CN213809475U - Sleeve for rapid repair of thermal pipeline - Google Patents
Sleeve for rapid repair of thermal pipeline Download PDFInfo
- Publication number
- CN213809475U CN213809475U CN202021828806.7U CN202021828806U CN213809475U CN 213809475 U CN213809475 U CN 213809475U CN 202021828806 U CN202021828806 U CN 202021828806U CN 213809475 U CN213809475 U CN 213809475U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- pipeline
- repair
- semi
- thick bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a sleeve for heating power pipeline rush-repair, the sleeve includes: the sealing device comprises two semicircular cylinders and ring fasteners, wherein the semicircular cylinders are symmetrically arranged, the ring fasteners are arranged on two sides of the outer side of each semicircular cylinder in the axial direction, the ring fasteners are used for connecting the two semicircular cylinders in a sealing mode through fasteners, through grooves are formed in the inner wall of each semicircular cylinder along the periphery, sealing rubber strips are arranged in the grooves and protrude out of the grooves to be in contact with the outer wall of a pipeline, and a sealed cavity is formed by the sealing rubber strips, the inner wall of each semicircular cylinder and the outer surface of the pipeline. The utility model discloses a sleeve can tentatively prevent the hot-water outflow scald personnel of being under construction of pipeline seepage, also provides the condition for the welding of sleeve and pipeline simultaneously, and this sleeve preparation technology is simple relatively in addition, the cost is lower relatively, can practice thrift a large amount of times when the heating power is salvageed, in time resumes resident heat commonly used.
Description
Technical Field
The utility model relates to a heat supply pipe network salvagees equipment technical field, especially relates to a sleeve for heating power pipeline salvagees fast.
Background
The heat pipe network often happens to leak in the heating season, especially for some buried pipe sections, the number of leakage times is relatively large, once the pipe section is leaked, the pipe section needs to be repaired, when the leaked pipe section is a main line with a large pipe diameter, a branch line and a branch line, the leaked pipe section needs to be cut off, a new pipe is welded, and when the pipe section is welded, the pipe section is cut off, no water can flow out, so that a long time is spent on water drainage and pressure relief to reach the welding condition during real construction, however, the time for closing a valve and water drainage and pressure relief is too long, so that a large amount of water resources are wasted, the normal life of residents is influenced, and even a large heat supply.
In addition, the heat primary pipeline at the present stage is in a high-temperature and high-pressure state during operation, and hot water leaked from the pipeline seeps out through a gap between the sleeve and the pipeline in the construction process, so that the construction personnel are easily scalded, and the personal safety of the construction personnel is damaged.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sleeve for heating power pipeline rush-repair can rush-repair impaired pipeline, protection constructor's personal safety fast.
In order to achieve the above object, the utility model discloses a telescopic concrete technical scheme for heating power pipeline rush-repair is:
a sleeve for use in a rapid repair of a thermal conduit, the sleeve comprising: the sealing device comprises two semicircular cylinders and ring buckles, wherein the semicircular cylinders are symmetrically arranged, the ring buckles are arranged on two sides of the outer sides of the semicircular cylinders along the axial direction, the ring buckles are used for connecting the two semicircular cylinders in a sealing manner through fasteners, through grooves are formed in the inner walls of the semicircular cylinders along the peripheries, sealing rubber strips are arranged in the grooves, the sealing rubber strips protrude out of the grooves and are in contact with the outer wall of a pipeline, and a sealed cavity is formed by the sealing rubber strips, the inner walls of the semicircular cylinders and the outer surface of the pipeline; in the construction process, hot water leaked from the pipeline flows out to enter the closed cavity, so that the hot water is prevented from flowing out of the sleeve to avoid scalding constructors, and meanwhile, conditions are provided for welding the sleeve and the pipeline.
Furthermore, the contact seam between the end face of the semicircular cylinder and the pipeline and the connecting seam between the two semicircular cylinders are welded by electric welding, and the sleeve is connected with the pipeline in a sealing way to have quite large pressure resistance so as to block the water leakage of the pipeline.
Furthermore, the sealing rubber strip is made of a temperature-resistant and pressure-resistant elastic material, so that the sealing performance is good, and hot water is effectively prevented from flowing out from gaps between the sleeve and the pipeline.
Furthermore, threads are arranged in the ring fasteners, the fasteners are bolts, and after the two semicircular cylinders are attached, the bolts penetrate through the ring fasteners on the two corresponding semicircular cylinders to be connected in a sealing mode.
Further, a sealing ring is arranged between the ring buckle and the bolt.
The utility model discloses a telescopic beneficial effect for heating power pipeline rush-repair lies in:
1) the utility model discloses a be provided with the joint strip of salient recess at the sleeve inner wall, joint strip contacts with the pipeline outside, and joint strip, sleeve inner wall and the outer wall of impaired pipeline form inclosed cavity, can prevent preliminarily that the hot water of pipeline seepage from flowing out from the gap and scalding the personnel of being under construction, also provide welding conditions for welding the joint between sleeve and the pipeline simultaneously;
2) the utility model has the advantages that the ring buckle arranged outside the sleeve is convenient for hoisting and dismounting, thereby avoiding personal safety such as scald caused by close installation of constructors;
3) the utility model discloses well sleeve preparation technology is simple relatively, the material principle is extensive, and the cost is lower relatively, can practice thrift a large amount of times when heating power is salvageed, in time resumes the resident and is heat commonly used.
Drawings
FIG. 1 is a schematic structural view of a front view of a semicircular cylinder of the present invention;
fig. 2 is a schematic sectional view of the sleeve according to the present invention;
fig. 3 is a schematic top view of the sleeve according to the present invention.
Description of reference numerals: 1. looping; 2. a pipeline; 3. sealing the cavity; 4. sealing rubber strips; 5. a semi-circular cylinder.
Detailed Description
For better understanding of the purpose, structure and function of the present invention, the following description will be made in detail with reference to the accompanying drawings.
The sleeve in embodiment 1 can be according to concrete leakage pipe diameter size, prepares the not sleeve of equidimension, through the circular bottom surface of cutting sleeve, makes it agree with the leakage pipeline 2 outside, then combines sleeve and leakage pipeline welding through the electric welding, also welds the joint seam of two semi-circular section of thick bamboo 5 simultaneously, reaches sleeve and leakage pipeline complete sealing connection at last for the sleeve has fairly big pressure resistance to block that the hot water that leaks flows to the road surface and causes the road to cave in or the personal injury accident.
Pipeline and sleeve in the embodiment 1 generally adopt rigid material to make, and the sleeve suit has certain gap between sleeve and the pipeline outside the pipeline, and the personnel of being under construction are scalded easily from the gap outflow to the hot water seepage in the pipeline in the work progress, and joint strip 4 preferably adopts the elastic material of temperature resistant resistance to compression, and the leakproofness is good, effectively prevents hot water from flowing out from the gap of sleeve and pipeline.
In the embodiment 1, the ring buckle 1 is internally provided with threads, the fastening piece is a bolt, a sealing ring is arranged between the ring buckle 1 and the bolt, and after the two semicircular cylinders 5 are attached, the bolt penetrates through the ring buckles 1 on the two corresponding semicircular cylinders 5 to be connected in a sealing manner; in addition, the ring buckle 1 can be used for penetrating the chain to lift and unload the sleeve, thereby reducing the close contact of constructors with the pipeline and avoiding scalding the human body due to hot water leakage in the pipeline or the pipeline.
The utility model relates to a sleeve for heating power pipeline rush-repair, through be provided with the joint strip of protrusion recess in the sleeve, joint strip, sleeve inner wall and the outer wall of impaired pipeline form inclosed cavity, can prevent preliminarily that the hot water of pipeline seepage from flowing out from the gap of sleeve and pipeline and scalding the personnel of being under construction, also provide welding conditions for welding the joint between sleeve and the pipeline simultaneously; in addition, the ring buckle arranged on the outer side of the sleeve is convenient to lift and dismount, and personal safety such as scalding caused by close-distance installation of constructors is avoided; the utility model discloses well sleeve preparation technology is simple relatively, the material principle is extensive, and the cost is lower relatively, can practice thrift a large amount of times when heating power is salvageed, in time resumes the resident and is heat commonly used.
The present invention has been further described with reference to specific embodiments, but it should be understood that the specific description herein should not be construed as limiting the spirit and scope of the present invention, and that various modifications to the above-described embodiments, which would occur to persons skilled in the art after reading this specification, are within the scope of the present invention.
Claims (5)
1. A sleeve for a thermal power pipeline rapid repair, characterized in that, the sleeve includes: two semi-circular section of thick bamboo (5) and latch closure (1), semi-circular section of thick bamboo (5) are the symmetry setting, axial direction both sides are followed in semi-circular section of thick bamboo (5) outside in latch closure (1) sets up, latch closure (1) are through fastener with two semi-circular section of thick bamboo (5) sealing connection, semi-circular section of thick bamboo (5) inner wall is provided with the recess that link up along the periphery, be provided with joint strip (4) in the recess, joint strip (4) protrusion recess and pipeline (2) outer wall contact, joint strip (4), a closed cavity (3) of semi-circular section of thick bamboo (5) inner wall and pipeline (2) surface formation.
2. Sleeve for the rapid rush-repair of thermal pipelines according to claim 1, characterized in that the contact seam between the end face of the semicircular cylinder (5) and the pipeline (2) and the joint seam between two semicircular cylinders (5) are welded by electric welding.
3. Sleeve for the rapid rush-repair of thermal pipelines according to claim 1, characterized in that the sealing rubber strip (4) is made of a temperature-resistant and pressure-resistant elastic material.
4. The sleeve for the rapid rush repair of the thermal pipeline according to claim 1, wherein the ring buckle (1) is internally provided with threads, and the fastening member is a bolt.
5. Sleeve for the rapid rush-repair of thermal pipelines according to claim 4, characterized in that a sealing ring is arranged between the ring buckle (1) and the bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021828806.7U CN213809475U (en) | 2020-08-27 | 2020-08-27 | Sleeve for rapid repair of thermal pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021828806.7U CN213809475U (en) | 2020-08-27 | 2020-08-27 | Sleeve for rapid repair of thermal pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213809475U true CN213809475U (en) | 2021-07-27 |
Family
ID=76951717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021828806.7U Active CN213809475U (en) | 2020-08-27 | 2020-08-27 | Sleeve for rapid repair of thermal pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213809475U (en) |
-
2020
- 2020-08-27 CN CN202021828806.7U patent/CN213809475U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206246920U (en) | A kind of rapid pipeline repairing device | |
CN213809475U (en) | Sleeve for rapid repair of thermal pipeline | |
CN111041142B (en) | Method for repairing water pipe of cooling wall of blast furnace | |
CN218177239U (en) | Deformation joint water inrush soil body restoration structure | |
CN210344705U (en) | Pressurized leakage blocking structure for gas pipeline | |
CN206246921U (en) | A kind of rapid pipeline repairing device | |
CN109578741A (en) | A kind of water leakage treatment method based on in-service pipeline | |
CN206530783U (en) | The sealing structure of nuclear reactor and its double-layer sleeve structure and return | |
CN213576217U (en) | Gas pipeline takes pressure to salvage device | |
CN209308053U (en) | A kind of leak stopping system of composite paster slip casting | |
CN207715976U (en) | It is a kind of can Operating Pressure pipe first-aid device | |
CN207685861U (en) | Concrete pipe gallery side wall or roof deformation stitch waterproof construction | |
CN106988279A (en) | A kind of application method of the sluice with hydraulic lock | |
CN215173245U (en) | Heating power pipeline leak protection device for municipal works | |
CN209876283U (en) | Thermal sealing water-stopping sleeve | |
CN107387935B (en) | Compensator upstream end pipeline pressure leakage blocking device and leakage blocking method | |
CN219453684U (en) | Heating power pipeline leakage detection equipment | |
CN115076508B (en) | Water supply steel pipe welding seam leakage repairing method | |
CN205560053U (en) | Pipeline flange protector is descaled to water under high pressure | |
CN214147008U (en) | Expansion joint with pipeline alarm system | |
CN217762640U (en) | Heat supply pipeline leaking stoppage device under pressure | |
CN216555990U (en) | Heat preservation connection structure of no joint coating of hot line way | |
CN211547310U (en) | Sealed waterproof telescoping device | |
CN219870200U (en) | Heating power energy-saving pipeline pressure maintaining detection tool | |
CN218409564U (en) | Boiler reheater system water pressure test pipeline convenient to installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |