CN213753860U - Fixing frame for buried construction of cable - Google Patents

Fixing frame for buried construction of cable Download PDF

Info

Publication number
CN213753860U
CN213753860U CN202022717854.5U CN202022717854U CN213753860U CN 213753860 U CN213753860 U CN 213753860U CN 202022717854 U CN202022717854 U CN 202022717854U CN 213753860 U CN213753860 U CN 213753860U
Authority
CN
China
Prior art keywords
cable
sleeve
supporting seat
plate
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022717854.5U
Other languages
Chinese (zh)
Inventor
邵峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tianqin Construction Group Co ltd
Original Assignee
Shandong Tianqin Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tianqin Power Engineering Co ltd filed Critical Shandong Tianqin Power Engineering Co ltd
Priority to CN202022717854.5U priority Critical patent/CN213753860U/en
Application granted granted Critical
Publication of CN213753860U publication Critical patent/CN213753860U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a mount for bury construction cable ground, including the base device, the base device includes the bottom plate, the bottom plate both ends all are equipped with fixed subassembly, fixed supporting seat on the bottom plate, the supporting seat lateral wall is equipped with the mount device, the mount device includes the slide rail, slide rail sliding connection supporting seat inner wall, four sliders of sliding connection on the slide rail, every the slider bottom all is equipped with locating component, be equipped with two on the slide rail and compress tightly the subassembly, be equipped with drive arrangement on the supporting seat, drive arrangement includes sign shell and lead screw, the sign shell is fixed on the supporting seat, lead screw bottom bearing connection bottom plate, lead screw nut connects the slide rail, the lead screw with be equipped with spacing subassembly between the sign shell. The utility model relates to a can adjust interval between cable, can fix the cable at the earth's surface, be convenient for with fixed cable immigration underground, bury the mount of construction with being convenient for.

Description

Fixing frame for buried construction of cable
Technical Field
The utility model relates to a cable laying's technical field specifically is a mount that is used for cable ground to bury construction.
Background
The cable laying refers to a process of laying and installing cables along the checked route to form a cable line, and the cables are often fixed by using a fixing frame in the cable burying construction process.
According to the cable mount convenient to change that patent document that application number is CN201921726373.1 provided, this product includes the fixed plate, a side-mounting supporting plate of fixed plate, and supporting plate's one end is connected with the connecting seat, and the surface of connecting seat is located supporting plate's both sides position department and has run through positioning screw, and the surface of connecting seat corresponds positioning screw's position department and has seted up the second connecting hole. This product is convenient for carry on spacing fixedly to the cable according to the draw-in groove of the corresponding size of not unidimensional cable installation, and the use of cooperation buffer layer prevents that metal draw-in groove from causing the destruction to the cable skin, also can solve the problem of the extrusion deformation that the cable caused the draw-in groove.
The product in the above-mentioned patent is convenient for not the fixed of unidimensional cable, nevertheless can't adjust the interval between the cable as required and bury the construction inconveniently, consequently need design one kind can adjust the interval between the cable, can fix the cable at the earth's surface, be convenient for with fixed cable immigration underground, bury the mount of construction conveniently.
SUMMERY OF THE UTILITY MODEL
The utility model mainly provides a mount that is used for burying construction with cable for solve the technical problem who proposes among the above-mentioned background art.
The utility model provides a technical scheme that above-mentioned technical problem adopted does:
the utility model provides a mount for bury construction cable, includes the base device, the base device includes the bottom plate, the bottom plate both ends all are equipped with fixed subassembly, vertical fixed supporting seat on the bottom plate, the supporting seat lateral wall is equipped with the mount device, the mount device includes the slide rail, slide rail sliding connection supporting seat inner wall, four sliders of sliding connection on the slide rail, every the slider bottom all is equipped with locating component, be equipped with two on the slide rail and compress tightly the subassembly, be equipped with drive arrangement on the supporting seat, drive arrangement includes sign shell and lead screw, the sign shell is fixed on the supporting seat, lead screw bottom bearing connecting plate, lead screw nut connects the slide rail, the lead screw with be equipped with spacing subassembly between the sign shell.
Preferably, the fixing assembly comprises a base plate, the base plate is fixed to one end of the bottom plate, two fixing rods are in threaded connection with the base plate, and a drill bit is arranged at the bottoms of the fixing rods. In the preferred embodiment, the stable fixing of the base plate is facilitated by the fixing assembly.
Preferably, the slide rail uses the supporting seat as the axisymmetric distribution, two U-shaped through holes are arranged on the slide rail, and a U-shaped groove is arranged on the slide block. In the preferred embodiment, the cable is secured by a U-shaped channel.
Preferably, the positioning assembly comprises a positioning plate, the positioning plate is connected with a positioning rod, and the positioning rod penetrates through the bottom of the U-shaped through hole in threaded connection with the sliding block. In the preferred embodiment, the stable fixation of the slider is facilitated by the positioning assembly.
Preferably, the pressing assembly comprises two positioning blocks, the two positioning blocks are fixed on the sliding rail, the two positioning blocks are rotatably connected with the pressing plate, and the pressing plate is in threaded connection with a bolt. In the preferred embodiment, the compression fixation of the cable is facilitated by a compression assembly.
Preferably, the limiting assembly comprises a first sleeve, a bearing at the bottom of the first sleeve is connected with the bottom of the inner wall of the identification shell and extends to the external connection screw rod, a second sleeve is sleeved on the inner wall of the first sleeve, and the second sleeve penetrates through the identification shell and extends to the external connection clamping block. In this preferred embodiment, realize the lock of lead screw through spacing subassembly and die.
Preferably, the inner wall of the first sleeve is provided with an anti-rotation boss, and the outer wall of the second sleeve is provided with an anti-rotation groove. In the preferred embodiment, the rotation-proof boss and the rotation-proof groove are matched to prevent the relative rotation between the two sleeves.
Preferably, the side wall of the clamping block is provided with two clamping tables which are in matched contact with the clamping groove, and the clamping groove is formed in the top of the identification shell. In the preferred embodiment, the two sleeves are locked by matching the clamping blocks and the clamping grooves.
Compared with the prior art, the beneficial effects of the utility model are that:
this utility model discloses in be convenient for the stable of bottom plate through fixed subassembly and fix, realize fixing the cable through the mount device, block the cable through slider and clamp plate cooperation among the mount device, be convenient for adjust the interval between the cable through the slider, be convenient for the stable of slider through locating component and fix, be convenient for through lead screw and slide rail cooperation will be in the fixed cable immigration underground of earth's surface, be convenient for die the lead screw lock through spacing subassembly, prevent two intertube relative rotations through preventing changeing the boss and preventing changeing the recess cooperation, realize locking function through fixture block and draw-in groove cooperation.
The present invention will be explained in detail with reference to the drawings and specific embodiments.
Drawings
FIG. 1 is an axial view of the overall structure of the present invention;
FIG. 2 is a side view of the structure of the spacing assembly of the present invention;
FIG. 3 is a side view of the overall structure of the present invention;
fig. 4 is an enlarged view of the structure at a of the present invention.
In the figure: 1. a base unit; 11. a base plate; 12. a fixing assembly; 121. a base plate; 122. fixing the rod; 123. a drill bit; 13. a supporting seat; 2. a mount device; 21. a slide rail; 211. a U-shaped through hole; 22. a slider; 221. a U-shaped groove; 23. a positioning assembly; 231. positioning a plate; 232. positioning a rod; 24. a compression assembly; 241. positioning blocks; 242. pressing a plate; 243. a bolt; 3. a drive device; 31. identifying the housing; 311. a card slot; 32. a screw rod; 33. a limiting component; 331. a first sleeve; 3311. an anti-rotation boss; 332. a second sleeve; 3321. an anti-rotation groove; 333. a clamping block; 3331. and (7) clamping the table.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully with reference to the accompanying drawings, in which several embodiments of the present invention are shown, but the present invention can be implemented in different forms, and is not limited to the embodiments described in the text, but rather, these embodiments are provided to make the disclosure of the present invention more thorough and comprehensive.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may be present, and when an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present, as the terms "vertical", "horizontal", "left", "right" and the like are used herein for descriptive purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the use of the term knowledge in the specification of the present invention is for the purpose of describing particular embodiments and is not intended to limit the present invention, and the term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
Please refer to fig. 1 and 3, the fixing frame for cable burying construction includes a base device 1, the base device 1 includes a bottom plate 11, fixing assemblies 12 are disposed at two ends of the bottom plate 11, a supporting seat 13 is vertically fixed on the bottom plate 11, a fixing frame device 2 is disposed on a side wall of the supporting seat 13, the fixing frame device 2 includes a sliding rail 21, the sliding rail 21 is slidably connected to an inner wall of the supporting seat 13, the fixing assembly 12 includes a backing plate 121, the backing plate 121 is fixed at one end of the bottom plate 11, two fixing rods 122 are screwed on the backing plate 121, and a drill bit 123 is disposed at a bottom of each fixing rod 122. During construction, a plurality of base devices 1 can be equidistantly installed in a dug cable pit, a bottom plate 11 is arranged in the pit, a fixing rod 122 is rotated, and a drill bit 123 at the bottom of the fixing rod 122 is drilled into the ground to complete the fixing of the bottom plate 11.
Please refer to fig. 1 and 3 again, the four sliding blocks 22 are slidably connected to the sliding rail 21, a positioning assembly 23 is disposed at the bottom of each sliding block 22, two pressing assemblies 24 are disposed on the sliding rail 21, the sliding rail 21 is axially and symmetrically distributed by taking the supporting seat 13 as an axis, two U-shaped through holes 211 are disposed on the sliding rail 21, a U-shaped groove 221 is disposed on the sliding block 22, the positioning assembly 23 includes a positioning plate 231, the positioning plate 231 is connected to a positioning rod 232, the positioning rod 232 penetrates through the U-shaped through hole 211 and is connected to the bottom of the sliding block 22 through threads, the pressing assembly 24 includes two positioning blocks 241, the two positioning blocks 241 are both fixed to the sliding rail 21, a pressing plate 242 is rotatably connected between the two positioning blocks 241, and a bolt 243 is connected to the pressing plate 242 through threads. The cable is placed in the U-shaped groove 221, the sliding block 22 is slid, the positioning rod 232 is rotated after the distance between the sliding blocks 22 is proper, the positioning plate 231 is rotated to press the bottom of the sliding rail 21, the positioning and fixing of the sliding block 22 are completed, the pressing plate 242 is rotated, the cable is pressed by the pressing plate 242, the pressing plate 242 and the sliding rail 21 are connected through the bolt 243, and the pressing and fixing of the cable are completed.
Please refer to fig. 1-4, a driving device 3 is disposed on the supporting seat 13, the driving device 3 includes an identification housing 31 and a screw rod 32, the identification housing 31 is fixed on the supporting seat 13, a bottom of the screw rod 32 is connected to the bottom plate 11 through a bearing, the screw rod 32 is connected to the slide rail 21 through a screw nut, a limiting component 33 is disposed between the screw rod 32 and the identification housing 31, the limiting component 33 includes a first sleeve 331, the bottom of the first sleeve 331 is connected to the bottom of the inner wall of the identification housing 31 through a bearing and extends to the outside to be connected to the screw rod 32, a second sleeve 332 is sleeved on the inner wall of the first sleeve 331, the second sleeve 332 extends to the outside to be connected to a fixture block 333 through the identification housing 31, an anti-rotation boss 3311 is disposed on the inner wall of the first sleeve 331, an anti-rotation groove 3321 is disposed on the outer wall of the second sleeve 332, two fixture blocks 3331 are disposed on the side wall of the fixture block 333, the clamping table 3331 is matched with the clamping groove 311, and the clamping groove 311 is arranged at the top of the identification shell 31. When the cable is moved downwards, the fixture block 333 is lifted upwards, the fixture table 3331 leaves the fixture groove 311, the second sleeve 332 is rotated, the second sleeve 332 drives the first sleeve 331 to rotate, the first sleeve 331 drives the screw rod 32 to rotate, the screw rod 32 drives the slide rail 21 to move downwards, the fixture block 333 is pressed downwards after the slide rail 21 moves downwards to the bottom, the fixture table 3331 is clamped into the fixture groove 311 to complete locking of the screw rod 32, soil can be filled, the soil is buried at the top of the support base 13, and the mark shell 31 can be used as a cable mark.
The utility model discloses a concrete operation as follows:
during construction, a plurality of base devices 1 can be equidistantly installed in a dug cable pit, a bottom plate 11 is arranged in the pit, a fixed rod 122 is rotated, a drill bit 123 at the bottom of the fixed rod 122 is drilled into the ground to fix the bottom plate 11, cables are arranged in a U-shaped groove 221, a sliding block 22 is slid, a positioning rod 232 is rotated after the distance between the sliding blocks 22 is proper, the positioning rod is rotated until a positioning plate 231 presses the bottom of a sliding rail 21 to complete positioning and fixing of the sliding block 22, a pressing plate 242 is rotated to press the cables, the pressing plate 242 and the sliding rail 21 are connected through a bolt 243 to complete pressing and fixing of the cables, when the cables move downwards, a clamping block 333 is lifted upwards, a clamping table 3331 is separated from a clamping groove 311, a second sleeve 332 is rotated, the second sleeve 332 drives a first sleeve 331 to rotate, the first sleeve 331 drives a screw rod 32 to rotate, the screw rod 32 drives the clamping block 21 to move downwards, the clamping block 333 is pressed downwards after the sliding rail 21 moves downwards to the bottom, the clamping table 3331 is clamped in the clamping groove 311 to complete locking of the screw rod 32, can carry out soil landfill, bury to supporting seat 13 top can, sign shell 31 can regard as the cable sign.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above-mentioned manner, if the method and the technical solution of the present invention are adopted, the present invention can be directly applied to other occasions without substantial improvement, and the present invention is within the protection scope of the present invention.

Claims (8)

1. The utility model provides a mount for bury construction cable, includes base device (1), its characterized in that, base device (1) includes bottom plate (11), bottom plate (11) both ends all are equipped with fixed subassembly (12), vertical fixed support seat (13) on bottom plate (11), supporting seat (13) lateral wall is equipped with mount device (2), mount device (2) include slide rail (21), slide rail (21) sliding connection supporting seat (13) inner wall, sliding connection four slider (22) on slide rail (21), every slider (22) bottom all is equipped with locating component (23), be equipped with two on slide rail (21) and compress tightly subassembly (24), be equipped with drive arrangement (3) on supporting seat (13), drive arrangement (3) include sign shell (31) and lead screw (32), sign shell (31) are fixed on supporting seat (13), the bottom of the screw rod (32) is connected with the bottom plate (11) through a bearing, the screw rod (32) is connected with the sliding rail (21) through a screw rod nut, and a limiting component (33) is arranged between the screw rod (32) and the identification shell (31).
2. The fixing frame for underground construction of cables as claimed in claim 1, wherein said fixing assembly (12) comprises a base plate (121), said base plate (121) is fixed on one end of the bottom plate (11), said base plate (121) is screwed with two fixing rods (122), and the bottom of each fixing rod (122) is provided with a drill bit (123).
3. The fixing frame for cable burying construction according to claim 1, wherein said slide rails (21) are axisymmetrically distributed with respect to said supporting base (13), said slide rails (21) are provided with two U-shaped through holes (211), and said slide blocks (22) are provided with U-shaped grooves (221).
4. The fixing frame for cable burying construction according to claim 3, wherein said positioning assembly (23) comprises a positioning plate (231), a positioning rod (232) is connected to said positioning plate (231), and said positioning rod (232) is threaded to the bottom of the sliding block (22) through the U-shaped through hole (211).
5. The fixing frame for cable burying construction according to claim 1, wherein said pressing assembly (24) comprises two positioning blocks (241), both said positioning blocks (241) are fixed on a sliding rail (21), a pressing plate (242) is rotatably connected between said two positioning blocks (241), and a bolt (243) is threadedly connected on said pressing plate (242).
6. The fixing frame for cable burying construction according to claim 1, wherein said limiting component (33) comprises a first sleeve (331), the bottom of said first sleeve (331) is bearing-connected to the bottom of the inner wall of the sign housing (31) and extends to the external connection screw rod (32), the inner wall of said first sleeve (331) is sleeved with a second sleeve (332), and said second sleeve (332) extends to the external connection fixture block (333) through the sign housing (31).
7. The fixing frame for underground construction of cables as claimed in claim 6, wherein the inner wall of the first sleeve (331) is provided with anti-rotation bosses (3311), and the outer wall of the second sleeve (332) is provided with anti-rotation grooves (3321).
8. The fixing frame for underground cable construction according to claim 6, wherein the side wall of the clamping block (333) is provided with two clamping platforms (3331), the clamping platforms (3331) are matched and contacted with the clamping groove (311), and the clamping groove (311) is arranged at the top of the identification shell (31).
CN202022717854.5U 2020-11-20 2020-11-20 Fixing frame for buried construction of cable Active CN213753860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022717854.5U CN213753860U (en) 2020-11-20 2020-11-20 Fixing frame for buried construction of cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022717854.5U CN213753860U (en) 2020-11-20 2020-11-20 Fixing frame for buried construction of cable

Publications (1)

Publication Number Publication Date
CN213753860U true CN213753860U (en) 2021-07-20

Family

ID=76827533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022717854.5U Active CN213753860U (en) 2020-11-20 2020-11-20 Fixing frame for buried construction of cable

Country Status (1)

Country Link
CN (1) CN213753860U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115967059A (en) * 2023-03-10 2023-04-14 国网山东省电力公司昌乐县供电公司 Power supply construction cable installation component

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115967059A (en) * 2023-03-10 2023-04-14 国网山东省电力公司昌乐县供电公司 Power supply construction cable installation component
CN115967059B (en) * 2023-03-10 2023-05-23 国网山东省电力公司昌乐县供电公司 Power supply construction cable installation component

Similar Documents

Publication Publication Date Title
CN213753860U (en) Fixing frame for buried construction of cable
CN211692307U (en) Petroleum drilling machine base convenient to location
CN213888228U (en) Square workpiece drilling tool structure
CN212808644U (en) Fixing device for geophone for monitoring microseism
CN219380464U (en) Mechanical slit clamp for internal optics of camera
CN219394319U (en) Cable support that traffic engineering used
CN214560572U (en) Nut restraint limiting and adjusting structure
CN219890909U (en) A easy regulation test fixture for mechanical structure
CN217572527U (en) Universal clamp structure for clamping small probe card
CN218906403U (en) Hydraulic press slide block guiding precision adjusting assembly
CN114109129B (en) Safety device and installation auxiliary tool
CN218588590U (en) Slide rail convenient to connect
CN220050105U (en) Drilling device for metal gasket
CN211777137U (en) Auxiliary device for management based on remote communication
CN216616964U (en) Container room crossbeam connecting piece
CN213438144U (en) Detachable extraction hydraulic turbine thrust tile device
CN218079912U (en) Punching clamp for machining automobile heat insulation plate
CN220553330U (en) Auxiliary supporting structure and column type insulating supporting piece
CN220691821U (en) Insulating base of current transformer
CN216643709U (en) Protection type electronic information bulletin device
CN216732165U (en) Punching device of projector heat dissipation shell
CN219535557U (en) Cable fixing clamp
CN218109774U (en) Fixing device is used in processing of thermal-insulated type aluminium alloy
CN114309286B (en) Stamping die for collecting pipe processing
CN220037182U (en) Pressure maintaining device for cementing limiting ring assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 24001, Unit 1, Dongcheng International Complex Building, Luzhuang Community, Danyang Office, Heze Development Zone, Shandong Province, 274000

Patentee after: Shandong Tianqin Construction Group Co.,Ltd.

Address before: 24 / F, Hejian building, 7177 East Changjiang Road, Heze Development Zone, Shandong Province 274000

Patentee before: Shandong tianqin Power Engineering Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Fixing frame for cable buried construction

Effective date of registration: 20221101

Granted publication date: 20210720

Pledgee: Heze rural commercial bank Limited by Share Ltd.

Pledgor: Shandong Tianqin Construction Group Co.,Ltd.

Registration number: Y2022980020372

PE01 Entry into force of the registration of the contract for pledge of patent right