating.
In a specific embodiment, as shown in fig. 1 to 4, the frame comprises a column main body 1 and hook plates 2, wherein the hook plates 2 are arranged on one side surface of the vertical wall of the column main body 1 at equal intervals, the hook plates 2 are L-shaped, the top opening and the bottom root of each hook plate 2 are welded to the vertical wall of the column main body 1, and the frame for bearing the steel grating 7 can be clamped between the hook plates 2 and the vertical wall of the column main body 1. The distance between two adjacent hook plates 2 is larger than the thickness of the steel grating 7. The top of the upright post main body 1 is provided with a hoisting part convenient for hoisting, and the hoisting part is connected with a hoisting balance beam below the overhead crane through a steel wire rope or an iron chain.
Through set up a plurality of couple boards 2 on the vertical wall side at stand main part 1, every couple board 2 can the joint bear the frame of a steel grating 7, consequently this frock can once load a plurality of steel gratings 7. During actual use, the tool is arranged at four corner positions of the steel grating 7 respectively, and a plurality of steel gratings 7 which are stacked in parallel and have the same specification can be lifted simultaneously. Moreover, a certain distance is arranged between the steel grating plates 7 up and down, so that mutual interference is avoided during hot dip galvanizing, and galvanizing quality defects caused by laminating are avoided. The utility model discloses steel grating hot dip galvanizing frock can hoist the steel grating of the same specification of multi-disc simultaneously and dip in the galvanizing bath, has improved galvanizing operation production efficiency.
The utility model discloses an in a specific embodiment, as shown in fig. 1 ~ 3, the utility model discloses steel grating hot dip galvanizing frock still includes plug 3, and stand main part 1 specifically adopts ordinary carbon steel square pipe preparation, sets up coaxial plug hole 103 and the locking hole 201 that link up on stand main part 1 and the couple board 2 respectively, and locking hole 201 is located the upper portion that couple board 2 visited the end, and plug 3 pegs graft in plug hole 103 and locking hole 201.
Specifically, as shown in fig. 3, the plug hole 103 and the lock hole 201 are provided in parallel and arranged in the height direction of the column body 1. The plug 3 can be inserted and locked by selecting the corresponding plug hole 103 and the corresponding locking hole 201 according to the height of the steel grating 7.
Particularly, as shown in fig. 1 and 2, the utility model discloses steel grating hot dip galvanizing frock still includes locking hook 4, and locking hook 4 is the L type, and locking hook 4's root welded connection is on the stand main part 1 founds the wall side relative with hanger plate 2, and the tail end of plug 3 sets up elbow bend, and elbow bend can the joint in locking hook 4's draw-in groove.
The plug 3 is inserted into the plug hole 103 and the locking hole 201, the opening at the top of the hook plate 2 is closed, and the frame of the steel grating 7 is locked to prevent falling off; the plurality of bolt holes 103 and the locking holes 201 are arranged along the height direction of the upright post main body 1, so that the bolt holes 103 and the locking holes 201 are correspondingly selected according to the height of the steel grating 7 for plugging and locking, and the shaking caused by overlarge margin in the hoisting process is reduced; through set up locking hook 4 on the upright wall side of stand main part 1 relative with couple board 2, can lock the elbow bend of the tail end of plug 3, avoid the handling in-process to rock or the not hard up fall of plug 3 that the vibration arouses.
In a specific embodiment of the present invention, the lifting portion is a lifting hole formed at the top of the column body 1.
In a specific embodiment of the present invention, as shown in fig. 1 to 3, the hoisting portion includes a hoisting ring 5, and the root of the hoisting ring 5 is fixedly connected to the top of the column main body 1.
Specifically, as shown in fig. 1 to 3, a sealing cover 101 is disposed on the top of the column main body 1, the root of the suspension ring 5 is welded to the top surface of the sealing cover 101, and reinforcing plates 102 are further welded to both sides of the root of the suspension ring 5.
The reinforcing plates 102 are welded on the two sides of the root of the lifting ring 5 respectively, so that the connection strength of the lifting ring 5 and the sealing cover 101 can be increased, and safety accidents caused by accidental breakage are avoided.
The utility model discloses an in a specific embodiment, as shown in fig. 1 ~ 4, the bottom fixedly connected with base 6 of stand main part 1, the lower border department of base 6 sets up to the great chamfer of size or fillet, and the chamfer be 50 millimeters 45 degrees, and the radius of fillet is 50 millimeters.
The base 6 is arranged at the bottom of the upright post main body 1, so that the frame of the steel grating 7 can be assembled conveniently after four fixtures are vertically arranged; meanwhile, after the bottom of the upright post main body 1 enters the bottom of the galvanized groove, smooth buffering is performed through a chamfer or a fillet, and equipment damage caused by hard collision of the corner line on the bottom of the galvanized groove is avoided.
The utility model discloses steel grating hot dip galvanizing frock through set up a plurality of couple boards 2 on the founding wall side at stand main part 1, and every couple board 2 can the joint bear the frame of a steel grating 7, consequently this frock can once load a plurality of steel gratings 7. During actual use, the tool is arranged at four corner positions of the steel grating 7 respectively, and a plurality of steel gratings 7 which are stacked in parallel and have the same specification can be lifted simultaneously. Moreover, a certain distance is arranged between the steel grating plates 7 up and down, so that mutual interference is avoided during hot dip galvanizing, and galvanizing quality defects caused by laminating are avoided. The utility model discloses steel grating hot dip galvanizing frock can hoist the steel grating of the same specification of multi-disc simultaneously and dip in the galvanizing bath, has improved galvanizing operation production efficiency. In addition, the plug 3 is inserted into the plug hole 103 and the locking hole 201, the opening at the top of the hook plate 2 is closed, and the frame of the steel grating 7 is locked to prevent falling off; the plurality of bolt holes 103 and the locking holes 201 are arranged along the height direction of the upright post main body 1, so that the bolt holes 103 and the locking holes 201 are correspondingly selected according to the height of the steel grating 7 for plugging and locking, and the shaking caused by overlarge margin in the hoisting process is reduced; through set up locking hook 4 on the upright wall side of stand main part 1 relative with couple board 2, can lock the elbow bend of the tail end of plug 3, avoid the handling in-process to rock or the not hard up fall of plug 3 that the vibration arouses. The reinforcing plates 102 are welded on the two sides of the root of the lifting ring 5 respectively, so that the connection strength of the lifting ring 5 and the sealing cover 101 can be increased, and safety accidents caused by accidental breakage are avoided. The base 6 is arranged at the bottom of the upright post main body 1, so that the frame of the steel grating 7 can be assembled conveniently after four fixtures are vertically arranged; meanwhile, after the bottom of the upright post main body 1 enters the bottom of the galvanized groove, smooth buffering is performed through a chamfer or a fillet, and equipment damage caused by hard collision of the corner line on the bottom of the galvanized groove is avoided.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
The above-mentioned embodiments are only intended to describe the preferred embodiments of the present invention, but not to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (8)

1. The steel grating hot-dip galvanizing tool is characterized by comprising a stand column main body (1) and hook plates (2), wherein the hook plates (2) are arranged on one side surface of the vertical wall of the stand column main body (1) at equal intervals, the top of each hook plate (2) is opened, the bottom of each hook plate is fixedly connected to the vertical wall of the stand column main body (1), and a frame for bearing the steel grating (7) can be clamped between each hook plate (2) and the vertical wall of the stand column main body (1); the top of the upright post main body (1) is provided with a hoisting part convenient for hoisting.
2. The steel grating hot-dip galvanizing fixture of claim 1, wherein: the vertical column is characterized by further comprising a plug bolt (3), the vertical column main body (1) is made of square tubes, a plug bolt hole (103) and a locking hole (201) which are coaxially communicated are formed in the vertical column main body (1) and the hook plate (2) respectively, the locking hole (201) is located in the upper portion of the extending end of the hook plate (2), and the plug bolt (3) is inserted into the plug bolt hole (103) and the locking hole (201).
3. The steel grating hot-dip galvanizing fixture of claim 2, wherein: the plug holes (103) and the locking holes (201) are arranged in parallel and are arranged along the height direction of the upright post main body (1).
4. The steel grating hot-dip galvanizing fixture of claim 3, wherein: still include locking hook (4), locking hook (4) fixed connection with couple board (2) are relative stand main part (1) founds on the wall side, the tail end of plug (3) sets up elbow bend, elbow bend can the joint be in the draw-in groove of locking hook (4).
5. A steel grating hot dip galvanising tool according to any one of claims 1 to 4, characterised in that: the hoisting part is a hoisting hole arranged at the top of the upright post main body (1).
6. A steel grating hot-dip galvanizing fixture as claimed in any one of claims 1 to 4, wherein: the hoisting part comprises a hoisting ring (5), and the root of the hoisting ring (5) is fixedly connected to the top of the upright post main body (1).
7. The steel grating hot-dip galvanizing fixture of claim 6, wherein: the top of stand main part (1) is provided with sealing cover (101), rings (5) root fixed connection be in on the top surface of sealing cover (101), just rings (5) root both sides are fixedly connected with reinforcing plate (102) respectively still.
8. The tool for hot dip galvanizing steel grating as claimed in any one of claims 1 to 4 or 7, wherein: the bottom of the upright post main body (1) is fixedly connected with a base (6), and the lower edge of the base (6) is provided with a large chamfer or a fillet.
CN202023099476.5U 2020-12-21 2020-12-21 Steel grating hot-dip galvanizing tool Active CN213865019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023099476.5U CN213865019U (en) 2020-12-21 2020-12-21 Steel grating hot-dip galvanizing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023099476.5U CN213865019U (en) 2020-12-21 2020-12-21 Steel grating hot-dip galvanizing tool

Publications (1)

Publication Number Publication Date
CN213865019U true CN213865019U (en) 2021-08-03

Family

ID=77069608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023099476.5U Active CN213865019U (en) 2020-12-21 2020-12-21 Steel grating hot-dip galvanizing tool

Country Status (1)

Country Link
CN (1) CN213865019U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117089796A (en) * 2023-10-13 2023-11-21 兴化市华成镀锌管件有限公司 Steel pipe hot galvanizing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117089796A (en) * 2023-10-13 2023-11-21 兴化市华成镀锌管件有限公司 Steel pipe hot galvanizing device
CN117089796B (en) * 2023-10-13 2024-03-05 兴化市华成镀锌管件有限公司 Steel pipe hot galvanizing device

Similar Documents

Publication Publication Date Title
CN213865019U (en) Steel grating hot-dip galvanizing tool
CN219342257U (en) Adjustable galvanization hanger
CN209554640U (en) A kind of novel pier front rack transporting device
CN206751166U (en) Half self-unloading steel scrap case
CN215558413U (en) Lifting sling for rectangular culvert sections
CN210438256U (en) 80 ton modular unit hangs row
CN213231186U (en) Multifunctional balance beam hoisting device for medium-sized kettle equipment
CN106365049B (en) Swing arm tower crane attachment support steel beam transporting device
CN106013819A (en) Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange
CN212893467U (en) Lifting appliance used under limited lifting height
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN110789815A (en) Movable steel structure anti-corrosion groove
CN209974102U (en) Corrosion-resistant gallows for pickling bath
CN218434466U (en) Special lifting device for tower equipment
CN212832335U (en) Steel-making factory building steel column hoists fast and uses balanced hoist
CN220866895U (en) Transfer device for construction of building steel structure
CN218667903U (en) Assembled steel structure connecting mechanism
CN215859042U (en) Point type claw and embedded part turnover equipment based on lightweight top die
CN210795491U (en) Lug mounting structure and hoist
CN213802602U (en) Lifting anti-swing device for crane installation
CN220537890U (en) Frock for hot dip galvanization work piece
CN216471740U (en) Interim fixing device during welding of outer hanging tower crane foundation girder steel
CN211846836U (en) Aluminum bar balance feeding frame
CN209872121U (en) Prefabricated component hoist of assembly type structure
CN211393530U (en) Hook head rotation-proof device for heavy-duty crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Hot-dip galvanization tooling for steel grating

Effective date of registration: 20230616

Granted publication date: 20210803

Pledgee: Cangzhou Bank Co.,Ltd. Zhuozhou Sub branch

Pledgor: Hebei Huaye steel grating Co.,Ltd.

Registration number: Y2023980044517

PE01 Entry into force of the registration of the contract for pledge of patent right