CN213806180U - Cast-in-place shear force wall position reinforcement construction structures of assembled house - Google Patents

Cast-in-place shear force wall position reinforcement construction structures of assembled house Download PDF

Info

Publication number
CN213806180U
CN213806180U CN202021993617.5U CN202021993617U CN213806180U CN 213806180 U CN213806180 U CN 213806180U CN 202021993617 U CN202021993617 U CN 202021993617U CN 213806180 U CN213806180 U CN 213806180U
Authority
CN
China
Prior art keywords
cast
shear wall
steel bars
shear force
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021993617.5U
Other languages
Chinese (zh)
Inventor
聂文高
杨莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jingdong Construction Development Co ltd
Original Assignee
Shanghai Jingdong Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jingdong Construction Development Co ltd filed Critical Shanghai Jingdong Construction Development Co ltd
Priority to CN202021993617.5U priority Critical patent/CN213806180U/en
Application granted granted Critical
Publication of CN213806180U publication Critical patent/CN213806180U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a cast-in-place shear force wall position reinforcement construction structures of assembled house, including PC component, the vertical reinforcing bar of shear force wall, lacing wire and stirrup, be provided with on the PC component and reserve the reinforcing bar, reserve reinforcing bar and stirrup respectively with the vertical steel bar connection of shear force wall, the lacing wire is connected with reservation reinforcing bar, the vertical reinforcing bar of shear force wall and stirrup cooperation. The main purpose is to provide the research of the construction technology of the reinforcement at the cast-in-place shear wall part of the fabricated house, so that the reinforcement at the cast-in-place shear wall part of the fabricated house can be quickly and firmly bound, the tensile property is good, and the condition that the yield strength is reduced and the stress requirement is not met is effectively avoided.

Description

Cast-in-place shear force wall position reinforcement construction structures of assembled house
Technical Field
The utility model relates to a cast-in-place shear force wall position reinforcement construction technical field of assembled house specifically is a cast-in-place shear force wall position reinforcement construction structures of assembled house.
Background
In the prior art, due to the characteristics of the construction process, when the cast-in-place shear wall part of the fabricated house is constructed, the conventional method is that the stirrups are firstly broken off and sleeved on the periphery of the vertical steel bars of the shear wall for binding, and finally the stirrups are bent back to the original shape for fixing, but the stirrups are bent for many times, so that the tensile property of the bent part is reduced, the toughness is lost, and the stress requirement cannot be met. Such construction process degree of difficulty is big, and the efficiency of construction is also low, is difficult to satisfy staff's demand, the utility model discloses a new technical scheme is proposed to above problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a cast-in-place shear force wall position reinforcement construction structures of assembled house can make the quick ligature of reinforcing bar at cast-in-place shear force wall position of assembled firm, and tensile strength is good, effectively avoids buckling the stirrup many times, makes its yield strength reduce and the condition emergence that does not satisfy the atress requirement.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a cast-in-place shear wall position reinforcement construction structures of assembled house, includes PC component, the vertical reinforcing bar of shear force wall, drawknot muscle and stirrup, be provided with the reservation reinforcing bar on the PC component, reservation reinforcing bar and stirrup are connected with the vertical reinforcing bar of shear force wall respectively, the drawknot muscle is connected with reservation reinforcing bar, the vertical reinforcing bar of shear force wall and stirrup cooperation.
Preferably, the stirrups are provided with a plurality of and are sequentially arranged on the outer sides of the vertical steel bars of the shear wall from bottom to top respectively.
Preferably, the opening tie bars are bound and connected with the reserved steel bars, the stirrups and the vertical steel bars of the shear wall.
Preferably, the reserved steel bars, the shear wall vertical steel bars, the stirrups and the tie bars form a reserved construction structure.
Preferably, the PC member and the reserved steel bar are of an integral structure and are prefabricated members.
(III) advantageous effects
Compared with the prior art, the utility model provides a cast-in-place shear force wall position reinforcement construction structures of assembled house possesses following beneficial effect:
the utility model provides a cast-in-place shear force wall position steel reinforcement construction structures of assembled house, the main objective is that the cast-in-place shear force wall position steel reinforcement construction technology of assembled house is provided and is studied, can make the quick ligature of reinforcing bar at cast-in-place shear force wall position of assembled firm, and tensile strength is good, effectively avoids buckling the stirrup many times, makes its yield strength reduce and the condition emergence that does not satisfy the atress requirement to solve some problems that exist among the prior art.
Drawings
FIG. 1 is a schematic view of the outward bending of the reserved steel bars of the PC member of the cast-in-place shear wall portion steel bar binding construction structure of the prefabricated house of the present invention;
FIG. 2 is a schematic view of a placing stirrup of the steel bar binding construction structure at the cast-in-place shear wall part of the prefabricated house of the utility model;
FIG. 3 is a schematic view of bending of the reserved steel bars of the PC member of the cast-in-place shear wall portion steel bar binding construction structure of the prefabricated house of the present invention;
fig. 4 is the utility model relates to a cast-in-place shear wall position steel reinforcement construction structures' of assembled house side view.
In the figure: 1. a PC component; 2. reserving a steel bar; 3. shear wall vertical steel bars; 4. stretching the ribs; 5. and (5) hooping.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b):
referring to fig. 1-4, the prefabricated house cast-in-place shear wall part steel bar binding construction structure comprises a PC component 1, shear wall vertical steel bars 3, tie bars 4 and stirrups 5, wherein reserved steel bars 2 are arranged on the PC component 1, the reserved steel bars 2 and the stirrups 5 are respectively connected with the shear wall vertical steel bars 3, and the tie bars 4 are connected with the reserved steel bars 2, the shear wall vertical steel bars 3 and the stirrups 5 in a matched mode.
The reserved steel bars 2 are bent outwards by a small amplitude, so that the prefabricated shear wall is convenient to hoist, and meanwhile, the stirrups 5 are prevented from colliding with the reserved steel bars 2; in addition, the reserved steel bars 2 are bent back to a normal state and bound with the vertical steel bars 3 of the shear wall, so that the vertical steel bars 3 of the shear wall and the stirrups 5 are still tightly combined under various load actions.
In this embodiment, the stirrups 5 are provided with a plurality of, and set gradually in the outside of the vertical reinforcing steel bar 3 of shear wall from the bottom up respectively. In the cast-in-place section, stirrups 5 are arranged at intervals from bottom to top outside the vertical steel bars 3 of the shear wall, so that the shear strength of the oblique section is increased, and the vertical steel bars 3 of the shear wall are connected, so that the position of the vertical steel bars is firmly and stably kept, and the displacement is avoided.
In this embodiment, the tie bar 4 is bound and connected with the reserved steel bar 2, the stirrup 5 and the shear wall vertical steel bar 3; and the reserved steel bar 2, the shear wall vertical steel bar 3, the stirrup 5 and the tie bar 4 form a reserved construction structure. The tie bars 4 are used, the reserved steel bars 2 and the stirrups 5 are firmly bound with the vertical steel bars 3 of the shear wall, and the binding of the steel bars 3 at the position of the cast-in-place shear wall is efficiently finished with quality guarantee.
The reserved steel bars 2, the shear wall vertical steel bars 3, the stirrups 5 and the tie bars 4 form a structural system, so that the steel bars 3 at the cast-in-place shear wall part of the prefabricated house are firmly and firmly bound, and the binding of the steel bars 3 at the cast-in-place shear wall part is finished with high quality guarantee and efficiency.
In this embodiment, the PC member 1 and the pre-cast steel bar 2 are an integral structure and are prefabricated members.
The construction technology comprises the following steps:
the method comprises the following steps: firstly, manufacturing a PC component 1, arranging a reserved steel bar 2 on the PC component 1, firstly, bending the reserved steel bar 2 outwards by a small amplitude, facilitating the hoisting of the prefabricated shear wall, and simultaneously avoiding the collision between a stirrup 5 and the reserved steel bar 2;
step two: then, 3 stirrups 5 are arranged at intervals from bottom to top outside the vertical reinforcing steel bars 3 of the shear wall at the cast-in-place section, so that the shear strength of the inclined section is increased, and the vertical reinforcing steel bars 3 of the shear wall are connected, so that the position of the vertical reinforcing steel bars is firmly and stably kept, and the vertical reinforcing steel bars 3 are prevented from shifting;
step three: then bending the reserved steel bars 2 back to a normal state and binding the reserved steel bars with the vertical steel bars 3 of the shear wall, so that the vertical steel bars 3 of the shear wall and the stirrups 5 are still tightly combined under the action of various loads;
step four: the opening tie bar 4 is used, the reserved steel bars 2, the stirrups 5 and the shear wall vertical steel bars 3 are firmly bound, the quality-guaranteeing and high-efficiency binding of the steel bars at the position of the cast-in-place shear wall is achieved, the reserved steel bars 2, the shear wall vertical steel bars 3, the stirrups 5 and the tie bars 4 form a structural system, the steel bars at the position of the cast-in-place shear wall of the prefabricated house are firmly bound, and the quality-guaranteeing and high-efficiency binding of the steel bars at the position of the cast-in-place shear wall is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a cast-in-place shear wall position reinforcement construction structures of assembled house, includes PC component (1), its characterized in that, be provided with reserved reinforcing bar (2) on PC component (1), still be connected with shear force wall vertical reinforcement (3), drawknot muscle (4) and stirrup (5) on the PC component, reserved reinforcing bar (2) and stirrup (5) are connected with shear force wall vertical reinforcement (3) respectively, drawknot muscle (4) are connected with reserved reinforcing bar (2), shear force wall vertical reinforcement (3) and stirrup (5) cooperation.
2. The cast-in-place shear wall position reinforcement construction structure of assembled house of claim 1, characterized in that: the stirrups (5) are provided with a plurality of and are sequentially arranged on the outer sides of the vertical steel bars (3) of the shear wall from bottom to top respectively.
3. The cast-in-place shear wall position reinforcement construction structure of assembled house of claim 1, characterized in that: the tie bars (4) are bound and connected with the reserved steel bars (2), the stirrups (5) and the shear wall vertical steel bars (3).
4. The cast-in-place shear wall position reinforcement construction structure of assembled house of claim 3, characterized in that: the construction structure is composed of the reserved steel bars (2), the shear wall vertical steel bars (3), the stirrups (5) and the tie bars (4).
5. The cast-in-place shear wall position reinforcement construction structure of assembled house of claim 1, characterized in that: the PC component (1) and the reserved steel bar (2) are of an integral structure and are prefabricated parts.
CN202021993617.5U 2020-09-11 2020-09-11 Cast-in-place shear force wall position reinforcement construction structures of assembled house Active CN213806180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021993617.5U CN213806180U (en) 2020-09-11 2020-09-11 Cast-in-place shear force wall position reinforcement construction structures of assembled house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021993617.5U CN213806180U (en) 2020-09-11 2020-09-11 Cast-in-place shear force wall position reinforcement construction structures of assembled house

Publications (1)

Publication Number Publication Date
CN213806180U true CN213806180U (en) 2021-07-27

Family

ID=76953405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021993617.5U Active CN213806180U (en) 2020-09-11 2020-09-11 Cast-in-place shear force wall position reinforcement construction structures of assembled house

Country Status (1)

Country Link
CN (1) CN213806180U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114483111A (en) * 2022-03-08 2022-05-13 中铁第六勘察设计院集团有限公司 Tunnel secondary lining side wall longitudinal construction joint shear steel bar and construction method
CN114892811A (en) * 2022-05-30 2022-08-12 中南建筑设计院股份有限公司 Construction method for connecting node of core tube and outer frame steel bar truss floor bearing plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114483111A (en) * 2022-03-08 2022-05-13 中铁第六勘察设计院集团有限公司 Tunnel secondary lining side wall longitudinal construction joint shear steel bar and construction method
CN114892811A (en) * 2022-05-30 2022-08-12 中南建筑设计院股份有限公司 Construction method for connecting node of core tube and outer frame steel bar truss floor bearing plate

Similar Documents

Publication Publication Date Title
CN213806180U (en) Cast-in-place shear force wall position reinforcement construction structures of assembled house
CN102312481A (en) Reinforced concrete prefabricated member
CN111719753A (en) Laminated slab with dragon boat hanging ribs for enhancing bearing capacity at abutted seam and preparation method thereof
CN101831868A (en) Connecting node structure of steel rod elements and concrete plate
CN110512800A (en) A kind of steel and concrete combined structure system and construction method
CN212295682U (en) Novel precast concrete component hoisting point embedded part system
CN110565796A (en) Connecting structure and construction method for prefabricated hollow column superposed beam
CN214461188U (en) Low-deflection large-cantilever structure
CN110952787A (en) Novel precast concrete component hoisting point embedded part system
CN218204955U (en) Play post connected node on large-span conversion roof beam
CN217461178U (en) Section steel concrete combined wide flat beam
CN210827829U (en) Connecting structure of prefabricated hollow column superposed beam
CN215483532U (en) Novel steel pipe concrete composite column and beam column node
CN212688927U (en) Precast pile
CN212984321U (en) Laminated slab with reinforced bearing capacity at spliced seam by using dragon boat hanging ribs
CN211499482U (en) Reinforcing steel bar layer positioned at external corner part
CN209145068U (en) A kind of horizontal joint connecting node of precast shear wall edge member
CN109024241B (en) Prefabricated assembled arch box and connecting method thereof
CN209509311U (en) A kind of rectangular opening girder construction
CN113175087A (en) Semi-steel bone beam assembly
CN218668043U (en) High-rise shear wall system house lateral force resistance optimizing structure
CN214833467U (en) Semi-steel bone beam assembly
CN205604581U (en) Large -span shaped steel prestressed concrete combination beam
CN114108943B (en) Prefabricated coupling beam, laminated beam and building structure of segmental cavity
CN218990374U (en) Diversion tunnel reinforced concrete structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant