CN213751166U - Pile foundation construction process supervisory systems - Google Patents

Pile foundation construction process supervisory systems Download PDF

Info

Publication number
CN213751166U
CN213751166U CN202023344567.0U CN202023344567U CN213751166U CN 213751166 U CN213751166 U CN 213751166U CN 202023344567 U CN202023344567 U CN 202023344567U CN 213751166 U CN213751166 U CN 213751166U
Authority
CN
China
Prior art keywords
pile foundation
mobile terminal
construction
management platform
positioning module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023344567.0U
Other languages
Chinese (zh)
Inventor
张立标
吴成华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Punctuation Information Technology Co ltd
Original Assignee
Zhejiang Punctuation Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Punctuation Information Technology Co ltd filed Critical Zhejiang Punctuation Information Technology Co ltd
Priority to CN202023344567.0U priority Critical patent/CN213751166U/en
Application granted granted Critical
Publication of CN213751166U publication Critical patent/CN213751166U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The utility model discloses a pile foundation work progress supervisory systems, include: the pile foundation is provided with a pile foundation number; the management platform is internally stored with pile foundation information corresponding to the pile foundation number; the mobile terminal is connected with the management platform; the construction equipment is provided with a two-dimensional code label; wherein, the user uses mobile terminal, selects the pile foundation that will be under construction through the pile foundation serial number, later, scans the two-dimensional code label and associates for construction equipment is under construction to the pile foundation, and the user passes through mobile terminal to the work progress record of uploading corresponding pile foundation in the management platform. The utility model discloses a can real time monitoring pile foundation's work progress.

Description

Pile foundation construction process supervisory systems
Technical Field
The utility model relates to a construction field, concretely relates to pile foundation work progress supervisory systems.
Background
Pile foundation construction in the building industry is always the foundation of the building construction process, but supervision personnel do not arrive at the site to carry out side station due to difficult supervision in the past; construction equipment and constructors are disorderly managed, and finally the quality of the pile foundation is uneven.
SUMMERY OF THE UTILITY MODEL
To the weak point that exists among the prior art, the utility model provides a pile foundation work progress supervisory systems.
The utility model discloses a pile foundation work progress supervisory systems, include: the pile foundation is provided with a pile foundation number;
the management platform is internally stored with the pile foundation information corresponding to the pile foundation number;
the mobile terminal is connected with the management platform;
the construction equipment is provided with a two-dimensional code label;
the mobile terminal is used by a user, the pile foundation to be constructed is selected through the pile foundation serial number, then the two-dimensional code label is scanned to be associated, so that the construction equipment is right for pile foundation construction, and the user passes through the mobile terminal to the management platform, wherein the mobile terminal uploads the construction process record corresponding to the pile foundation.
Preferably, the pile foundation information includes a pile foundation contract, a pile foundation number, and a pile foundation construction position.
Preferably, the system further comprises a positioning module arranged on the construction equipment, and the mobile terminal is connected with the positioning module and used for displaying the current position of the pile foundation.
Preferably, the positioning module is a GPS positioning module or a beidou positioning module.
Preferably, the mobile terminal is provided with application software, and the application software is used for scanning the two-dimensional code label.
Preferably, the application software includes a cloud server, the cloud server is connected to the management platform, and the cloud server is connected to the positioning module.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in through storing every on management platform pile foundation information, the user can inquire pile foundation information and upload the construction record in the current pile foundation work progress through mobile terminal, and the supervision can all clearly be looked up through management platform in the later stage like this.
Drawings
Fig. 1 is the structural schematic diagram of the monitoring system for pile foundation construction process of the utility model.
Reference numerals:
1. a pile foundation; 11. numbering; 2. a mobile terminal; 3. a management platform; 31. pile foundation information; 4. construction equipment; 41. a two-dimensional code label; 42. and a positioning module.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The present invention will be described in further detail with reference to the accompanying drawing 1:
referring to fig. 1, a pile foundation construction process supervision system includes: the pile foundation comprises at least one pile foundation 1, wherein a pile foundation code 11 is arranged on the pile foundation 1;
the management platform 3 is used for storing each pile foundation information 31 in the management platform 3;
specifically, the pile foundation information 31 includes a pile foundation 1 contract, a pile foundation 1 number, and a pile foundation 1 construction position.
The mobile terminal 2 is connected with the management platform 3;
specifically, the mobile terminal 2 is provided with application software, the application software comprises a cloud server, and the cloud server is connected with the management platform 3.
The construction equipment 4 is provided with a two-dimensional code label 41;
wherein, the user uses mobile terminal 2, selects the pile foundation 1 that will be under construction through pile foundation number 11, later, scans two-dimensional code label 41 and associates for construction equipment 4 is under construction to pile foundation 1, and the user uploads the work progress record that corresponds pile foundation 1 in to management platform 3 through mobile terminal 2.
Wherein, constructor uses mobile terminal 2 to scan two-dimensional code label 41, and pile foundation information 31 that corresponds two-dimensional code label 41 is relevant, and can consult pile foundation information 31 or to the pile foundation information upload corresponding pile foundation 1's work progress record in through mobile terminal 2.
Further, the construction equipment comprises a positioning module 42 arranged on the construction equipment 4, and the mobile terminal 2 is connected with the positioning module 42 and used for displaying the current position of the construction equipment 4. That is, the position of the construction equipment 4 is known through the positioning module 42, and the construction position of the pile foundation 1 can be displayed through the mobile terminal 2, so that whether the position of the pile foundation 1 is correct or not is supervised.
Wherein, cloud service end is connected with orientation module 42, and orientation module 42 is GPS orientation module 42 or big dipper orientation module 42.
In this embodiment, the mobile terminal 2 may be an electronic device such as a mobile phone, an ipad, or a computer.
Pile foundation construction supervision process:
the pile foundation 1 is provided with a number 11;
opening application software on the mobile terminal 2, and selecting the pile foundation 1 to be constructed through the pile foundation number 11;
scanning the two-dimension code label 41 for correlation, so that the construction equipment 4 constructs the pile foundation 1;
a user uploads the construction process of the pile foundation 1 to a photo or a video in the construction process through the application software;
the concrete construction process of consulting the pile foundation 1 can be monitored through the supervision platform 3.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A pile foundation construction process supervisory system, comprising:
the pile foundation is provided with a pile foundation number;
the management platform is internally stored with the pile foundation information corresponding to the pile foundation number;
the mobile terminal is connected with the management platform;
the construction equipment is provided with a two-dimensional code label;
the mobile terminal is used by a user, the pile foundation to be constructed is selected through the pile foundation serial number, then the two-dimensional code label is scanned to be associated, so that the construction equipment is right for pile foundation construction, and the user passes through the mobile terminal to the management platform, wherein the mobile terminal uploads the construction process record corresponding to the pile foundation.
2. The pile foundation construction process supervisory system of claim 1, wherein the pile foundation information includes pile foundation contract, pile foundation number, pile foundation construction location.
3. The system for supervising pile foundation construction processes of claim 1, further comprising a positioning module disposed on the construction equipment, wherein the mobile terminal is connected to the positioning module for displaying a current construction position of the construction equipment.
4. The pile foundation construction process supervisory system of claim 3, wherein the positioning module is a GPS positioning module or a Beidou positioning module.
5. The system for supervising pile foundation construction processes of claim 3, wherein application software is provided on the mobile terminal, the application software being configured to scan the two-dimensional code tag.
6. The pile foundation construction process supervisory system of claim 5, wherein the application software includes a cloud server, the cloud server is connected with the management platform, and the cloud server is connected with the positioning module.
CN202023344567.0U 2020-12-31 2020-12-31 Pile foundation construction process supervisory systems Active CN213751166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023344567.0U CN213751166U (en) 2020-12-31 2020-12-31 Pile foundation construction process supervisory systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023344567.0U CN213751166U (en) 2020-12-31 2020-12-31 Pile foundation construction process supervisory systems

Publications (1)

Publication Number Publication Date
CN213751166U true CN213751166U (en) 2021-07-20

Family

ID=76837736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023344567.0U Active CN213751166U (en) 2020-12-31 2020-12-31 Pile foundation construction process supervisory systems

Country Status (1)

Country Link
CN (1) CN213751166U (en)

Similar Documents

Publication Publication Date Title
US7966384B2 (en) Real-time interactive system and method for making and updating changes to infrastructure data
CN103309306B (en) Concrete vibrating quality monitoring communication network-building method
CN102136162B (en) A kind of power transmission line polling system
CN110118973A (en) Warehouse Intellisense recognition methods, device and electronic equipment
CN105976448A (en) Patrol system and method
CN102147886A (en) Geographic-information system (GIS) and general packet radio service (GPRS) technology-based remote metro construction inspection and management system
CN101325784A (en) Polling mobile communication terminal, system and method
Sarkar et al. Development of integrated cloud-based Internet of Things (IoT) platform for asset management of elevated metro rail projects
CN107516136A (en) Power Line Inspection System
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN107423826A (en) A kind of method for inspecting of multi-reservoir, device and system
CN108650665A (en) A kind of electronic cyclic method and system of data center's total management system
CN207799760U (en) Intelligent building management system
CN104966329A (en) System for intelligent scheduling and polling of photovoltaic power station
KR101480784B1 (en) River Facility Maintenance Method using Near Field Communication
CN213751166U (en) Pile foundation construction process supervisory systems
CN112116045A (en) Intelligent scaffold safety state prompting and detecting system
JP5007043B2 (en) Cable position information management system, apparatus, method and program
CN112383960A (en) Two-dimensional and three-dimensional integrated factory personnel positioning system
CN110880096A (en) Multi-party cooperative office system for constructional engineering
CN208705222U (en) Data management terminal and its system for laser gas detector
CN110766174A (en) Method, device and system for acquiring maintenance scheme
CN213094360U (en) Full-control management system for line grounding wire
KR20220034559A (en) Utility pole monitoring system and method usign drone and utility pole numberplate
CN115329994A (en) Intelligent water conservancy routing inspection method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant