CN213686804U - Blast cap of fluidized bed furnace - Google Patents

Blast cap of fluidized bed furnace Download PDF

Info

Publication number
CN213686804U
CN213686804U CN202022693491.6U CN202022693491U CN213686804U CN 213686804 U CN213686804 U CN 213686804U CN 202022693491 U CN202022693491 U CN 202022693491U CN 213686804 U CN213686804 U CN 213686804U
Authority
CN
China
Prior art keywords
hood
screw
plate
blast cap
thread post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022693491.6U
Other languages
Chinese (zh)
Inventor
张汝军
赵红艳
周燕春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tongzheng Machinery Manufacturing Co ltd
Original Assignee
Jiangsu Tongzheng Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tongzheng Machinery Manufacturing Co ltd filed Critical Jiangsu Tongzheng Machinery Manufacturing Co ltd
Priority to CN202022693491.6U priority Critical patent/CN213686804U/en
Application granted granted Critical
Publication of CN213686804U publication Critical patent/CN213686804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)

Abstract

The utility model discloses a fluidized bed furnace hood, installation mechanism includes the upper junction plate and connects the bottom plate, the bottom of connecting the bottom plate is first screw thread post of fixedly connected with, second screw thread post and third screw thread post respectively, the top of upper junction plate is run through respectively and has been seted up first screw, second screw and third screw, the utility model relates to a hood technical field. This fluidized bed furnace hood, through the upper junction plate, the connecting bottom plate, first screw thread post, second screw thread post, third screw thread post, first screw, the second screw, the cooperation of third screw and nut is used, when going on with trading the hood, only need with first screw thread post, the nut above second screw thread post and the third screw thread post is twisted off, can follow the trade to the hood, solved and current hood need beat the fire prevention mud when going on with trading, cause unnecessary extravagant, the running cost has been increased, and the replacement process is comparatively troublesome, the problem of work efficiency has been reduced.

Description

Blast cap of fluidized bed furnace
Technical Field
The utility model relates to a hood technical field specifically is a fluidized bed furnace hood.
Background
The fluidized bed furnace is a coal-fired boiler and is one of new combustion technologies developed in recent years. Modern fluidized bed furnaces are thermal devices utilizing the "fluidized bed" technology. When the fluid flows through the stationary granular material layer from below to above, if the flow rate exceeds a certain limit, the bulk material layer begins to expand and creep and becomes fluid, and the state becomes pseudo-fluid, which is called fluidization of the bulk material layer. The fluidized granular material turns up and down similarly to the boiling of fluid, so it is also called boiling layer, and the thermal equipment for treating material by this method is called boiling furnace.
The hood is the very important component on the fluidized bed furnace, its lower part of hood is fixed on the grid plate when using, and pour the cover with fire prevention mud, it is used for the grid to expose the hood head, the hood is after long-time the use, inevitable wearing and tearing can appear, lead to life lower, so need frequent change, and current hood need beat the fire prevention mud rotten with going on when trading, and the fire prevention mud is for sealed effect, beat the rotten unnecessary waste that causes of fire prevention mud, the running cost has been increased, and the change process is comparatively troublesome, work efficiency has been reduced, therefore, the utility model provides a fluidized bed furnace hood, in order to solve the above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a fluidized bed furnace hood has solved and current hood need beat the fire prevention mud when carrying out with changing, causes unnecessary extravagant, has increased the running cost, and the change process is comparatively troublesome, has reduced work efficiency's problem.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a fluidized bed furnace hood, includes grid plate and hood, the surface of hood is provided with the air intake, the opening has been seted up at the top of hood, be provided with installation mechanism between grid plate and the hood.
The installation mechanism comprises an upper connecting plate and a connecting bottom plate, the bottom of the connecting bottom plate is fixedly connected with a first threaded column, a second threaded column and a third threaded column respectively, the top of the upper connecting plate is penetrated with a first screw hole, a second screw hole and a third screw hole respectively, and the outer surfaces of the first threaded column, the second threaded column and the third threaded column are in threaded connection with nuts respectively.
Preferably, the top of the air distribution plate is fixedly connected with a support body, and the top of the support body is fixedly connected with the bottom of the connecting bottom plate.
Preferably, the top of the support body is provided with an air inlet duct in a penetrating manner, the top of the air distribution plate is provided with an air outlet in a penetrating manner, and the air outlet is communicated with the air inlet duct.
Preferably, the outer surface of the first threaded column is matched with the inside of the first screw hole, the outer surface of the second threaded column is matched with the inside of the second screw hole, and the outer surface of the third threaded column is matched with the inside of the third screw hole.
Preferably, the bottom of the blast cap is fixedly connected with an annular plate, the top of the connecting bottom plate is provided with an annular groove, and the inside of the annular groove is fixedly connected with a sealing gasket.
Preferably, the outer surface of the annular plate is matched with the inside of the annular groove, the inside of the upper connecting plate is fixedly connected with the outer surface of the blast cap, and the top of the connecting bottom plate is provided with a through groove in a penetrating manner.
Advantageous effects
The utility model provides a blast cap of a fluidized bed furnace. Compared with the prior art, the method has the following beneficial effects:
(1) the fluidized bed furnace hood comprises an upper connecting plate and a connecting bottom plate, wherein the bottom of the connecting bottom plate is fixedly connected with a first threaded column, a second threaded column and a third threaded column respectively, the top of the upper connecting plate is respectively provided with a first screw hole, a second screw hole and a third screw hole in a penetrating way, the outer surfaces of the first threaded column, the second threaded column and the third threaded column are respectively in threaded connection with nuts, when the hood is replaced, the hood can be replaced only by screwing down the nuts on the first threaded column, the second threaded column and the third threaded column, the first screw hole, the second screw hole, the third screw hole and the nuts, the problem that the existing hood needs to be mashed with fire-proof mud when the hood is replaced is solved, unnecessary waste is caused, and the operation cost is increased, and the replacement process is troublesome, and the working efficiency is reduced.
(2) This fluidized bed furnace hood, through the bottom fixedly connected with annular plate at the hood, the ring channel has been seted up at the top of connecting the bottom plate, and the inside fixedly connected with of ring channel seals up the pad, and the surface of annular plate and the inside looks adaptation of ring channel can play when the installation hood through setting up annular plate and sealed the pad to the installation department to the hood carries out sealed effect.
Drawings
FIG. 1 is a front view of the internal structure of the present invention;
FIG. 2 is a bottom view of the external structure of the hood of the present invention;
FIG. 3 is a top view of the external structure of the connecting base plate according to the present invention;
fig. 4 is a front view of the external structure of the present invention.
In the figure: 1-air distribution plate, 2-blast cap, 3-air inlet, 4-through hole, 5-installation mechanism, 51-upper connection plate, 52-connection bottom plate, 53-first threaded column, 54-second threaded column, 55-third threaded column, 56-first screw hole, 57-second screw hole, 58-third screw hole, 59-screw cap, 6-support body, 7-air inlet channel, 8-air outlet, 9-annular plate, 10-annular groove, 11-sealing gasket and 12-through groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a fluidized bed furnace blast cap comprises a blast distribution plate 1 and a blast cap 2, the bottom of the blast cap 2 is fixedly connected with an annular plate 9, the outer surface of the annular plate 9 is matched with the inside of an annular groove 10, the inside of an upper connecting plate 51 is fixedly connected with the outer surface of the blast cap 2, the top of a connecting bottom plate 52 is penetrated and provided with a through groove 12, the top of the connecting bottom plate 52 is provided with the annular groove 10, the inside of the annular groove 10 is fixedly connected with a sealing gasket 11, through the arrangement of the annular plate 9 and the sealing gasket 11, the sealing effect on the installation position of the blast cap 2 can be realized when the blast cap 2 is installed, the top of the blast distribution plate 1 is fixedly connected with a support body 6, the top of the support body 6 is penetrated and provided with an air inlet channel 7, the top of the blast distribution plate 1 is penetrated and provided with an air outlet 8, the air outlet 8 is communicated with the air inlet channel 7, the, the top of the blast cap 2 is provided with a through hole 4, and an installation mechanism 5 is arranged between the air distribution plate 1 and the blast cap 2; the mounting mechanism 5 comprises an upper connecting plate 51 and a connecting bottom plate 52, the bottom of the connecting bottom plate 52 is fixedly connected with a first threaded column 53, a second threaded column 54 and a third threaded column 55 respectively, the outer surface of the first threaded column 53 is matched with the inside of a first threaded hole 56, the outer surface of the second threaded column 54 is matched with the inside of a second threaded hole 57, the outer surface of the third threaded column 55 is matched with the inside of a third threaded hole 58, the top of the upper connecting plate 51 is respectively provided with a first threaded hole 56, a second threaded hole 57 and a third threaded hole 58 in a penetrating way, the outer surfaces of the first threaded column 53, the second threaded column 54 and the third threaded column 55 are respectively connected with a nut 59 in a threaded way, when the air cap 2 is replaced with the upper connecting plate 51, the connecting bottom plate 52, the first threaded column 53, the second threaded column 54, the third threaded column 55, the first threaded hole 56, the second threaded hole 57, the third threaded hole 58 and the nut 59 are matched, only need to unscrew nut 59 above first screw thread post 53, second screw thread post 54 and the third screw thread post 55, can follow the trade to hood 2, solved and present hood 2 need beat the mashed fire prevention mud when going on with trading, cause unnecessary extravagant, increased the running cost, and the change process is comparatively troublesome, has reduced work efficiency's problem.
And those not described in detail in this specification are well within the skill of those in the art.
In operation, the upper connecting plate 51 is removed from the upper connecting base plate 52 by unscrewing the nuts 59 on the first threaded post 53, the second threaded post 54 and the third threaded post 55, a new hood 2 is replaced, the first screw hole 56, the second screw hole 57 and the third screw hole 58 on the upper connecting plate 51 are aligned with the first threaded post 53, the second threaded post 54 and the third threaded post 55 on the connecting base plate 52, and then the nut 59 is screwed on the first threaded post 53, the second threaded post 54 and the third threaded post 55, so that the hood 2 can be replaced, thereby solving the problems that the existing hood 2 needs to be burnt out by fire-proof mud when being replaced, causing unnecessary waste, increasing the operation cost, being troublesome in the replacement process and reducing the working efficiency, when the replacement hood 2 is installed, the annular plate 9 is clamped in the annular groove 10, the bottom of annular plate 9 and the laminating of sealed pad 11 through setting up annular plate 9 and sealed pad 11, can play when installation hood 2 to the installation department to hood 2 seals up the effect.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a fluidized bed furnace hood, includes air distribution plate (1) and hood (2), the surface of hood (2) is provided with air intake (3), its characterized in that: a through hole (4) is formed in the top of the blast cap (2), and an installation mechanism (5) is arranged between the air distribution plate (1) and the blast cap (2); installation mechanism (5) include upper junction plate (51) and connect bottom plate (52), the bottom of connecting bottom plate (52) is first screw post (53), second screw post (54) and third screw post (55) of fixedly connected with respectively, first screw (56), second screw (57) and third screw (58) have been run through respectively to the top of upper junction plate (51), the equal threaded connection of surface of first screw post (53), second screw post (54) and third screw post (55) has nut (59).
2. The blast cap of claim 1, wherein: the top of the air distribution plate (1) is fixedly connected with a support body (6), and the top of the support body (6) is fixedly connected with the bottom of the connecting bottom plate (52).
3. The blast cap of claim 2, wherein: the top of the supporting body (6) penetrates through and is provided with an air inlet duct (7), the top of the air distribution plate (1) penetrates through and is provided with an air outlet (8), and the air outlet (8) is communicated with the air inlet duct (7).
4. The blast cap of claim 1, wherein: the outer surface of the first threaded column (53) is matched with the interior of the first threaded hole (56), the outer surface of the second threaded column (54) is matched with the interior of the second threaded hole (57), and the outer surface of the third threaded column (55) is matched with the interior of the third threaded hole (58).
5. The blast cap of claim 1, wherein: the bottom fixedly connected with annular plate (9) of hood (2), ring channel (10) have been seted up at the top of connecting bottom plate (52), the inside fixedly connected with of ring channel (10) seals up pad (11).
6. The blast cap of claim 5, wherein: the outer surface of the annular plate (9) is matched with the inner part of the annular groove (10), the inner part of the upper connecting plate (51) is fixedly connected with the outer surface of the blast cap (2), and the top of the connecting bottom plate (52) is provided with a through groove (12) in a penetrating mode.
CN202022693491.6U 2020-11-20 2020-11-20 Blast cap of fluidized bed furnace Active CN213686804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022693491.6U CN213686804U (en) 2020-11-20 2020-11-20 Blast cap of fluidized bed furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022693491.6U CN213686804U (en) 2020-11-20 2020-11-20 Blast cap of fluidized bed furnace

Publications (1)

Publication Number Publication Date
CN213686804U true CN213686804U (en) 2021-07-13

Family

ID=76734748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022693491.6U Active CN213686804U (en) 2020-11-20 2020-11-20 Blast cap of fluidized bed furnace

Country Status (1)

Country Link
CN (1) CN213686804U (en)

Similar Documents

Publication Publication Date Title
CN213686804U (en) Blast cap of fluidized bed furnace
CN201959801U (en) Ion exchange column device
CN210802144U (en) Coal economizer for dry absorption stage of sulfuric acid production conversion
CN205360855U (en) Vacuum filter
CN205954690U (en) Multifunctional well cover
CN209459496U (en) Open cooling tower pool water distribution system water inlet buffer unit
CN207365082U (en) A kind of movable gas hood for the waste heat boiler being easily installed
CN209340719U (en) A kind of duck-beak type drainage arrangement
WO2021237894A1 (en) Filter cartridge installation structure of filter cartridge dust collector
CN206379186U (en) A kind of new iodine adsorber
CN210800380U (en) Corner-replaceable conveying bent pipe
CN212251730U (en) Water conservancy water and electricity construction fastener
CN212899982U (en) Novel triangular valve
CN203212597U (en) Converter petticoat water seal barrel with backwash mechanism
CN219290833U (en) Filter for chemical production
CN109797007A (en) A kind of detachable coal slurry gasifier decline cartridge module
CN208478235U (en) Baffle-type flow switch
CN211421253U (en) Structure for preventing large-particle impurity slag from entering pipeline and having buffering function on pipe orifice
CN211678301U (en) Industrial water-saving spraying device
CN208382853U (en) The dedicated high temperature resistant settlement cooler of enclosed calcium carbide furnace gas
CN216129656U (en) Annular air knife for tinned photovoltaic solder strip
CN208269049U (en) A kind of lightbar with heat sinking function
CN216320455U (en) Gasification black water filter
CN2385184Y (en) Hot air valve body
CN215939372U (en) Dust-containing flue gas filtering device for waste heat utilization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant