CN213779016U - Novel waist forced centering device for shield tunnel measurement - Google Patents

Novel waist forced centering device for shield tunnel measurement Download PDF

Info

Publication number
CN213779016U
CN213779016U CN202022198364.9U CN202022198364U CN213779016U CN 213779016 U CN213779016 U CN 213779016U CN 202022198364 U CN202022198364 U CN 202022198364U CN 213779016 U CN213779016 U CN 213779016U
Authority
CN
China
Prior art keywords
channel
section
bolt
section steel
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022198364.9U
Other languages
Chinese (zh)
Inventor
刘昆龙
雷创
王继山
薛海儒
周向东
金增禄
郑樑
孟志明
王毅
刘欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd, First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN202022198364.9U priority Critical patent/CN213779016U/en
Application granted granted Critical
Publication of CN213779016U publication Critical patent/CN213779016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a novel shield constructs tunnel measurement and forces centering with waist device, mainly used shield constructs laying of tunnel control point. It includes channel-section steel, No. two channel-section steels, base plate, centering bolt, the asymmetric position of a channel-section steel both sides sets up an regulation reinforcing bolt nut respectively, wherein the nut of regulation reinforcing bolt nut and the side welded fastening of a channel-section steel, No. two channel-section steels be horizontal gesture, and the one end welding is in on the channel-section steel, the other end is provided with the bolt hole, the centering bolt through No. two bolt holes on the channel-section steel with No. two channel-section steels are connected, the base plate sets up two, all is equipped with the bolt hole, is the welding of horn mouth form the both ends of a channel-section steel, the base plate is connected respectively at the both ends of the section of jurisdiction bolt of shield tunnel section of jurisdiction and is together fixed with the shield tunnel section of jurisdiction. The utility model discloses simple structure, low in manufacturing cost, convenient to use.

Description

Novel waist forced centering device for shield tunnel measurement
Technical Field
The utility model relates to a tunnel measurement control point lays forced centering device of measuring instrument, mainly used shield tunnel control point lays.
Background
Economic development has increasingly high requirements on resource flow and speed, and traffic network construction is also promoted. The subway is one of the important traffic ways at present, and the shield method is mostly adopted in the construction of subway interval engineering at present. With the development of the shield tunnel construction technology, the requirements for shield measurement are higher and higher, the control point in the tunnel is used as an indispensable part of the shield measurement, and the arrangement mode and the method have great influence on the subsequent measurement.
At present, a duct piece needs to be punched in the installation process of a forced centering bracket used in a construction site, so that the appearance and the internal structure of the duct piece are damaged, and a large amount of manpower and material resources are consumed for later-stage repair;
if in the punching process, after obstacles such as steel bars and the like are arranged in the duct piece, the position needs to be changed for punching again, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a simple structure can install fast and dismantle, guarantee the device that measurement accuracy required.
The utility model discloses a realize through following technical scheme: the utility model provides a novel shield constructs tunnel measurement and forces centering with waist device, includes a channel-section steel, No. two channel-section steels, base plate, centering bolt, the asymmetric position of a channel-section steel both sides sets up an adjustment reinforcing bolt nut respectively, wherein adjust the nut of reinforcing bolt nut and the side welded fastening of a channel-section steel, No. two channel-section steels be horizontal gesture, the one end welding is in on the channel-section steel, the other end is provided with the bolt hole, the centering bolt through No. two channel-section steels bolt with No. two channel-section steels are connected, the base plate sets up two, all is equipped with the bolt hole, is the welding of horn mouth form the both ends of a channel-section steel, the base plate is connected respectively at the both ends of the section of jurisdiction bolt of jurisdiction of shield tunnel section of jurisdiction and is together fixed with the shield tunnel section of jurisdiction.
During the use, the base plate of this device is connected respectively at the both ends of the section of jurisdiction bolt of shield tunnel section of jurisdiction, and the installation is dismantled conveniently, labour saving and time saving. The asymmetric position of the both sides of a channel-section steel is provided with an adjusting and reinforcing bolt nut respectively, can carry out the fine leveling after this device is tentatively fixed, has improved the stability of device when guaranteeing the installation accuracy.
The utility model discloses a be provided with the measurement positioning disc on the second channel-section steel, the measurement positioning disc passes through the centering bolt with No. two channel-sections link together. By arranging the positioning disc, the bottom of the measuring instrument can be reliably contacted with the measuring positioning disc, and the measuring precision is improved.
The utility model has the advantages that: the installation and the disassembly are convenient and quick, time and labor are saved, and shield tunnel segments are not damaged; and the two sides of the device are provided with adjusting and reinforcing bolts and nuts, so that the stability of the device is improved while the installation precision is ensured.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic view of a second channel steel of the present invention;
fig. 3 is a schematic view of a first channel steel of the present invention;
fig. 4 is a schematic view of a base plate of the present invention;
FIG. 5 is a front view of the present invention with a measuring positioning disc;
fig. 6 is a schematic view of the second channel steel of the present invention with a positioning disc;
description of reference numerals: 1. u-steel, 2, No. two U-steel, 3, regulation reinforcing bolt nut, 4, base plate, 5, centering bolt, 6, shield tunnel section of jurisdiction, 7, section of jurisdiction bolt, 8, measurement positioning disc.
Detailed Description
The present invention will be further described with reference to the following drawings and examples, which should not be construed as limiting the present invention.
The utility model provides a novel shield constructs tunnel measurement and forces centering with waist device, it includes channel-section steel 1, No. two channel-sections 2, adjusts reinforcing bolt nut 3, base plate 4, centering bolt 5.
As shown in the attached drawings, the first channel steel 1 and the second channel steel 2 are both made of channel steel with the thickness of 5 mm and are used as bearing structures. No. two channel-section steel 2's one end welding is in on the channel-section steel 1, wherein No. two channel-section steel 2's welding angle and position depend on the position that this device installed on the pipe fitting, and the purpose makes No. two channel-section steels 2 after the installation finishes be the horizontal angle. Adjusting and reinforcing bolt nut 3 sets up two, welds nut wherein respectively the both sides of a channel-section steel 1, the welding position is asymmetric, and its effect carries out the micro leveling after this device installation is accomplished. Base plate 4 sets up two, welds respectively No. 1 both ends of channel-section steel are horn mouth form after the welding. All be equipped with the bolt hole on base plate 4. No. two channel-section steels 2 keep away from section of jurisdiction one end and are provided with the bolt hole, centering bolt 5 through No. two channel-section steels 2's bolt hole with No. two channel-section steels 2 are connected. The base plates 4 at the two ends of the first channel steel 1 are respectively connected at the two ends of the segment bolt 7 of the shield tunnel segment 6 and fixedly connected with the shield tunnel segment 6.
For guaranteeing that the measuring instrument installation is stable, improve measurement accuracy, the utility model discloses in still can No. two 2 upper portions of channel-section steel set up measurement positioning disc 8, measurement positioning disc 8 passes through centering bolt 5 with No. two channel-section steels 2 link together.
When this device is installed, generally select near 6 position and 12 position (concrete position can be adjusted according to actual conditions) at the shield tunnel section of jurisdiction, the section of jurisdiction bolt 7 of relevant position must be demolishd during the installation, install this device on section of jurisdiction bolt 7 mouth that corresponds (demolish stagnant water rubber ring that the in-process drops with section of jurisdiction bolt 7 before the installation and resume the normal position, prevent that novel bracket position from appearing the percolating water and leading to the section of jurisdiction displacement to appear) and carry out preliminary fixed with the section of jurisdiction bolt 7 connection of demolising before, later utilize the horizon rule and adjust reinforcing bolt to carry out the leveling, at last with section of jurisdiction bolt 7 and adjust reinforcing bolt nut 3 retightening, avoid rocking about the device, guarantee the stability of device.
Other parts in this embodiment are the prior art, and are not described herein again.

Claims (2)

1. The utility model provides a novel waist is forced centering for shield tunnel measurement device, its characterized in that, including a channel-section steel, No. two channel-section steels, base plate, centering bolt, the asymmetric position of a channel-section steel both sides sets up an adjustment reinforcing bolt nut respectively, wherein the nut of adjusting reinforcing bolt nut and the side welded fastening of a channel-section steel, No. two channel-section steels be horizontal gesture, the one end welding is in on the channel-section steel, the other end is provided with the bolt hole, the centering bolt through No. two bolt holes on the channel-section steel with No. two channel-section steels are connected, the base plate sets up two, all is equipped with the bolt hole, is the welding of horn mouth form the both ends of a channel-section steel, the base plate is connected respectively at the both ends of the section of jurisdiction bolt of shield tunnel section of jurisdiction and is fixed together with the shield tunnel section of jurisdiction.
2. The novel waist forced centering device for shield tunnel measurement according to claim 1, wherein a measuring positioning disc is arranged on the second channel steel, and the measuring positioning disc is connected with the second channel steel through the centering bolt.
CN202022198364.9U 2020-09-30 2020-09-30 Novel waist forced centering device for shield tunnel measurement Active CN213779016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022198364.9U CN213779016U (en) 2020-09-30 2020-09-30 Novel waist forced centering device for shield tunnel measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022198364.9U CN213779016U (en) 2020-09-30 2020-09-30 Novel waist forced centering device for shield tunnel measurement

Publications (1)

Publication Number Publication Date
CN213779016U true CN213779016U (en) 2021-07-23

Family

ID=76907187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022198364.9U Active CN213779016U (en) 2020-09-30 2020-09-30 Novel waist forced centering device for shield tunnel measurement

Country Status (1)

Country Link
CN (1) CN213779016U (en)

Similar Documents

Publication Publication Date Title
CN213779016U (en) Novel waist forced centering device for shield tunnel measurement
CN110359485A (en) A kind of pre-buried trough fixation device of steel form and its construction method
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN205407672U (en) Non - welded connection's photovoltaic support
CN101264790A (en) Method for mounting stern herringbone bracket
CN210712507U (en) Steel case roof beam diaphragm guiding orientation fixing device
CN210256635U (en) Immersed tube prefabricated template segment end mould
CN202291958U (en) Mould for adjustable-type cable duct bracket
CN204627001U (en) PC structure floor assembled prefabricated post diagonal brace support system
CN109944332A (en) A kind of system and operating method suitable for there is the pre-embedded bolt of high-precision requirement quickly to position
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN206815542U (en) A kind of portable bracket pre-embedded bolt fixed structure
CN203066491U (en) Locator for installing round tube type connection member
CN205476528U (en) Precast pile device of taking one's place fast
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN210649137U (en) Be used for accurate adjusting device of on-spot welding seam groove root clearance surplus
CN209200573U (en) Movably connected cable fixed mount
CN211172422U (en) U-shaped beam outer flange embedded part fixing device
CN210164106U (en) Steel joist unitized curtain wall bottom connecting device
CN213951963U (en) Adjustable high mound concrete pump pipe attaches wall device temporarily
CN208105049U (en) A kind of carrier setting bolt hole precision positioning model
CN207806978U (en) A kind of tunnel arch ring flange fixing tool
CN220978891U (en) Fixing and positioning device for steel structure steel column foundation bolt
CN206732438U (en) A kind of steel structure bridge support frame
CN108792920B (en) Tool and method for quickly installing draft tube of large bulb through-flow turbine unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant