CN213771048U - Hoisting device of hydropower station factory building equipment - Google Patents

Hoisting device of hydropower station factory building equipment Download PDF

Info

Publication number
CN213771048U
CN213771048U CN202022311950.XU CN202022311950U CN213771048U CN 213771048 U CN213771048 U CN 213771048U CN 202022311950 U CN202022311950 U CN 202022311950U CN 213771048 U CN213771048 U CN 213771048U
Authority
CN
China
Prior art keywords
clamping
plate
clamping plate
arm
clamping arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022311950.XU
Other languages
Chinese (zh)
Inventor
田浩杰
谭祥武
陈陆
张洲境
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Hami Pumped Storage Co ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
Xinjiang Hami Pumped Storage Co ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Hami Pumped Storage Co ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical Xinjiang Hami Pumped Storage Co ltd
Priority to CN202022311950.XU priority Critical patent/CN213771048U/en
Application granted granted Critical
Publication of CN213771048U publication Critical patent/CN213771048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A hoisting accessory of hydropower station factory building equipment, it includes: first arm lock, second arm lock and connecting rod. The first clamping arm comprises a first clamping plate, a transition plate, a second clamping plate, a connecting plate and a connecting ring; the connecting ring is arranged at one end of the first clamping plate; the structure of the second clamping arm is completely the same as that of the first clamping arm; the connecting rod passes through the connecting rings of the first clamping arm and the second clamping arm respectively and is fastened to connect the first clamping arm and the second clamping arm. The utility model discloses a hoisting accessory of power station factory building equipment simple structure, convenient operation is particularly suitable for being used for hoisting equipment such as power station factory building back timber, stand.

Description

Hoisting device of hydropower station factory building equipment
Technical Field
The application belongs to the technical field of hydropower station factory building, and particularly relates to a hoisting device of hydropower station factory building equipment.
Background
In the process of building a hydropower station building, a common top beam and a column need to be lifted and carried by a crane to reach a preset position for building.
If the publication number is CN 209815497U's patent, this patent provides a hoist of being exclusively used in hoist of power station underground powerhouse furred ceiling arched beam hoist, and this hoist can effectively improve work efficiency, save material, and this hoist simple structure simultaneously, easy dismounting, but the space between two splint of this hoist is certain, only can hoist the centre gripping thing of a fixed dimension, fixed shape, if when meeting the centre gripping thing of multiple size and appearance, then need this hoist of multiple different models.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that exists among the prior art, this application provides a hoisting accessory of power station factory building equipment, it includes: first arm lock, second arm lock and connecting rod. The first clamping arm comprises a first clamping plate, a transition plate, a second clamping plate, a connecting plate and a connecting ring; the connecting ring is arranged at one end of the first clamping plate; the structure of the second clamping arm is completely the same as that of the first clamping arm; the connecting rod passes through the connecting rings of the first clamping arm and the second clamping arm respectively and is fastened to connect the first clamping arm and the second clamping arm.
Preferably, the first clamping arm and the second clamping arm rotate by taking the connecting rod as an axis.
Preferably, the other end of the first clamping plate is connected with one end of the second clamping plate through the transition plate, and the other end of the second clamping plate is connected with the connecting plate.
Preferably, an included angle between the first clamping plate and the transition plate and an included angle between the transition plate and the second clamping plate are obtuse angles.
Preferably, the first clamping plate is a combined rectangular and triangular shape.
Preferably, a first cushion layer for increasing friction is installed on the first clamping plate.
Preferably, a second cushion layer for increasing friction is installed on the second clamping plate.
Preferably, the connecting plate is further provided with at least one connecting hole for fastening the first clamping arm and the second clamping arm for filling clamping objects.
Preferably, the connecting ring is arranged on one side of the central axis of the first clamping plate, and one side surface of the connecting ring is tightly attached to the central axis of the first clamping plate.
Preferably, the outer diameter of the connecting rod is fitted to the inner diameter of the connecting ring.
Compared with the prior art, the utility model discloses a hoisting accessory of power station factory building equipment simple structure, convenient operation is particularly suitable for being used for lifting by crane equipment such as power station factory building back timber, stand, can effectively avoid damage and the mar to the holder, has also guaranteed the safety of building when having practiced thrift the equipment loss, and simultaneously, because the flexibility of two arm lock, can the holder of centre gripping multiple size and shape, make its application range wider, also can used repeatedly, practiced thrift the material, economic expenditure has also been reduced.
Drawings
Fig. 1 is a schematic structural view of a hoisting device of a hydropower station plant equipment of the present invention;
fig. 2 is a schematic structural view of one of the clamp arms in fig. 1.
Detailed Description
To facilitate a better understanding of the technical solutions of the present application, specific embodiments of the present application will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1, the lifting device using the novel hydropower station plant equipment mainly comprises a first clamping arm, a second clamping arm and a connecting rod 6.
The first clamping arm comprises a first clamping plate 1, a transition plate 2, a second clamping plate 3, a connecting plate 4 and a connecting ring 5. The connecting ring 5 is arranged at one end of the first clamping plate 1 and connected with the first clamping plate.
The structure of second arm lock and the structure of first arm lock are the same completely, and first arm lock and second arm lock set up relatively, and connecting rod 6 passes go-between 5 of first arm lock and go-between 5 of second arm lock respectively to fasten, thereby couple together first arm lock and second arm lock, and first arm lock and second arm lock can use connecting rod 6 as the rotation of axes.
The other end of the first clamping plate 1 is connected with one end of the second clamping plate 3 through the transition plate 2, the other end of the second clamping plate 3 is connected with the connecting plate 4, the included angle formed between the first clamping plate 1 and the transition plate 2 is an obtuse angle, the included angle formed between the transition plate 2 and the second clamping plate 3 is also an obtuse angle, and the included angle of a preset angle is formed between the second clamping plate 3 and the connecting plate 4.
The space formed among the first clamping plate 1, the transition plate 2 and the second clamping plate 3 of the first clamping arm and the second clamping arm can be filled with clamping objects to be clamped and lifted.
The first clamping plate 1 is preferably of a combined rectangular and triangular shape. It will be appreciated by those skilled in the art that the first clamping plate 1 may be of any shape that meets the requirements, except for a combination of rectangular and triangular shapes.
As shown in fig. 2, a first cushion layer 101 is mounted on the first splint 1, the first splint 1 and the first cushion layer 101 are fixedly connected by a rivet 7, a second cushion layer 301 is mounted on the second splint 3, and the second splint 3 and the second cushion layer 301 are fixedly connected by a rivet 7. The first cushion layer 101 and the second cushion layer 301 are preferably cushion layers made of rubber, and firstly, the friction coefficient of the cushion layers made of rubber is larger, so that the friction force can be increased, and clamped objects can be effectively prevented from sliding off; secondly, the cushion layer made of rubber has low hardness, and can avoid damage to the clamping object and deformation of the clamping object in the clamping and hoisting processes, thereby influencing the appearance and the use strength of the clamping object.
The connecting plate 4 is preferably provided with at least one connecting hole 401 for fastening a first clamping arm and a second clamping arm for filling clamped objects, and more preferably provided with two connecting holes 401, so that the hoisting process is more stable, and the possibility of deviation is reduced.
The coupling ring 5 is disposed at one side of the central axis of the first clamping plate 1, and one side surface of the coupling ring 5 is closely adhered to the central axis of the first clamping plate, so that the coupling rings 5 of the two clamping arms can be closely adhered together. The outer diameter of the connecting rod 6 is matched with the inner diameter of the connecting ring 5.
When using this hoisting accessory who uses neotype power station factory building equipment, open two arm lock of this device at first, place the cramping thing in the space between two arm lock, fold two arm lock afterwards, use suitable instrument such as steel rope or bolt to press from both sides two arm lock through connecting hole 401 on the connecting plate 4 tightly, make cramping thing and this device can not produce relative motion, hoist this device and cramping thing from connecting tool such as steel rope or bolt of connecting hole 401 department afterwards.
The utility model discloses a hoisting accessory of power station factory building equipment simple structure, convenient operation is particularly suitable for being used for lifting by crane equipment such as power station factory building back timber, stand, can effectively avoid damage and mar to the holder, has also guaranteed the safety of building when having practiced thrift the equipment loss, simultaneously, because the flexibility of two arm lock, can the holder of centre gripping multiple size and shape, make its application range wider, also can used repeatedly, practiced thrift the material, also reduced economic expenditure.
The applicant of the present invention has made detailed description and description of the embodiments of the present invention with reference to the drawings, but those skilled in the art should understand that the above embodiments are only the preferred embodiments of the present invention, and the detailed description is only for helping the reader to better understand the spirit of the present invention, and not for the limitation of the protection scope of the present invention, on the contrary, any improvement or modification made based on the spirit of the present invention should fall within the protection scope of the present invention.

Claims (9)

1. A hoisting accessory of hydropower station factory building equipment, it includes: first arm lock, second arm lock and connecting rod (6), its characterized in that:
the first clamping arm comprises a first clamping plate (1), a transition plate (2), a second clamping plate (3), a connecting plate (4) and a connecting ring (5);
the connecting ring (5) is arranged at one end of the first clamping plate (1);
the structure of the second clamping arm is completely the same as that of the first clamping arm;
the connecting rod (6) respectively penetrates through the connecting rings (5) of the first clamping arm and the second clamping arm, is fastened and connects the first clamping arm and the second clamping arm.
2. The hoisting device of hydropower station plant equipment according to claim 1, characterized in that:
the first clamping arm and the second clamping arm rotate by taking the connecting rod (6) as an axis.
3. The hoisting device of hydropower station plant equipment according to claim 1, characterized in that:
the other end of the first clamping plate (1) is connected with one end of the second clamping plate (3) through the transition plate (2), and the other end of the second clamping plate (3) is connected with the connecting plate (4).
4. The hoisting device of hydropower station plant equipment according to any one of claims 1 to 3, characterized in that:
the included angle between the first clamping plate (1) and the transition plate (2) and the included angle between the transition plate (2) and the second clamping plate (3) are all obtuse angles.
5. The hoisting device of hydropower station plant equipment according to any one of claims 1 to 3, characterized in that:
the first clamping plate is in the shape of a combination of a rectangle and a triangle.
6. The hoisting device of hydropower station plant equipment according to any one of claims 1 to 3, characterized in that:
a first cushion layer (101) for increasing friction force is arranged on the first clamping plate (1);
and a second cushion layer (301) for increasing friction force is arranged on the second clamping plate (3).
7. The hoisting device of hydropower station plant equipment according to any one of claims 1 to 3, characterized in that:
the connecting plate (4) is also provided with at least one connecting hole (401) for fastening the first clamping arm and the second clamping arm for filling and clamping objects.
8. The hoisting device of hydropower station plant equipment according to any one of claims 1 to 3, characterized in that:
the connecting ring (5) is arranged on one side of the central axis of the first clamping plate (1), and the surface of one side of the connecting ring (5) is tightly attached to the central axis of the first clamping plate (1).
9. The hoisting device of hydropower station plant equipment according to any one of claims 1 to 3, characterized in that:
the outer diameter of the connecting rod (6) is matched with the inner diameter of the connecting ring (5).
CN202022311950.XU 2020-10-16 2020-10-16 Hoisting device of hydropower station factory building equipment Active CN213771048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022311950.XU CN213771048U (en) 2020-10-16 2020-10-16 Hoisting device of hydropower station factory building equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022311950.XU CN213771048U (en) 2020-10-16 2020-10-16 Hoisting device of hydropower station factory building equipment

Publications (1)

Publication Number Publication Date
CN213771048U true CN213771048U (en) 2021-07-23

Family

ID=76909366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022311950.XU Active CN213771048U (en) 2020-10-16 2020-10-16 Hoisting device of hydropower station factory building equipment

Country Status (1)

Country Link
CN (1) CN213771048U (en)

Similar Documents

Publication Publication Date Title
CN2897963Y (en) Clamp
CN201427836Y (en) Three-jaw sling
CN213771048U (en) Hoisting device of hydropower station factory building equipment
CN201151614Y (en) Clamp for turning steel plates over
CN205773027U (en) A kind of convenient chain block hung
CN201180371Y (en) Steel pipe fast chucking buckle
CN112299239A (en) Hoisting device of hydropower station factory building equipment
CN217025047U (en) Dead weight clamping lifting appliance for column workpieces
CN110733964A (en) kinds of hoist cable for gripping round large articles
CN215854620U (en) Template hoist convenient to handling multiunit roof beam body
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN212450249U (en) Detachable hoist and mount lug frock
CN204265302U (en) One can dismounting loop wheel machine flexibly
CN203474244U (en) Roller ring hanging tool of straightener
CN221093442U (en) Special lifting device
CN214326893U (en) Hoisting device matched with UHPC plate with four open corners
CN211377389U (en) Overhead ground wire hoisting device for high-voltage transmission line
CN2212581Y (en) Gripping member for lifting concrete pipe
CN214653017U (en) Finish rolling pipe pipeline hoist and mount cutting ferrule
CN220618140U (en) Barreled chemical agent lifting appliance
CN217126786U (en) Novel portable hoisting support and hoist and mount system that are mobilizable
CN220393079U (en) Shield constructs grease bucket handling anchor clamps
CN215160313U (en) Carbon product lifting clamp
CN214652990U (en) Marine specific large-scale prefabricated part lifting appliance
CN215516348U (en) Hydraulic cylinder hoisting device convenient to use

Legal Events

Date Code Title Description
GR01 Patent grant