CN213782631U - Power distribution device for building construction - Google Patents

Power distribution device for building construction Download PDF

Info

Publication number
CN213782631U
CN213782631U CN202022794218.2U CN202022794218U CN213782631U CN 213782631 U CN213782631 U CN 213782631U CN 202022794218 U CN202022794218 U CN 202022794218U CN 213782631 U CN213782631 U CN 213782631U
Authority
CN
China
Prior art keywords
block terminal
mounting panel
crane span
span structure
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022794218.2U
Other languages
Chinese (zh)
Inventor
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Liangdu Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022794218.2U priority Critical patent/CN213782631U/en
Application granted granted Critical
Publication of CN213782631U publication Critical patent/CN213782631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model discloses a distribution device for construction, including the block terminal, be provided with the through wires mouth on the block terminal, be provided with the mounting panel that is used for fixing a position the crane span structure on the block terminal, be provided with the notch on the mounting panel, and be provided with the backup pad that is used for accepting the crane span structure on the mounting panel. Through setting up the mounting panel, have the backup pad that can accept the crane span structure on the mounting panel, during the construction, installed the block terminal, then arranged the crane span structure in the backup pad, great increase the convenience of installation crane span structure, and alone can operate the completion, the effectual artificial consumption that has reduced reduces construction cost.

Description

Power distribution device for building construction
Technical Field
The utility model relates to a construction technical field especially relates to a distribution device for construction.
Background
Electric is important partly in the construction field, electric installation includes the crane span structure usually, the installation of spool and block terminal and the wearing to establish of cable, when carrying out erection joint to block terminal and crane span structure, the block terminal need be fixed on the wall, the crane span structure needs align and fix on the wall with the import or the export of block terminal, at the in-process that aligns crane span structure and block terminal, often need a plurality of operation workman to assist the installation together, until all firm on the wall with crane span structure and block terminal, consume more manual work, influence the promotion of efficiency of construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to avoid prior art's weak point, provide a distribution device for construction to effectively solve the weak point that exists among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a distribution device for construction, includes the block terminal, is provided with the through wires mouth on the block terminal, is provided with the mounting panel that is used for fixing a position the crane span structure on the block terminal, is provided with the notch on the mounting panel, and is provided with the backup pad that is used for accepting the crane span structure on the mounting panel.
Furthermore, a bearing platform for bearing the bridge and a folding edge clamped with the distribution box are arranged on the supporting plate.
Further, the bearing platform and the folded edge are formed by continuously bending the support plate, and the folded edge is the edge of the support plate.
Further, all be provided with the logical groove that is used for passing the bolt on mounting panel and the block terminal.
Furthermore, a fixing plate convenient for fixing the mounting plate is arranged on the mounting plate, and a fixing hole is formed in the fixing plate.
Further, be provided with the reinforcing ring on the block terminal, the hem is in order to compress tightly reinforcing ring and block terminal.
Furthermore, a plurality of convex teeth are arranged on the reinforcing ring and extend towards the inner side of the reinforcing ring.
The above technical scheme of the utility model following beneficial effect has: through setting up the mounting panel, have the backup pad that can accept the crane span structure on the mounting panel, during the construction, installed the block terminal, then arranged the crane span structure in the backup pad, great increase the convenience of installation crane span structure, and alone can operate the completion, the effectual artificial consumption that has reduced reduces construction cost.
Drawings
Fig. 1 is a schematic perspective view of an embodiment of the present invention;
fig. 2 is an exploded view of an embodiment of the present invention;
fig. 3 is a perspective view of a mounting plate structure according to an embodiment of the present invention;
FIG. 4 is an enlarged view of a portion A of FIG. 3;
fig. 5 is a cross-sectional view of an embodiment of the invention;
fig. 6 is a partially enlarged view of fig. 5 at B.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-6, the utility model discloses a distribution device for construction, including block terminal 1, be provided with through wires mouth 2 on the block terminal 1, in order to increase the utility model discloses the convenience of installation reduces artificial consumption, the utility model discloses make following improvement:
as shown in fig. 1 and 2, a mounting plate 3 for positioning the bridge is disposed on the distribution box 1, a notch 4 is disposed on the mounting plate 3, and a support plate 5 for receiving the bridge is disposed on the mounting plate 3.
In this embodiment, mounting panel 3 is used for location and interim fixed crane span structure, and the crane span structure is located behind 5 in the backup pad on mounting panel 3, then installs the crane span structure on the wall firmly, and this operation process can be accomplished by alone, very big increase the utility model discloses the convenience of installation does not need a plurality of people to assist, can effectual reduction artificial consumption.
As shown in fig. 3, 4 and 6, the support plate 5 is provided with a bearing platform 6 for bearing the bridge and a folding edge 7 for clamping with the distribution box 1.
Cushion cap 6 extends towards the direction of notch 4 for accept the crane span structure, 7 extensions towards the outside of hem, be used for with 1 joint of block terminal, the material of backup pad 5 adopts the metal material the same with 1 of block terminal, make backup pad 5 have certain elasticity, when fixing mounting panel 3 on block terminal 1, pull backup pad 5 to the inboard, can carry out the joint with hem 7 and block terminal 1.
The support platform 6 and the folded edge 7 are continuously bent from the support plate 5, and the folded edge 7 is an edge of the support plate 5.
Make the bridge frame be accepted to the department of buckling of backup pad 5, when wearing to establish the cable, can make the marginal part of cable and backup pad 5 avoid, avoid causing unnecessary damage to the surface of cable.
As shown in fig. 2, all be provided with the logical groove 8 that is used for passing the bolt on mounting panel 3 and the block terminal 1, after mounting panel 3 and block terminal 1 passed through 5 joints of backup pad, then wear to establish the bolt in leading to groove 8 for increase the bonding strength between mounting panel 3 and the block terminal 1, promote the utility model discloses an overall structure stability.
As shown in fig. 1 and 2, be provided with the fixed plate 9 of the fixed mounting panel 3 of being convenient for on the mounting panel 3, be provided with the fixed orifices 10 on the fixed plate 9, be convenient for fix the fixed plate 9 on the wall through the bolt, increase the utility model discloses an overall structure stability avoids the heavy pressure of crane span structure to make block terminal 1 drop on the wall.
As shown in fig. 3, 5 and 6, a reinforcing ring 11 is arranged on the distribution box 1, the folded edge 7 is used for compressing the reinforcing ring 11 and the distribution box 1, the reinforcing ring 11 can obviously increase the structural strength of the threading opening 2 of the distribution box 1, and the reinforcing ring 11 and the distribution box 1 can be connected by welding or fastening bolts.
The reinforcing ring 11 is provided with a plurality of teeth 12, and the teeth 12 extend toward the inner side of the reinforcing ring 11.
In this embodiment, after wearing to establish the cable, dogtooth 12 can be divided the cable, arranges the cable in between the 12 clearances of different dogteeth, is convenient for carry out the identification label to the cable.
The utility model discloses a theory of operation: when the utility model is installed, the distribution box 1 is fixedly installed on the wall, then the mounting plate 3 is clamped on the distribution box 1 under the action of the supporting plate 5, the hem 7 on the supporting plate 5 is clamped with the distribution box 1, then the bottom end of the bridge frame passes through the notch 4 on the mounting plate 3 and the threading port 2 on the distribution box 1, so that the bridge frame is located on the bearing platform 6 on the supporting plate 5, and then the bridge frame is fixed on the wall, in order to increase the stability between the mounting plate 3 and the distribution box 1, when the mounting plate 3 and the distribution box 1 are connected, the mounting plate 3 and the distribution box 1 can be fastened by inserting the fastening bolt in the through groove 8 on the mounting plate 3 and the distribution box 1, in order to avoid that the distribution box 1 falls off due to heavy pressure, the bolt can be inserted in the fixing hole 10 on the fixing plate 9 before the bridge frame is installed, the fixing plate 9 is fixed on the wall, in order to increase the utility model discloses an overall structure stability.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (7)

1. The utility model provides a distribution device for construction, includes the block terminal, is provided with through wires mouth, its characterized in that on the block terminal: the distribution box is provided with a mounting plate for positioning the bridge, the mounting plate is provided with a notch, and the mounting plate is provided with a supporting plate for bearing the bridge.
2. An electrical distribution apparatus for building operations as claimed in claim 1, wherein: the supporting plate is provided with a bearing platform for bearing the bridge and a folding edge clamped with the distribution box.
3. An electrical distribution apparatus for building operations as claimed in claim 2, wherein: the bearing platform and the folded edge are formed by continuously bending the supporting plate, and the folded edge is the edge of the supporting plate.
4. An electrical distribution apparatus for building operations as claimed in claim 1, wherein: all be provided with the logical groove that is used for passing the bolt on mounting panel and the block terminal.
5. An electric power distribution apparatus for building construction according to any one of claims 1-4, characterized in that: the mounting plate is provided with a fixing plate convenient for fixing the mounting plate, and the fixing plate is provided with a fixing hole.
6. An electrical distribution apparatus for building operations as claimed in claim 2, wherein: and a reinforcing ring is arranged on the distribution box, and the folded edge is used for compressing the reinforcing ring and the distribution box.
7. An electrical distribution apparatus for building operations as claimed in claim 6, wherein: a plurality of convex teeth are arranged on the reinforcing ring and extend towards the inner side of the reinforcing ring.
CN202022794218.2U 2020-11-27 2020-11-27 Power distribution device for building construction Active CN213782631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022794218.2U CN213782631U (en) 2020-11-27 2020-11-27 Power distribution device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022794218.2U CN213782631U (en) 2020-11-27 2020-11-27 Power distribution device for building construction

Publications (1)

Publication Number Publication Date
CN213782631U true CN213782631U (en) 2021-07-23

Family

ID=76892427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022794218.2U Active CN213782631U (en) 2020-11-27 2020-11-27 Power distribution device for building construction

Country Status (1)

Country Link
CN (1) CN213782631U (en)

Similar Documents

Publication Publication Date Title
CN213782631U (en) Power distribution device for building construction
CN204737609U (en) European style hoist girder connection structure
CN206619883U (en) A kind of Wiring structure being assemblied on metope
CN206673191U (en) A kind of PDU intelligent cabinets serial socket structure
CN210040586U (en) Grounding screw and grounding device with quick fixing and assembling and disassembling wiring terminal
CN211231149U (en) Complete set of hoop
CN210897738U (en) Transformer cold pressure welding binding post
CN206111945U (en) Join in marriage rural power grids circuit head of acting as go -between
CN209045297U (en) A kind of transformer of the electrotechnical, electronic with Fast Installation structure
CN207663704U (en) A kind of charactron pad pasting tooling
CN218215701U (en) Tube-made wiring terminal
CN210517589U (en) Multifunctional M pin taking and assembling device
CN214643248U (en) SMP disassembly and extraction clamp
CN210867088U (en) Just, take off card and press pre-buried line box of auricle formula
CN210393344U (en) Novel cover plate connecting structure
CN213979867U (en) Connecting piece for building external wall
CN218586380U (en) Double-frequency double-voltage single-phase generator wiring board
CN208296122U (en) Outdoor machine of air-conditioner electric machine support and outdoor machine of air-conditioner with pressuring line structure
CN208478656U (en) A kind of multipole adaptor plug
CN213425651U (en) High strength C shape fastener convenient to dismantle
CN216698838U (en) Novel wiring terminal
CN215645871U (en) Multifunctional manual wire crimping pliers for erecting electric wires
CN213366833U (en) Aluminum wire clamp
CN214753376U (en) Transformer wire cake winding device
CN104134876B (en) Transformer low voltage mouthpiece goes out wiring connector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240110

Address after: Room 101, Building 1, Lotus West Garden, Group 18, Chengxi, Tongling County, Tongling City, Anhui Province, 244100

Patentee after: Wang Jun

Patentee after: Liu Xianqi

Address before: 061000 No.6 Laobao Hutong, Chaoyang Road, Yunhe District, Cangzhou City, Hebei Province

Patentee before: Liu Gang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240326

Address after: 244000, 4th Floor, Yi'an Economic Development Zone Management Committee, Yi'an District, Tongling City, Anhui Province

Patentee after: Anhui Liangdu Construction Engineering Co.,Ltd.

Country or region after: China

Address before: Room 101, Building 1, Lotus West Garden, Group 18, Chengxi, Tongling County, Tongling City, Anhui Province, 244100

Patentee before: Wang Jun

Country or region before: China

Patentee before: Liu Xianqi

TR01 Transfer of patent right