CN213779549U - On-spot sampling tool is used in building engineering cost budget - Google Patents

On-spot sampling tool is used in building engineering cost budget Download PDF

Info

Publication number
CN213779549U
CN213779549U CN202021795433.8U CN202021795433U CN213779549U CN 213779549 U CN213779549 U CN 213779549U CN 202021795433 U CN202021795433 U CN 202021795433U CN 213779549 U CN213779549 U CN 213779549U
Authority
CN
China
Prior art keywords
bolt
sample
base
fixedly connected
threaded hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021795433.8U
Other languages
Chinese (zh)
Inventor
陈凯
李会杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021795433.8U priority Critical patent/CN213779549U/en
Application granted granted Critical
Publication of CN213779549U publication Critical patent/CN213779549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a building engineering cost budgets with on-spot sampling tool, including base, swash plate, A screw hole, A bolt and handlebar hand, one side fixedly connected with lantern ring of swash plate, the inside of the lantern ring is provided with the collection shovel, the B screw hole has been seted up to the upper surface of base, the inside of B screw hole is provided with the B bolt, the base has B assembly seat through B bolt swing joint, the one end fixedly connected with sample groove of B assembly seat, the last fixed surface of sample groove is connected with the apron. The utility model has the advantages of the utility model provides a building engineering cost budgets and uses on-the-spot sampling tool uses the collection shovel to take a sample building material, can use the concrete to bore the core sampler and come to take a sample to the concrete, can put the sample very first time to in the sample groove, has avoided the staff to take a sample and has not had corresponding storage facilities team sample to accomodate after, has alleviateed staff's pressure, has improved sample efficiency.

Description

On-spot sampling tool is used in building engineering cost budget
Technical Field
The utility model relates to a field sampling instrument technical field specifically is a building engineering cost budgets and uses field sampling instrument.
Background
Construction project cost budget is a plan for the income and expense of a project over a period of time in the future. The construction project cost budget can evaluate the investment of the project in a currency form and reflect the economic effect of the project, is the basis for strengthening enterprise management, carrying out economic accounting, examining the project cost and compiling a construction plan, and is also the main basis for bidding the project and determining the construction cost. The construction cost budget of the building engineering comprises the following steps: 1. collecting various construction data including construction drawings, construction organization design or construction scheme, budget quota of existing building installation project, charge standard, etc. 2. Familiarizing with construction drawings and quota. 3. The engineering quantity is calculated, and the calculation of the engineering quantity is the most important and tedious link in the whole budgeting process, so that the timeliness of budgeting is influenced, and more importantly, the accuracy of budgeting cost is influenced. The method for calculating the engineering quantity is to sample the field material to estimate, the existing field sampling tools for construction cost budget of the building engineering only have the sampling function and cannot receive the sample at the first time after the sampling is finished, and meanwhile, the building materials such as cement and the like need to be protected after the sampling is finished, so that other impurities such as water inflow and the like are prevented.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering cost budgets with on-spot sampling tool has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a field sampling tool for construction project cost budgeting comprises a base: the upper surface of the base is fixedly connected with an inclined plate, the surface of the inclined plate is provided with an A threaded hole, the interior of the A threaded hole is movably connected with an A bolt, the inclined plate is movably connected with a handlebar through the A bolt, one side of the inclined plate is fixedly connected with a lantern ring, the interior of the lantern ring is provided with a collecting shovel, the upper surface of the base is provided with a B threaded hole, the interior of the B threaded hole is provided with a B bolt, the base is movably connected with a B assembling seat through the B bolt, one end of the B assembling seat is fixedly connected with a sampling groove, the upper surface of the sampling groove is fixedly connected with a cover plate, the upper surface of the base is provided with a C threaded hole, the interior of the C threaded hole is provided with a C bolt, the base is movably connected with a C assembling seat through the C bolt, one end of the C assembling seat is fixedly connected with a bottom plate, and the upper surface of the bottom plate is fixedly connected with a fixed block, and a concrete core sampler is arranged inside the fixing block.
Optionally, the threaded hole A is matched with the bolt A, the threaded hole B is matched with the bolt B, and the threaded hole C is matched with the bolt C.
Optionally, a pulley is arranged at the bottom of the base.
Optionally, the upper surface of the cover plate is fixedly connected with a handle.
Optionally, one side of the fixing block is fixedly connected with a binding band.
Optionally, the upper surface of the base is fixedly connected with a support rod.
(III) advantageous effects
The utility model provides a building engineering cost budgets with on-spot sampling tool possesses following beneficial effect:
the utility model has the advantages of the utility model provides a building engineering cost budgets and uses on-the-spot sampling tool, use the A bolt earlier and carry out equipment connection between swash plate and handlebar hand, the B bolt carries out equipment connection between with B assembly seat and the base, the C bolt carries out equipment connection between with C assembly seat and the base, reuse collection shovel takes a sample to building material, can place in the sample groove after the sample is accomplished, can use concrete drill core sampler to come to take a sample to the concrete at last, setting through the sample groove, can put the sample very first time to in the sample groove, avoided the staff to take a sample and did not have corresponding storage device team sample to accomodate after, staff's pressure has been alleviateed, sampling efficiency has been improved.
The utility model has the advantages of the utility model provides a building engineering cost budgets with on-spot sampling tool, the back is accomplished in the staff sample, can place some materials that need light-resistant, dehumidification in the sample cell to cover with the apron, reduce the damage of external environment factor to the sample, avoided the secondary sample, improved sampling efficiency.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the sectional structure of the present invention.
In the figure: 1. a base; 2. a sloping plate; 3. a, bolt; 4. a handlebar; 5. a collar; 6. collecting shovels; 7. B, assembling a base; 8. a sampling groove; 9. a cover plate; 10. c, assembling a base; 11. a base plate; 12. a fixed block; 13. A concrete core sampler; 14. a pulley; 15. a handle; 16. binding bands; 17. a support rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: an on-site sampling tool for construction engineering cost budget comprises a base 1, wherein an inclined plate 2 is fixedly connected to the upper surface of the base 1, a threaded hole A is formed in the surface of the inclined plate 2, a bolt A3 is movably connected to the inside of the threaded hole A, a handlebar 4 is movably connected to the inclined plate 2 through the bolt A3, a lantern ring 5 is fixedly connected to one side of the inclined plate 2, a collecting shovel 6 is arranged inside the lantern ring 5, a threaded hole B is formed in the upper surface of the base 1, a bolt B is arranged inside the threaded hole B, the base 1 is movably connected with a mounting seat B7 through the bolt B, a sampling groove 8 is fixedly connected to one end of the mounting seat B, a cover plate 9 is fixedly connected to the upper surface of the sampling groove 8, a threaded hole C is formed in the upper surface of the base 1, a bolt C is arranged inside the threaded hole C, the base 1 is movably connected with a mounting seat C10 through the bolt C, and a bottom plate 11 is fixedly connected to one end of the mounting seat 10, the upper surface of bottom plate 11 is fixedly connected with fixed block 12, and the inside of fixed block 12 is provided with concrete core sampler 13. Firstly, the inclined plate 2 and the handlebar 4 are assembled and connected by using the bolt A3, the B assembly seat 7 and the base 1 are assembled and connected by using the bolt B, the C assembly seat 10 and the base 1 are assembled and connected by using the bolt C, then the building material is sampled by using the collecting shovel 6, the building material can be placed in the sampling groove 8 after the sampling is finished, finally the concrete can be sampled by using the concrete drill core sampler 13, the sample can be placed in the sampling groove 8 at the first time through the arrangement of the sampling groove 8, the situation that no corresponding storage equipment team sample exists for storage after the sampling of the working personnel is finished is avoided, the pressure of the working personnel is reduced, the sampling efficiency is improved, the utility model has the main advantages that the on-site sampling tool for the construction cost is provided, the working personnel can place materials which need light shielding and dehumidification in the sampling groove after the sampling is finished, and cover with the apron, reduce the damage of external environment factor to the sample, avoided the secondary sampling, improved sampling efficiency, for traditional building engineering cost budget uses on-the-spot sampling tool, this equipment more can conveniently carry out the auxiliary use according to user's needs, for example, through the setting of small handcart, make the staff need not self carry sampling tool and sample when taking a sample on the building site, the burden of staff has been alleviateed, sampling efficiency has been improved simultaneously, this on-the-spot sampling tool for building engineering cost budget does not involve complicated technology and accurate component, moreover, the steam generator is simple in structure, and is scientific and practical, and the raw and other materials source of this equipment is extensive, and is with low costs, can effectually satisfy the demand in market, therefore, on-the-spot sampling tool for building engineering cost budget has good market prospect and space.
To sum up, the on-site sampling tool for construction cost budget of the utility model has the advantages that when in use, the A bolt is firstly used for assembling and connecting the inclined plate and the handlebar, the B bolt is used for assembling and connecting the B assembly seat and the base, the C bolt is used for assembling and connecting the C assembly seat and the base, then the collecting shovel is used for sampling the construction material, the construction material can be placed in the sampling groove after sampling is completed, finally the concrete core sampler can be used for sampling the concrete, the sample can be placed in the sampling groove at the first time through the arrangement of the sampling groove, the condition that no corresponding storage equipment team sample is available after sampling by workers is avoided, the budget pressure of the workers is reduced, and the sampling efficiency is improved, can place some materials that need light-resistant, dehumidification in the sample cell to cover with the apron, reduce the damage of external environment factor to the sample, avoid the secondary sampling, improve sampling efficiency.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building engineering cost budgets and uses on-spot sampling tool, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with an inclined plate (2), the surface of the inclined plate (2) is provided with an A threaded hole, the inside of the A threaded hole is movably connected with an A bolt (3), the inclined plate (2) is movably connected with a handlebar (4) through the A bolt (3), one side of the inclined plate (2) is fixedly connected with a lantern ring (5), the inside of the lantern ring (5) is provided with a collecting shovel (6), the upper surface of the base (1) is provided with a B threaded hole, the inside of the B threaded hole is provided with a B bolt, the base (1) is movably connected with a B assembling seat (7) through the B bolt, one end of the B assembling seat is fixedly connected with a sampling groove (8), the upper surface of the sampling groove (8) is fixedly connected with a cover plate (9), the upper surface of the base (1) is provided with a C threaded hole, and the inside of the C threaded hole is provided with a C bolt, base (1) has C assembly seat (10) through C bolt swing joint, the one end fixedly connected with bottom plate (11) of C assembly seat (10), the last fixed surface of bottom plate (11) is connected with fixed block (12), the inside of fixed block (12) is provided with concrete core sampler (13).
2. The site sampling tool for construction cost budgeting of a building according to claim 1, wherein: the threaded hole A is matched with the bolt A (3), the threaded hole B is matched with the bolt B, and the threaded hole C is matched with the bolt C.
3. The site sampling tool for construction cost budgeting of a building according to claim 1, wherein: the bottom of the base (1) is provided with a pulley (14).
4. The site sampling tool for construction cost budgeting of a building according to claim 1, wherein: the upper surface of the cover plate (9) is fixedly connected with a handle (15).
5. The site sampling tool for construction cost budgeting of a building according to claim 1, wherein: one side of the fixed block (12) is fixedly connected with a binding band (16).
6. The site sampling tool for construction cost budgeting of a building according to claim 1, wherein: the upper surface of the base (1) is fixedly connected with a supporting rod (17).
CN202021795433.8U 2020-08-25 2020-08-25 On-spot sampling tool is used in building engineering cost budget Active CN213779549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021795433.8U CN213779549U (en) 2020-08-25 2020-08-25 On-spot sampling tool is used in building engineering cost budget

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021795433.8U CN213779549U (en) 2020-08-25 2020-08-25 On-spot sampling tool is used in building engineering cost budget

Publications (1)

Publication Number Publication Date
CN213779549U true CN213779549U (en) 2021-07-23

Family

ID=76902934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021795433.8U Active CN213779549U (en) 2020-08-25 2020-08-25 On-spot sampling tool is used in building engineering cost budget

Country Status (1)

Country Link
CN (1) CN213779549U (en)

Similar Documents

Publication Publication Date Title
CN107424079A (en) A kind of heavy construction energy consumption management system and method based on big data platform
CN103942440A (en) Photovoltaic power station real-time power-generating efficiency calculation method
CN213779549U (en) On-spot sampling tool is used in building engineering cost budget
CN211717468U (en) Civil engineering measuring device
CN210862632U (en) Multifunctional measuring device for building engineering management
CN209525346U (en) A kind of solar energy surveys moisture in the soil and surveys fertile system and fertigation recommender system
CN107831032A (en) A kind of roadbed sampler of the architectural engineering with anti-deviation structure
Jiang et al. Lean construction practice: Culture, standardization and informatization—A case from China
CN210464483U (en) Surveying instrument positioning device for land surveying and mapping
Xu et al. Study on Methodology of Repair by Disassembly: The Case of Buyi Ethnic Construction Techniques of a Timber Granary in Guizhou Province, China
CN213632217U (en) Remote use environment monitoring equipment
CN209765928U (en) Site investigation information collecting equipment
CN206025520U (en) Engineering cost budget toolbox that can accomodate
CN212979672U (en) Civil engineering is with portable drawing device
CN213765700U (en) Portable multi-use architecture hammer
CN220893334U (en) Building theodolite convenient to carry
CN215201846U (en) Dustproof device of impact drill for constructional engineering
CN213874073U (en) Building engineering detects structure
CN213508593U (en) Well lid structure for municipal works
CN213259416U (en) Engineering cost specialized tool case
CN213874321U (en) Multi-functional water conservancy surveying instrument
CN218725756U (en) Hydrology water resource survey device with adjustable it is portable
CN209862745U (en) Computer input device for engineering cost
CN211977733U (en) Multifunctional band tape for building
CN213397073U (en) Stretchable type multipurpose measuring device based on constructional engineering design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant