CN213707298U - Hydraulic engineering construction pipe laying and paying-off equipment - Google Patents
Hydraulic engineering construction pipe laying and paying-off equipment Download PDFInfo
- Publication number
- CN213707298U CN213707298U CN202022086242.0U CN202022086242U CN213707298U CN 213707298 U CN213707298 U CN 213707298U CN 202022086242 U CN202022086242 U CN 202022086242U CN 213707298 U CN213707298 U CN 213707298U
- Authority
- CN
- China
- Prior art keywords
- supporting
- rod
- bracing piece
- equipment
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a hydraulic engineering construction pipe laying and paying-off device, which comprises a first supporting column, a baffle plate and a second supporting column, wherein a fixed rod is fixedly arranged in the first supporting column, two bearings are fixedly arranged on the outer sides of the fixed rod, a first supporting rod is fixedly arranged on the outer sides of the two bearings, a spring is arranged in the first supporting rod, a second supporting rod is movably arranged in the inner parts of the two ends of the first supporting rod, a winding rod is fixedly arranged at one end of the second supporting rod far away from the first supporting rod, supporting blocks are fixedly arranged on the opposite sides of the second supporting rod and the first supporting column, threaded holes are arranged in the two ends of each supporting block, internal threads of the threaded holes are provided with screw rods, the screw rods can be adjusted up and down along with the height of a wire by the supporting rods and the spring during laying-off, the screw rods stand on the ground stably in four corners, and the problem of wire, the device can work stably in any environment, and adaptability of the paying-off device to different environments of a construction site is improved.
Description
Technical Field
The utility model belongs to the technical field of hydraulic engineering, concretely relates to hydraulic engineering construction pipe laying unwrapping wire equipment.
Background
The hydraulic engineering construction has many same parts with the construction of general civil engineering such as roads, railways, bridges, house buildings and the like, main construction objects are mainly projects such as earthwork, stonework, concrete, metal structures, electromechanical equipment installation and the like, different types of hydraulic buildings such as dams, dikes, spillways, sluice gates, water inlets, channels, ferry tanks, rafts, fishways and the like need to be built, and the hydraulic engineering bears the tasks of retaining water, storing water and draining water, so the quality of the building of the hydraulic engineering is strictly required, and special construction methods and measures need to be adopted according to the technical specification of the hydraulic engineering to ensure the engineering quality and bring benefits to the mankind.
Present pay-off simple structure, need double cooperation to accomplish the unwrapping wire work during the use, if one-man operation, can't ensure that equipment can steadily be fixed, and lead to the slope or empty, ordinary unwrapping wire equipment wire casing bracing piece can not stretch out and draw back from top to bottom along with the quantity of coil when the unwrapping wire in addition, the line height leads to the line to be blocked because of being less than the bracing piece in the unwrapping wire process, can't work smoothly, thereby produce the unwrapping wire trouble easily, consequently, the line of fixed quantity can only be put into at every turn, influence the progress of work, on the other hand produces the winding because of the line is many easy at the during operation unwrapping wire, consequently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hydraulic engineering construction pipe laying unwrapping wire equipment to it is at the use to provide a current unwrapping wire equipment in solving above-mentioned background art, because unwrapping wire equipment wire casing bracing piece can not be along with the high vertical flexibility of coil when the unwrapping wire, the too high unwrapping wire that leads to of wire frame during the unwrapping wire is imperfect, produce the unwrapping wire trouble easily, lead to the line that can only put into fixed quantity at every turn, on the other hand produces the winding because of the line is many easy at the during operation unwrapping wire, thereby hinder the problem of the progress of man-hour influence work.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hydraulic engineering construction pipe laying unwrapping wire equipment, includes first support column, baffle and second support column, the inside fixed mounting of first support column has the dead lever, the outside fixed mounting of dead lever has two bearings, two the equal fixed mounting in the outside of bearing has first bracing piece, the internally mounted of first bracing piece has the spring, the equal movable mounting in inside at first bracing piece both ends has the second bracing piece, the one end fixed mounting that first bracing piece was kept away from to the second bracing piece has the winding bar, the equal fixed mounting in the looks dorsal part of second support column and first support column has the supporting shoe, the screw hole has all been seted up to the inside at supporting shoe both ends, the internal thread of screw hole has the hob.
Preferably, one end of the fixing rod, which is far away from the first support column, is fixedly installed in the second support column, which is far away from the side where the support block is installed.
Preferably, one end of the spring, which is far away from the first supporting rod, is fixedly arranged inside the second supporting rod.
Preferably, two cross bars are fixedly mounted on opposite sides of the first support bar.
Preferably, the baffle is fixedly installed at both ends of the wire winding rod.
Preferably, a rocker is fixedly mounted at the top of the spiral rod, and a shell is mounted on the outer side of the rocker.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the supporting rod, the spring and the baffle are arranged, the supporting rod and the spring can be adjusted up and down along with the weight of the thread when the thread is paid off, then the supporting rod and the spring can be reduced along with the reduction of the thread when the thread is paid off, then the fixed rod is pulled out through the handle, the first supporting rod and the second supporting rod are taken down, one end of the thread is fixed on the cross rod, then the thread is placed on the winding rod, the height of the second supporting rod is adjusted through the spring in the first supporting rod according to the weight of the thread, then the first supporting rod and the second supporting rod are placed at the original positions, the fixed rod is inserted through the handle to fix the positions, then the thread is rotated through the bearing, the thread is always kept in a tight state in the working process, the problem that the thread is wound due to the loosening of the thread is solved, in addition, the baffle can fix the thread in the supporting rod, the thread is prevented from sliding off in the working process, and therefore, but also improves the working efficiency.
2. Can be fine the fixing at construction ground with unwrapping wire equipment through setting up the spiral post, the hob at four corners of during operation is the steady station in four corners on ground, carry out simple fixed to equipment, then rotate the rocker through the shell, then drive the hob, the hob carries out the downwardly rotating in the inside screw hole of supporting shoe, it is fixed to play the secondary to equipment in the earth creeps into, can make equipment be no matter can steady work of going on under any environment, so both promoted the adaptability of unwrapping wire equipment to the different environment in building site, also improve the progress of work.
Drawings
Fig. 1 is a schematic sectional structure of the present invention;
fig. 2 is a schematic front structural view of the present invention;
fig. 3 is a schematic side view of the present invention.
In the figure: 1. a first support column; 2. a baffle plate; 3. a wire winding rod; 4. a cross bar; 5. a spring; 6. a first support bar; 7. a threaded hole; 8. a housing; 9. a rocker; 10. a screw rod; 11. A bearing; 12. a second support bar; 13. a support block; 14. fixing the rod; 15. and a second support column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a hydraulic engineering construction pipe laying unwrapping wire equipment, includes first support column 1, baffle 2 and second support column 15, its characterized in that: inside fixed mounting of first support column 1 has dead lever 14, the outside fixed mounting of dead lever 14 has two bearings 11, the equal fixed mounting in outside of two bearings 11 has first bracing piece 6, the internally mounted of first bracing piece 6 has spring 5, the equal movable mounting in inside at first bracing piece 6 both ends has second bracing piece 12, the one end fixed mounting that first bracing piece 6 was kept away from to second bracing piece 12 has winding rod 3, the equal fixed mounting in the opposite sides of second bracing piece 15 and first support column 1 has supporting shoe 13, threaded hole 7 has all been seted up to the inside at supporting shoe 13 both ends, threaded hole 7's internal thread has hob 10.
In the embodiment, when the paying-off equipment is needed, the first supporting column 1 and the second supporting column 15 can be inserted into the ground, the screw rods 10 at four corners are stably stood on the ground in four corners to simply fix the equipment, the rocker 9 is rotated through the shell 8, the screw rods 10 are driven, the screw rods 10 rotate downwards in the threaded holes 7 in the supporting blocks 13 to drill into soil to fix the equipment for the second time, the fixing rods 14 are pulled out, the first supporting rod 6 and the second supporting rod 12 are taken down, one end of a wire is fixed on the cross rod 4, the wire is put on the winding rod 3, the height of the second supporting rod 12 is adjusted through the spring 5 in the first supporting rod 6 according to the weight of the wire, the first supporting rod 6 and the second supporting rod 12 are put at the original positions, the fixing rods 14 are inserted to fix the positions, then rotate through bearing 11, baffle 2 can be fixed the line on the winding rod 3 in the course of the work, has avoided the line to twine each other, and the staff pulls the end of a thread and can begin work.
Specifically, one end of the fixing rod 14 away from the first support column 1 is fixedly installed inside one side of the second support column 15 away from the installation support block 13.
In this embodiment, the fixing rod 14 is used to support the first support rod 6 and the second support rod 12, so that the coil can rotate.
Specifically, one end of the spring 5 away from the first support rod 6 is fixedly arranged inside the second support rod 12.
In this embodiment, the spring 5 is used for conveniently driving the second supporting column 15 to move up and down along with the height of the thread, so as to ensure that the thread is always in a tight state during operation.
Specifically, two cross bars 4 are fixedly mounted on opposite sides of the first support bar 6.
In this embodiment, the cross bar 4 is used to fix one end of the string.
Specifically, the baffle plates 2 are fixedly arranged at two ends of the winding rod 3.
In this embodiment, the baffle 2 is used to prevent the thread from slipping off during operation.
Specifically, a rocker 9 is fixedly mounted at the top of the screw rod 10, and a shell 8 is mounted on the outer side of the rocker 9.
In this embodiment, the housing 8 rotates the rocker 9 to rotate the screw rod 10.
The utility model discloses a theory of operation and use flow: when the paying-off equipment is needed, the first supporting column 1 and the second supporting column 15 can be inserted into the ground, then the screw rods 10 at four corners are stably stood on the ground in a four-corner mode, the equipment is simply fixed, then the rocker 9 is rotated through the shell 8, then the screw rods 10 are driven, the screw rods 10 rotate downwards in the threaded holes 7 in the supporting blocks 13, the equipment is fixed for the second time when the equipment is drilled into soil, then the fixing rods 14 are pulled out, the first supporting rod 6 and the second supporting rod 12 are taken down, then one end of a thread is fixed on the cross rod 4, then the thread is put on the winding rod 3, the height of the second supporting rod 12 is adjusted through the spring 5 in the first supporting rod 6 according to the weight of the thread, then the first supporting rod 6 and the second supporting rod 12 are put in the original positions, then the fixing rods 14 are inserted, the positions are fixed, and then the rotation is carried out through the bearing 11, baffle 2 can fix the line on winding rod 3 in the course of the work, has avoided the line to twine each other, and the staff pulls the end of a thread and can begin work.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a hydraulic engineering construction pipe laying unwrapping wire equipment, includes first support column (1), baffle (2) and second support column (15), its characterized in that: the utility model discloses a supporting structure, including first bracing piece (1), the inside fixed mounting of first bracing piece (1) has dead lever (14), the outside fixed mounting of dead lever (14) has two bearings (11), two the equal fixed mounting in the outside of bearing (11) has first bracing piece (6), the internally mounted of first bracing piece (6) has spring (5), the equal movable mounting in inside at first bracing piece (6) both ends has second bracing piece (12), the one end fixed mounting that first bracing piece (6) were kept away from in second bracing piece (12) has winding rod (3), the equal fixed mounting in the opposite sides mutually of second bracing piece (15) and first bracing piece (1) has supporting shoe (13), threaded hole (7) have all been seted up to the inside at supporting shoe (13) both ends, the inside screw thread of threaded hole (7) has spiral pole (10).
2. The hydraulic engineering construction pipe laying and paying-off equipment as claimed in claim 1, wherein: one end of the fixing rod (14) far away from the first supporting column (1) is fixedly installed in the second supporting column (15) far away from one side of the installation supporting block (13).
3. The hydraulic engineering construction pipe laying and paying-off equipment as claimed in claim 1, wherein: one end, far away from the first supporting rod (6), of the spring (5) is fixedly arranged inside the second supporting rod (12).
4. The hydraulic engineering construction pipe laying and paying-off equipment as claimed in claim 1, wherein: two cross rods (4) are fixedly arranged on the opposite sides of the first supporting rod (6).
5. The hydraulic engineering construction pipe laying and paying-off equipment as claimed in claim 1, wherein: the baffle plates (2) are fixedly arranged at two ends of the winding rod (3).
6. The hydraulic engineering construction pipe laying and paying-off equipment as claimed in claim 1, wherein: the top of the screw rod (10) is fixedly provided with a rocker (9), and the outer side of the rocker (9) is provided with a shell (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022086242.0U CN213707298U (en) | 2020-09-21 | 2020-09-21 | Hydraulic engineering construction pipe laying and paying-off equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022086242.0U CN213707298U (en) | 2020-09-21 | 2020-09-21 | Hydraulic engineering construction pipe laying and paying-off equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213707298U true CN213707298U (en) | 2021-07-16 |
Family
ID=76794257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022086242.0U Expired - Fee Related CN213707298U (en) | 2020-09-21 | 2020-09-21 | Hydraulic engineering construction pipe laying and paying-off equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213707298U (en) |
-
2020
- 2020-09-21 CN CN202022086242.0U patent/CN213707298U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213707298U (en) | Hydraulic engineering construction pipe laying and paying-off equipment | |
CN210263929U (en) | A preformed hole template for building civil engineering | |
CN216515706U (en) | Detachable tower machine foundation reinforcing apparatus | |
CN214657064U (en) | Foundation ditch is reinforcing apparatus for slope support | |
CN213952248U (en) | Small-size supporting system suitable for deep foundation pit | |
CN215144195U (en) | Reinforcing bar bending device is used in civil engineering construction | |
CN210341904U (en) | Civil engineering composite pile | |
CN214195707U (en) | Anti-seismic energy-saving environment-friendly movable board house | |
CN212534091U (en) | Pile driving device for ocean engineering | |
CN211286905U (en) | Intelligence pole base and installation device | |
CN217601456U (en) | Deep foundation pit supporting beam frame structure for geotechnical engineering | |
CN217654447U (en) | Measuring device for hydraulic engineering | |
CN217684182U (en) | A portable monitoring device for water conservancy is supervised | |
CN211949894U (en) | H-shaped steel anchor rod composite pile structure for deep foundation pit enclosure | |
CN220395301U (en) | Baffle strutting arrangement is used in earth and stone side engineering construction | |
CN217596465U (en) | Raw material cutting device for civil engineering | |
CN217480194U (en) | Pile foundation engineering is with strutting seepage prevention structure | |
CN210155810U (en) | Hydrology planning early warning device convenient to adjust | |
CN217679138U (en) | Do benefit to underground structure of drainage | |
CN215160348U (en) | Auxiliary support for installing pipeline for municipal water supply and drainage | |
CN217460605U (en) | Novel foundation pit support replacing device | |
CN112376581B (en) | Deep foundation pit supporting structure and construction method thereof | |
CN220414132U (en) | But quick assembly disassembly's water conservancy flood control engineering concatenation formula slope protection structure | |
CN218757509U (en) | Slag sluiceway foundation pit supporting structure | |
CN217679197U (en) | Drainage device for foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210716 Termination date: 20210921 |
|
CF01 | Termination of patent right due to non-payment of annual fee |