CN213683494U - Protector for construction - Google Patents

Protector for construction Download PDF

Info

Publication number
CN213683494U
CN213683494U CN202021920064.0U CN202021920064U CN213683494U CN 213683494 U CN213683494 U CN 213683494U CN 202021920064 U CN202021920064 U CN 202021920064U CN 213683494 U CN213683494 U CN 213683494U
Authority
CN
China
Prior art keywords
installation
piece
fixedly connected
square
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021920064.0U
Other languages
Chinese (zh)
Inventor
范会芳
马旭
李晶
王树琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xinyu Minxin Building Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021920064.0U priority Critical patent/CN213683494U/en
Application granted granted Critical
Publication of CN213683494U publication Critical patent/CN213683494U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a protector for construction, including the rail guard, the left side of rail guard and the equal square piece of fixedly connected with in right side. Through setting up square piece, square groove and stop gear's cooperation is used, can make the user install square piece to square groove in, insert the top of installation piece with the installation pole, stop gear atress deformation is effectual carries on spacingly to installation piece and square piece, prevent the condition that square piece breaks away from square groove to appear, the installation of having solved current rail guard and fender rod is mostly the dead eye department screw thread and continues to fix, threaded installation causes the damage to the screw hole easily under the uneven condition of atress and appears the unable fixed and smooth silk condition, and the long-time exposure of rail guard is outdoor, cause the screw to rust the scheduling problem easily, be not convenient for dismantle after the construction is accomplished, lead to unable secondary use that carries on, increase user's use cost and the operation degree of difficulty, the problem that is not convenient for user to use, this is worth promoting.

Description

Protector for construction
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a protector for construction.
Background
The building construction refers to the production activities in the construction implementation stage of engineering construction, is the construction process of various buildings, also can be said to be the process of changing various lines on the design drawing into real objects in the appointed place, and comprises the basic engineering construction, the main structure construction, the roofing engineering construction, the decoration engineering construction and the like, the building construction is the production activities which are carried out by people according to the specific design blueprint in a certain space and time by utilizing various building materials and mechanical equipment and comprises all the production processes from construction preparation, earth breaking and engineering to engineering completion acceptance.
The rail guard is one of the striking protector that building construction place was used commonly, and the problem that prior art exists is: the installation of rail guard and protective rod is mostly dead hole department screw thread and continues to be fixed, and threaded installation causes the damage to the screw hole easily under the uneven condition of atress and appears the unable fixed condition with smooth silk, and the long-time exposure of rail guard is in the open air, causes the screw easily to rust the scheduling problem, is not convenient for dismantle after the construction is accomplished, leads to unable secondary use of carrying on, increases user's use cost and the operation degree of difficulty, and the person of not being convenient for uses.
SUMMERY OF THE UTILITY MODEL
Problem to prior art exists, the utility model provides a protector for construction, possess the advantage that carries out convenient loading and unloading to rail guard and fender rod, the installation of having solved current rail guard and fender rod is mostly the hole department screw thread and continues to fix, threaded installation causes the damage to the screw hole easily under the uneven condition of atress and appears the unable fixed condition with smooth silk, and the long-time exposure of rail guard is outdoor, cause the screw to rust the scheduling problem easily, be not convenient for dismantle after the construction is accomplished, lead to unable secondary use that carries on, increase user's use cost and the operation degree of difficulty, the problem that the person of not being convenient for used uses.
The utility model discloses a realize like this, a protector for construction, including the rail guard, the left side and the equal square piece of fixedly connected with in right side of rail guard, the left side and the right side of rail guard all are provided with the fender rod, the left side and the equal fixedly connected with in right side of fender rod and the installation piece that square piece cooperation was used, the square groove that uses with square piece cooperation is seted up near one side of square piece to the installation piece, the inner chamber swing joint of installation piece has the installation pole, the inner chamber of installation pole is provided with stop gear.
As the utility model discloses preferred, stop gear includes two carriage release levers, the top fixedly connected with of carriage release lever presses the pole, the bottom fixedly connected with limiting plate of carriage release lever, two springs of fixedly connected with between the relative one side of two carriage release levers.
As the utility model discloses it is preferred, the equal fixedly connected with dead lever in top and the bottom of installation pole inner chamber, the equal fixedly connected with locating lever in one side that two dead levers are relative, set up the constant head tank that uses with the locating lever cooperation according to the pole one side that is close to the locating lever.
As the utility model discloses preferred, the equal fixedly connected with stopper in one side that two carriage release levers are opposite, square piece is close to one side of stopper and has seted up the spacing groove that uses with the stopper cooperation.
As the utility model discloses it is preferred, the first through-hole that uses with pressing the pole cooperation is all seted up at the top of installation pole front side and rear side, the second through-hole that uses with the limiting plate cooperation is all seted up to the bottom of installation pole front side and rear side.
As the utility model discloses preferred, press the bottom of pole and the top contact of installation piece, the top of limiting plate and the bottom contact of installation piece.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up square piece, square groove and stop gear's cooperation is used, can make the user install square piece to square groove in, insert the top of installation piece with the installation pole, stop gear atress deformation is effectual carries on spacingly to installation piece and square piece, prevent that square piece from breaking away from the condition in square groove, the installation of having solved current rail guard and fender rod is mostly the cavity department screw thread and continues to fix, threaded installation causes the condition that can't fix and smooth silk appear damaging the screw easily under the uneven condition of atress to the screw hole, and the long-time exposure of rail guard is outdoor, cause the screw easily to rust the scheduling problem, be not convenient for dismantle after the construction is accomplished, lead to can't carrying out the secondary use, increase user's use cost and the operation degree of difficulty, the problem that is not convenient for use, this is worth promoting.
2. The utility model discloses a set up stop gear, can make and get into back in the square groove when square piece, press the installation pole and get into in the installation piece, thereby drive the limiting plate and get into in the installation pole, the limiting plate drives the carriage release lever and removes, the carriage release lever drives spring atress deformation, the carriage release lever drives according to the pole removal, after the installation pole passes the installation piece, spring atress deformation drives the stopper and moves out the installation pole according to the pole, reached spacing to the installation pole, prevent that the installation pole from breaking away from in the installation piece, and the other side carries on spacingly, prevent that square piece from breaking away from the condition in square groove.
3. The utility model discloses a cooperation that sets up locating lever and constant head tank is used, has played the location effect to pressing pole and limiting plate, prevents the limiting plate and can't effectually carry out spacing effect to the position of installing the pole according to the pole slope.
4. The utility model discloses a cooperation that sets up stopper and spacing groove is used, has played the location to installation pole and square piece, prevents the condition that square piece breaks away from in the square groove by near step.
5. The utility model discloses a cooperation that sets up first through-hole and second through-hole is used, has played and has reduced and install the friction of pole inner wall when carrying out the back-and-forth movement according to pole and limiting plate, increases the effect according to pole and limiting plate abrasionproof loss.
6. The utility model discloses a pole and limiting plate are pressed in the setting, press pole and limiting plate all with the top and the bottom contact of installation piece, reduce the home range of installation pole, increase the stable function after rail guard and the fender rod installation.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a partial right sectional view provided by an embodiment of the present invention;
fig. 3 is a partial enlarged view of a portion a in fig. 1 according to an embodiment of the present invention.
In the figure: 1. protecting the fence; 2. a square block; 3. a guard bar; 4. mounting blocks; 5. a square groove; 6. mounting a rod; 7. a limiting mechanism; 701. a travel bar; 702. a pressing rod; 703. a limiting plate; 704. a spring; 8. Fixing the rod; 9. positioning a rod; 10. positioning a groove; 11. a limiting block; 12. a limiting groove; 13. a first through hole; 14. a second via.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, the embodiment of the utility model provides a pair of protector for construction, including rail guard 1, rail guard 1's the equal fixedly connected with square piece 2 in left side and right side, rail guard 1's left side and right side all are provided with fender rod 3, fender rod 3's the equal fixedly connected with in left side and right side and the installation piece 4 that square piece 2 cooperateed and use, installation piece 4 is close to square piece 2 one side and has seted up square groove 5 with square piece 2 cooperation use, installation piece 4's inner chamber swing joint has installation pole 6, the inner chamber of installation pole 6 is provided with stop gear 7.
Referring to fig. 2, the limiting mechanism 7 includes two moving rods 701, a pressing rod 702 is fixedly connected to the top of the moving rod 701, a limiting plate 703 is fixedly connected to the bottom of the moving rod 701, and two springs 704 are fixedly connected between opposite sides of the two moving rods 701.
Adopt above-mentioned scheme: through setting up stop gear 7, can make and get into square groove 5 back when square piece 2, press installation pole 6 and get into installation piece 4, thereby drive limiting plate 703 and get into in installation pole 6, limiting plate 703 drives carriage release lever 701 and removes, carriage release lever 701 drives spring 704 atress deformation, carriage release lever 701 drives and moves according to pole 702, after installation pole 6 passes installation piece 4, spring 704 atress deformation drives stopper 11 and moves out installation pole 6 according to pole 702, reached spacing to installation pole 6, prevent that installation pole 6 breaks away from in installation piece 4, and spacing side shape piece 2 carries on, prevent that square piece 2 from breaking away from the condition of square groove 5.
Referring to fig. 2, the fixing rods 8 are fixedly connected to the top and the bottom of the inner cavity of the mounting rod 6, the positioning rod 9 is fixedly connected to one side of the two fixing rods 8 opposite to each other, and a positioning groove 10 matched with the positioning rod 9 is formed in one side of the pressing rod 702 close to the positioning rod 9.
Adopt above-mentioned scheme: through the cooperation that sets up locating lever 9 and constant head tank 10 and use, played the location effect to pressing pole 702 and limiting plate 703, prevented that limiting plate 703 and pressing the unable effectual position to installing pole 6 of pole 702 slope from carrying out spacing effect.
Referring to fig. 2, the two moving rods 701 are fixedly connected to the limiting blocks 11 on opposite sides, and the square blocks 2 are provided with limiting grooves 12 on the sides close to the limiting blocks 11 and used in cooperation with the limiting blocks 11.
Adopt above-mentioned scheme: through the cooperation that sets up stopper 11 and spacing groove 12, played the location to installation pole 6 and square piece 2, the condition in square piece 2 breaks away from square groove 5 is prevented to near step.
Referring to fig. 2, the top of the front side and the top of the rear side of the mounting rod 6 are both provided with first through holes 13 used in cooperation with the pressing rod 702, and the bottom of the front side and the bottom of the rear side of the mounting rod 6 are both provided with second through holes 14 used in cooperation with the limiting plate 703.
Adopt above-mentioned scheme: through the cooperation of setting up first through-hole 13 and second through-hole 14 and using, played press pole 702 and limiting plate 703 reduce when carrying out the back-and-forth movement with the friction of installation pole 6 inner wall, increase press the effect that pole 702 and limiting plate 703 abrasionproof decreases.
Referring to fig. 2, the bottom of the pressing rod 702 is in contact with the top of the mounting block 4, and the top of the stopper plate 703 is in contact with the bottom of the mounting block 4.
Adopt above-mentioned scheme: by arranging the pressing rod 702 and the limiting plate 703, the pressing rod 702 and the limiting plate 703 are both contacted with the top and the bottom of the mounting block 4, the moving range of the mounting rod 6 is reduced, and the stabilizing function of the guard rail 1 and the guard bar 3 after mounting is increased.
The utility model discloses a theory of operation:
when the mounting device is used, a user installs the square block 2 into the square groove 5, the mounting rod 6 is pressed to enter the mounting block 4, the mounting rod 6 penetrates through the square groove 5, the limiting plate 703 is driven to enter the mounting rod 6, the limiting plate 703 drives the moving rod 701 to move, the moving rod 701 drives the spring 704 to deform under stress, the moving rod 701 drives the pressing rod 702 to move, after the mounting rod 6 penetrates through the mounting block 4, the spring 704 deforms under stress to drive the limiting block 11 and the pressing rod 702 to move, the pressing rod 702 and the limiting plate 703 are in contact with the top and the bottom of the mounting block 4 to achieve clamping, the limiting block 11 is clamped into the limiting groove 12, and the effect of conveniently assembling and disassembling the guard rail and the protection rod is achieved.
In summary, the following steps: the protective device for building construction can ensure that a user can install the square block 2 into the square groove 5 by the matching use of the square block 2, the square groove 5 and the limiting mechanism 7, the mounting rod 6 is inserted into the top of the mounting block 4, the limiting mechanism 7 is stressed to deform to effectively limit the mounting block 4 and the square block 2, the square block 2 is prevented from being separated from the square groove 5, solves the problems that the prior protective guard and the protective rod are mostly installed and are continuously fixed by screw threads at hollow holes, the screw threads are easily damaged under the condition of uneven stress, the fixing and the screw thread sliding cannot be realized, the protective guard is exposed outdoors for a long time, the screw holes are easily rusted, and the like, after the construction is completed, the construction tool is inconvenient to disassemble, so that secondary use cannot be performed, the use cost and the operation difficulty of a user are increased, and the construction tool is inconvenient to use and worthy of popularization.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a protector for construction, includes rail guard (1), its characterized in that: the utility model discloses a safety guard for vehicle, including rail guard (1), guard rail (1), installation piece (4), installation piece (6), the equal fixedly connected with square piece (2) in left side and the equal fixedly connected with in right side of rail guard (1), the left side and the right side of guard rail (1) all are provided with fender rod (3), the equal fixedly connected with in left side and the right side of fender rod (3) and square piece (2) cooperation installation piece (4) of using, square groove (5) of using with square piece (2) cooperation are seted up to one side that installation piece (4) are close to square piece (2), the inner chamber swing joint of installation piece (4) has installation pole (6), the inner.
2. The protective device for building construction as claimed in claim 1, wherein: stop gear (7) include two carriage release levers (701), the top fixedly connected with of carriage release lever (701) presses pole (702), the bottom fixedly connected with limiting plate (703) of carriage release lever (701), two springs (704) of fixedly connected with between the relative one side of two carriage release levers (701).
3. The protective device for building construction as claimed in claim 2, wherein: the installation pole (6) inner chamber the top and the equal fixedly connected with dead lever (8) in bottom, the equal fixedly connected with locating lever (9) in one side that two dead lever (8) are relative, press pole (702) to be close to one side of locating lever (9) and set up constant head tank (10) with locating lever (9) cooperation use.
4. The protective device for building construction as claimed in claim 2, wherein: the equal fixedly connected with stopper (11) in one side that two carriage release levers (701) are opposite, spacing groove (12) that use with stopper (11) cooperation are seted up to one side that square piece (2) are close to stopper (11).
5. The protective device for building construction as claimed in claim 2, wherein: first through-hole (13) that use with press pole (702) cooperation are all seted up at the top of installation pole (6) front side and rear side, second through-hole (14) that use with limiting plate (703) cooperation are all seted up to the bottom of installation pole (6) front side and rear side.
6. The protective device for building construction as claimed in claim 2, wherein: the bottom of the pressing rod (702) is in contact with the top of the mounting block (4), and the top of the limiting plate (703) is in contact with the bottom of the mounting block (4).
CN202021920064.0U 2020-09-04 2020-09-04 Protector for construction Active CN213683494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021920064.0U CN213683494U (en) 2020-09-04 2020-09-04 Protector for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021920064.0U CN213683494U (en) 2020-09-04 2020-09-04 Protector for construction

Publications (1)

Publication Number Publication Date
CN213683494U true CN213683494U (en) 2021-07-13

Family

ID=76746427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021920064.0U Active CN213683494U (en) 2020-09-04 2020-09-04 Protector for construction

Country Status (1)

Country Link
CN (1) CN213683494U (en)

Similar Documents

Publication Publication Date Title
CN107498304A (en) Spring clip kludge and its method of work
CN213683494U (en) Protector for construction
CN111113977A (en) Brake pad stamping die
CN216233904U (en) Toughened glass with explosion-proof function
CN205614310U (en) Furniture oil pressure kludge
CN211227951U (en) Garden walkway
CN217346794U (en) Buckling equipment for metal piece and plastic piece
CN217974981U (en) Steel construction curtain roof beam
CN214942599U (en) Supporting component for mounting based on color steel plate
CN110877247A (en) Metal stamping workpiece surface treatment device
CN212586909U (en) Display device based on eyeball identification
CN215056014U (en) Construction engineering construction is with enclosing fender
CN220775855U (en) Wall-mounted gateway
CN204194612U (en) A kind of frock for hinge assemblies riveting
CN220253060U (en) High insulating pull rod of factor of safety
CN219443049U (en) Stamping equipment
CN213259236U (en) Locking bail installation auxiliary device
CN218958028U (en) Power wiring terminal convenient to dismantle connecting wire
CN221196659U (en) Digital light engraving device for projector
CN213067246U (en) Energy saving and emission reduction device for building
CN216921129U (en) Wallboard convenient to installation
CN220839909U (en) Filler rod installation tool
CN220582111U (en) Supporting component and household internet of things safety monitor
CN219305508U (en) Multifunctional water bonsai
CN211499492U (en) Color stone metal tile and structural layer convenient to install and lay

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231008

Address after: No. 2220, 22 / F, building 1, No. 1566, middle section of Jiannan Avenue, high tech Zone, Chengdu, Sichuan 610000

Patentee after: SICHUAN XINYU MINXIN BUILDING ENGINEERING Co.,Ltd.