CN213707345U - Novel water pipe winding mechanism for building construction - Google Patents
Novel water pipe winding mechanism for building construction Download PDFInfo
- Publication number
- CN213707345U CN213707345U CN202022386387.2U CN202022386387U CN213707345U CN 213707345 U CN213707345 U CN 213707345U CN 202022386387 U CN202022386387 U CN 202022386387U CN 213707345 U CN213707345 U CN 213707345U
- Authority
- CN
- China
- Prior art keywords
- fixed
- water pipe
- tripod
- winding mechanism
- movable roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
Abstract
The utility model discloses a novel water pipe rolling mechanism for building construction, which comprises a movable roller and a fixed support, wherein the two ends of the movable roller are fixedly welded with rollers, the inside of the rollers is provided with hubs, the two ends of the movable roller are provided with fixed tripods, a balancing stand is arranged at the lower ends of the two fixed tripods through fixed screws, the bottom of each fixed tripod is fixedly provided with a foot rest, one end of the movable roller is provided with a rolling shaft, a fixed support is added on the water pipe rolling mechanism, one end of a water pipe needing to be rolled is sleeved into the fixed ring when in use, then the water pipe is fixed on the movable roller, a rubber leather sleeve is held, a crank is rotated to drive the movable roller to rotate, so that the water pipe is rolled on the movable roller through the fixed ring, and the water pipe can be better wound on the movable roller through, the winding disorder of the water pipe is avoided, and the service performance of the water pipe winding mechanism is improved.
Description
Technical Field
The utility model belongs to the technical field of the building equipment is relevant, concretely relates to novel water pipe winding mechanism for construction.
Background
The water pipe not only plays a great role in daily life of people, but also is widely applied to the building industry. Need carry out rolling work after the water pipe is used to the building, present rolling water pipe work is mostly the manual work and goes on, has that intensity of labour is big, rolling inefficiency, shortcoming with high costs, consequently needs urgent research and development a rolling is efficient, with low costs, simple structure's water pipe coiling mechanism for building.
The existing water pipe winding mechanism technology has the following problems: the existing water pipe winding mechanism is easy to pack up messy when winding the water pipe, so that the winding of the water pipe is not facilitated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel water pipe winding mechanism for construction to solve the water pipe winding mechanism that proposes in the above-mentioned background art and when carrying out the rolling to the water pipe, the mixed and disorderly of packing up easily, thereby be unfavorable for the problem of water pipe rolling.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a novel water pipe winding mechanism for construction, includes activity cylinder and fixed bolster, activity cylinder both ends fixed welding has the gyro wheel, the inside of gyro wheel is provided with wheel hub, fixed tripod has been installed at the both ends of activity cylinder, the balancing stand passes through the fixed screw and installs the lower extreme at two fixed tripods, the bottom fixed mounting of fixed tripod has the foot rest, the one end of activity cylinder is provided with the roll axis, the upper end fixed mounting of fixed tripod has the support frame, the crank passes the entrance to a cave and the roll axis fixed connection of support frame, the fixed bolster passes through fixing bolt fixed mounting at the front end of two fixed tripods.
Preferably, the fixed support is composed of support plates, two fixing bolts and a fixing ring, the support plates are fixed to two sides of a fixed tripod through the fixing bolts, the two fixing bolts are arranged on one side and are both mounted on the fixed tripod, and the fixing ring is fixedly welded to the upper end of the support.
Preferably, the movable roller is made of stainless steel materials, and the movable roller is in a cylindrical shape.
Preferably, the rollers are made of iron materials, the rollers are in a cylindrical shape, and six hubs are fixedly welded inside the two rollers.
Preferably, the crank is made of iron materials, the crank is in a positive Z shape, and a rubber leather sleeve is arranged at the outer end of the crank.
Preferably, what fixed tripod adopted is stainless steel material, fixed tripod is a triangle body shape, the fixed welding of the lower extreme of fixed tripod has the foot rest, the foot rest is provided with four altogether, and four foot rests all correspond the lower extreme position department of installing at fixed tripod, the foot rest is a circular structure.
Compared with the prior art, the utility model provides a novel water pipe winding mechanism for construction possesses following beneficial effect:
the utility model discloses a fixed bolster has been added on water pipe winding mechanism, the fixed bolster is by the mounting panel, fixing bolt and solid fixed ring are constituteed, the fixed bolster passes through the fixing bolt installation to be fixed on fixed tripod, the water pipe one end that will need the rolling during use embolias in the fixed ring, then fix on movable drum, hold the rubber leather sheath, it rotates movable drum to rotate the crank, thereby make the water pipe pass through solid fixed ring rolling on movable drum, setting through the fixed bolster, can make the better winding of water pipe at movable drum, the winding in a jumble of water pipe winding has been avoided, the performance of water pipe winding mechanism has been improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description, do not constitute a limitation of the invention, in which:
FIG. 1 is a schematic structural view of a novel water pipe winding mechanism for building construction provided by the utility model;
FIG. 2 is a schematic structural view of a water pipe winding mechanism for building construction according to the present invention;
fig. 3 is a schematic structural view of the fixing bracket according to the present invention;
in the figure: 1. fixing a bracket; 2. a roller; 3. a hub; 4. a movable drum; 5. fixing the tripod; 6. a balancing stand; 7. fixing screws; 8. a foot rest; 9. a roll axis; 10. a support frame; 11. a crank; 12. a rubber leather sheath; 13. a mounting plate; 14. fixing the bolt; 15. and (4) fixing the ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be a fixed connection, a detachable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides a technical solution:
a novel water pipe winding mechanism for building construction comprises a movable roller 4 and a fixed support 1, wherein two ends of the movable roller 4 are fixedly welded with rollers 2, the rollers 2 are internally provided with hubs 3, two ends of the movable roller 4 are provided with fixed tripods 5, a balance frame 6 is arranged at the lower ends of the two fixed tripods 5 through fixed screws 7, the bottom of each fixed tripod 5 is fixedly provided with a foot rest 8, one end of the movable roller 4 is provided with a rolling shaft 9, the upper end of each fixed tripod 5 is fixedly provided with a support frame 10, a crank 11 passes through a hole of the support frame 10 and is fixedly connected with the rolling shaft 9, the fixed support 1 is fixedly arranged at the front ends of the two fixed tripods 5 through a fixed bolt 14, the fixed support 1 is composed of a support plate 13, a fixed bolt 14 and a fixed ring 15, the support plate 13 is fixed at two sides of the fixed tripo, fixing bolt 14 has two on one side, and all install on fixed tripod 5, the fixed welding in the upper end of mounting panel 13 of solid fixed ring 15, what activity cylinder 4 chooseed for use is stainless steel material, activity cylinder 4 is a cylinder shape, what gyro wheel 2 adopted is the iron material, gyro wheel 2 is a cylinder shape, six wheel hub 3 of the equal fixed welding in inside of two gyro wheels 2, iron material is chooseed for use to crank 11, crank 11 is a positive Z shape, the outer end of crank 11 is provided with rubber leather sheath 12, what fixed tripod 5 adopted is the stainless steel material, fixed tripod 5 is a triangle shape, the fixed welding of lower extreme of fixed tripod 5 has foot rest 8, foot rest 8 is provided with four altogether, and four foot rest 8 all correspond the lower extreme position department of installing at fixed tripod 5, foot rest 8 is a circular structure.
The utility model discloses a theory of operation and use flow: the utility model discloses install the back, place water pipe winding mechanism on the level land, upper end at fixed tripod 5 sets up a support frame 10, fix movable cylinder 4 and gyro wheel 2, prevent that the rolling in-process from droing, water pipe one end that will need the rolling during use embolias solid fixed ring 15 in, then fix on movable cylinder 4, hold rubber leather sheath 12, it is rotatory to rotate crank 11 and drive roll axis 9, roll axis 9 function also drives movable cylinder 4 motion, thereby make the water pipe pass through solid fixed ring 15 rolling on movable cylinder 4, rubber leather sheath 12 can increase the frictional force with the hand, the rolling is easier, put the position that needs with water pipe winding mechanism after the use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a novel water pipe winding mechanism for construction, includes movable roller (4) and fixed bolster (1), its characterized in that: fixed welding in activity cylinder (4) both ends has gyro wheel (2), the inside of gyro wheel (2) is provided with wheel hub (3), fixed tripod (5) have been installed at the both ends of activity cylinder (4), and the lower extreme at two fixed tripod (5) is installed through fixed screw (7) in balancing stand (6), the bottom fixed mounting of fixed tripod (5) has foot rest (8), the one end of activity cylinder (4) is provided with roll axis (9), the upper end fixed mounting of fixed tripod (5) has support frame (10), and crank (11) pass the entrance to a cave and roll axis (9) fixed connection of support frame (10), fixed bolster (1) are through fixing bolt (14) fixed mounting at the front end of two fixed tripod (5).
2. The novel water pipe winding mechanism for building construction as claimed in claim 1, wherein: the fixing support (1) is composed of a support plate (13), fixing bolts (14) and fixing rings (15), the support plate (13) is fixed on two sides of a fixing tripod (5) through the fixing bolts (14), the number of the fixing bolts (14) is two on one side, the fixing bolts are all installed on the fixing tripod (5), and the fixing rings (15) are fixedly welded at the upper end of the support plate (13).
3. The novel water pipe winding mechanism for building construction as claimed in claim 1, wherein: the movable roller (4) is made of stainless steel materials, and the movable roller (4) is in a cylindrical shape.
4. The novel water pipe winding mechanism for building construction as claimed in claim 1, wherein: the roller (2) is made of iron materials, the roller (2) is in a cylindrical shape, and six hubs (3) are fixedly welded in the roller (2).
5. The novel water pipe winding mechanism for building construction as claimed in claim 1, wherein: the crank (11) is made of iron materials, the crank (11) is in a positive Z shape, and a rubber leather sleeve (12) is arranged at the outer end of the crank (11).
6. The novel water pipe winding mechanism for building construction as claimed in claim 1, wherein: fixed tripod (5) adopt be stainless steel, fixed tripod (5) are a triangle shape, the fixed welding of lower extreme of fixed tripod (5) has foot rest (8), foot rest (8) are provided with four altogether, and four foot rests (8) all correspond and install the lower extreme position department at fixed tripod (5), foot rest (8) are a circular structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022386387.2U CN213707345U (en) | 2020-10-23 | 2020-10-23 | Novel water pipe winding mechanism for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022386387.2U CN213707345U (en) | 2020-10-23 | 2020-10-23 | Novel water pipe winding mechanism for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213707345U true CN213707345U (en) | 2021-07-16 |
Family
ID=76800827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022386387.2U Active CN213707345U (en) | 2020-10-23 | 2020-10-23 | Novel water pipe winding mechanism for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213707345U (en) |
-
2020
- 2020-10-23 CN CN202022386387.2U patent/CN213707345U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213707345U (en) | Novel water pipe winding mechanism for building construction | |
CN112209176A (en) | Novel water pipe winding mechanism for building construction | |
CN211003779U (en) | Winding device for glass fiber cloth | |
CN214879260U (en) | Manual rolling machine of adjustable reel size | |
CN214270006U (en) | Cantilever hoisting accessory of rotatory support in area | |
CN210456951U (en) | Plastic pipe coiler device | |
CN211081077U (en) | Pay-off for building engineering | |
CN218798169U (en) | Material receiving and discharging platform and rolling mill | |
CN219371093U (en) | Compression roller assembly | |
CN218538770U (en) | Wire winding device for customized wire processing | |
CN202885489U (en) | Drying cylinder | |
CN216728945U (en) | Steel plate rolling machine | |
CN215479352U (en) | Tower machine counter weight mounting structure | |
CN218057977U (en) | Winding roller and winding system with self-cleaning function | |
CN218493138U (en) | Steel pipe concrete batter post pretension is adjusted structure | |
CN211854724U (en) | Rotary drum dryer | |
CN212638918U (en) | Acid-alkali salt-resistant polymer carrier roller | |
CN220748838U (en) | Cylindrical roller bearing convenient to dismouting | |
CN217508110U (en) | Cable erecting device for electromechanical installation | |
CN215248996U (en) | Rolling mill dismounting device | |
CN216356953U (en) | Intelligent building high definition video monitoring device | |
CN218841538U (en) | Monitoring device for bridge hanging basket construction | |
CN211169292U (en) | Optical cable production is with roll-up device | |
CN211293590U (en) | Roll up electronic curtain of formula engineering | |
CN217818789U (en) | Installation fixing device that indoor environment monitoring ware was used |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |