CN213829741U - Water and electricity installation is with terminal box fluting device on wall - Google Patents
Water and electricity installation is with terminal box fluting device on wall Download PDFInfo
- Publication number
- CN213829741U CN213829741U CN202021991246.7U CN202021991246U CN213829741U CN 213829741 U CN213829741 U CN 213829741U CN 202021991246 U CN202021991246 U CN 202021991246U CN 213829741 U CN213829741 U CN 213829741U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- telescopic
- spring
- wall
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 18
- 230000005611 electricity Effects 0.000 title claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 13
- 239000011449 brick Substances 0.000 abstract description 11
- 239000012634 fragment Substances 0.000 abstract description 10
- 230000000694 effects Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 239000007787 solid Substances 0.000 abstract 1
- 230000007246 mechanism Effects 0.000 description 13
- 230000009471 action Effects 0.000 description 6
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/50—Hydropower in dwellings
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The utility model belongs to the technical field of the fluting device technique and specifically relates to a terminal box fluting device on wall is used in water and electricity installation, comprising a main body, fixedly connected with motor in the main part, the output of motor passes through ring flange fixedly connected with drill bit, the first spring of solid connection in the main part, the top of first spring has linked firmly flexible clamping ring, it connects to contradict between flexible clamping ring and the motor, the bottom of main part is seted up flutedly, sliding connection has the flexible piece on the recess, fixedly connected with telescopic link in the recess, telescopic link and flexible piece fixed connection, the concave type piece of bottom fixedly connected with of flexible piece, set up threaded hole on the concave type piece. The utility model discloses an effect of telescopic link, flexible piece, concave type piece, connecting rod and arc piece for the device is when the operation, and it can just collect the fragment of brick of having cut by work, and the fragment of brick of avoiding cutting is piled up, causes the house in a jumble.
Description
Technical Field
The utility model relates to a fluting technical field specifically is a terminal box fluting device on wall is used in water and electricity installation.
Background
In the house building decoration process, often need carry out the water and electricity installation to the house, all need slot on the wall when the workman before carrying out the water and electricity installation to the house, consequently can need with the help of slotted work, chinese patent application number for example: CN201811111654.6, the invention relates to the technical field of construction equipment, in particular to a wall grooving device, which comprises a base, a travelling mechanism, an adjusting mechanism, a grooving mechanism, a spraying mechanism and a dedusting mechanism, wherein the travelling mechanism is arranged at the lower end of the base, the adjusting mechanism, the spraying mechanism and the dedusting mechanism are all arranged at the upper end of the base, the grooving mechanism is fixedly connected with the adjusting mechanism, the adjusting mechanism comprises a lifting component, a rotating component and a moving component, the lifting component is arranged at the upper end of the base, the rotating component is arranged at the upper end of the lifting component, the moving component is fixedly connected with the rotating component, the grooving mechanism comprises a mounting frame, a driving component and a grooving component, the mounting frame is fixedly connected with the moving component, the driving component and the grooving component are both arranged in the mounting frame and are in transmission connection with the grooving component, this method is inherently good, but has the following problems:
1. when it is when carrying out the fluting on to the wall, its device is difficult to collect the fragment of brick that cuts to make the fragment of brick can pile and scatter one ground, cause the difficult clearance of health.
2. When the device is slotting the wall, its device is because the operation of motor leads to vibrations dynamics bigger to make the workman can be harder when controlling.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a terminal box fluting device on wall is used in water and electricity installation has solved and has been difficult to the cutting fall the fragment of brick and collect and the too big difficult problem of workman that causes of shaking force.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a slotting device of a junction box on a wall for water and electricity installation comprises a main body, wherein a motor is fixedly connected in the main body, the output end of the motor is fixedly connected with a drill bit through a flange plate, a first spring is fixedly connected in the main body, the top end of the first spring is fixedly connected with a telescopic clamping ring, the telescopic clamping ring is in contact connection with the motor, a groove is formed in the bottom of the main body, a telescopic block is slidably connected on the groove, a telescopic rod is fixedly connected in the groove, the telescopic rod is fixedly connected with the telescopic block, the bottom of the telescopic block is fixedly connected with a concave block, a threaded hole is formed in the concave block, a threaded rod is in threaded connection with the outer surface of the threaded hole, a connecting rod is inserted on the concave block, the connecting rod is in threaded connection with the threaded rod, a storage box is fixedly connected on the connecting rod, and a slot is formed in the bottom of the storage box, the slot is inserted with a plug board, and the plug board is connected with the storage box in a sliding manner.
As an optimized technical scheme of the utility model, the quantity of first spring is eight, and eight first springs encircle a week at flexible clamping ring.
As a preferred technical scheme of the utility model, the both sides fixedly connected with handle of main part, the outer fixed surface of picture peg is connected with the handle.
As a preferred technical scheme of the utility model, first spout has been seted up to the both sides of recess, fixedly connected with slide bar on the first spout, sliding connection has first slider on the slide bar, the surface cover of slide bar is equipped with the second spring, the both ends of second spring respectively with first slider and slide bar fixed connection, first slider and arc piece fixed connection.
As a preferred technical scheme of the utility model, store fixedly connected with arc piece on the box, the material of arc piece is rubber.
As a preferred technical scheme of the utility model, the second spout has been seted up to the both sides of slot, sliding connection has the second slider on the second spout, second slider and picture peg fixed connection.
(III) advantageous effects
Compared with the prior art, the utility model provides a terminal box fluting device on wall is used in water and electricity installation possesses following beneficial effect:
1. this terminal box fluting device on wall is used in water and electricity installation through the effect of telescopic link, flexible piece, concave type piece, connecting rod and arc piece for the device is when the operation, and it can just collect the fragment of brick of having cut by work, and the fragment of brick of avoiding cutting is piled up, causes the house in a jumble.
2. This terminal box fluting device on wall is used in water and electricity installation through the effect of first spring and flexible clamping ring for the device can effectively carry out the cushioning effect to the device at the during operation, thereby the platform is too hard when avoiding its workman's operation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic front view of the present invention;
fig. 4 is the schematic diagram of the internal structure of the groove of the present invention.
In the figure: 1. a main body; 2. a motor; 3. a drill bit; 4. a first spring; 5. a telescopic clamping ring; 6. a handle; 7. a groove; 8. a first chute; 9. a slide bar; 10. a first slider; 11. a second spring; 12. a telescopic block; 13. a telescopic rod; 14. a concave block; 15. a threaded hole; 16. a threaded rod; 17. a connecting rod; 18. storing the box; 19. an arc-shaped sheet; 20. a slot; 21. a second chute; 22. a second slider; 23. inserting plates; 24. and (4) a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: a slotting device for a junction box on a wall for water and electricity installation comprises a main body 1, a motor 2 is fixedly connected in the main body 1, the output end of the motor 2 is fixedly connected with a drill bit 3 through a flange, a first spring 4 is fixedly connected in the main body 1, the top end of the first spring 4 is fixedly connected with a telescopic clamping ring 5, the telescopic clamping ring 5 is in contact connection with the motor 2, a groove 7 is formed in the bottom of the main body 1, a telescopic block 12 is slidably connected on the groove 7, a telescopic rod 13 is fixedly connected in the groove 7, the telescopic rod 13 is fixedly connected with the telescopic block 12, a concave block 14 is fixedly connected at the bottom of the telescopic block 12, a threaded hole 15 is formed in the concave block 14, a threaded rod 16 is connected on the outer surface of the threaded hole 15 through a thread, a connecting rod 17 is inserted in the concave block 14, the connecting rod 17 is in threaded connection with the threaded rod 16, a box 18 is fixedly connected on the connecting rod 17, and a storage slot 20 is formed in the bottom of the storage box 18, the inserting plate 23 is inserted into the inserting groove 20, and the inserting plate 23 is connected with the storage box 18 in a sliding mode.
In this embodiment, can change the drill bit 3 of different models through the ring flange, the quantity of telescopic link 13 is two, and two telescopic links 13 are located flexible piece 12 both sides, and when flexible piece 12 removed, relative motion was done to two flexible pieces 12, when needs clearance stored box 18, only need with threaded rod 16 and connecting rod 17 between threaded connection not, will store and take out between box 18 and the connecting rod 17, alright with convenient clearing up the fragment of brick in the arc piece 19 to the collection point.
Specifically, the number of the first springs 4 is eight, and the eight first springs 4 surround the telescopic clamping ring 5 for one circle.
In this embodiment, the vibration generated by the motor 2 during operation can be reduced more effectively under the combined action of the eight first springs 4.
Specifically, handles 6 are fixedly connected to two sides of the main body 1, and a handle 24 is fixedly connected to the outer surface of the insertion plate 23.
In this embodiment, the handle 6 is used for facilitating the work of workers, and the handle 24 is used for facilitating the pulling of the inserting plate 23.
Specifically, first chutes 8 are formed in two sides of the groove 7, slide bars 9 are fixedly connected to the first chutes 8, first sliders 10 are slidably connected to the slide bars 9, second springs 11 are sleeved on outer surfaces of the slide bars 9, two ends of the second springs 11 are respectively fixedly connected with the first sliders 10 and the slide bars 9, and the first sliders 10 and the arc-shaped pieces 19 are fixedly connected.
In this embodiment, when the telescopic block 12 moves, two sides of the telescopic block 12 slide on the sliding rod 9 along with the first sliding block 10, so that the telescopic block 12 is more stable in the moving process, and meanwhile, when the telescopic block 12 moves, the second spring 11 has a contact force against the telescopic block 12, so that the storage box 18 can be more tightly contacted with the wall.
Specifically, the storage box 18 is fixedly connected with an arc-shaped sheet 19, and the arc-shaped sheet 19 is made of rubber.
In this embodiment, the curved rubber piece 19 allows for a tight connection between the storage compartment 18 and the wall.
Specifically, the two sides of the slot 20 are provided with a second sliding groove 21, the second sliding groove 21 is connected with a second sliding block 22 in a sliding manner, and the second sliding block 22 is fixedly connected with the inserting plate 23.
In this embodiment, when the insert plate 23 moves, the two sides of the insert plate 23 move on the second slide groove 21 along with the second slide block 22, and under the action of the second slide groove 21 and the second slide block 22, the insert plate 23 can be more gently and stably moved.
The utility model discloses a theory of operation and use flow: the drill bit 3 is driven to rotate by the motor 2, so that the device can open a slot in a wall, when the motor 2 is started, the motor 2 can vibrate the device during operation, the device can be damped by the action of the first spring 4 and the telescopic clamping ring 5, meanwhile, under the action of the first spring 4, the telescopic clamping ring 5 collides with the motor 2, when the drill bit 3 rotates on the wall, the storage box 18 collides with the wall surface through the arc-shaped sheet 19, and simultaneously, when the drill bit 3 moves towards the wall, the storage box 18 slides in the groove 7 along with the telescopic block 12 through the connecting rod 17 and the concave block 14, so that the storage box 18 can not influence the operation of the drill bit 3, and can also collect bricks, when the telescopic block 12 moves, under the action of the telescopic rod 13, the telescopic block 12 can stably move under the action of force, and through the threaded rod 16, the threaded hole 15 and the connecting rod 17, so that store box 18 can be fixed in the drill bit 3 under the time, also can conveniently dismantle storing box 18, when storing the fragment of brick that has cut off on box 18, through pulling handle 24 for handle 24 drives picture peg 23 and takes out on second spout 21, alright clear up the fragment of brick that holds in storing box 18 this moment.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides a water and electricity installation is with terminal box fluting device on wall, includes main part (1), its characterized in that: the drill bit is characterized in that a motor (2) is fixedly connected in the main body (1), the output end of the motor (2) is fixedly connected with a drill bit (3) through a flange plate, a first spring (4) is fixedly connected in the main body (1), the top end of the first spring (4) is fixedly connected with a telescopic clamping ring (5), the telescopic clamping ring (5) and the motor (2) are in butt connection, a groove (7) is formed in the bottom of the main body (1), a telescopic block (12) is slidably connected on the groove (7), a telescopic rod (13) is fixedly connected in the groove (7), the telescopic rod (13) and the telescopic block (12) are fixedly connected, a concave block (14) is fixedly connected at the bottom of the telescopic block (12), a threaded hole (15) is formed in the concave block (14), and a threaded rod (16) is connected to the outer surface of the threaded hole (15), it has connecting rod (17) to peg graft on concave type piece (14), connecting rod (17) and threaded rod (16) threaded connection, fixedly connected with stores box (18) on connecting rod (17), slot (20) have been seted up to the bottom of storing box (18), it has picture peg (23) to peg graft on slot (20), picture peg (23) and store box (18) sliding connection.
2. A wall terminal block grooving apparatus for hydroelectric installation according to claim 1, wherein: the number of the first springs (4) is eight, and the eight first springs (4) encircle the circle of the telescopic clamping ring (5).
3. A wall terminal block grooving apparatus for hydroelectric installation according to claim 1, wherein: the both sides fixedly connected with handle (6) of main part (1), the surface fixed connection of picture peg (23) has handle (24).
4. A wall terminal block grooving apparatus for hydroelectric installation according to claim 1, wherein: first spout (8) have been seted up to the both sides of recess (7), fixedly connected with slide bar (9) are gone up in first spout (8), sliding connection has first slider (10) on slide bar (9), the surface cover of slide bar (9) is equipped with second spring (11), the both ends of second spring (11) respectively with first slider (10) and slide bar (9) fixed connection, first slider (10) and arc piece (19) fixed connection.
5. A wall terminal block grooving apparatus for hydroelectric installation according to claim 1, wherein: the storage box (18) is fixedly connected with an arc-shaped sheet (19), and the arc-shaped sheet (19) is made of rubber.
6. A wall terminal block grooving apparatus for hydroelectric installation according to claim 1, wherein: second spout (21) have been seted up to the both sides of slot (20), sliding connection has second slider (22) on second spout (21), second slider (22) and picture peg (23) fixed connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021991246.7U CN213829741U (en) | 2020-09-11 | 2020-09-11 | Water and electricity installation is with terminal box fluting device on wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021991246.7U CN213829741U (en) | 2020-09-11 | 2020-09-11 | Water and electricity installation is with terminal box fluting device on wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213829741U true CN213829741U (en) | 2021-07-30 |
Family
ID=77004756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021991246.7U Expired - Fee Related CN213829741U (en) | 2020-09-11 | 2020-09-11 | Water and electricity installation is with terminal box fluting device on wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213829741U (en) |
-
2020
- 2020-09-11 CN CN202021991246.7U patent/CN213829741U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213829741U (en) | Water and electricity installation is with terminal box fluting device on wall | |
CN212706049U (en) | Metal spring production and processing device | |
CN212468926U (en) | A clean type perforating device for door frame punches | |
CN210648574U (en) | Multistation drilling equipment is used in metal component processing | |
CN203917942U (en) | A kind of Pneumatic manipulator process equipment | |
CN216654925U (en) | Permanent magnet iron remover for recycling iron powder | |
CN114054829B (en) | Planer for planing | |
CN214162939U (en) | Portable building design instrument receiver | |
CN210850842U (en) | Gas block fluting ware | |
CN211001489U (en) | Cullet collection device in glassware production | |
CN210633135U (en) | Laser pipe cutting machine device | |
CN210996665U (en) | Automatic drilling equipment | |
CN210359554U (en) | Cutting device for auxiliary processing of pipes | |
CN210435238U (en) | Material receiving device of plate shearing machine | |
CN212146348U (en) | Measuring tool bin for building decoration | |
CN218555907U (en) | Automatic change small-size fixer for welding set of supersound | |
CN218314099U (en) | A engraver work piece centre gripping equipment for furniture production | |
CN211466481U (en) | Guillootine with collision protection device | |
CN211102798U (en) | Positioning tool for automobile parts | |
CN211140151U (en) | Insulation moving device for power equipment | |
CN213704041U (en) | Handheld dustproof perforating device for building | |
CN220154180U (en) | Concrete hardness detection device | |
CN209240189U (en) | A kind of drilling equipment of decorations insulated wall | |
CN217666548U (en) | Device for processing thimble hole of anode plate | |
CN218193773U (en) | Multifunctional milling machine tool fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210730 |