CN213706340U - Drainage structure of water body purification equipment - Google Patents

Drainage structure of water body purification equipment Download PDF

Info

Publication number
CN213706340U
CN213706340U CN202022572723.2U CN202022572723U CN213706340U CN 213706340 U CN213706340 U CN 213706340U CN 202022572723 U CN202022572723 U CN 202022572723U CN 213706340 U CN213706340 U CN 213706340U
Authority
CN
China
Prior art keywords
quick
reserve tank
cardboard
liquid
liquid reserve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022572723.2U
Other languages
Chinese (zh)
Inventor
陈臻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Aikesheng Laboratory System Engineering Co ltd
Original Assignee
Xiamen Aikesheng Laboratory System Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Aikesheng Laboratory System Engineering Co ltd filed Critical Xiamen Aikesheng Laboratory System Engineering Co ltd
Priority to CN202022572723.2U priority Critical patent/CN213706340U/en
Application granted granted Critical
Publication of CN213706340U publication Critical patent/CN213706340U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a drainage structure of water clarification plant relates to water clarification plant technical field, for the not quick installation of being convenient for of drainage structure who solves current water clarification plant, influences staff's installation effectiveness's problem. Quick cardboard is installed to the outside one side of liquid reserve tank, quick cardboard and liquid reserve tank welded connection, the spring is installed to one side of being close to the liquid reserve tank of quick cardboard, the baffle is installed to the one end of spring, spring and baffle and the equal welded connection of quick cardboard, the inside at both ends all installs the tight lead screw in top about liquid reserve tank one side is kept away from to quick cardboard, the tight lead screw in top passes through threaded connection with quick cardboard, the kicking block is installed to the one end that the tight lead screw in top is close to the liquid reserve tank, kicking block and the tight lead screw fixed connection in top.

Description

Drainage structure of water body purification equipment
Technical Field
The utility model relates to a water clarification plant technical field specifically is a water clarification plant's flowing back structure.
Background
The water treatment mode comprises physical treatment and chemical treatment. The mode of human being's water treatment has been quite a lot of years history, and the physical method includes utilizing the different filter media of various aperture sizes, utilizes absorption or separation mode, gets rid of the impurity in aquatic outside, and the more important person in the absorption mode is for adsorbing with active carbon, and separation method is to pass through the filter media with water, lets the impurity of bigger volume can't pass through, and then obtains comparatively clean water. In addition, the physical methods also include precipitation methods, which are obtained by floating impurities with a smaller specific gravity on the water surface or precipitating impurities with a larger specific gravity below the water surface. The chemical method is to convert the impurities in water into substances which are less harmful to human bodies by various chemicals or concentrate the impurities, and the longest historical chemical treatment method can be that alum is added into water, and after the impurities in the water are collected, the volume is increased, and then the impurities can be removed by a filtration method.
However, the drainage structure of the existing water body purification equipment is inconvenient to install quickly, and the installation efficiency of workers is influenced; therefore, the existing requirements are not met, and the liquid discharge structure of the water body purification equipment is provided for the existing requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water clarification plant's flowing back structure to the quick installation of being not convenient for of the flowing back structure of the water clarification plant who proposes in solving above-mentioned background art influences staff's installation effectiveness's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water clarification plant's flowing back structure, includes the liquid reserve tank, quick cardboard is installed to the outside one side of liquid reserve tank, quick cardboard and liquid reserve tank welded connection, the spring is installed to one side that is close to the liquid reserve tank of quick cardboard, the baffle is installed to the one end of spring, the equal welded connection of spring and baffle and quick cardboard, the inside at both ends all installs the tight lead screw in top about the liquid reserve tank one side is kept away from to quick cardboard, the tight lead screw in top passes through threaded connection with quick cardboard, the tight lead screw in top is close to the one end of liquid reserve tank and installs the kicking block, kicking block and the tight lead screw fixed connection in top.
Preferably, the installing support is installed to the inside lower extreme of liquid reserve tank, installing support and liquid reserve tank welded connection, the filter screen is all installed to the inside both sides of installing support, filter screen and installing support welded connection, the internally mounted of installing support has the centre gripping support, centre gripping support and installing support welded connection, the formula level sensor that puts in is installed to the upper end of centre gripping support, formula level sensor and centre gripping support fixed connection put in.
Preferably, the upper end of one side of the liquid storage tank is provided with a control box, and the control box is connected with the liquid storage tank through a screw.
Preferably, a material inlet pipeline is installed at the upper end of the liquid storage tank and is connected with the liquid storage tank in a welded mode.
Preferably, the lower extreme of liquid reserve tank is installed the flowing back pipeline, the internally mounted of flowing back pipeline has the flowing back ball axle, the flowing back ball axle passes through the bearing with the flowing back pipeline and is connected, the driving motor is installed to the one side that quick cardboard was kept away from to the flowing back pipeline, driving motor and flowing back pipeline fixed connection, driving motor and flowing back ball axle fixed connection.
Preferably, the alarm is installed at the upper end of the quick clamping plate and is connected with the quick clamping plate through a screw.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an installation spring can play the effect of buffering, and the staff of being convenient for installs this device, prevents that device and installation wall body from colliding, avoids the device to take place deformation, increases the practicality of device, and installation top tight lead screw can push up the kicking block, makes it promote baffle and wall body contact, reduces the space between baffle and the wall body, need not the staff and installs at the installation wall body upper end punching, and the staff of being convenient for installs this device fast, avoids influencing staff's installation effectiveness;
2. the utility model discloses an installation input level sensor can the surplus of the inside liquid of detection device, guarantees the complete of device function, and the installation alarm can send out the police dispatch newspaper and remind the staff in time to add liquid when the inside liquid surplus of device is not enough, avoids influencing the use, makes the device more humanized.
Drawings
Fig. 1 is a schematic structural view of a liquid discharge structure of the water body purification device of the present invention;
FIG. 2 is a front view of a liquid discharge structure of the water purifying apparatus of the present invention;
fig. 3 is an enlarged view of a portion a of fig. 1.
In the figure: 1. a liquid storage tank; 2. mounting a bracket; 3. clamping the bracket; 4. a drop-in liquid level sensor; 5. a filter screen; 6. a liquid discharge conduit; 7. a drive motor; 8. a liquid discharge ball shaft; 9. a control box; 10. introducing the materials into a pipeline; 11. quickly clamping the board; 12. a spring; 13. a baffle plate; 14. tightly pushing the screw rod; 15. an alarm; 16. and (7) a top block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: a liquid discharge structure of water body purification equipment comprises a liquid storage tank 1, wherein a quick clamping plate 11 is arranged on one side outside the liquid storage tank 1, the quick clamping plate 11 is welded with the liquid storage tank 1, a spring 12 is arranged on one side of the quick clamping plate 11 close to the liquid storage tank 1, the mounting spring 12 can play a role of buffering, workers can conveniently mount the device, the device is prevented from colliding with a mounting wall body, the deformation of the device is avoided, the practicability of the device is improved, a baffle 13 is arranged at one end of the spring 12, the spring 12 is welded with the baffle 13 and the quick clamping plate 11, a jacking screw rod 14 is arranged inside the upper end and the lower end of one side of the quick clamping plate 11 far away from the liquid storage tank 1, a jacking block 16 can be jacked by the jacking screw rod 14, the jacking screw rod can push the baffle 13 to be in contact with the wall body, the gap between the baffle, this device is installed fast to the staff of being convenient for, avoids influencing staff's installation effectiveness, and the tight lead screw 14 in top passes through threaded connection with quick cardboard 11, and the ejector pad 16 is installed to the tight lead screw 14 in top near the one end of liquid reserve tank 1, ejector pad 16 and the tight lead screw 14 fixed connection in top.
Further, installing support 2 is installed to 1 inside lower extreme of liquid reserve tank, installing support 2 and 1 welded connection of liquid reserve tank, filter screen 5 is all installed to 2 inside both sides of installing support, filter screen 5 and 2 welded connection of installing support, the internally mounted of installing support 2 has centre gripping support 3, centre gripping support 3 and 2 welded connection of installing support, input level sensor 4 is installed to the upper end of centre gripping support 3, input level sensor 4 and 3 fixed connection of centre gripping support, input level sensor 4 can the inside liquid's of detection device surplus in the installation, guarantee the complete of device function.
Further, control box 9 is installed to the upper end of liquid reserve tank 1 one side, and control box 9 passes through the screw connection with liquid reserve tank 1, and installation control box 9 can guarantee the device steady operation.
Further, the upper end of liquid reserve tank 1 is installed the material and is let in pipeline 10, and the material lets in pipeline 10 and 1 welded connection of liquid reserve tank, and the installation material lets in pipeline 10 and is convenient for liquid eduction gear.
Further, drain 6 is installed to the lower extreme of liquid reserve tank 1, and the internally mounted of drain 6 has flowing back ball 8, and flowing back ball 8 passes through the bearing with drain 6 and is connected, and quick cardboard 11 one side is kept away from to drain 6 installs driving motor 7, driving motor 7 and drain 6 fixed connection, driving motor 7 and 8 fixed connection of drain ball, and installation flowing back ball 8 and driving motor 7 are convenient for control liquid discharging equipment.
Further, alarm 15 is installed to quick cardboard 11's upper end, is that alarm 15 passes through the screw connection with quick cardboard 11, and installation alarm 15 can send out the police dispatch newspaper and remind the staff in time to add liquid when the inside liquid surplus of device is not enough, avoids influencing the use, makes the device more humanized.
The working principle is as follows: when the device is used, the control box 9 starts the driving motor 7 within a set time to drive the liquid drainage ball shaft 8 to rotate, liquid in the device is subjected to the action of gravity, the liquid level of the liquid is continuously reduced along with the discharge of the liquid, the pressure applied to the throw-in type liquid level sensor 4 is gradually reduced, after the pressure is reduced by a certain value, the throw-in type liquid level sensor 4 sends a signal to the control box 9, the control box 9 controls the driving motor 7 to stop liquid drainage, when the residual amount of the liquid in the device is insufficient, the throw-in type liquid level sensor 4 sends a signal to the control box 9, the control box 9 controls the alarm 15 to send an alarm to remind a worker to add the liquid in time, this device installation spring 12 can play the effect of buffering, the staff of being convenient for installs this device, prevent that device and installation wall body from bumping, avoid the device to take place deformation, increase the practicality of device, tight lead screw 14 in installation top can push up and move kicking block 16, make it promote baffle 13 and wall body contact, reduce the space between baffle 13 and the wall body, need not the staff and punch the installation in installation wall body upper end, the staff of being convenient for installs this device fast, avoid influencing staff's installation effectiveness, installation input level sensor 4 can the inside liquid's of detection device surplus, guarantee the device function complete, installation alarm 15 when the inside liquid surplus of device is not enough, can send the police dispatch newspaper and remind the staff in time to add liquid, avoid influencing the use, make the device more humanized.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a water clarification plant's flowing back structure, includes liquid reserve tank (1), its characterized in that: quick cardboard (11) are installed to outside one side of liquid reserve tank (1), quick cardboard (11) and liquid reserve tank (1) welded connection, spring (12) are installed to one side that is close to liquid reserve tank (1) of quick cardboard (11), baffle (13) are installed to the one end of spring (12), spring (12) and baffle (13) and the equal welded connection of quick cardboard (11), the inside at both ends all installs tight lead screw (14) in top about liquid reserve tank (1) one side is kept away from in quick cardboard (11), the tight lead screw in top (14) passes through threaded connection with quick cardboard (11), ejector block (16) are installed to the one end that the tight lead screw in top (14) is close to liquid reserve tank (1), ejector block (16) and tight lead screw (14) fixed connection in top.
2. The liquid discharge structure of water body purification equipment according to claim 1, wherein: installing support (2) are installed to the inside lower extreme of liquid reserve tank (1), installing support (2) and liquid reserve tank (1) welded connection, filter screen (5) are all installed to the inside both sides of installing support (2), filter screen (5) and installing support (2) welded connection, the internally mounted of installing support (2) has centre gripping support (3), centre gripping support (3) and installing support (2) welded connection, input level sensor (4) are installed to the upper end of centre gripping support (3), input level sensor (4) and centre gripping support (3) fixed connection.
3. The liquid discharge structure of water body purification equipment according to claim 1, wherein: the upper end of one side of the liquid storage box (1) is provided with a control box (9), and the control box (9) is connected with the liquid storage box (1) through screws.
4. The liquid discharge structure of water body purification equipment according to claim 1, wherein: the upper end of the liquid storage tank (1) is provided with a material inlet pipeline (10), and the material inlet pipeline (10) is connected with the liquid storage tank (1) in a welding manner.
5. The liquid discharge structure of water body purification equipment according to claim 1, wherein: drainage tube (6) are installed to the lower extreme of liquid reserve tank (1), the internally mounted of drainage tube (6) has drainage ball axle (8), drainage ball axle (8) are connected through the bearing with drainage tube (6), driving motor (7) are installed to one side that quick cardboard (11) were kept away from in drainage tube (6), driving motor (7) and drainage tube (6) fixed connection, driving motor (7) and drainage ball axle (8) fixed connection.
6. The liquid discharge structure of water body purification equipment according to claim 1, wherein: an alarm (15) is installed at the upper end of the quick clamping plate (11), and the alarm (15) is connected with the quick clamping plate (11) through screws.
CN202022572723.2U 2020-11-09 2020-11-09 Drainage structure of water body purification equipment Expired - Fee Related CN213706340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022572723.2U CN213706340U (en) 2020-11-09 2020-11-09 Drainage structure of water body purification equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022572723.2U CN213706340U (en) 2020-11-09 2020-11-09 Drainage structure of water body purification equipment

Publications (1)

Publication Number Publication Date
CN213706340U true CN213706340U (en) 2021-07-16

Family

ID=76804093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022572723.2U Expired - Fee Related CN213706340U (en) 2020-11-09 2020-11-09 Drainage structure of water body purification equipment

Country Status (1)

Country Link
CN (1) CN213706340U (en)

Similar Documents

Publication Publication Date Title
CN213706340U (en) Drainage structure of water body purification equipment
CN215627317U (en) Facility is handled to sponge city initial stage rainwater
CN205953703U (en) Black and odorous water body administers integrated device
CN213569673U (en) Sewage treatment plant for environmental engineering
CN213407826U (en) Industrial wastewater sedimentation tank
CN206395950U (en) A kind of profit processor
CN202876507U (en) Horizontal cylindrical grating
CN210825722U (en) Emergent sewage treatment device in river course
CN211056839U (en) Plastic waste liquid retrieves and uses purifier
CN210331941U (en) Chemical wastewater continuous treatment device
CN113082820A (en) Sewage treatment device
CN207699316U (en) A kind of efficient waste water reclamation apparatus
CN214990800U (en) Sewage treatment system that treatment effeciency is high
CN219585921U (en) High-efficient integration sewage treatment plant
CN220951291U (en) Waste water storage device is used in laboratory
CN220920311U (en) Sewage storage tank cleaning device
CN221071265U (en) Waste water treatment device with slow flow function
CN212770340U (en) Mobile garbage leachate treatment vehicle
CN210631799U (en) Filter equipment for sewage treatment
CN216106107U (en) Anti-blocking air flotation device for chemical water treatment
CN218709818U (en) Tubular membrane defluorination processor for industrial wastewater
CN220766748U (en) Novel landfill leachate treatment device
CN218491528U (en) Floating mud removing device
CN220802289U (en) Municipal wastewater primary treatment equipment with anti-blocking structure
CN220012273U (en) Precipitator for water purification treatment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210716