CN213801230U - Deposit ore bucket for mining - Google Patents

Deposit ore bucket for mining Download PDF

Info

Publication number
CN213801230U
CN213801230U CN202022238660.7U CN202022238660U CN213801230U CN 213801230 U CN213801230 U CN 213801230U CN 202022238660 U CN202022238660 U CN 202022238660U CN 213801230 U CN213801230 U CN 213801230U
Authority
CN
China
Prior art keywords
hopper
welding
frame
separation blade
deposit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022238660.7U
Other languages
Chinese (zh)
Inventor
刘学征
贺岳峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022238660.7U priority Critical patent/CN213801230U/en
Application granted granted Critical
Publication of CN213801230U publication Critical patent/CN213801230U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model discloses a deposit mining fill is adopted in mine, including the discharge hopper, the welding has horizontal separation blade on the outer wall of discharge hopper, the welding of the upper surface left and right sides of discharge hopper has the crossbeam, the upper surface welding of crossbeam has the side separation blade, the welding of the left and right sides of side separation blade has the support frame. This mine mining is with deposit ore deposit fill, backplate and the slope inner panel of installation in the inner chamber of hopper frame are fixed with it through the screw, because the ore can cause the damage to the inside casing of hopper frame, through the quick detach of backplate and slope inner panel, realize quick installation and dismantlement, secondly at the bottom installation welding horizontal piece of discharge hopper, and welded stromatolite frame is used for the fixed to holding the hopper between two sets of welding horizontal pieces, and holds the hopper and be in discharge hopper ejection of compact position, can realize the discharge to the material.

Description

Deposit ore bucket for mining
Technical Field
The utility model relates to a mine mining field specifically is a deposit ore deposit fill is used in mine.
Background
The mining of mineral resources refers to the mining of solid metal and nonmetal mineral deposits, and comprises the open-pit mining of surface ore body outcrops and shallow ore bodies, the underground mining of blind ores and deep ore bodies.
However, traditional mining deposit bucket for mining on the market at present, this application improves to prior art, and mining deposit bucket among the prior art is using, and the steadiness need improve, and secondly the ore plate does not possess the change effect, leads to its structure of the condition that the ore plate appears damaging the indent to optimize inadequately, design rationally inadequately.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a deposit ore deposit fill is used in mine to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a deposit mining fill for mine mining, includes the discharge hopper, the welding has horizontal separation blade on the outer wall of discharge hopper, the welding of the upper surface left and right sides of discharge hopper has the crossbeam, the upper surface welding of crossbeam has the side separation blade, the welding of the left and right sides of side separation blade has the support frame, and is two sets of the welding has the hopper frame between the support frame, the backplate is installed to the preceding facade of hopper frame, the screw is installed to the preceding facade left and right sides of backplate, the bottom of screw runs through the preceding facade of backplate to with the preceding facade fixed connection of hopper frame, the lower surface of hopper frame is provided with the hang plate, and the upper surface mounting of hang plate has the slope inner panel.
As a further aspect of the present invention: the welding of the bottom of discharge hopper has the welding crossblock, and is two sets of the inboard welding of welding crossblock has the stack frame, and is two sets of it has the hopper to lean on the welding of lower part position between the stack frame.
As a further aspect of the present invention: the hopper frame and the side blocking pieces form a frame body, and a material storage hopper is arranged at the discharge end of the frame body.
As a further aspect of the present invention: the quantity of horizontal separation blade is two sets of, and is two sets of the outer wall middle part welding of horizontal separation blade has vertical separation blade, the lower surface that the top of vertical separation blade is in.
As a further aspect of the present invention: and the bottom ends of the two groups of supporting frames are provided with supporting racks, and the supporting racks are placed on the ground.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, at the upper surface installation hopper frame of discharge hopper, and the left and right walls of hopper frame lean on the crossbeam that lower position is connected to be used for docking vertical pole on the horizontal separation blade outer wall, thereby can support the hopper frame, the support frame can the overlap joint on place the platform simultaneously, can realize holistic equipment, backplate and the slope inner panel of installation in the inner chamber of hopper frame, fix it through the screw, because the ore can cause the damage to the inside casing of hopper frame, quick detach through backplate and slope inner panel, realize quick installation and dismantlement, secondly at the bottom erection welding lateral mass of discharge hopper, and welded stromatolite frame is used for the fixed of holding the hopper between two sets of welding lateral masses, and hold the hopper and be in discharge hopper ejection of compact position, can realize the discharge to the material, its structure is more optimized, the design is more reasonable.
Drawings
Fig. 1 is a schematic structural diagram of a deposit bucket for mining.
Fig. 2 is a plan view of a deposit bucket for mining.
Fig. 3 is a side view of a deposit bucket for mining.
Fig. 4 is a perspective view of a deposit bucket for mining.
In the figure: the device comprises a discharge hopper 1, a storage hopper 2, a welding transverse block 3, a vertical baffle 4, a stacking frame 5, a transverse baffle 6, a support frame 7, side baffles 8, a protective plate 9, screws 10, an inclined inner plate 11, a hopper frame 12 and a cross beam 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in the embodiment of the present invention, a mine mining savings hopper comprises a discharge hopper 1, a transverse baffle 6 welded to the outer wall of the discharge hopper 1, a cross beam 13 welded to the left and right sides of the upper surface of the discharge hopper 1, a side baffle 8 welded to the upper surface of the cross beam 13, support frames 7 welded to the left and right sides of the side baffle 8, a hopper frame 12 welded between the two sets of support frames 7, a protection plate 9 mounted to the front vertical surface of the hopper frame 12, screws 10 mounted to the left and right sides of the front vertical surface of the protection plate 9, the bottom of the screw 10 penetrating through the front vertical surface of the protection plate 9 and fixedly connected to the front vertical surface of the hopper frame 12, an inclined plate provided on the lower surface of the hopper frame 12, an inclined inner plate 11 mounted on the upper surface of the inclined plate, a welding cross block 3 welded to the bottom end of the discharge hopper 1, a stacking frame 5 welded to the inner side of the two sets of welding cross blocks 3, a storage hopper 2 welded to the lower portion between the two sets of stacking frames 5, hopper frame 12 and side separation blade 8 constitute a framework, and the discharge end of framework is provided with hopper 2, and the quantity of horizontal separation blade 6 is two sets of, and vertical separation blade 4 has been welded to the outer wall middle part of two sets of horizontal separation blades 6, and the top of vertical separation blade 4 is in 14 lower surfaces, and the support rack is installed to the bottom of two sets of support frames 7, and the support rack places subaerial.
The utility model discloses a theory of operation is: when in use: a hopper frame 12 is arranged on the upper surface of the discharging hopper 1, and a cross beam 13 connected to the lower part of the left and right walls of the hopper frame 12 is used for butt joint of vertical rods on the outer walls of the transverse separation blades 6, so that the hopper frame 12 can be supported, and meanwhile, the support frame 7 can be lapped on a placing platform, and integral assembly can be realized;
backplate 9 and slope inner panel 11 of installation in the inner chamber of hopper frame 12, fix it through screw 10, because the ore can cause the damage to the inside casing of hopper frame 12, through the quick detach of backplate 9 and slope inner panel 11, realize quick installation and dismantlement, secondly at the bottom installation welding horizontal block 3 of discharge hopper 1, and welded stromatolite frame 5 is used for the fixed to holding hopper 2 between two sets of welding horizontal blocks 3, and hold hopper 2 and be in 1 ejection of compact position of discharge hopper, can realize the discharge to the material.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a deposit ore deposit fill for mine mining, includes discharge hopper (1), its characterized in that: the welding has horizontal separation blade (6) on the outer wall of discharge hopper (1), the welding of the upper surface left and right sides of discharge hopper (1) has crossbeam (13), the upper surface welding of crossbeam (13) has side separation blade (8), the welding of the left and right sides of side separation blade (8) has support frame (7), and is two sets of the welding has hopper frame (12) between support frame (7), backplate (9) are installed to the preceding facade of hopper frame (12), screw (10) are installed to the preceding facade left and right sides of backplate (9), the preceding facade of backplate (9) is run through to the bottom of screw (10) to with the preceding facade fixed connection of hopper frame (12), the lower surface of hopper frame (12) is provided with the hang plate, and the last surface mounting of hang plate has slope inner panel (11).
2. A deposit bucket for mine mining as defined in claim 1, wherein: the welding of the bottom of discharge hopper (1) has welding crossblock (3), and is two sets of the inboard welding of welding crossblock (3) has lamination frame (5), and is two sets of lean on the welding of lower part position to have hopper (2) between lamination frame (5).
3. A deposit bucket for mine mining as defined in claim 1, wherein: the hopper frame (12) and the side blocking pieces (8) form a frame body, and the discharge end of the frame body is provided with a storage hopper (2).
4. A deposit bucket for mine mining as defined in claim 1, wherein: the quantity of horizontal separation blade (6) is two sets of, and is two sets of vertical separation blade (4) have been welded to the outer wall middle part of horizontal separation blade (6), the top of vertical separation blade (4) is located the lower surface of (14).
5. A deposit bucket for mine mining as defined in claim 1, wherein: and the bottom ends of the two groups of supporting frames (7) are provided with supporting racks, and the supporting racks are placed on the ground.
CN202022238660.7U 2020-10-10 2020-10-10 Deposit ore bucket for mining Expired - Fee Related CN213801230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022238660.7U CN213801230U (en) 2020-10-10 2020-10-10 Deposit ore bucket for mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022238660.7U CN213801230U (en) 2020-10-10 2020-10-10 Deposit ore bucket for mining

Publications (1)

Publication Number Publication Date
CN213801230U true CN213801230U (en) 2021-07-27

Family

ID=76957142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022238660.7U Expired - Fee Related CN213801230U (en) 2020-10-10 2020-10-10 Deposit ore bucket for mining

Country Status (1)

Country Link
CN (1) CN213801230U (en)

Similar Documents

Publication Publication Date Title
WO2018040738A1 (en) Bottom bearing and unblocking device for discharge port of ore pass of mine stope
CN107060291A (en) A kind of wall plastering machine of base with guide rail
CN213801230U (en) Deposit ore bucket for mining
CN215444108U (en) Hydraulic support for solid filling and mining of coal mine
CN110748052A (en) Open type stone small unit curtain wall structure
CN210090115U (en) Silt sampling device for hydraulic engineering
CN209896981U (en) Solar photovoltaic panel convenient to install
CN213163578U (en) Placing table for installing arc striking and extinguishing plate
CN211767566U (en) Quartz boat support temporary storage rack with buffering function
CN211028291U (en) Device for cutting and arranging aluminum tubes
CN210305973U (en) Plate cutting device for machining middle plate of automobile beam
CN210002640U (en) curtain wall mounting structure
CN213597188U (en) A pipeline cleaning device for municipal administration plumbing
CN214811784U (en) Cyclone convenient to stably put
CN213676771U (en) Mine mining is with adjustable shallow
CN104889370A (en) Cast welding die for busbar of storage battery
CN216305902U (en) Breaking hammer for mine geological sampling
CN212701880U (en) Electrolytic flocculation reactor
CN209739454U (en) Gun barrel sequencing mechanism
CN211950550U (en) Fully-mechanized mining face hydraulic support pulling frame auxiliary device
CN217647345U (en) Aluminum plate bending device convenient to get piece
CN214118222U (en) Fully-mechanized coal mining face end subframe shield
CN217984452U (en) Insulation protection structure for power engineering transmission line
CN215784804U (en) Feeding structure of mining cylinder screen
CN211470100U (en) Coal mine excavation conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210727

Termination date: 20211010

CF01 Termination of patent right due to non-payment of annual fee