CN213745284U - All-plastic heat-insulating pipe fixing clamp used between floors - Google Patents
All-plastic heat-insulating pipe fixing clamp used between floors Download PDFInfo
- Publication number
- CN213745284U CN213745284U CN202022031832.3U CN202022031832U CN213745284U CN 213745284 U CN213745284 U CN 213745284U CN 202022031832 U CN202022031832 U CN 202022031832U CN 213745284 U CN213745284 U CN 213745284U
- Authority
- CN
- China
- Prior art keywords
- fixing piece
- fixing
- fixing part
- insulating tube
- floors
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229920003023 plastic Polymers 0.000 title claims abstract description 21
- 239000004033 plastic Substances 0.000 title claims abstract description 21
- 238000004321 preservation Methods 0.000 claims abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 4
- 238000005728 strengthening Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 3
- 238000009413 insulation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
- Thermal Insulation (AREA)
Abstract
The utility model discloses a full plastic heat preservation pipe fixing fixture used between floors, which comprises a first fixing part and a second fixing part connected with the first fixing part, wherein the first fixing part and the second fixing part are of semicircular structures which are mutually matched; mounting holes are formed in the two ends of the first fixing piece and the second fixing piece; the inner side surfaces of the first fixing piece and the second fixing piece are provided with bulges at equal intervals. The utility model adopts the above structure be used for plastic insulating tube fixed fixture between floor, solved because the difference in temperature causes the problem of insulating tube longitudinal length change greatly, the pipe fitting quality is light simultaneously, construction convenience, fastening is respond well, the cost is reduced.
Description
Technical Field
The utility model belongs to the technical field of fixed fixture technique and specifically relates to a plastic insulating tube fixed fixture for between floor is related to.
Background
At present, in northern areas of China, the temperature difference between winter and summer is large, all-plastic heat-insulating pipes between floors are easily affected by the temperature difference, obvious longitudinal length change can occur when the temperature difference is large, so that restraint must be carried out between every two floors.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a plastic insulating tube fixing fixture for between floor has solved because the difference in temperature causes the problem of insulating tube longitudinal length change greatly, and the pipe fitting quality is light simultaneously, construction convenience, and fastening is respond well, the cost is reduced.
In order to achieve the purpose, the utility model provides a full plastic heat preservation pipe fixing fixture used between floors, which comprises a first fixing part and a second fixing part connected with the first fixing part, wherein the first fixing part and the second fixing part are of semicircular structures which are mutually matched;
mounting holes are formed in the two ends of the first fixing piece and the second fixing piece;
the inner side surfaces of the first fixing piece and the second fixing piece are provided with bulges at equal intervals.
Preferably, the protrusion is a ring-shaped structure, and the protrusion is integrally formed with the first fixing member and the second fixing member.
Preferably, the top symmetry of first mounting is provided with latch device, latch device's medial surface is the arc structure, and with the interior circle radius of first mounting is the same.
Preferably, the outer side surfaces of the first fixing piece and the second fixing piece are provided with reinforcing ribs, and the angle of inclination of the reinforcing ribs close to the mounting holes is larger than that of the reinforcing ribs far away from the mounting holes.
Preferably, the first fixing member and the second fixing member are connected by a bolt.
Preferably, the first fixing piece and the second fixing piece are made of plastics.
Therefore, the utility model adopts the above structure be used for plastic insulating tube fixed fixture between floor, solved because the difference in temperature causes the problem of insulating tube longitudinal length change greatly, the pipe fitting quality is light simultaneously, construction convenience, fastening respond well, the cost is reduced.
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
Drawings
Fig. 1 is a schematic structural view of an embodiment of a fixing clamp for all-plastic heat preservation pipes between floors of the present invention.
Detailed Description
Examples
Fig. 1 is a schematic structural view of an embodiment of a full-plastic thermal insulation pipe fixing fixture used between floors, as shown in the drawings, the utility model provides a full-plastic thermal insulation pipe fixing fixture used between floors, which comprises a first fixing part 1 and a second fixing part 2 connected with the first fixing part 1, wherein the first fixing part 1 and the second fixing part 2 are semi-circular structures which are matched with each other; mounting holes 3 are formed in the two ends of the first fixing piece 1 and the second fixing piece 2; the even equidistance of medial surface of first mounting 1 and second mounting 2 is provided with arch 4, and arch 4 is the loop configuration, and arch 4 is integrated into one piece with first mounting 1 and second mounting 2, the utility model discloses a structure of two huff's piece concatenations of first mounting and second mounting, with plastic insulating tube chucking, inside sets up bellied purpose has fine friction in insulating tube and first mounting and second mounting contact department, has increased the fastening nature between insulating tube and the fixture, falls the screw when using, wraps up first mounting and second mounting in the outside of insulating tube, and the reuse screw is screwed up, has adjusted the screw after the angle and has tightened, has just so accomplished insulating tube's fixed.
The top symmetry of first mounting 1 is provided with latch 5, and latch 5's medial surface is the arc structure, and is the same with the interior radius of circle of first mounting 1, and the straightness that hangs down of plastic insulating tube is rectified to the purpose that sets up two latch, and this is because the hardness of plastic insulating tube is very low, can not guarantee to hang down straightness, installs latch and both played the effect of rectifying, is convenient for install again, has saved the time.
The lateral surface of first mounting 1 and second mounting 2 all is provided with the strengthening rib, 6 inclination angles of strengthening rib that are close to the mounting hole are greater than 7 inclination angles of strengthening rib of keeping away from the mounting hole, set up the intensity that the fixture can be guaranteed to the strengthening rib, simultaneously can also save material, the strengthening rib inclination angle that is close to the mounting hole is great, this is because the strengthening rib can obstruct the installation when twisting the screw, it is inconvenient to tighten the screw, can influence the use of fixed fixture like this, the inclination increase of strengthening rib, the installation of the screw of being convenient for.
The first fixing member 1 and the second fixing member 2 are connected by a bolt 8.
The first fixing piece 1 and the second fixing piece 2 are made of plastics, so that the material is light and the installation is convenient.
Therefore, the utility model adopts the above structure be used for plastic insulating tube fixed fixture between floor, solved because the difference in temperature causes the problem of insulating tube longitudinal length change greatly, the pipe fitting quality is light simultaneously, construction convenience, fastening respond well, the cost is reduced.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting the same, and although the present invention is described in detail with reference to the preferred embodiments, those skilled in the art should understand that: the technical solution of the present invention can still be modified or replaced by other equivalent means, and the modified technical solution can not be separated from the spirit and scope of the technical solution of the present invention.
Claims (2)
1. The utility model provides a plastic insulating tube fixes fixture for between floor which characterized in that:
the fixing device comprises a first fixing piece and a second fixing piece connected with the first fixing piece, wherein the first fixing piece and the second fixing piece are of semicircular structures matched with each other;
mounting holes are formed in the two ends of the first fixing piece and the second fixing piece;
the inner side surfaces of the first fixing piece and the second fixing piece are uniformly provided with bulges at equal intervals;
the bulge is of an annular structure and is integrally formed with the first fixing piece and the second fixing piece;
the top end of the first fixing piece is symmetrically provided with clamping devices, and the inner side surfaces of the clamping devices are of arc structures and have the same radius as the inner circle of the first fixing piece;
reinforcing ribs are arranged on the outer side surfaces of the first fixing piece and the second fixing piece, and the inclination angle of the reinforcing ribs close to the mounting holes is larger than that of the reinforcing ribs far away from the mounting holes;
the first fixing piece is connected with the second fixing piece through a bolt.
2. The all-plastic heat preservation pipe fixing clamp used between the floor slabs as claimed in claim 1, characterized in that: the first fixing piece and the second fixing piece are made of plastics.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022031832.3U CN213745284U (en) | 2020-09-16 | 2020-09-16 | All-plastic heat-insulating pipe fixing clamp used between floors |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022031832.3U CN213745284U (en) | 2020-09-16 | 2020-09-16 | All-plastic heat-insulating pipe fixing clamp used between floors |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213745284U true CN213745284U (en) | 2021-07-20 |
Family
ID=76844736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022031832.3U Active CN213745284U (en) | 2020-09-16 | 2020-09-16 | All-plastic heat-insulating pipe fixing clamp used between floors |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213745284U (en) |
-
2020
- 2020-09-16 CN CN202022031832.3U patent/CN213745284U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3221316U (en) | Tension line clamp for carbon fiber composite core | |
KR101353512B1 (en) | Fixing unit for a outside panel of building | |
CN213745284U (en) | All-plastic heat-insulating pipe fixing clamp used between floors | |
CN105507478A (en) | Suspended ceiling mounting component | |
CN210123056U (en) | Butt-joint structure for water supply and drainage pipes | |
CN210111074U (en) | Electrified fastener that connects sparks suitable for equidirectional drainage line is set up | |
CN211315455U (en) | Pipe fitting saddle connecting structure | |
CN205118443U (en) | Thermal -insulated fixture of air conditioner pipe | |
CN104455939B (en) | Crosslinked polyethylene insulating tube spanning tee alarming line fixing device and fixing means | |
CN208058131U (en) | A kind of omnipotent pipe clamp | |
CN215060032U (en) | Novel installation pipe fitting structure | |
CN213871644U (en) | Connecting piece for end face of glass fiber reinforced plastic purification tank | |
CN215928638U (en) | Iron hoop | |
CN220792368U (en) | Steel pipe convenient to install | |
CN215772465U (en) | U-shaped hanging ring with high stability | |
CN217353210U (en) | Length-adjustable anti-pulling grouting sleeve | |
CN211901832U (en) | Building outer tube mounting | |
KR200216498Y1 (en) | Thermal pipe hanger | |
CN217507632U (en) | Mounting structure of omnidirectional ceiling antenna | |
CN219365440U (en) | Triangle building templates pull rod | |
CN208024957U (en) | A kind of piping fixing structure for waste-water heat-energy recovery device | |
CN207894292U (en) | A kind of ready-package underground heat tube assembly | |
CN218845456U (en) | Stainless steel air duct with detachable external heat insulation layer | |
KR200382039Y1 (en) | Connecting band for pipes | |
KR970005327Y1 (en) | Joint for plastic piping |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Fixing fixtures for all plastic insulation pipes between floor slabs Granted publication date: 20210720 Pledgee: Bank of China Limited Baoding Branch Pledgor: HEBEI CONSTRUCTION & INVESTMENT BAOSU PIPE INDUSTRY Co.,Ltd. Registration number: Y2024980019935 |