CN213742012U - Hang stone material wall futilely - Google Patents

Hang stone material wall futilely Download PDF

Info

Publication number
CN213742012U
CN213742012U CN202022087093.XU CN202022087093U CN213742012U CN 213742012 U CN213742012 U CN 213742012U CN 202022087093 U CN202022087093 U CN 202022087093U CN 213742012 U CN213742012 U CN 213742012U
Authority
CN
China
Prior art keywords
stone
dry
operation support
stone material
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022087093.XU
Other languages
Chinese (zh)
Inventor
徐嘉宁
洪平清
胡世发
林偲慧
杜娜
刘丹
廖翠婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jianyi Decoration Group Co Ltd
Original Assignee
Shenzhen Jianyi Decoration Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jianyi Decoration Group Co Ltd filed Critical Shenzhen Jianyi Decoration Group Co Ltd
Priority to CN202022087093.XU priority Critical patent/CN213742012U/en
Application granted granted Critical
Publication of CN213742012U publication Critical patent/CN213742012U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a hang stone material wall futilely adopts the integral branch that is fixed in horizontal angle steel fossil fragments to drag interim supplementary fixed bottom stone material, and the wall top sets up logical long stuff, and stuff top grout is as coping apron under to the slabstone mouth, and should hang stone material wall futilely adopts portable regularization handling support to install, and portable regularization handling support upper portion sets up the hinge, sets up the twice and props and draw the telescopic link, and the top sets up safety protection frame. The utility model discloses can promote the efficiency of hanging stone material wall construction futilely by a wide margin to carry out better protection to the constructor.

Description

Hang stone material wall futilely
Technical Field
The utility model relates to a civil engineering field, a stone material construction easy operation, the high stone material wall of hanging futilely of efficiency of construction are applicable to the construction of hanging the stone material wall futilely.
Background
The dry hanging method for stone is a new construction technology in decoration of decoration surface materials, the method adopts metal hanging pieces to directly hang decoration surface stone on the wall surface or on a steel frame in a hollow way, and marble, granite, artificial marble and other decoration surface stone can be directly hung on the outer surface of a building structure without grouting and pasting, a cavity of 40-50 mm is reserved between the stone and the structure, and the decoration surface made by the technology is allowed to generate proper displacement under the action of wind power and earthquake power to absorb partial wind power and earthquake power without cracks and falling off.
However, in the prior art, the problem that the dry-hanging stone falls off easily occurs when the stone of the outer wall is dry-hung during construction, and further a great deal of serious danger is caused. In other words, the dry-hanging stone wall in the prior art cannot accurately and effectively support the bottom layer stone, so that the field construction speed is slow and the construction cost is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a not only can carry out effectual interim support to hanging the stone material futilely, improve the dry stone material wall of hanging stone material wall efficiency of construction moreover futilely.
For the purpose above the realization, this scheme provides a hang stone material wall futilely, includes: horizontal angle steel fossil fragments, vertical channel-section steel fossil fragments, the dry pendant of stainless steel, the stone material, logical long stuff, the apron of pushing down, wherein the channel-section steel mounting is fixed in wall body or ground, on vertical channel-section steel fossil fragments were fixed in the channel-section steel mounting, horizontal angle steel fossil fragments and vertical channel-section steel fossil fragments are connected perpendicularly, the dry pendant of stainless steel is fixed on horizontal angle steel fossil fragments, on the dry pendant of stainless steel was arranged in to the stone material, the wall top set up logical long stuff, logical long stuff top is equipped with the apron of pushing down, add in the middle of the position in the middle of the stone material top and establish one top dry pendant.
In some embodiments, the transverse angle keels are spaced apart across the vertical channel keels, and the transverse angle keels are disposed on a side of the vertical channel keels away from the wall.
In some embodiments, the stone is provided with a groove, the groove of the stone is filled with epoxy structural adhesive and is arranged on the stainless steel dry hanging piece, and the gap between the stones is filled with caulking paste.
In some embodiments, the channel steel fixing piece is fixed on the wall or the ground through expansion bolts, the vertical channel steel keel and the channel steel fixing piece are anchored through bolts, and the vertical channel steel keel and the transverse angle steel keel are connected through welding.
In some embodiments, the stainless steel dry hanging piece is a T-shaped dry hanging piece and is fixed on the transverse angle steel keel through a fixing bolt.
In some embodiments, the one-piece temporary lug includes an outer U-shaped lug and an inner U-shaped lug, wherein the outer U-shaped lug is disposed outside the inner U-shaped lug and the stone material is disposed on the inner U-shaped lug.
In some embodiments, the integral temporary support bracket is fixed on the transverse angle steel keel of the bottom layer through a support bracket fixing plate.
In some embodiments, the bottom of the integral temporary support bracket is provided with a bracket adjusting bolt.
In some embodiments, this can adopt portable regularization handling support auxiliary construction when hanging stone material construction futilely, wherein portable regularization handling support includes the safety protection railing, the handling support cat ladder, the bracing, the handling support stand, the top side of handling support stand is arranged in to the safety protection railing, the both sides of handling support stand are arranged in to the handling support cat ladder, and handling support cat ladder one end is arranged subaerially through dismantling the walking wheel, the other end passes through cat ladder axis of rotation and rotates to be connected in the handling support stand, prop through the lower part between the handling support cat ladder of arranging both sides and pull the telescopic link connection with upper portion through the lower part.
Compared with the prior art, the technical scheme has the following characteristics and beneficial effects:
1. the utility model discloses an integral interim support drags and carries out interim fixing to hanging stone material bottom futilely, and integral interim support drags to fix on the horizontal angle steel fossil fragments of bottom, and for bilayer structure, accessible adjusting bolt finely tunes the stone material.
2. The utility model discloses a hang stone material construction futilely adopts portable regularization handling support auxiliary construction, and handling support top sets up the safety protection railing, and the walking wheel can be dismantled in the bottom setting, can install fast and demolish.
Drawings
Fig. 1 is a schematic view of a mobile styling handling stand according to an embodiment of the present invention.
Fig. 2 is a side view of a mobile sizing handling frame according to an embodiment of the invention.
Fig. 3 is a schematic view of a dry-hung stone wall according to an embodiment of the present invention.
Fig. 4 is a schematic diagram of a stainless steel dry-hang element according to an embodiment of the present invention.
Fig. 5 is a schematic diagram of an integrated support according to an embodiment of the present invention.
In the figure: 1-safety protection railing, 2-operation support ladder stand, 3-diagonal support, 4-lower supporting telescopic rod, 5-walking wheel fixer, 6-detachable walking wheel, 7-ladder stand rotating shaft, 8-upper supporting telescopic rod, 9-operation support upright post, 10-channel steel fixing piece, 11-wall body, 12-transverse angle steel keel, 13-vertical channel steel keel, 14-stainless steel dry hanging piece, 15-caulking paste, 16-epoxy structural adhesive, 17-fixing bolt, 18-stone material, 19-integral support, 20-universal wood strip, 21-capping plate, 22-top dry hanging piece, 23-expansion bolt, 24-outer side U-shaped support, 25-inner side U-shaped support, 26-support adjusting bolt, 27-support fixing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
Welding construction technical requirement, stone material fluting construction technical requirement, bolt installation technical requirement etc. no longer give unnecessary details in this embodiment, key explanation the utility model relates to an embodiment of method.
This dry-hang stone material can adopt portable regularization operation support to assist the construction during construction.
Fig. 1 is a schematic view of the mobile fixed operation support of the present invention, and fig. 2 is a side view of the mobile fixed operation support of the present invention. Referring to fig. 1-2, the utility model discloses a portable regularization operation support includes safety protection railing (1), operation support cat ladder (2), bracing (3), operation support stand (9).
The top side of operation support stand (9) is arranged in safety protection railing (1), the both sides of operation support stand (9) are arranged in operation support cat ladder (2), and operation support cat ladder (2) one end is arranged subaerially through dismantling walking wheel (6), the other end passes through cat ladder axis of rotation (7) and rotates to be connected in operation support stand (9), prop through the lower part between the operation support cat ladder (2) of arranging both sides and draw telescopic link (4) and upper portion to prop and draw telescopic link (8) to connect, wherein the lower part props to draw telescopic link (4) and upper portion to prop and draw telescopic link (4) to be the telescopic link, can fix it after confirming the position of operation support cat ladder (2).
In order to ensure the stability of the movable type sizing operation support, an inclined strut (3) is arranged between the upright columns (9) of the operation support. The bottom of the operation support ladder stand (2) is fixed with the detachable walking wheel (6) through the walking wheel fixer (5) so as to realize the detachable assembly of the detachable walking wheel (6).
Specifically, the mobile sizing operation support is used as follows: the top of portable regularization operation support sets up safety protection railing (1), and operation support cat ladder (2) rotate through cat ladder axis of rotation (7) and in order to adjust portable regularization operation support height, and after confirming portable regularization operation support height, prop through adjusting the lower part and draw telescopic link (4), upper portion and draw telescopic link (8) to fix operation support cat ladder (2) of both sides. When the movable type sizing operation support needs to be moved, the detachable walking wheels (6) are installed at the bottom of the operation support ladder (2), the detachable walking wheels (6) are detached during construction, and the operation support ladder (2) is adjusted.
Fig. 3 is a schematic view of the dry hanging stone wall of the utility model, and fig. 4 is a schematic view of the stainless steel dry hanging piece of the utility model. Referring to fig. 3-4, the dry-hanging stone wall surface comprises a transverse angle steel keel (12), a vertical channel steel keel (13), a stainless steel dry hanging piece (14), stone (18), an integral temporary support mop (19), a long through wood strip (20) and a top pressing cover plate (21). Channel-section steel mounting (10) are fixed in wall body (11) or ground, vertical channel-section steel fossil fragments (13) are fixed in on channel-section steel mounting (10), horizontal angle steel fossil fragments (12) and vertical channel-section steel fossil fragments (13) are connected perpendicularly, stainless steel is done pendant (14) and is fixed on horizontal angle steel fossil fragments (12), on stainless steel is done pendant (14) in arranging stone material (18), the wall top sets up logical long stuff (20), logical long stuff (20) top is equipped with and presses a apron (21), add in the middle of the position in the middle of stone material (18) top and establish one top dry pendant (22).
Wherein vertical channel steel fossil fragments (13) set up with ground is perpendicular, and horizontal angle steel fossil fragments (12) interval is horizontal on vertical channel steel fossil fragments (13), and one side that vertical channel steel fossil fragments (13) kept away from wall body (11) is arranged in to horizontal angle steel fossil fragments (12), and the horizontal pole of stainless steel dry hanging piece (14) is arranged in on horizontal angle steel fossil fragments (12) and is connected fixedly with horizontal angle steel fossil fragments (12).
The groove is formed in the stone (18), the area of the groove opening is matched with the vertical rod of the stainless steel dry hanging piece (14), the groove of the stone (18) is filled with epoxy structural adhesive (16) and is arranged on the stainless steel dry hanging piece (14), and gaps among the stones (18) are filled with caulking paste (15).
Wherein the through long battens (20) and the top cover plate (21) are arranged on the inner side of the stone (18).
Specifically, the channel steel fixing piece (10) is fixed on a wall body (11) or the ground through an expansion bolt (23), the vertical channel steel keel (13) and the channel steel fixing piece (10) are anchored through a bolt, the vertical channel steel keel (13) is connected with the transverse angle steel keel (12) in a welding mode, the vertical channel steel keel (13) is made of 80 x 43 x 5 channel steel, and the transverse angle steel keel (12) is 40 x 4(mm) or 50 x 5 (mm). The stainless steel dry hanging piece (14) is a T-shaped dry hanging piece and is fixed on the transverse angle steel keel (12) through a fixing bolt (17). The stone (18) generally requires that the depth of the groove is not less than 10mm, and the solidification time of the T-shaped drying hanger and the stone is ensured so as to avoid brittle fracture caused by early solidification and looseness caused by slow solidification.
The wall top sets up logical long stuff (20), thick stuff top grout as coping apron (21) under to slabstone mouth, adds in the middle of top stone material (18) and establishes one top and do pendant (22), and wherein the shape of top dry pendant (22) adopts the dry pendant of Y type.
Fig. 5 is a schematic view of the integral support of the present invention, and referring to fig. 5, the integral temporary support (19) comprises an outer U-shaped support (24) and an inner U-shaped support (25), wherein the outer U-shaped support (24) is disposed outside the inner U-shaped support (25), and the stone (18) is disposed on the inner U-shaped support (25), so that the integral temporary support (19) supports the bottom stone. The integral temporary support (19) is fixed on the transverse angle steel keel (12) of the bottom layer through a support fixing plate (27), and in addition, a support adjusting bolt (26) is arranged at the bottom of the integral temporary support (19) to finely adjust the position of the stone.
The present invention is not limited to the above-mentioned preferred embodiments, and any other products in various forms can be obtained by the teaching of the present invention, but any changes in the shape or structure thereof, which have the same or similar technical solutions as the present invention, fall within the protection scope of the present invention.

Claims (9)

1. The utility model provides a hang stone material wall futilely which characterized in that includes:
horizontal angle steel fossil fragments (12), vertical channel-section steel fossil fragments (13), stainless steel is pendant (14), stone material (18), logical rectangular batten (20), gland apron (21), wherein channel-section steel mounting (10) are fixed in wall body (11) or ground, vertical channel-section steel fossil fragments (13) are fixed in on channel-section steel mounting (10), horizontal angle steel fossil fragments (12) and vertical channel-section steel fossil fragments (13) are connected perpendicularly, stainless steel is pendant (14) fixed on horizontal angle steel fossil fragments (12), on stainless steel pendant (14) are arranged in to stone material (18), the wall top sets up logical rectangular batten (20), logical rectangular batten (20) top is equipped with gland apron (21), add in the middle of the position in the middle of stone material (18) top and establish one top dry pendant (22).
2. The wall surface with dry-hanging stone as claimed in claim 1, wherein the transverse angle keels (12) are spaced apart and transversely disposed on the vertical channel keels (13), and the transverse angle keels (12) are disposed on a side of the vertical channel keels (13) away from the wall body (11).
3. The wall surface with dry-hanging stone as claimed in claim 1, wherein the stone (18) is grooved, the grooves of the stone (18) are filled with epoxy structural adhesive (16) and are placed on the stainless steel dry-hanging member (14), and the gaps between the stones (18) are filled with caulking paste (15).
4. The wall surface with dry-hanging stone as claimed in claim 1, wherein the channel steel fixing piece (10) is fixed on the wall body (11) or the ground by using an expansion bolt (23), the vertical channel steel keel (13) is anchored with the channel steel fixing piece (10) through a bolt, and the vertical channel steel keel (13) is connected with the transverse angle steel keel (12) through welding.
5. The wall surface of claim 1, wherein the stainless steel dry hanging member (14) is a T-shaped dry hanging member and is fixed on the transverse angle iron keel (12) through a fixing bolt (17).
6. Wall surface of dry hanging stone, according to claim 1, characterized in that the integral temporary support (19) comprises an outer U-shaped bracket (24) and an inner U-shaped bracket (25), wherein the outer U-shaped bracket (24) is placed outside the inner U-shaped bracket (25) and the stone (18) is placed on the inner U-shaped bracket (25).
7. A dry-hang stone wall surface as claimed in claim 6, wherein the integral temporary support bracket (19) is fixed on the transverse angle iron keel (12) of the bottom layer by a support fixing plate (27).
8. Wall surface of dry-hang stone, as claimed in claim 6, characterized in that the bottom of the integral temporary support (19) is provided with a support adjusting bolt (26).
9. The wall surface with the dry-hanging stone as claimed in claim 1, wherein the wall surface with the dry-hanging stone can be constructed with a movable type shaping operation support, wherein the movable type shaping operation support comprises a safety protection railing (1), an operation support ladder (2), an inclined strut (3) and an operation support upright post (9), the safety protection railing (1) is arranged on the top side of the operation support upright post (9), the operation support ladder (2) is arranged on two sides of the operation support upright post (9), one end of the operation support ladder (2) is arranged on the ground through a detachable travelling wheel (6), the other end of the operation support ladder is rotatably connected with the operation support upright post (9) through a ladder stand rotating shaft (7), and the operation support ladder (2) arranged on the two sides is connected with an upper stretching telescopic rod (8) through a lower stretching telescopic rod (4).
CN202022087093.XU 2020-09-21 2020-09-21 Hang stone material wall futilely Active CN213742012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022087093.XU CN213742012U (en) 2020-09-21 2020-09-21 Hang stone material wall futilely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022087093.XU CN213742012U (en) 2020-09-21 2020-09-21 Hang stone material wall futilely

Publications (1)

Publication Number Publication Date
CN213742012U true CN213742012U (en) 2021-07-20

Family

ID=76844113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022087093.XU Active CN213742012U (en) 2020-09-21 2020-09-21 Hang stone material wall futilely

Country Status (1)

Country Link
CN (1) CN213742012U (en)

Similar Documents

Publication Publication Date Title
CN103132692B (en) A kind of tilted cylinder erecting device and mold method
CN106193589A (en) Concrete superelevation heavy type beam and superimposed sheet combinative structure method for supporting
CN213742012U (en) Hang stone material wall futilely
CN211114801U (en) Roof template supporting component for constructional engineering
CN110714527A (en) Integrated assembled steel construction building
CN207166421U (en) A kind of photovoltaic bracket
CN106958233B (en) For pouring the hydraulic self-lifting formula cantilever form construction method of Arch Dam Concrete
CN210797549U (en) Building structure pile foundation reinforcing apparatus
CN217027654U (en) Multi-angle aluminum veneer mounting structure
CN215802536U (en) Novel hyperboloid curtain skeleton
CN215858373U (en) Prefabricated shear wall of assembly type structure
CN202482766U (en) Support structure for large span continuous beam constructions
CN210767707U (en) A construction structures for shaping window reinforced concrete frame stand
CN208168281U (en) A kind of plastering machine that can consolidate placement
CN207259981U (en) A kind of removable assembled wind and rain vestibule
CN206815821U (en) A kind of high-low bay hoisting die construction device
CN220184595U (en) Anti-shaking building installation scaffold
CN220080106U (en) Keel frame structure of well lid that fastness is high
CN217627287U (en) Tower crane with high-stability base
CN214614614U (en) Stone surface course bottom and ground connected node structure
CN210396808U (en) Detachable fender thick liquid device based on mine filling mining technology
CN206385772U (en) One kind exempts from welding steel structure attachment structure
CN218150947U (en) Concrete formwork supporting structure for underground excavation tunnel deformation joint post-cast strip
CN214657062U (en) Side wall reinforcing steel bar positioning support
CN216552770U (en) Precast concrete slab type stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant