CN213709932U - Insulation board fixing assembly in reinforced concrete wall - Google Patents

Insulation board fixing assembly in reinforced concrete wall Download PDF

Info

Publication number
CN213709932U
CN213709932U CN202021925103.6U CN202021925103U CN213709932U CN 213709932 U CN213709932 U CN 213709932U CN 202021925103 U CN202021925103 U CN 202021925103U CN 213709932 U CN213709932 U CN 213709932U
Authority
CN
China
Prior art keywords
chuck
sleeve
clamping piece
heated board
side sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021925103.6U
Other languages
Chinese (zh)
Inventor
王兰军
王晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021925103.6U priority Critical patent/CN213709932U/en
Application granted granted Critical
Publication of CN213709932U publication Critical patent/CN213709932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a building connection technology field, concretely relates to fixed subassembly of heated board in reinforced concrete wall, including right side sleeve (holding) chuck, elastic splint, hasp board, sprue, locating frame, U-shaped clip, wire net, steel reinforcement cage and clamping piece. In the use, insert two clamping pieces from two horizontal poles from the right-hand member to install the left part at the posting, install the wire net on square clamp, adorn hasp board and sprue on the posting left side, insert into two through-holes of heated board the right-hand member of two horizontal poles of posting, move the heated board to the posting left end left, two sleeves insert into respectively insert two through-holes of heated board, insert the left side of fastening end with right side sleeve (holding) chuck, promote right side sleeve (holding) chuck and press from both sides tight heated board, spring splint barb joint is on the check groove, the utility model discloses it is poor to have solved indoor heat preservation effect better, and the heated board drops the big scheduling problem of safe risk.

Description

Insulation board fixing assembly in reinforced concrete wall
Technical Field
The utility model belongs to the technical field of the building connection, specifically be a subassembly is fixed to heated board in reinforced concrete wall.
Background
Chinese patent with application number CN201820713065.4 discloses coupling assembling and core composite wall structure of concrete heat preservation composite wall, including steel bar support, back bolster and connecting piece, steel bar support and back bolster correspond to set up on the both sides face of heat preservation board and connect by the connecting piece, and steel bar support includes bottom plate and the riser of vertical fixation on the bottom plate, and the last border of riser is equipped with the recess that is used for placing the steel wire of wire net. The steel bar support of the connecting assembly consists of a bottom plate and a vertical plate vertically fixed on the bottom plate, and a simple structure cannot cause a heat insulation plate protective layer to generate large internal stress, so that the heat insulation plate protective layer cannot crack; the steel bar support and the rear cushion plate are made of engineering plastics, so that the connecting assembly is very light and convenient to mount, and the workload of mounting personnel is reduced.
However, at present most of reinforced concrete wall bodies are not internally provided with insulation boards, the indoor insulation effect is poor, under the requirement of building use, the insulation boards can be fixed outside the existing wall bodies through cement paint sticky boxes or cement nails, the method is used for a long time, along with wall skin aging, the probability of the insulation boards falling is increased, casualties or economic losses can be caused, and the problem is solved well through the installation of insulation board fixing components.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned weak point that exists among the prior art, the utility model provides a fixed subassembly of heated board in reinforced concrete wall for it is poor to solve indoor heat preservation effect, and the heated board drops the big scheduling problem of safe risk.
In order to solve the technical problem, the utility model discloses a following technical scheme:
a heat insulation plate fixing assembly in a reinforced concrete wall is used for connecting a heat insulation plate and a concrete pouring template, and comprises a positioning frame, a right sleeve chuck and a clamping piece; the positioning frame is formed by connecting the left ends of two cross rods through a vertical rod; the clamping piece includes left side sleeve (holding) chuck and sleeve, the left side of clamping piece is located to left side sleeve (holding) chuck, the middle part of clamping piece is located to the sleeve, two the clamping piece is installed in the left part of two horizontal poles, be equipped with two through-holes on the insulation board side, the centre-to-centre spacing of two through-holes is the same with two horizontal pole centre-to-centre spacings, installs the left part of locating frame, two with the insulation board the sleeve inserts in two through-holes of insulation board, left side sleeve (holding) chuck and right side sleeve (holding) chuck are (holding) chuck in pairs, the right-hand member at the clamping piece is installed to right side sleeve (holding).
Further, the clamping piece further comprises a check groove, and the right sleeve chuck comprises an elastic clamping plate; the clamping piece right-hand member is equipped with a plurality of annular check grooves, the left side of right side sleeve (holding) chuck is located to the elastic splint, elastic splint and check groove barb joint.
Further, the lock catch plate and the steel wire mesh are further included; the clamping piece still includes square chuck, the left end of clamping piece is located to square chuck, square chuck is installed at the left end of locating frame, the wire net is installed on square chuck, the hasp board is connected through physics joint with square chuck.
Further, the device also comprises a U-shaped clamp and a steel bar framework; the U-shaped clamps are arranged in the middle and the right of the two cross rods of the positioning frame and are clamped on the steel reinforcement framework.
Further, still include the sprue, the sprue is installed respectively at the both ends of two horizontal poles.
Furthermore, the steel wire mesh, the steel bar framework and the concrete pouring template are vertically arranged relative to the positioning frame and are parallel to each other.
Compared with the prior art, the utility model, following beneficial effect has:
the utility model discloses it is poor to have solved indoor heat preservation effect better, and the heated board drops the big scheduling problem of safe risk.
The utility model discloses simple structure, convenient operation, reliable and stable, long service life.
Drawings
Fig. 1 is a schematic working view of an embodiment of a fixing assembly for a heat insulation board in a reinforced concrete wall according to the present invention;
fig. 2 is a schematic view of an embodiment of a fixing assembly for a heat insulation board in a reinforced concrete wall according to the present invention;
fig. 3 is a schematic structural view of the positioning frame 9 of the present invention;
reference numerals in the drawings of the specification include:
a right side sleeve chuck 1; an elastic splint 2; a check groove 3; a sleeve 4; a left side sleeve chuck 5; a square chuck 6; a locking plate 7; a blocking block 8; a positioning frame 9; a U-shaped clip 10; concrete pouring formworks 11; a steel wire mesh 12; concrete 13; an insulation board 14; a steel reinforcement cage 15.
Detailed Description
In order to make the present invention better understood by those skilled in the art, the technical solutions of the present invention are further described below with reference to the accompanying drawings and examples.
The first embodiment is as follows:
as shown in fig. 1 to 3, an insulation board fixing assembly in a reinforced concrete wall body is used for connecting an insulation board 14 and a concrete pouring template 11, and comprises a positioning frame 9, a right sleeve chuck 1 and a clamping piece; the positioning frame 9 is formed by connecting the left ends of two cross rods through a vertical rod; the clamping piece includes left side sleeve (holding) chuck 5 and sleeve 4, left side sleeve (holding) chuck 5 locates the left side of clamping piece, the middle part of clamping piece is located to sleeve 4, the left part at two horizontal poles is installed to two clamping pieces, be equipped with two through-holes on the heated board 14 side, the centre-to-centre spacing of two through-holes is the same with two horizontal pole centre-to-centre spacings, install the left part of locating frame 9 with heated board 14, two sleeves 4 insert in the two through-holes of heated board 14, left side sleeve (holding) chuck 5 and right side sleeve (holding) chuck 1 are (holding) chuck in pairs, right-hand member at the clamping piece is installed to right side sleeve (holding). Two horizontal poles of locating frame 9 insert in heated board 14, guarantee that heated board 14 can not appear pivoting's phenomenon, and right side sleeve (holding) chuck 1 and left side sleeve (holding) chuck 5 are through mechanical clamping, and fixed heated board 14 does not sway or the drunkenness in the use.
Preferably, the clamping piece further comprises a check groove 3, and the right sleeve chuck 1 comprises an elastic clamping plate 2; the clamping piece right-hand member is equipped with a plurality of annular check grooves 3, and elastic splint 2 locates the left side of right side sleeve chuck 1, elastic splint and 3 barb joints in check groove. When the right sleeve chuck 1 is tightly attached to the heat insulation plate 14, the elastic clamping plate 2 is clamped with the check groove 3 to play a role in fixing the right sleeve chuck 1, so that long-term and firm clamping is ensured.
Preferably, the steel wire mesh lock also comprises a lock catch plate 7 and a steel wire mesh 12; the clamping piece still includes square chuck 6, and the left end of clamping piece is located to square chuck 6, and square chuck 6 is installed in the left end of locating frame 9, and wire net 12 is installed on square chuck 6, and hasp board 7 is connected through physics joint with square chuck 6. The latch plate 7 is clamped with the square chuck 6, and the wire netting 12 is vertically fixed on the positioning frame 9, so that the normal operation of the subsequent concrete pouring work is ensured.
Example two:
as shown in fig. 1 to 3, an insulation board fixing assembly in a reinforced concrete wall body is used for connecting an insulation board 14 and a concrete pouring template 11, and comprises a positioning frame 9, a right sleeve chuck 1 and a clamping piece; the positioning frame 9 is formed by connecting the left ends of two cross rods through a vertical rod; the clamping piece includes left side sleeve (holding) chuck 5 and sleeve 4, left side sleeve (holding) chuck 5 locates the left side of clamping piece, the middle part of clamping piece is located to sleeve 4, the left part at two horizontal poles is installed to two clamping pieces, be equipped with two through-holes on the heated board 14 side, the centre-to-centre spacing of two through-holes is the same with two horizontal pole centre-to-centre spacings, install the left part of locating frame 9 with heated board 14, two sleeves 4 insert in the two through-holes of heated board 14, left side sleeve (holding) chuck 5 and right side sleeve (holding) chuck 1 are (holding) chuck in pairs, right-hand member at the clamping piece is installed to right side sleeve (holding). Two horizontal poles of locating frame 9 insert in heated board 14, guarantee that heated board 14 can not appear pivoting's phenomenon, and right side sleeve (holding) chuck 1 and left side sleeve (holding) chuck 5 are through mechanical clamping, and fixed heated board 14 does not sway or the drunkenness in the use.
Preferably, the clamping piece further comprises a check groove 3, and the right sleeve chuck 1 comprises an elastic clamping plate 2; the clamping piece right-hand member is equipped with a plurality of annular check grooves 3, and elastic splint 2 locates the left side of right side sleeve chuck 1, elastic splint and 3 barb joints in check groove. When the right sleeve chuck 1 is tightly attached to the heat insulation plate 14, the elastic clamping plate 2 is clamped with the check groove 3 to play a role in fixing the right sleeve chuck 1, so that long-term and firm clamping is ensured.
Preferably, the steel wire mesh lock also comprises a lock catch plate 7 and a steel wire mesh 12; the clamping piece still includes square chuck 6, and the left end of clamping piece is located to square chuck 6, and square chuck 6 is installed in the left end of locating frame 9, and wire net 12 is installed on square chuck 6, and hasp board 7 is connected through physics joint with square chuck 6. The latch plate 7 is clamped with the square chuck 6, and the wire netting 12 is vertically fixed on the positioning frame 9, so that the normal operation of the subsequent concrete pouring work is ensured.
Preferably, the steel bar framework comprises a U-shaped clamp 10 and a steel bar framework 15; u-shaped clip 10 is installed at the middle part and the right part of two horizontal poles of locating frame 9, and U-shaped clip 10 joint is on framework of steel reinforcement 15. U-shaped clip 10 is connected with framework of steel reinforcement 15 through physics joint physics card ground connection mode, fixes locating frame 9 on the wall, conveniently pours.
Preferably, the concrete pouring device further comprises blocks 8 and concrete pouring formworks 11, the blocks 8 are respectively installed at two ends of the two cross rods, the concrete pouring formworks 11 are symmetrically installed at two ends of the positioning frame 9, and the concrete pouring formworks 11 are installed on the blocks 8. The sprue 8 plays the fixed action to the hasp board 7 of the 9 left ends of locating frame, and the sprue 8 is and stretch out the port to four of locating frame 9 and play the guard action, links together with concrete placement template 11, guarantees concrete placement template and locating frame 9's being connected.
Preferably, the steel wire mesh 12, the steel reinforcement framework 15 and the concrete pouring formwork 11 are vertically arranged relative to the positioning frame 9, and the steel wire mesh 12, the steel reinforcement framework 15 and the concrete pouring formwork 11 are parallel to each other. The vertical parallel distribution mode ensures the flatness and stability of the wall surface after concrete pouring and improves the firm reliability and stability of the fixing assembly.
Advantages of the second embodiment over the first embodiment:
the stability and the reliability of this fixed subassembly of heated board are improved, operating personnel's the construction degree of difficulty is reduced, improve work efficiency, have prolonged the life of this fixed subassembly of heated board.
The use method of the insulation board fixing assembly comprises the following steps:
inserting two clamping pieces from the right end of two cross rods respectively, installing the clamping pieces at the left part of a positioning frame 9, installing a steel wire mesh 12 on a square clamping head 6, installing a locking plate 7 and a blocking block 8 on the left side of the positioning frame 9, simultaneously inserting the right ends of the two cross rods of the positioning frame 9 into two through holes of a heat insulation plate 14, moving the heat insulation plate 14 to the left end of the positioning frame 9, inserting two sleeves 4 into the two through holes respectively inserted into the heat insulation plate 14 until the left side edge of the heat insulation plate 14 is tightly attached to the right end of a sleeve chuck 5 at the left side, inserting the sleeve chuck 1 at the right side into the left side of a fastening end, pushing the sleeve chuck 1 at the right side to clamp the heat insulation plate 14, clamping and installing a spring clamp plate 2 barb on a check groove 3 to complete clamping and installing, installing a U-shaped clamp 10 and the blocking block 8 at the right part of the positioning frame, placing a fixing, the U-shaped clip 10 is snapped onto the steel reinforcement cage 15 and the concrete pouring operation is started.
In the description of the present invention, it is to be understood that the terms "front end", "rear end", "horizontal", "upper", "lower", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
The above description is only for the embodiments of the present invention, and the common general knowledge of the known specific structures and characteristics in the schemes is not described herein too much, and those skilled in the art will know all the common technical knowledge in the technical field of the present invention before the application date or the priority date, can know all the prior art in this field, and have the ability to apply the conventional experimental means before this date, and those skilled in the art can combine their own ability to perfect and implement the schemes, and some typical known structures or known methods should not become obstacles for those skilled in the art to implement the present application. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.

Claims (6)

1. The utility model provides a fixed subassembly of heated board in reinforced concrete wall for connect heated board (14) and concrete placement template (11), its characterized in that: the fixing assembly comprises a positioning frame (9), a right sleeve chuck (1) and a clamping piece; the positioning frame (9) is formed by connecting the left ends of two cross rods through a vertical rod; the clamping piece includes left side sleeve (5) chuck and sleeve (4), the left side of clamping piece is located in left side sleeve (5), the middle part of clamping piece is located in sleeve (4), two the left part at two horizontal poles is installed to clamping piece, be equipped with two through-holes on heated board (14) side, the centre-to-centre spacing of two through-holes is the same with two horizontal pole centre-to-centre spacings, installs the left part of locating frame (9), two with heated board (14) sleeve (4) insert in the two through-holes of heated board (14), left side sleeve (5) chuck and right side sleeve (1) are the (in pairs) chuck, the right-hand member at the clamping piece is installed in right side sleeve (1), the two opposite and heated board (14) both sides limit of left side sleeve (5) and right side sleeve (1) are hugged closely.
2. The assembly of claim 1, wherein the heat retaining plate comprises: the clamping piece further comprises a check groove (3), and the right sleeve chuck (1) comprises an elastic clamping plate (2); the clamping piece right-hand member is equipped with a plurality of annular check grooves (3), the left side of right side sleeve (chuck) (1) is located in elastic splint (2), elastic splint and check groove (3) barb joint.
3. The assembly of claim 2, wherein the plate comprises: the steel wire mesh lock also comprises a lock catch plate (7) and a steel wire mesh (12); the clamping piece still includes square chuck (6), the left end of clamping piece is located in square chuck (6), the left end at locating frame (9) is installed in square chuck (6), wire net (12) are installed on square chuck (6), hasp board (7) are connected through the physics joint with square chuck (6).
4. The assembly of claim 3, wherein the plate comprises: the steel bar framework is characterized by also comprising a U-shaped clamp (10) and a steel bar framework (15); u-shaped clip (10) are installed at the middle part and the right part of two horizontal poles of locating frame (9), U-shaped clip (10) joint is on framework of steel reinforcement (15).
5. The insulation board fixing assembly in the reinforced concrete wall body according to claim 4, wherein: the novel horizontal pole is characterized by further comprising blocking blocks (8), wherein the blocking blocks (8) are respectively installed at two ends of the two horizontal poles.
6. The insulation board fixing assembly in the reinforced concrete wall body according to claim 5, wherein: the steel wire meshes (12), the steel bar frameworks (15) and the concrete pouring formworks (11) are vertically arranged relative to the positioning frames (9), and the steel wire meshes (12), the steel bar frameworks (15) and the concrete pouring formworks (11) are parallel to each other.
CN202021925103.6U 2020-09-07 2020-09-07 Insulation board fixing assembly in reinforced concrete wall Active CN213709932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021925103.6U CN213709932U (en) 2020-09-07 2020-09-07 Insulation board fixing assembly in reinforced concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021925103.6U CN213709932U (en) 2020-09-07 2020-09-07 Insulation board fixing assembly in reinforced concrete wall

Publications (1)

Publication Number Publication Date
CN213709932U true CN213709932U (en) 2021-07-16

Family

ID=76792956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021925103.6U Active CN213709932U (en) 2020-09-07 2020-09-07 Insulation board fixing assembly in reinforced concrete wall

Country Status (1)

Country Link
CN (1) CN213709932U (en)

Similar Documents

Publication Publication Date Title
CN213709932U (en) Insulation board fixing assembly in reinforced concrete wall
CN214658215U (en) Building module for replacing cast-in-place template for energy-saving earthquake-resistant building
CN216276915U (en) Building beam mold clamp
CN213202063U (en) Evaporate and press sand concrete panel fossil fragments transfer device snatch drill rod
CN212836634U (en) Climb frame and use net piece fixation clamp
CN213571565U (en) Assembled bridge floor protection device
CN210117876U (en) Protection type concatenation wallboard
CN210713811U (en) Square column formwork support system
CN210263548U (en) Fusiform grid system
JP3934453B2 (en) Roof structure with solar panel
CN209788289U (en) Combined mouse baffle
CN215407304U (en) Assembled scaffold
CN218623259U (en) Can splice formula scaffold frame design rail guard
CN202596101U (en) Structure of wood veneer mounted on wall
CN215167841U (en) Assembled steel structure protection frame
CN211899550U (en) Fastener type movable scaffold
CN217924777U (en) Outer wall climbing scaffold
CN219622245U (en) Concrete shaping plate convenient to equipment
CN220058483U (en) Floor skeleton texture and floor
CN214784803U (en) Steel structure cantilever beam connection structure for building
CN214574938U (en) Heat-preservation composite wall structure
CN214840642U (en) Dismounting structure of art canopy horse race lamp
CN210947783U (en) Standard knot for positioning and binding steel bars of shear wall and steel bar shaping tool of shear wall
CN217581247U (en) Adjustable building template connecting and locking device for building construction
CN214884679U (en) Corrosion-resistant sound-proof curtain wall steel structure

Legal Events

Date Code Title Description
GR01 Patent grant