CN213774418U - Dual self-lifting type external climbing frame for super high-rise building - Google Patents
Dual self-lifting type external climbing frame for super high-rise building Download PDFInfo
- Publication number
- CN213774418U CN213774418U CN202022285422.1U CN202022285422U CN213774418U CN 213774418 U CN213774418 U CN 213774418U CN 202022285422 U CN202022285422 U CN 202022285422U CN 213774418 U CN213774418 U CN 213774418U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- rise building
- super high
- groove
- fixing rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 23
- 230000009977 dual effect Effects 0.000 title claims abstract description 20
- 230000009471 action Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Abstract
The utility model discloses a superelevation building's dual outer frame of climbing of formula of lifting certainly, including the first dead lever that connects gradually, second dead lever and fixed pipe, fixed inside pipe wall fixedly connected with electric putter, electric putter's top fixedly connected with movable rod, the top fixedly connected with backup pad of movable rod, the lower fixed surface of backup pad is connected with electric block, a plurality of second spouts have been seted up respectively on the surface of first dead lever and second dead lever, a plurality of second spouts and slide sliding connection, the first fixed surface of slide is connected with the scaffold frame, the second fixed surface of slide is connected with the connecting plate, electric block is connected to the connecting plate through the haulage rope. The utility model discloses when moving the adversary's foot rest, through the combined action of the electric putter, electric block and the slide that set up to control scaffold frame reciprocates, and it is more convenient to compare to use with current outer climbing frame, and then has improved people's work efficiency.
Description
Technical Field
The utility model belongs to the technical field of climb the frame outward, especially, relate to a dual from promotion formula of super high-rise building frame of climbing outward.
Background
Super high-rise buildings refer to buildings with a height of more than 40 floors and more than 100 meters, and generally, when the building height exceeds 100 meters, no matter the residential buildings and public buildings are super high-rise buildings, according to the new standard of world super high-rise building society, more than 300 meters are super high-rise buildings, climbing frames, also called lifting frames, and can be divided into several main types such as hydraulic type, electric type, manual pull type and the like according to the power source. The scaffold system is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, can ascend or descend upwards along buildings, enables the scaffold technology to be completely improved, avoids the dismounting and mounting processes of the scaffold (used till construction is finished after one-time assembly), is not limited by the height of the buildings, greatly saves manpower and materials, has great improvement on the traditional scaffold in a safety angle, has development advantages in the high-rise buildings, and is inconvenient when the outer climbing frame ascends or descends.
SUMMERY OF THE UTILITY MODEL
In view of this, the embodiments of the present invention are expected to provide a dual self-lifting type climbing frame for a super high-rise building, so as to solve the problem of inconvenience in ascending or descending of the climbing frame.
In order to achieve the above purpose, the technical scheme of the utility model is realized like this:
the utility model provides a frame is climbed outward from dual self-lifting of super high-rise building, is including the first dead lever 1, second dead lever 2 and the fixed pipe 3 that connect gradually, fixed 3 inner wall fixedly connected with electric putter 16 of pipe, electric putter 16's top fixedly connected with movable rod 17, movable rod 17's top fixedly connected with backup pad 20, the lower fixed surface of backup pad 20 is connected with electric block 24, a plurality of second spouts 21 have been seted up respectively to first dead lever 1 with the surface of second dead lever 2, a plurality of second spouts 21 and slide 22 sliding connection, slide 22's first fixed surface is connected with scaffold 26, slide 22's second fixed surface is connected with connecting plate 25, electric block 24 is connected to through the haulage rope connecting plate 25.
According to the utility model discloses a specific embodiment, first fixture block 4 of first end fixedly connected with of first dead lever 1, first draw-in groove 5 has been seted up to the first end of second dead lever 2, first fixture block 4 is inlayed in first draw-in groove 5, just first fixture block 4 with first draw-in groove 5 phase-match.
According to the utility model discloses a specific embodiment, first thread groove 8 has been seted up to one side of first fixture block 4, first screw hole 6 has been seted up to the first end of second dead lever 2, be provided with first screw bolt 7 in the first screw hole 6, first screw bolt 7 passes through first screw hole 6 fixed connection to in the first thread groove 8.
According to the utility model discloses a specific embodiment, the first end fixedly connected with second fixture block 9 of fixed pipe 3, second draw-in groove 10 has been seted up to the second end of second dead lever 2, second fixture block 9 is inlayed in second draw-in groove 10, just second fixture block 9 with second draw-in groove 10 phase-match.
According to the present invention, in a specific embodiment, a second thread groove 13 is opened on one side of the second clamping block 9, a second threaded hole 11 is opened on the second end of the second fixing rod 2, a second threaded bolt 12 is disposed in the second threaded hole 11, and the second threaded bolt 12 is fixedly connected to the second thread groove 13 through the second threaded hole 11.
According to the utility model discloses a specific embodiment, fixed pipe 3 inner wall has seted up first spout 18, the surface of movable rod 17 is provided with first slider 19, first spout 18 with first slider 19 sliding connection.
According to the utility model discloses a concrete embodiment, the through-hole has been seted up to the second end of fixed pipe 3, the aperture of through-hole with the movable rod 17 phase-match.
According to the utility model discloses a concrete embodiment, third draw-in groove 14 has been seted up to the second end of first dead lever 1, third screw hole 15 has been seted up to one side of third draw-in groove 14.
According to a specific embodiment of the present invention, the surface of the first fixing rod 1 and the surface of the second fixing rod 2 are fixedly connected with embedded parts 23 respectively.
According to the utility model discloses a concrete embodiment still includes control switch, control switch respectively with electric putter 16 with electric block 24 electric connection.
Compared with the prior art, the utility model discloses a set up electric putter, electric block and slide, when people need move the tripod, people at first extend through external control switch control electric putter, thereby can drive the backup pad and remove, people are through external control switch control electric block pine rope simultaneously, and then electric block can rise, and the scaffold frame does not take place to remove, then people are through external control switch control electric block shrink, and then can remove by the connecting plate, can drive the scaffold frame simultaneously and remove, at electric putter, under the combined action of electric block and slide, thereby control scaffold frame reciprocates, it is more convenient to compare with current outer climbing frame, and then work efficiency has been improved.
Drawings
Fig. 1 is a schematic structural view of a dual self-lifting type climbing frame of a super high-rise building according to an embodiment of the present invention.
Fig. 2 is a cross-sectional view of a dual self-lifting climbing frame of a super high-rise building according to an embodiment of the present invention.
Fig. 3 is a schematic side view of a dual self-lifting climbing frame of a super high-rise building according to an embodiment of the present invention.
Fig. 4 is a schematic structural diagram of a first fixing rod according to an embodiment of the present invention.
Reference numerals:
1-a first fixing rod; 2-a second fixing rod; 3-fixing the tube; 4-a first fixture block; 5-a first card slot; 6-a first threaded hole; 7-a first fixing bolt; 8-a first thread groove; 9-a second fixture block; 10-a second card slot; 11-a second threaded hole; 12-a second fixing bolt; 13-a second thread groove; 14-a third card slot; 15-a third threaded hole; 16-an electric push rod; 17-a movable rod; 18-a first runner; 19-a first slide; 20-a support plate; 21-a second chute; 22-a slide plate; 23-embedded parts; 24-an electric hoist; 25-a connecting plate; 26-scaffold.
Detailed Description
The present invention will be described in detail below with reference to specific embodiments in order to make the concept and idea of the present invention more clearly understood by those skilled in the art. It is to be understood that the embodiments presented herein are only a few of all embodiments that the present invention may have. Those skilled in the art who review this disclosure will readily appreciate that many modifications, variations, and alternatives to those embodiments described below, in whole or in part, are possible and are contemplated as falling within the scope of the claimed invention.
As used herein, the terms "first," "second," and the like are not intended to imply any order, quantity, or importance, but rather are used to distinguish one element from another. As used herein, the terms "a," "an," and the like are not intended to mean that there is only one of the described items, but rather that the description is directed to only one of the described items, which may have one or more. As used herein, the terms "comprises," "comprising," and other similar words are intended to refer to logical interrelationships, and are not to be construed as referring to spatial structural relationships. For example, "a includes B" is intended to mean that logically B belongs to a, and not that spatially B is located inside a. Furthermore, the terms "comprising," "including," and other similar words are to be construed as open-ended, rather than closed-ended. For example, "a includes B" is intended to mean that B belongs to a, but B does not necessarily constitute all of a, and a may also include C, D, E and other elements.
The terms "embodiment," "present embodiment," "an embodiment," "one embodiment," and "one embodiment" herein do not mean that the pertinent description applies to only one particular embodiment, but rather that the description may apply to yet another embodiment or embodiments. It will be understood by those skilled in the art that any description made herein of one embodiment may be substituted, combined, or otherwise combined with the description made herein with respect to one or more other embodiments, and that the resulting new embodiments may be readily envisioned by those skilled in the art, and fall within the scope of the present disclosure.
Example 1
Additional aspects and advantages of embodiments of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of embodiments of the invention. Referring to fig. 1-4, the present invention provides the following technical solutions:
the utility model provides a frame is climbed outward from promotion formula of dual of super high-rise building, including the first dead lever 1 that connects gradually, second dead lever 2 and fixed pipe 3, 3 inner wall fixedly connected with electric putter 16 of fixed pipe, electric putter 16's top fixedly connected with movable rod 17, the top fixedly connected with backup pad 20 of movable rod 17, the lower fixed surface of backup pad 20 is connected with electric block 24, a plurality of second spout 21 have been seted up respectively on the surface of first dead lever 1 and second dead lever 2, a plurality of second spout 21 and slide 22 sliding connection, slide 22's first fixed surface is connected with scaffold 26, slide 22's second fixed surface is connected with connecting plate 25, electric block 24 is connected to on connecting plate 25 through the haulage rope.
Specifically, a first clamping groove 5 is formed in the first end of the first fixing rod 1 and fixedly connected with a first clamping block 4, the first end of the second fixing rod 2 is inlaid in the first clamping groove 5, and the first clamping block 4 is matched with the first clamping groove 5. Wherein, one side of the first fixture block 4 is further provided with a first thread groove 8, the first end of the second fixing rod 2 is provided with a first thread hole 6, a first thread bolt 7 is arranged in the first thread hole 6, the first thread bolt 7 is matched with the first thread groove 8, and the first thread bolt 7 is fixedly connected to the first thread groove 8 through the first thread hole 6. A third slot 14 is formed at the second end of the first fixing rod 1, and a third threaded hole 15 is formed at one side of the third slot 14.
Specifically, the first end of the fixed pipe 3 is fixedly connected with a second clamping block 9, the second end of the second fixed rod 2 is provided with a second clamping groove 10, the second clamping block 9 is embedded in the second clamping groove 10, and the second clamping block 9 is matched with the second clamping groove 10. A second thread groove 13 is further formed in one side of the second fixture block 9, a second threaded hole 11 is formed in a second end of the second fixing rod 2, a second threaded bolt 12 is arranged in the second threaded hole 11, the second threaded bolt 12 is matched with the second thread groove 13, and the second threaded bolt 12 is fixedly connected to the second thread groove 13 through the second threaded hole 11. The second end of the fixed pipe 3 is provided with a through hole, and the aperture of the through hole is matched with the movable rod 17.
Specifically, a first sliding groove 18 is formed in the inner wall of the fixed pipe 3, a first sliding block 19 is arranged on the surface of the movable rod 17, and the first sliding groove 18 is connected with the first sliding block 19 in a sliding manner. In the present embodiment, two first sliders 19 are provided in total and symmetrically connected to the surface of the movable rod 17.
Specifically, embedded parts 23 are fixedly connected to the surfaces of the first fixing rod 1 and the second fixing rod 2 respectively. In the embodiment, two embedded parts 23 are arranged, fixed on the first fixing rod 1 and the second fixing rod 2 respectively,
specifically, the dual self-lifting type climbing frame further comprises a control switch, and the control switch is electrically connected with the electric push rod 16 and the electric hoist 24 respectively. When people need remove the tripod, at first extend through control switch control electric putter 16, thereby can drive backup pad 20 and remove, simultaneously through the 24 loose ropes of control switch control electric hoist, and then electric hoist 24 can rise, and scaffold 26 does not take place to remove, then through the shrink of control switch control electric hoist 24, and then can make connecting plate 25 remove, can drive scaffold 26 simultaneously and remove, at electric putter 16, under the combined action of electric hoist 24 and slide 22, thereby remove scaffold 26.
Specifically, the dual self-lifting type climbing frame further comprises a storage battery, and the storage battery is electrically connected with the electric push rod 16 and the electric hoist 24 respectively and is used for providing electric energy for the electric push rod 16 and the electric hoist 24.
Example 2
The apparatus is described in detail below with reference to a specific example.
The utility model discloses when using, at first place suitable position with the device, then people fix first dead lever 1 and second dead lever 2 and built-in fitting 23, when people need move the tripod, people at first extend through control switch control electric putter 16, thereby can drive backup pad 20 and remove, people are simultaneously through the 24 loose ropes of control switch control electric block, and then electric block 24 can rise, and scaffold frame 26 does not take place to remove, then people are through the 24 shrink of external control switch control electric block, and then can remove by connecting plate 25, can drive scaffold frame 26 and remove simultaneously. The utility model discloses under the combined action of electric putter, electric block and slide, control scaffold reciprocates, and it is more convenient to climb the frame with current outward and compare to use, and then has improved people's work efficiency.
The concepts, principles and concepts of the present invention have been described above in detail in connection with specific embodiments (including examples and illustrations). It should be understood by those skilled in the art that the embodiments of the present invention may be embodied in many different forms and that various changes, modifications, substitutions and equivalents of the steps, methods, devices and components described in the above embodiments may be made by those skilled in the art after reading the present specification and should be considered as falling within the scope of the present invention. The protection scope of the present invention is subject to the claims only.
Claims (10)
1. The utility model provides a frame is climbed outward to dual self-lifting formula of super high-rise building which characterized in that: comprises a first fixed rod (1), a second fixed rod (2) and a fixed tube (3) which are connected in sequence, the inner wall of the fixed tube (3) is fixedly connected with an electric push rod (16), the top end of the electric push rod (16) is fixedly connected with a movable rod (17), the top end of the movable rod (17) is fixedly connected with a supporting plate (20), the lower surface of the supporting plate (20) is fixedly connected with an electric hoist (24), a plurality of second sliding grooves (21) are respectively arranged on the surfaces of the first fixing rod (1) and the second fixing rod (2), the plurality of second sliding chutes (21) are connected with the sliding plate (22) in a sliding way, a scaffold (26) is fixedly connected with the first surface of the sliding plate (22), the second surface of the sliding plate (22) is fixedly connected with a connecting plate (25), and the electric hoist (24) is connected to the connecting plate (25) through a traction rope.
2. The dual self-lifting climbing frame of a super high-rise building according to claim 1, wherein a first clamping block (4) is fixedly connected to a first end of the first fixing rod (1), a first clamping groove (5) is formed in a first end of the second fixing rod (2), the first clamping block (4) is embedded in the first clamping groove (5), and the first clamping block (4) is matched with the first clamping groove (5).
3. The dual self-lifting climbing frame of a super high-rise building according to claim 2, wherein a first threaded groove (8) is opened at one side of the first clamping block (4), a first threaded hole (6) is opened at a first end of the second fixing rod (2), a first threaded bolt (7) is arranged in the first threaded hole (6), and the first threaded bolt (7) is fixedly connected to the first threaded groove (8) through the first threaded hole (6).
4. The dual self-lifting climbing frame of a super high-rise building according to claim 1, wherein a second clamping block (9) is fixedly connected to a first end of the fixing tube (3), a second clamping groove (10) is opened at a second end of the second fixing rod (2), the second clamping block (9) is embedded in the second clamping groove (10), and the second clamping block (9) is matched with the second clamping groove (10).
5. The dual self-lifting climbing frame of a super high-rise building according to claim 4, wherein a second threaded groove (13) is opened at one side of the second clamping block (9), a second threaded hole (11) is opened at a second end of the second fixing rod (2), a second threaded bolt (12) is arranged in the second threaded hole (11), and the second threaded bolt (12) is fixedly connected to the second threaded groove (13) through the second threaded hole (11).
6. The double self-lifting climbing frame of a super high-rise building according to claim 1, wherein a first sliding groove (18) is formed in the inner wall of the fixed pipe (3), a first sliding block (19) is arranged on the surface of the movable rod (17), and the first sliding groove (18) is slidably connected with the first sliding block (19).
7. The double self-lifting climbing frame of a super high-rise building according to claim 1, wherein the second end of the fixed pipe (3) is provided with a through hole, and the diameter of the through hole is matched with that of the movable rod (17).
8. The dual self-lifting climbing frame of a super high-rise building according to claim 1, wherein the second end of the first fixing rod (1) is provided with a third clamping groove (14), and one side of the third clamping groove (14) is provided with a third threaded hole (15).
9. The dual self-lifting climbing scaffold of a super high-rise building according to claim 1, wherein embedded parts (23) are fixedly connected to the surfaces of the first fixing rod (1) and the second fixing rod (2), respectively.
10. The dual self-lifting outrigger of a very high-rise building as claimed in claim 1, further comprising a control switch electrically connected to the electric push rod (16) and the electric hoist (24), respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022285422.1U CN213774418U (en) | 2020-10-14 | 2020-10-14 | Dual self-lifting type external climbing frame for super high-rise building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022285422.1U CN213774418U (en) | 2020-10-14 | 2020-10-14 | Dual self-lifting type external climbing frame for super high-rise building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213774418U true CN213774418U (en) | 2021-07-23 |
Family
ID=76908826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022285422.1U Expired - Fee Related CN213774418U (en) | 2020-10-14 | 2020-10-14 | Dual self-lifting type external climbing frame for super high-rise building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213774418U (en) |
-
2020
- 2020-10-14 CN CN202022285422.1U patent/CN213774418U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106241679B (en) | A kind of mechanical platform being mostly used extensible automatic control lifting | |
CN210976535U (en) | Building external climbing type building construction operation platform | |
CN213774418U (en) | Dual self-lifting type external climbing frame for super high-rise building | |
CN202850484U (en) | Safety mechanism for building construction climbing template | |
CN110711365A (en) | Pole-climbing device suitable for electric power overhaul and use method | |
CN210828242U (en) | Lifting device for building water and electricity construction | |
CN202899608U (en) | Climbing device of building construction hydraulic pressure template | |
CN210948453U (en) | Staircase for building | |
CN215167771U (en) | Novel concrete placement workstation is built in room | |
CN209554749U (en) | A kind of buckle structure of building hoist | |
CN211499833U (en) | Novel hydraulic climbing type unloading platform matched with attached scaffold for use | |
CN206667735U (en) | A kind of scaffold Multifunction foot pedal board | |
CN203321304U (en) | Auxiliary ladder of steel tube tower | |
CN212836621U (en) | Building climbing frame protection device | |
CN214995821U (en) | Construction hanging flower basket for building | |
CN211341687U (en) | All-steel climbing frame with stable structure | |
CN211691373U (en) | Novel construction roof beam structure | |
CN215978409U (en) | Climb frame and prevent weighing down and prevent toppling and attach wall support device | |
CN214785831U (en) | Attached lifting climbing frame for super high-rise building | |
CN219451438U (en) | Liftable climbing frame for building construction | |
CN220487477U (en) | Photovoltaic power generation project climbing ladder | |
CN215167908U (en) | External construction safety device for super-high altitude building | |
CN207022224U (en) | A kind of Communication Engineering signal tower | |
CN219794582U (en) | Medical project stress fastening type operation platform frame | |
CN214885320U (en) | Scaffold for concrete pouring construction of double-first-layer underground bottom plate and wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210723 |