CN213840036U - Water supply and drainage pipeline plugging device for high-rise building - Google Patents

Water supply and drainage pipeline plugging device for high-rise building Download PDF

Info

Publication number
CN213840036U
CN213840036U CN202022821685.XU CN202022821685U CN213840036U CN 213840036 U CN213840036 U CN 213840036U CN 202022821685 U CN202022821685 U CN 202022821685U CN 213840036 U CN213840036 U CN 213840036U
Authority
CN
China
Prior art keywords
fixedly connected
fixed
drainage pipeline
water supply
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022821685.XU
Other languages
Chinese (zh)
Inventor
何源
孙雨卉
贾彬杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Engineering Corp Ltd
Original Assignee
China United Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Engineering Corp Ltd filed Critical China United Engineering Corp Ltd
Priority to CN202022821685.XU priority Critical patent/CN213840036U/en
Application granted granted Critical
Publication of CN213840036U publication Critical patent/CN213840036U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model belongs to the technical field of plugging device, a water supply and drainage pipeline plugging device for high-rise building is related to, wherein, comprises a fixed bench, the last fixed surface of fixed bench is connected with the surge bin, the inside fixedly connected with mount in surge bin, the inside fixedly connected with servo motor of mount, the first bevel gear of servo motor's output shaft fixedly connected with, the inside fixedly connected with bearing in surge bin, the pivot is worn to be equipped with in the inside of bearing. The water supply and drainage pipeline leakage stopping device for the high-rise building has the advantages that by the aid of the servo motor, when workers use the device to stop leakage of the drainage pipeline, the workers only need to start the servo motor through the control switch, and under the cooperation of the first bevel gear and the second bevel gear, the rolling disc can drive the protective pad inside the clamping plate to be tightly attached to the surface of the drainage pipeline through the traction rope, so that the effect of stopping leakage of the drainage pipeline is achieved.

Description

Water supply and drainage pipeline plugging device for high-rise building
Technical Field
The utility model belongs to the technical field of plugging device, concretely relates to water supply and drainage pipeline plugging device for high-rise building.
Background
High-rise building water use needs to be carried through special water supply and drainage pipeline, in-process at the pipe use, the live time overlength with receive external environment's influence, the condition that the pipeline leaked can appear, maintenance to the water pipe adopts the leaking stoppage ware to realize usually, the leaking stoppage ware is a pipeline leaking stoppage ware of restoreing the pipeline usefulness, however traditional pipeline leaking stoppage ware's mounting means, mainly install pipeline leaking stoppage ware in leaking water pipe department through the maintenance personal, and consolidate through the multiunit bolt of both sides and tighten, such mounting means installation rate is slow, staff's operating time has been wasted, staff's work efficiency has been reduced.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a water supply and drainage pipeline plugging device for high-rise building, it is slow that it has solved the installation rate, has wasted staff operating time's technical problem.
In order to achieve the above object, the utility model provides a following technical scheme: a leakage blocking device for a water supply and drainage pipeline for a high-rise building comprises a fixing table, wherein an adjusting bin is fixedly connected to the upper surface of the fixing table, a fixing frame is fixedly connected to the inner portion of the adjusting bin, a servo motor is fixedly connected to the inner portion of the fixing frame, a first bevel gear is fixedly connected to an output shaft of the servo motor, a bearing is fixedly connected to the inner portion of the adjusting bin, a rotating shaft is arranged in the bearing in a penetrating mode, a second bevel gear is fixedly connected to the surface of the rotating shaft, the first bevel gear is meshed with the second bevel gear, a winding disc is fixedly connected to the surface of the rotating shaft, a traction rope is wound on the surface of the winding disc, a through hole is formed in the surface of the adjusting bin, the traction rope is arranged in the through hole in a penetrating mode, a supporting column is fixedly connected to the upper surface of the adjusting bin, a placing groove is fixedly connected to the top end of the supporting column, and a clamping plate is arranged on the upper surface of the placing groove, the side fixedly connected with backup pad of grip block, the lower fixed surface of backup pad is connected with solid fixed ring, the other end fixed connection of haulage rope is on solid fixed ring's surface.
As a further aspect of the present invention: the support columns are two groups in total and are symmetrically arranged on the upper surface of the adjusting bin, and the winding disc and the traction rope are two groups and are symmetrically arranged on the surface of the rotating shaft.
As a further aspect of the present invention: the upper surface fixed connection of standing groove is filled up in the protection, the protection is filled up totally two sets ofly, and another group protection fills up fixed connection at the lower surface of grip block, the protection is filled up and is made for rubber materials.
As a further aspect of the present invention: the upper surface of standing groove fixedly connected with boss, the lower surface of grip block is seted up flutedly, boss and recess phase-match, boss and recess all have two sets ofly, and the symmetrical arrangement is at the lower surface of grip block.
As a further aspect of the present invention: the side fixedly connected with fixed block of fixed station, the fixed block is total two sets of, and the symmetrical arrangement is in the both sides of fixed station, the screw hole has been seted up on the surface of fixed block, fixing bolt is worn to be equipped with in the inside of screw hole.
As a further aspect of the present invention: the energy storage bin is arranged inside the fixed table, the storage battery is fixedly connected inside the energy storage bin, the control switch is fixedly connected to the surface of the adjusting bin, and the microprocessor is arranged inside the control switch.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this water supply and drainage pipeline plugging device for high-rise building through setting up servo motor, uses the device to carry out the in-process of leaking stoppage to the drain pipe when the staff, and the staff only needs to start servo motor through control switch, under the cooperation of first bevel gear and second bevel gear, can make the rolling dish pass through the haulage rope and drive the inside protection of grip block and fill up the surface of laminating at the drain pipe closely to the effect of leaking stoppage has been carried out to the drain pipe.
2. This water supply and drainage pipeline plugging device for high-rise building through setting up fixed block and fixing bolt, uses the device to carry out the in-process of leaking stoppage to the drain pipe when the staff, and the staff only needs fix the position of fixed block through fixing bolt, can fix the device's position to the skew has been avoided the device in-process emergence of using.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a front view section of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic three-dimensional structure of the fixing table of the present invention;
in the figure: 1. a fixed table; 2. a regulating bin; 3. a fixed mount; 4. a servo motor; 5. a first bevel gear; 6. a bearing; 7. a rotating shaft; 8. a second bevel gear; 9. a winding disc; 10. a hauling rope; 11. a through hole; 12. a support pillar; 13. a placement groove; 14. a clamping plate; 15. a support plate; 16. a fixing plate; 17. a protective pad; 18. a groove; 19. a boss; 20. a fixed block; 21. a threaded hole; 22. fixing the bolt; 23. An energy storage bin; 24. a storage battery; 25. and controlling the switch.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a leakage stopping device for a water supply and drainage pipeline for a high-rise building comprises a fixed table 1, wherein an adjusting bin 2 is fixedly connected to the upper surface of the fixed table 1, a fixed frame 3 is fixedly connected to the inside of the adjusting bin 2, a servo motor 4 is fixedly connected to the inside of the fixed frame 3, by arranging the servo motor 4, when a worker uses the device to stop leakage of a drainage pipeline, the worker only needs to start the servo motor 4 through a control switch 25, under the matching of a first bevel gear 5 and a second bevel gear 8, a winding disc 9 can drive a protective pad 17 inside a clamping plate 14 to be tightly attached to the surface of the drainage pipeline through a traction rope 10, so that the effect of stopping leakage of the drainage pipeline is achieved, the output shaft of the servo motor 4 is fixedly connected with the first bevel gear 5, a bearing 6 is fixedly connected to the inside of the adjusting bin 2, and a rotating shaft 7 penetrates through the inside of the bearing 6, fixed surface of pivot 7 is connected with second bevel gear 8, first bevel gear 5 and second bevel gear 8 mesh mutually, the fixed surface of pivot 7 is connected with rolling dish 9, the surface winding of rolling dish 9 has haulage rope 10, through-hole 11 has been seted up on the surface of surge bin 2, haulage rope 10 wears to establish the inside at through-hole 11, the last fixed surface of surge bin 2 is connected with support column 12, the top fixedly connected with standing groove 13 of support column 12, the upper surface of standing groove 13 is provided with grip block 14, the side fixedly connected with backup pad 15 of grip block 14, the fixed surface of lower fixed surface of backup pad 15 is connected with solid fixed ring, the other end fixed connection of haulage rope 10 is on solid fixed ring's surface.
Specifically, the support columns 12 are two groups and are symmetrically arranged on the upper surface of the adjusting bin 2, and the winding disc 9 and the traction rope 10 are two groups and are symmetrically arranged on the surface of the rotating shaft 7.
Specifically, the upper surface fixedly connected with protection of standing groove 13 fills up 17, and protection fills up 17 total two sets ofly, and another group protection fills up 17 fixed connection at the lower surface of grip block 14, and protection fills up 17 and make for rubber materials, and the upper surface fixedly connected with boss 19 of standing groove 13, recess 18 has been seted up to the lower surface of grip block 14, and boss 19 and recess 18 phase-match, boss 19 and recess 18 all have two sets ofly, and the symmetrical arrangement is at the lower surface of grip block 14.
Concretely, the side fixedly connected with fixed block 20 of fixed station 1, fixed block 20 is total two sets of, and the symmetrical arrangement is in the both sides of fixed station 1, threaded hole 21 has been seted up on the surface of fixed block 20, fixing bolt 22 is worn to be equipped with in threaded hole 21's inside, through setting up fixed block 20 and fixing bolt 22, use the device to carry out the in-process of leaking stoppage to the drain pipe when the staff, the staff only needs to fix the position of fixed block 20 through fixing bolt 22, can fix the position of the device, thereby avoided the device to take place the skew at the in-process that uses.
Specifically, energy storage bin 23 has been seted up to the inside of fixed station 1, and the inside fixedly connected with battery 24 in energy storage bin 23, the fixed surface in regulation storehouse 2 is connected with control switch 25, and control switch 25's inside is provided with microprocessor.
The utility model discloses a theory of operation does:
s1, the utility model discloses, when using, at first remove the device to suitable position, when the staff uses the device to leak stoppage to the drain pipe, fix the position of fixed station 1 through fixing bolt 22 at first to avoided the device to take place the skew in the process of using, then place the drain pipe in the inside of standing groove 13, and laminate grip block 14 on the surface of drain pipe, then the staff starts servo motor 4 through control switch 25, servo motor 4 drives first bevel gear 5 to rotate simultaneously;
s2, the first bevel gear 5 drives the rotating shaft 7 to rotate through the second bevel gear 8, then the rotating shaft 7 drives the winding disc 9 to rotate, meanwhile, the winding disc 9 winds the traction rope 10, and the traction rope 10 drives the clamping plate 14 on the side face of the supporting plate 15 to move through the fixing ring, so that the boss 19 moves to the inside of the groove 18, the protection pad 17 is tightly attached to the surface of the drainage pipe, and the leakage stoppage process of the drainage pipe is completed.
While embodiments of the present invention have been shown and described, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that modifications, alterations, substitutions and variations may be made to the above embodiments by those of ordinary skill in the art without departing from the scope of the present invention.

Claims (6)

1. The utility model provides a water supply and drainage pipeline plugging device for high-rise building, includes fixed station (1), its characterized in that: the upper surface of the fixed table (1) is fixedly connected with an adjusting bin (2), the inner part of the adjusting bin (2) is fixedly connected with a fixed frame (3), the inner part of the fixed frame (3) is fixedly connected with a servo motor (4), an output shaft of the servo motor (4) is fixedly connected with a first bevel gear (5), the inner part of the adjusting bin (2) is fixedly connected with a bearing (6), a rotating shaft (7) is penetrated in the bearing (6), the surface of the rotating shaft (7) is fixedly connected with a second bevel gear (8), the first bevel gear (5) is meshed with the second bevel gear (8), the surface of the rotating shaft (7) is fixedly connected with a winding disc (9), a traction rope (10) is wound on the surface of the winding disc (9), a through hole (11) is formed in the surface of the adjusting bin (2), and the traction rope (10) is penetrated in the through hole (11), the upper surface fixedly connected with support column (12) of surge bin (2), top fixedly connected with standing groove (13) of support column (12), the upper surface of standing groove (13) is provided with grip block (14), side fixedly connected with backup pad (15) of grip block (14), the lower fixed surface of backup pad (15) is connected with solid fixed ring, the other end fixed connection of haulage rope (10) is on solid fixed ring's surface.
2. The water supply and drainage pipeline plugging device for the high-rise building as claimed in claim 1, wherein: the supporting columns (12) are two groups in total and are symmetrically arranged on the upper surface of the adjusting bin (2), and the winding disc (9) and the traction rope (10) are two groups and are symmetrically arranged on the surface of the rotating shaft (7).
3. The water supply and drainage pipeline plugging device for the high-rise building as claimed in claim 1, wherein: the upper surface fixed connection of standing groove (13) is protected and is filled up (17), protection is filled up (17) and is total two sets ofly, and another group protection fills up (17) fixed connection at the lower surface of grip block (14), protection fills up (17) and is made for rubber materials.
4. The water supply and drainage pipeline plugging device for the high-rise building as claimed in claim 1, wherein: the upper surface of the placing groove (13) is fixedly connected with a boss (19), the lower surface of the clamping plate (14) is provided with a groove (18), the boss (19) is matched with the groove (18), the boss (19) and the groove (18) are both provided with two groups, and the bosses and the grooves are symmetrically arranged on the lower surface of the clamping plate (14).
5. The water supply and drainage pipeline plugging device for the high-rise building as claimed in claim 1, wherein: the side fixedly connected with fixed block (20) of fixed station (1), fixed block (20) are total two sets ofly, and the symmetrical arrangement is in the both sides of fixed station (1), threaded hole (21) have been seted up on the surface of fixed block (20), fixing bolt (22) are worn to be equipped with in the inside of threaded hole (21).
6. The water supply and drainage pipeline plugging device for the high-rise building as claimed in claim 1, wherein: energy storage bin (23) have been seted up to the inside of fixed station (1), the inside fixedly connected with battery (24) in energy storage bin (23), the fixed surface of regulation storehouse (2) is connected with control switch (25), the inside of control switch (25) is provided with microprocessor.
CN202022821685.XU 2020-11-30 2020-11-30 Water supply and drainage pipeline plugging device for high-rise building Active CN213840036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022821685.XU CN213840036U (en) 2020-11-30 2020-11-30 Water supply and drainage pipeline plugging device for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022821685.XU CN213840036U (en) 2020-11-30 2020-11-30 Water supply and drainage pipeline plugging device for high-rise building

Publications (1)

Publication Number Publication Date
CN213840036U true CN213840036U (en) 2021-07-30

Family

ID=76994579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022821685.XU Active CN213840036U (en) 2020-11-30 2020-11-30 Water supply and drainage pipeline plugging device for high-rise building

Country Status (1)

Country Link
CN (1) CN213840036U (en)

Similar Documents

Publication Publication Date Title
CN110937518B (en) Pipeline embedding device for hydraulic engineering
CN213840036U (en) Water supply and drainage pipeline plugging device for high-rise building
CN208174612U (en) A kind of photovoltaic module mounting bracket
CN216078864U (en) Water supply equipment is with dismantling safety cover
CN213537016U (en) Auxiliary device for equipment maintenance of hydropower station
CN213951982U (en) Movable hanging basket used in sectional type efficient bridge construction
CN213072528U (en) High-efficiency electric automation photovoltaic module
CN212366694U (en) Zinc-nickel alloy electroplating cable bridge
CN211481214U (en) Energy-conserving building solar panel installation fixed bolster device
CN113958768A (en) Supporting structure for hydraulic pipeline installation of hydraulic engineering
CN214281836U (en) Smart city monitoring device with energy-saving function
CN214658244U (en) Assembled three-dimensional greening wallboard
CN217904317U (en) Connecting structure of photovoltaic support
CN216923451U (en) Power plant equipment maintains and maintains strutting arrangement with high-efficient dismouting type pipeline
CN213829508U (en) Prefabricated piping lane mould
CN217762390U (en) Safety device for hydraulic and hydroelectric engineering
CN213089287U (en) Intelligent block chain safety device based on HSM encryption module
CN215488616U (en) Dynamic display column for operation management data of power industry
CN215807432U (en) Display device for water resource planning
CN212613560U (en) Rapid positioning support for mounting passive window
CN212657430U (en) Fixing device for water conservancy and hydropower buried pipe
CN213420127U (en) Pipeline fixing device for water conservancy and hydropower construction
CN219980729U (en) Photovoltaic strutting arrangement on water
CN214006164U (en) Point-supported single-side photovoltaic glass curtain wall
CN212473142U (en) Bottom fixed mounting structure of charging pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant