CN213803124U - Stepped ecological water purification dam - Google Patents

Stepped ecological water purification dam Download PDF

Info

Publication number
CN213803124U
CN213803124U CN202022350220.0U CN202022350220U CN213803124U CN 213803124 U CN213803124 U CN 213803124U CN 202022350220 U CN202022350220 U CN 202022350220U CN 213803124 U CN213803124 U CN 213803124U
Authority
CN
China
Prior art keywords
baffle
water purification
lagging
dam
purification dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022350220.0U
Other languages
Chinese (zh)
Inventor
魏巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hongcheng Environment Technology Co ltd
Original Assignee
Shanghai Hongcheng Environment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hongcheng Environment Technology Co ltd filed Critical Shanghai Hongcheng Environment Technology Co ltd
Priority to CN202022350220.0U priority Critical patent/CN213803124U/en
Application granted granted Critical
Publication of CN213803124U publication Critical patent/CN213803124U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The utility model relates to an ecological water purification dam technical field discloses a cascaded ecological water purification dam, including the water purification dam, the water purification dam is fixed to be set up at the base upper surface, and the base is the clay layer, water purification dam top is provided with the soil horizon, the soil horizon left and right sides all is provided with the plant, the lagging has all been pegged graft to the left and right sides in water purification dam and the soil horizon, the lagging is the middle part structure, and has pegged graft in the lagging has the baffle, a plurality of groups through holes have all been seted up to the left and right sides that the lagging is close to the baffle, and has pegged graft in the through hole has the diaphragm. The utility model discloses a be provided with baffle and lagging, when being in higher water level for a long time, the baffle is carried to the accessible hoist, moves to the lagging top on the baffle, and is located the plant both sides of water purification dam, uses external water pump instrument to deliver to the baffle outside with the inboard ponding drainage of baffle afterwards, and then makes the plant expose the surface of water, the staff carry out the plant prune the maintenance can, can promote the plant survival rate to a certain extent.

Description

Stepped ecological water purification dam
Technical Field
The utility model relates to an ecological water purification dam technical field specifically is a cascaded ecological water purification dam.
Background
In the black and odorous river treatment and water quality improvement technology, the bypass treatment needs to occupy more land compared with in-situ remediation, the equipment cost and the operation cost are higher, and the treatment capacity and the treatment effect are limited. In-situ restoration of the river channel is realized by throwing immobilized microorganisms and arranging auxiliary measures such as a damming dam, an efficient biological base and the like.
In implementing the present invention, the inventor finds that the following problems exist in the prior art and are not solved: 1. the current water purification dam need wait for the water level decline, and the plant exposes the level or is in the shallow water district, just can prune the maintenance to it to promote its survival rate, but the water level is very easily appeared in unnecessary season and lasts higher, can't implement the pruning maintenance to the plant, influences the survival rate of plant, and then influences plant water purification effect scheduling problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cascaded ecological water purification dam, through being provided with baffle and lagging, when being in higher water level for a long time, the baffle is carried to the accessible hoist, moves to the lagging top on the baffle, and is located the plant both sides of water purification dam, uses external water pump instrument to deliver to the baffle outside with the inboard ponding drainage of baffle afterwards, and then makes the plant expose the surface of water, the staff carry out the plant prune the maintenance can, can promote the plant survival rate to a certain extent, the problem that proposes in the background art has been solved.
In order to achieve the above object, the utility model provides a following technical scheme: a stepped ecological water purification dam comprises a water purification dam;
the utility model discloses a water purification dam, including water purification dam, base, apron, baffle, apron, diaphragm, baffle, water purification dam, base upper surface, and the base is the clay layer, water purification dam top is provided with the soil horizon, the soil horizon left and right sides all is provided with the plant, the lagging has all been pegged graft to the left and right sides in water purification dam and the soil horizon, the lagging is the middle part structure, and has connect the baffle in the lagging, a plurality of groups of through holes have all been seted up to the left and right sides that the lagging is close to the baffle, and has pegged graft in the through hole has the diaphragm, the diaphragm is close to the fixed dog that is provided with of one end of baffle.
As an embodiment of the present invention, the one end of the transverse plate away from the baffle is provided as a blade.
As a preferred embodiment of the present invention, the baffle plate has a hanging ring fixed on its upper surface.
As a preferred embodiment of the present invention, the left and right end faces of the baffle are attached to the stoppers on the same side.
As a preferred embodiment of the present invention, the bottom of the sleeve plate is fixedly provided with a conical head.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a cascaded ecological water purification dam through being provided with baffle and lagging, when being in higher water level for a long time, the baffle is carried to the accessible hoist, moves to the lagging top on the baffle, and is located the plant both sides of water purification dam, uses external water pump instrument to discharge the inboard ponding of baffle to the baffle outside afterwards, and then makes the plant expose the surface of water, the staff carry on the plant prune the maintenance can, can promote the plant survival rate to a certain extent.
2. The utility model relates to a cascaded ecological water purification dam, through being provided with diaphragm and dog, the accessible diaphragm transversely runs through the lagging lateral wall, and pegs graft in the clay of base, and then effectively avoids the lagging crooked situation to appear, accessible baffle conflict dog to prevent that the situation of droing appears in the diaphragm, and then guarantee the diaphragm and stabilize the location.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic view of the overall front cross-sectional structure of a stepped ecological water purification dam of the present invention;
fig. 2 is the sectional structure diagram of the stepped ecological water purification dam with the sleeve plate and the baffle connecting part viewed from the front.
In the figure: 1. a water purification dam; 2. a base; 3. a soil layer; 4. a plant; 5. a baffle plate; 6. sheathing; 7. a conical head; 8. a stopper; 9. a transverse plate; 10. a blade part.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-2, the present invention provides a technical solution: a stepped ecological water purification dam comprises a water purification dam 1;
clean dam 1 is fixed to be set up on 2 upper surfaces of base, and base 2 is the clay layer, 1 top of clean dam is provided with soil horizon 3, the 3 left and right sides in soil horizon all are provided with plant 4, the left and right sides has all been pegged graft sleeve plate 6 in clean dam 1 and the soil horizon 3, sleeve plate 6 is the middle part structure, and has pegged graft baffle 5 in the sleeve plate 6, a plurality of groups of through holes have all been seted up to the sleeve plate 6 left and right sides that is close to baffle 5, and has pegged graft in the through hole and have diaphragm 9, diaphragm 9 is close to the fixed dog 8 that is provided with of one end of baffle 5.
In this embodiment (as shown in fig. 1 and 2), baffle 5 is lifted by a lifting appliance, baffle 5 moves up to the top of jacket plate 6, and is located 4 both sides of plant of water purification dam 1, then use outside water pump instrument to deliver the inboard ponding of baffle 5 to the baffle 5 outside, the displacement is greater than interior flowing water, and then make plant 4 expose the surface of water, the staff carry out plant 4 prune maintenance can, can promote the 4 survival rate of plant to a certain extent, through being provided with diaphragm 9 and dog 8, accessible diaphragm 9 transversely runs through jacket plate 6 lateral wall, and peg graft in the clay of base 2, and then effectively avoid jacket plate 6 to appear crooked situation, accessible baffle 5 conflicts dog 8, prevent the situation of coming off from appearing in diaphragm 9, and then guarantee diaphragm 9 stable positioning.
The blade 10 is arranged at one end of the transverse plate 9 far away from the baffle 5.
In this embodiment (as shown in fig. 1 and fig. 2), the blade 10 is disposed, so that the transverse plate 9 is broken and inserted into clay, thereby improving the assembly efficiency of the transverse plate 9.
Wherein, the upper surface of the baffle 5 is fixedly provided with a hanging ring.
In this embodiment (as shown in fig. 1), by being provided with the hoisting ring, the hoisting ring can be externally connected with a lifting appliance, so that the assembly and disassembly are convenient.
Wherein, the left and right end surfaces of the baffle 5 are jointed with the stop blocks 8 at the same side.
In this embodiment (as shown in fig. 1), the left and right end surfaces of the baffle 5 are attached to the stoppers 8 on the same side, so as to prevent the baffle 5 from inclining.
Wherein, the bottom of the sleeve plate 6 is fixedly provided with a conical head 7.
In this embodiment (as shown in fig. 1), by providing the conical head 7, the clay layer can be broken and inserted into the conical head 7, so that the assembling difficulty of the sleeve plate 6 can be reduced.
The working principle is as follows: it should be noted that the present invention relates to a stepped ecological water purification dam, which comprises a water purification dam 1, a base 2, a soil layer 3, a plant 4, a baffle 5, a sleeve plate 6, a cone head 7, a stop block 8, a transverse plate 9 and a blade 10, wherein the components are all universal standard components or known by technicians in the field, the structure and principle of the components can be known by technicians through technical manuals or conventional test methods, when the stepped ecological water purification dam is used, the baffle 5 and the sleeve plate 6 are arranged, when the stepped ecological water purification dam is in a high water level for a long time, the baffle 5 can be lifted by a lifting appliance, the baffle 5 is moved up to the upper part of the sleeve plate 6 and is positioned at two sides of the plant 4 of the water purification dam 1, then, accumulated water inside the baffle 5 is discharged to the outer side of the baffle 5 by using an external water pump tool, the water discharge is greater than the inner running water, so that the plant 4 is exposed out of the water surface, and the workers can trim the plant for 4 maintenance, can promote the 4 livability of plant to a certain extent, through being provided with diaphragm 9 and dog 8, accessible diaphragm 9 transversely runs through 6 lateral walls of lagging, and pegs graft in the clay of base 2, and then effectively avoids lagging 6 crooked situation to appear, and accessible baffle 5 contradicts dog 8 to prevent diaphragm 9 from appearing the situation of droing, and then guarantees diaphragm 9 stable positioning, and the result of use is comparatively ideal.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a cascaded ecological water purification dam which characterized in that: comprises a water purification dam (1);
clean water dam (1) is fixed to be set up on base (2) upper surface, and base (2) are the clay layer, clean water dam (1) top is provided with soil horizon (3), the soil horizon (3) left and right sides all is provided with plant (4), the left and right sides has all been pegged graft in clean water dam (1) and soil horizon (3) and has been had lagging (6), lagging (6) are the middle part structure, and have pegged graft in lagging (6) baffle (5), a plurality of groups of through holes have all been seted up to the left and right sides that lagging (6) are close to baffle (5), and have pegged graft in the through hole and have had diaphragm (9), diaphragm (9) are close to the fixed dog (8) that is provided with of one end of baffle (5).
2. The stepped ecological water purification dam of claim 1, wherein: one end of the transverse plate (9) far away from the baffle (5) is provided with a blade part (10).
3. The stepped ecological water purification dam of claim 1, wherein: and a hanging ring is fixedly arranged on the upper surface of the baffle (5).
4. The stepped ecological water purification dam of claim 1, wherein: the left end surface and the right end surface of the baffle (5) are attached to the stop blocks (8) on the same side.
5. The stepped ecological water purification dam of claim 1, wherein: the bottom of the sleeve plate (6) is fixedly provided with a conical head (7).
CN202022350220.0U 2020-10-21 2020-10-21 Stepped ecological water purification dam Expired - Fee Related CN213803124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022350220.0U CN213803124U (en) 2020-10-21 2020-10-21 Stepped ecological water purification dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022350220.0U CN213803124U (en) 2020-10-21 2020-10-21 Stepped ecological water purification dam

Publications (1)

Publication Number Publication Date
CN213803124U true CN213803124U (en) 2021-07-27

Family

ID=76960341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022350220.0U Expired - Fee Related CN213803124U (en) 2020-10-21 2020-10-21 Stepped ecological water purification dam

Country Status (1)

Country Link
CN (1) CN213803124U (en)

Similar Documents

Publication Publication Date Title
CN213803124U (en) Stepped ecological water purification dam
CN211872862U (en) Ecological slope protection block for windward slope
CN216765726U (en) Water conservancy ecological wall
CN209797563U (en) Water body purifying equipment
CN217771173U (en) Porous water collection and guide combined structure
CN215819545U (en) Afforestation water saving fixtures
CN214990757U (en) Water source ecological environment processing apparatus is used in gardens
CN212035078U (en) Special seedling growing device for forestry
CN210580343U (en) Irrigation equipment is collected to rainwater for gardens
CN209876721U (en) Street lamp for ecological landscape design
CN212212230U (en) Circulating water is cultivated in gardens and is driped irrigation device of growing seedlings
CN210726122U (en) From jardiniere of taking filter equipment
CN208692132U (en) A kind of gardens seedling irrigation device
CN209891270U (en) Biological purification pond sediment removal device
CN208857008U (en) A kind of composite bacillus water purification treatment device
CN211532015U (en) Container for cultivating seedlings
CN210017501U (en) Aquarium of water and scene separation
CN219670277U (en) Ecological floating island for river pollution treatment
CN219781168U (en) Nutrient solution adding device
CN220284997U (en) Be used for sponge city water guide device
CN210537687U (en) North America begonia three-dimensional ladder view wall
CN213265916U (en) Rural distributed sewage treatment plant of formula of burying
CN211004857U (en) Water source ecological environment processing apparatus is used in gardens
CN213848007U (en) A base for arbor is transplanted
CN217608699U (en) Gardens nursery stock transplanting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210727

CF01 Termination of patent right due to non-payment of annual fee