CN213745222U - Novel design hoist and mount system of tuber pipe for purification engineering - Google Patents
Novel design hoist and mount system of tuber pipe for purification engineering Download PDFInfo
- Publication number
- CN213745222U CN213745222U CN202022683407.2U CN202022683407U CN213745222U CN 213745222 U CN213745222 U CN 213745222U CN 202022683407 U CN202022683407 U CN 202022683407U CN 213745222 U CN213745222 U CN 213745222U
- Authority
- CN
- China
- Prior art keywords
- tuber pipe
- support frame
- jib
- novel design
- mount system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000746 purification Methods 0.000 title claims description 17
- 230000008093 supporting effect Effects 0.000 claims abstract description 5
- 238000012856 packing Methods 0.000 claims description 8
- 239000000725 suspension Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 description 9
- 230000000694 effects Effects 0.000 description 6
- NIXOWILDQLNWCW-UHFFFAOYSA-N acrylic acid group Chemical group C(C=C)(=O)O NIXOWILDQLNWCW-UHFFFAOYSA-N 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000001125 extrusion Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model relates to a purify novel design hoist and mount system of tuber pipe for engineering relates to engineering design technical field, it includes the jib with wall body fixed connection, slide the thread bush that sets up with the jib, with jib detachable connection's connecting rod and the support frame that is used for supporting the tuber pipe, the connecting rod is removable setting with the support frame, the jib upper end is provided with and is used for the connecting piece with wall body fixed connection, be provided with the joint subassembly that is used for restricting the thread bush motion between jib and the thread bush, the first threaded rod of one end fixedly connected with of connecting rod, thread bush and first threaded rod threaded connection. This application has the advantage of disassembling fast and installing the tuber pipe gallows.
Description
Technical Field
The utility model belongs to the technical field of engineering design technique and specifically relates to a novel design hoist and mount system of tuber pipe for purification engineering is related to.
Background
Current tuber pipe need adopt special gallows to install at the installation work in-process, and the gallows uses the welding form usually, is unfavorable for the disassembling of later stage tuber pipe gallows.
Now, retrieving the Chinese patent with the publication number of CN211423543U, it discloses an adjustable air duct hanger applied to subway stations and connected with an embedded chute, comprising a pair of T-shaped bolts, a pair of adjusting parts, a pair of hanging rods and a support frame, wherein the hanging rods are vertically and detachably connected with the two ends of the support frame, the lower ends of the hanging rods are in threaded connection with fifth nuts, the hanging rods penetrate through the support frame and are connected with sixth nuts, the support frame can be fixed at the lower ends of the hanging rods by the fifth nuts and the sixth nuts, the adjusting parts are respectively and detachably connected with the adjusting parts, the adjusting parts comprise square rings, third nuts and fourth nuts, the lower ends of the hanging rods are in threaded connection with second nuts, the second nuts are in contact with the bottom ends of the square rings, the upper ends of the hanging rods can be fixed at the lower ends of the square rings by the second nuts and the fourth nuts, the tops of the square rings are detachably, the first and third nuts may secure the upper square end to the T-bolt.
The above prior art solutions have the following drawbacks: when the air duct hanger is installed, the hanger rod needs to penetrate through the square ring firstly, then the fourth nut is screwed and fixed on the hanger rod in the square ring, then the second nut is screwed and fixed on the hanger rod on the lower end face of the square ring, then the fifth nut is screwed and fixed on the hanger rod below the second nut, then the support frame penetrates through the hanger rod, and finally the sixth nut is screwed and fixed on the hanger rod on the lower end face of the support frame.
SUMMERY OF THE UTILITY MODEL
In order to improve the disassembly and the installation of tuber pipe gallows, this application provides a novel design hoist and mount system of tuber pipe for purification engineering.
The application provides a purify novel design hoist and mount system of tuber pipe for engineering adopts following technical scheme:
the utility model provides a purify novel design hoist and mount system of tuber pipe for engineering, include with wall body fixed connection's jib, slide the thread bush that sets up, with jib detachable connection's connecting rod and the support frame that is used for supporting the tuber pipe with the jib, its characterized in that: the connecting rod with the support frame is removable setting, the jib upper end be provided with be used for with wall body fixed connection's connecting piece, the jib with be provided with the joint subassembly that is used for restricting the thread bush motion between the thread bush, the first threaded rod of one end fixedly connected with of connecting rod, the thread bush with first threaded rod threaded connection.
Through adopting above-mentioned technical scheme, two sets of connecting pieces are fixed respectively on the wall body with two sets of jibs, when carrying out the installation of tuber pipe gallows, earlier with support frame both ends fixed connection on two sets of connecting rods, then with first threaded rod and two sets of jib butt on the support frame both ends connecting rod, rotatory thread bush after that, make thread bush and first threaded rod screw-thread fit, stop to rotate the thread bush under the joint subassembly effect, connecting rod and jib realize fixed locking under thread bush and the screw action of first threaded rod screw thread and joint subassembly mutual contact extrusion effect this moment.
Preferably, the joint subassembly includes joint ring and spacing collar, the joint ring with thread bush fixed connection, the spacing collar sets up the jib is close to the one end of connecting rod.
Through adopting above-mentioned technical scheme, thread bush and first threaded rod screw-thread fit, rotatory thread bush moves towards the spacing collar direction through screw drive thread bush and joint ring, and when spacing collar and joint ring butt, jib and first threaded rod realize fixed locking under the screw thread effect of thread bush and the mutual supporting effect of joint ring and spacing collar.
Preferably, the thread bush periphery is provided with the multiunit arch, the multiunit protruding equipartition is in the thread bush is kept away from the one end of connecting rod.
Through adopting above-mentioned technical scheme, the frictional force of operator's hand and thread bush periphery can be increased to the multiunit arch, is convenient for the operator to rotate the thread bush.
Preferably, the connecting rod is kept away from the one end fixedly connected with second threaded rod of first threaded rod, screw-thread fit has two nuts on the second threaded rod, two the nut is located respectively support frame upper and lower both ends face.
Through adopting above-mentioned technical scheme, it is fixed with the nut of backup pad top and second threaded rod screw-thread fit earlier, then pass the connecting rod with the backup pad and be close to the lower terminal surface of top nut, at last with the nut of backup pad top and second threaded rod screw-thread fit and be close to the backup pad lower terminal surface along second threaded rod screw, realize fixed locking under the mutual supporting effect of nut and second threaded rod screw-thread effect and two nuts and backup pad.
Preferably, two the nut is close to all be provided with the circular ring groove on the terminal surface of support frame, all inlay in the circular ring groove and be equipped with rubber packing ring, rubber packing ring's terminal surface all is higher than the terminal surface in circular ring groove.
Through adopting above-mentioned technical scheme, the ring groove is used for fixed rubber packing ring, and bellied rubber packing ring can eliminate the compressive stress of two nuts and support frame upper and lower surface, reduces the wearing and tearing between two nuts and the support frame upper and lower surface, prolongs the life of support frame.
Preferably, the connector is provided as an expansion bolt for fixing the boom.
Through adopting above-mentioned technical scheme, expansion bolts passes through with the wall body between the frictional force with the jib fastening of expansion bolts below on the wall body.
Preferably, the bottom surface of support frame is provided with the mounting groove, the embedded spirit level that is equipped with of mounting groove, the spirit level is followed support frame length direction arranges.
Through adopting above-mentioned technical scheme, the spirit level inlays in the mounting groove of locating the support frame bottom surface for spirit level and support frame closely laminate, improve the measuring accuracy of spirit level, the bottom surface at the support frame is seted up to the mounting groove simultaneously, and the person of being convenient for detection observes the bubble position in the spirit level.
Preferably, the opening part lock of mounting groove has transparent ya keli board, ya keli board is located the periphery of spirit level.
Through adopting above-mentioned technical scheme, the transparent ya keli apron of mounting groove opening part can effectively protect the spirit level not by the wearing and tearing that collide with, also can directly perceivedly present whether current support frame is in the horizontality for the detector simultaneously.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the novel design hoisting system of the air pipe for the purification engineering has the advantage of rapid disassembly and installation;
2. whether the support frame is in the horizontality can be directly observed to the novel design hoist and mount system of air hose for purification engineering, the quick installation of the support frame of being convenient for.
Drawings
FIG. 1 is a schematic structural diagram of the whole in the embodiment of the present application;
FIG. 2 is a cross-sectional view of the overall vertical direction of FIG. 1;
FIG. 3 is an enlarged partial schematic view at A in FIG. 2;
fig. 4 is a partially enlarged schematic view at B in fig. 2.
Description of reference numerals: 1. a boom; 2. a threaded sleeve; 3. a connecting rod; 4. a support frame; 5. a connecting member; 51. an expansion bolt; 6. a clamping assembly; 61. a snap ring; 62. a limiting ring; 7. a first threaded rod; 8. a protrusion; 9. a second threaded rod; 10. a nut; 11. a circular groove; 12. a rubber gasket; 13. mounting grooves; 14. a level gauge; 15. acrylic plates.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The connecting piece 5 is set as an expansion bolt 51 for fixing the suspender 1, the suspender 1 is made of steel, when the suspender 1 is fixed, the expansion bolt 51 is firstly driven into a wall body, and then the suspender 1 is fixed with expansion welding to realize the fastening connection of the suspender 1 and the wall body.
The embodiment of the application discloses a novel design hoist and mount system of tuber pipe for purification engineering.
Referring to fig. 2 and 3, the hoisting system of the new design of the air duct for purification engineering comprises a hanger rod 1, a threaded sleeve 2, a connecting rod 3 and a support frame 4.
2 slip covers of two sets of thread bush are established on jib 1, 2 the thread bush is kept away from and is provided with the protruding 8 of multiunit on the periphery of 3 one ends of connecting rod, multiunit arch 8 is evenly distributed, be provided with joint subassembly 6 between thread bush 2 and the jib 1, joint subassembly 6 includes joint ring 61 and spacing collar 62, joint ring 61 and spacing collar 62 are made by steel, the welding of joint ring 61 is in the one end that thread bush 2 is close to expansion bolts 51 body, spacing collar 62 welded fastening is in the one end that 1 kept away from expansion bolts 51 of jib, the one end welding that connecting rod 3 is close to jib 1 has first threaded rod 7, first threaded rod 7 and 2 screw-thread fit of thread bush.
Referring to fig. 2 and 4, the one end that first threaded rod 7 was kept away from to two sets of connecting rods 3 has all welded second threaded rod 9, the through-hole has been seted up at the both ends of support frame 4, support frame 4 moves smoothly through the through-hole horizontal plane at both ends and erects on two sets of second threaded rod 9, equal screw-thread fit has two nuts 10 on two sets of second threaded rod 9, two nuts 10 are located the upper and lower both ends face of support frame 4 respectively, circular groove 11 has all been seted up on two nuts 10 are close to the terminal surface of support frame 4, the embedded rubber packing ring 12 that is equipped with of circular groove 11, the terminal surface that rubber packing ring 12 exposes outside circular groove 11 all is higher than the terminal surface of nut 10.
Referring to fig. 1 and 2, an installation groove 13 is formed in the bottom surface of the support frame 4 along the length dimension direction of the support frame 4, a level 14 is horizontally embedded in the installation groove 13, the level 14 is made of a plastic material, a bubble area and a scale area on the level 14 are both located outside the installation groove 13, a transparent acrylic plate 15 is fixed at the notch of the installation groove 13 through a screw, and the acrylic plate 15 is coated on the periphery of the level 14.
The implementation principle of the novel design hoisting system of the air pipe for the purification engineering in the embodiment of the application is as follows: when the novel design hoisting system of the air pipe for the purification engineering is installed, the expansion bolt 51 is firstly driven into the wall body, and then the suspender 1 is fixedly welded with the expansion, so that the suspender 1 is fixedly connected with the wall body.
After two sets of jibs 1 are all fixed locking again with the one end butt of expansion bolts 51 body is kept away from to first threaded rod 7 with jib 1, rotatory thread bush 2 after that for thread bush 2 and the threaded fit of first threaded rod 7, back stall thread bush 2 when spacing collar 62 and joint ring 61 butt, connecting rod 3 and jib 1 realize fixed locking under the screw thread effect of thread bush 2 and first threaded rod 7 screw thread and spacing collar 62 and joint ring 61 mutual contact extrusion at this moment.
After the two groups of connecting rods 3 are fixedly locked, the two screw caps 10 are respectively in threaded fit with the two groups of corresponding second screw rods, the screw cap 10 above the support frame 4 is fixed on the second screw rod, then the two rubber gaskets 12 are respectively embedded and fixed in the circular grooves 11 of the two screw caps 10, the level meter 14 bubbles embedded on the bottom surface of the support frame 4 are observed through the transparent acrylic plate 15, the height of the two ends of the support frame 4 is adjusted, so that the level meter 14 bubbles are positioned at the middle position, then the through holes at the two ends of the support frame 4 pass through two groups of second screw rods, two screw caps 10 with rubber gaskets 12 arranged below the support frame 4 are fixed below the support frame 4 in a rotating way through the thread matching with the second screw rods, finally the screw caps above the support frame 4 are screwed, so that the support frame 4 is fixed and locked under the screw action of the two groups of nuts and the second screw rod and the mutual contact and extrusion action of the two groups of rubber gaskets 12 and the support frame 4.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a purify novel design hoist and mount system of tuber pipe for engineering, includes with wall body fixed connection's jib (1), slide threaded sleeve (2) that set up with jib (1), with jib (1) releasable connection's connecting rod (3) and support frame (4) that are used for supporting the tuber pipe, its characterized in that: connecting rod (3) with support frame (4) are removable setting, jib (1) upper end is provided with and is used for connecting piece (5) with wall body fixed connection, jib (1) with be provided with joint subassembly (6) that are used for restricting the movement of thread bush (2) between thread bush (2), the first threaded rod (7) of one end fixedly connected with of connecting rod (3), thread bush (2) with first threaded rod (7) threaded connection.
2. The novel design hoist and mount system of tuber pipe for purification engineering of claim 1, its characterized in that: joint subassembly (6) are including joint ring (61) and spacing collar (62), joint ring (61) with thread bush (2) fixed connection, spacing collar (62) set up jib (1) is close to the one end of connecting rod (3).
3. The novel design hoist and mount system of tuber pipe for purification engineering of claim 1, its characterized in that: the periphery of the threaded sleeve (2) is provided with a plurality of groups of bulges (8), and the plurality of groups of bulges (8) are uniformly distributed on the threaded sleeve (2) away from one end of the connecting rod (3).
4. The novel design hoist and mount system of tuber pipe for purification engineering of claim 1, its characterized in that: keep away from connecting rod (3) one end fixedly connected with second threaded rod (9) of first threaded rod (7), screw-thread fit has two nuts (10) on second threaded rod (9), two nut (10) are located respectively upper and lower both ends face of support frame (4).
5. The novel design hoist and mount system of tuber pipe for purification engineering according to claim 4, characterized in that: two nut (10) are close to all be provided with circular ring groove (11) on the terminal surface of support frame (4), all inlay in circular ring groove (11) and be equipped with rubber packing ring (12), the terminal surface of rubber packing ring (12) all is higher than the terminal surface of circular ring groove (11).
6. The novel design hoist and mount system of tuber pipe for purification engineering of claim 1, its characterized in that: the connecting piece (5) is designed as an expansion bolt (51) for fixing the suspension rod (1).
7. The novel design hoist and mount system of tuber pipe for purification engineering of claim 1, its characterized in that: the bottom surface of support frame (4) is provided with mounting groove (13), embedded spirit level (14) that is equipped with of mounting groove (13), spirit level (14) are followed support frame (4) length direction arranges.
8. The novel design hoist and mount system of tuber pipe for purification engineering according to claim 7, characterized in that: the opening part lock of mounting groove (13) has transparent ya keli board (15), ya keli board (15) are located the periphery of spirit level (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022683407.2U CN213745222U (en) | 2020-11-18 | 2020-11-18 | Novel design hoist and mount system of tuber pipe for purification engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022683407.2U CN213745222U (en) | 2020-11-18 | 2020-11-18 | Novel design hoist and mount system of tuber pipe for purification engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213745222U true CN213745222U (en) | 2021-07-20 |
Family
ID=76826210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022683407.2U Active CN213745222U (en) | 2020-11-18 | 2020-11-18 | Novel design hoist and mount system of tuber pipe for purification engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213745222U (en) |
-
2020
- 2020-11-18 CN CN202022683407.2U patent/CN213745222U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208292485U (en) | TBM headstock turnniing over and lifting device | |
CN213745222U (en) | Novel design hoist and mount system of tuber pipe for purification engineering | |
CN110748194B (en) | Building supporting device and construction method | |
CN108442729A (en) | A kind of adjustable supporting device for Construction of Civil Engineering | |
CN206153820U (en) | High safe welding jig | |
CN113144457A (en) | Hanging and fixing device for height hanging and height hanging of safety belt for transformer | |
CN214410734U (en) | Hydraulic engineering LED publicity board with voice broadcast | |
CN216703447U (en) | Transmission protection device of central transmission mud scraper | |
CN211342042U (en) | Adjustable sleeve bolt fixing support | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN214506405U (en) | Power line support with hang tag function | |
CN211313300U (en) | Construction structure body of bottom fastener support for large-scale wall installation | |
CN205636628U (en) | A self coupling formula installation device for river model water supply water pump | |
CN208200142U (en) | A kind of architectural electricity equipment construction device | |
CN218529575U (en) | Detachable fixing clamp | |
CN212722837U (en) | Station is examined to multi-functional water that effectively improves rate of utilization | |
CN221038406U (en) | Building steel intensity detector | |
CN211873764U (en) | A remove handling frame for building engineering | |
CN217078862U (en) | High-efficient assembled rigidity landfill that takes precautions against earthquakes | |
CN215673953U (en) | A support connecting device for hydraulic engineering water conservancy pipeline | |
CN215439289U (en) | Gear horizontal machining and mounting lifting appliance | |
CN220301834U (en) | Detachable spider man suspension device | |
CN216692676U (en) | Adjustable pipeline hanger | |
CN217736946U (en) | Water supply plant water supply pipe network detection structure | |
CN218145527U (en) | Crane attaches wall assembly convenient to equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: New Design and Lifting System for Air Ducts in Purification Engineering Granted publication date: 20210720 Pledgee: Wuhan rural commercial bank Limited by Share Ltd. Jianghan Branch Pledgor: Wuhan Haijing medical purification Engineering Co.,Ltd. Registration number: Y2024980037501 |