- CN213709212U CN213709212U CN202022250843.0U CN202022250843U CN213709212U CN 213709212 U CN213709212 U CN 213709212U CN 202022250843 U CN202022250843 U CN 202022250843U CN 213709212 U CN213709212 U CN 213709212U
- Authority
- CN
- China
- Prior art keywords
- base
- support bracket
- road
- welded
- bridge construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 125000003003 spiro group Chemical group 0.000 claims abstract description 3
- 239000000428 dust Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 abstract description 11
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 241000282326 Felis catus Species 0.000 description 3
- 230000007547 defect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a portable support bracket is used in road and bridge construction, including backup pad and base, the welding of backup pad bottom has electric crane, and electric crane keeps away from backup pad one end and welds in the base, it has the fixed plate to articulate through the hinge in base one side outer wall, and fixed plate one end sets up the fixed orifices that the equidistance distributes, the fixed plate is kept away from base one end welding and is had the supporting shoe, and the supporting shoe top and has seted up the draw-in groove, the draw-in groove joint has L type fixture block, and the welding of L type fixture block top has the shield, the welding of base one. The utility model discloses an electric crane of welding between base and backup pad, the arrival appointed height that can be more quick safety when starting electric crane avoids using the support bracket that the steel pipe was built temporarily through the manpower, through set up the universal wheel bottom the base, for support bracket has increased the mobility, fixes support bracket on ground through the fixing bolt of spiro union on the fixed orifices.
Description
Technical Field
The utility model relates to a support bracket technical field especially relates to a portable support bracket is used in road bridge construction.
Background
Along with the development of era, the improvement of standard of living, simultaneously along with social economy's continuous development and the continuous promotion of building level, and the continuous increase of vehicle, little bridge is built greatly, in bridge construction and maintenance operation, often can use the support bracket, road bridge construction support bracket is mostly no setting up crane or the support bracket that the staff scene was built temporarily through the steel pipe on the present market now, make the unable free movement of support bracket like this, altitude mixture control is inconvenient simultaneously, the work efficiency of reduction, build a large amount of steel pipes that the support bracket used simultaneously, accomodate inconvenient needs to spend the dismouting of plenty of time when not using, thereby a large amount of funds and manpower resources have been wasted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects in the prior art and providing a movable support bracket for road and bridge construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a road bridge construction is with portable support bracket, includes backup pad and base, the welding of backup pad bottom has electronic crane, and electronic crane keeps away from backup pad one end and welds in the base, it has the fixed plate to articulate through the hinge in base one side outer wall, and fixed plate one end sets up the fixed orifices that the equidistance distributes, the fixed plate is kept away from base one end welding and is had the supporting shoe, and the supporting shoe top has seted up the draw-in groove, the draw-in groove joint has L type fixture block, and the welding of L type fixture block top has the shield, the welding of base one end has flexible cat ladder, and the one end that base was kept away from to flexible cat ladder welds in backup pad one end, the mounting hole has been seted up to base both.
Preferably, the fixing plate is fixed to the ground by a fixing bolt screwed to the fixing hole.
Preferably, the top edge of the support plate is welded with a guardrail, and the height of the guardrail is 140cm-150 cm.
Preferably, the electric lifting frame is connected with a switch fixed on the outer wall of one side of the base through a wire, and the switch is connected with the storage battery through a wire.
Preferably, the top of the dustproof cover is welded with a handle, and the handle is sleeved with an anti-skidding soft sleeve.
Preferably, universal wheels are welded at four corners of the bottom of the base.
The utility model has the advantages that:
1. the electric lifting frame is welded between the base and the supporting plate, so that the electric lifting frame can reach the designated height more quickly and safely when being started, a supporting bracket temporarily built by using a steel pipe through manpower is avoided, and the moving capacity of the supporting bracket is increased by arranging the universal wheels at the bottom of the base;
2. the support bracket is fixed on the ground through the fixing bolt screwed on the fixing hole, so that the stability during working is improved, and the electric lifting frame can climb up the support plate to work when being lifted through the telescopic ladder;
3. through hinge connection fixed plate and base, do not use at the support bracket and can lift the fixed plate, through the draw-in groove joint shield on the fixed plate, accomodate the removal state for the dolly form with the support bracket, be convenient for remove and deposit.
Drawings
Fig. 1 is a schematic structural view of a working state of a movable support bracket for road and bridge construction provided by the present invention;
fig. 2 is a schematic structural view of a movable support bracket for road and bridge construction in a moving state according to the present invention;
FIG. 3 is a schematic structural view of a side view of a movable support bracket for road and bridge construction according to the present invention;
fig. 4 is a schematic structural view of a movable support bracket for road and bridge construction, which is provided by the present invention;
fig. 5 is the utility model provides a road bridge construction is with portable support bracket supporting shoe's schematic structure.
In the figure: the device comprises a guardrail 1, an electric lifting frame 2, a base 3, a fixing plate 4, a supporting plate 5, a telescopic ladder stand 6, a hinge 7, a mounting hole 8, a fixing bolt 9, a dust cover 10, a handle 11, a push rod 12, a supporting block 13 and a clamping block 14L-shaped.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, a movable support bracket for road and bridge construction comprises a support plate 5 and a base 3, wherein an electric lifting frame 2 is welded at the bottom of the support plate 5, one end of the electric lifting frame 2, which is far away from the support plate 5, is welded on the base 3, a fixed plate 4 is hinged on the outer wall of one side of the base 3 through a hinge 7, one end of the fixed plate 4 is provided with fixed holes distributed equidistantly, one end of the fixed plate 4, which is far away from the base 3, is welded with a support block 13, the top of the support block 13 is provided with a clamping groove, the clamping groove is clamped with an L-shaped clamping block 14, the top of the L-shaped clamping block 14 is welded with a dust cover 10, one end of the base 3 is welded with a telescopic ladder 6, one end of the telescopic ladder 6, which is far away from the base, and the power supply is a storage battery;
the fixed plate 4 is fixed on the ground through a fixing bolt 9 screwed on the fixing hole, the guardrail 1 is welded at the edge of the top of the supporting plate 5, the height of the guardrail 1 is 140cm-150cm, the electric lifting frame 2 is connected with a switch fixed on the outer wall of one side of the base 3 through a wire, the switch is connected to the storage battery through a wire, the handle 11 is welded at the top of the dustproof cover 10, the handle 11 is sleeved with an anti-skidding soft sleeve, and universal wheels are welded at four corners of the bottom of the base 3.
The working principle is as follows: the utility model provides a road bridge construction is divided into two kinds of states with portable support bracket, be moving state and operating condition respectively, during operating condition, fix support bracket on ground through fixing bolt 9 of spiro union on the fixed orifices, promote the stability of during operation, through welding electric crane 2 between base 3 and backup pad 5, can be fast safe arrival appointed height more when starting electric crane 2, through welding flexible cat ladder 6 on backup pad 5, also can climb up backup pad 5 and carry out work when electric crane 2 risees, when moving state, connect fixed plate 4 and base 3 through hinge 7, do not use at support bracket and can lift fixed 4 board, through draw-in groove joint shield 10 on fixed plate 4, accomodate support bracket for the dolly form, conveniently deposit and remove.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A movable support bracket for road and bridge construction comprises a support plate (5) and a base (3), and is characterized in that an electric lifting frame (2) is welded at the bottom of the support plate (5), one end of the electric lifting frame (2), which is far away from the support plate (5), is welded on the base (3), a fixed plate (4) is hinged on the outer wall of one side of the base (3) through a hinge (7), one end of the fixed plate (4) is provided with fixed holes distributed at equal intervals, one end of the fixed plate (4), which is far away from the base (3), is welded with a support block (13), the top of the support block (13) is provided with a clamping groove, the clamping groove is clamped with an L-shaped fixture block (14), the top of the L-shaped fixture block (14) is welded with a dust cover (10), one end of the base (3) is welded with a telescopic ladder (, mounting holes (8) have been seted up to base (3) both sides outer wall, and mounting holes (8) have push rod (12) through the bolt spiro union, base (3) top is provided with the power, and the power is the battery.
2. The movable support bracket for road and bridge construction according to claim 1, wherein the fixing plate (4) is fixed to the ground by a fixing bolt (9) screwed to the fixing hole.
3. The movable support bracket for road and bridge construction according to claim 1, wherein the top edge of the support plate (5) is welded with a guardrail (1), and the height of the guardrail (1) is 140cm-150 cm.
4. The movable support bracket for road and bridge construction according to claim 1, wherein the electric lifting frame (2) is connected with a switch fixed on the outer wall of one side of the base (3) through a lead, and the switch is connected with a storage battery through a lead.
5. The movable support bracket for road and bridge construction according to claim 1, wherein a handle (11) is welded on the top of the dust cover (10), and the handle (11) is sleeved with an anti-skid soft sleeve.
6. The movable support bracket for road and bridge construction according to claim 1, wherein universal wheels are welded at four corners of the bottom of the base (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022250843.0U CN213709212U (en) | 2020-10-12 | 2020-10-12 | Movable supporting bracket for road and bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022250843.0U CN213709212U (en) | 2020-10-12 | 2020-10-12 | Movable supporting bracket for road and bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213709212U true CN213709212U (en) | 2021-07-16 |
Family
ID=76797569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022250843.0U Expired - Fee Related CN213709212U (en) | 2020-10-12 | 2020-10-12 | Movable supporting bracket for road and bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213709212U (en) |
-
2020
- 2020-10-12 CN CN202022250843.0U patent/CN213709212U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212503731U (en) | Boiler installation overhead hoist | |
CN211201100U (en) | Civil engineering construction support | |
CN213709212U (en) | Movable supporting bracket for road and bridge construction | |
CN210793290U (en) | Conveyor is used in converter production | |
CN213679698U (en) | Auxiliary insulating platform of overhead vehicle | |
CN210286677U (en) | Assembled steel construction is with ladder frame convenient to remove | |
CN210712584U (en) | Movable supporting bracket for road and bridge construction | |
CN213268800U (en) | Anti-tilting scaffold | |
CN210482125U (en) | Road and bridge stop device | |
CN211369662U (en) | Special analysis cabin in petrochemical industry scene | |
CN218592182U (en) | Welding robot mobile device capable of being supported in stretching mode | |
CN209881203U (en) | Distribution transformer platform district patrols and examines operation platform | |
CN212563049U (en) | Multifunctional crawling ladder for electric power | |
CN212503877U (en) | Electric power adjustable maintenance ladder | |
CN216159862U (en) | Ground levelness mapping system for urban planning | |
CN215528655U (en) | Power supply replacement type mobile power supply trolley | |
CN211182301U (en) | High-heat type electric energy conversion and storage device | |
CN221001890U (en) | Outer wall construction platform for civil engineering | |
CN212454538U (en) | Integrated guarantee vehicle for tunneling construction | |
CN214009058U (en) | Solar photovoltaic power generation wisdom street lamp | |
CN215300224U (en) | Construction is with removing charging device | |
CN214942184U (en) | Scaffold for multi-use architecture | |
CN215212213U (en) | Tunnel construction scaffold frame that structure is firm | |
CN215577504U (en) | Novel line warning for optical fiber communication device | |
CN216104368U (en) | Carry on mechanism with flexible function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210716 |